Security Controls.pdf
PDF 653 KB Posted
- Solicitation number
- S120-00XX
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Complete Vendor Questions-Answers.xlsx | XLSX spreadsheet | |
| Vendor Questions (Sets 4-7).xlsx | XLSX spreadsheet | |
| EDWSanitizedTopology.pdf | ||
| Vendor Questions and responses (Sets 1 - 3).xlsx | XLSX spreadsheet | |
| EVV RFI Attachment 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Baseline AC-2(1) Automated System Account Management
NIST SP 800-53
Revision 4
Access Control
Baseline AC-2(2)
Removal Of Temporary / Emergency Accounts
NIST SP 800-53
Revision 4
Access Control
Baseline AC-2(3) Disable Inactive Accounts
NIST SP 800-53
Revision 4
Access Control
Baseline AC-2(4) Automated Audit Actions
NIST SP 800-53
Revision 4
Access Control
Baseline AC-2(5) Inactivity Logout
NIST SP 800-53
Revision 4
Access Control
Baseline AC-2(7) Role-based Schemes
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-2(10) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If credentials are not terminated, users who are no longer part of the group, or more importantly shared root groups, will inappropriately retain rights and privileges. Access control is jeopardized, compounding over time.
Shared / Group Account Credential Termination
NIST SP 800-53
Revision 4
Access Control
Baseline AC-2(12) Account Monitoring / Atypical Usage
NIST SP 800-53
Revision 4
Access Control
Baseline AC-3(4) Discretionary Access Control
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-6(1) This control requires investigation because non-compliance has the potential to allow unauthorized individuals to modify security settings.
Authorize Access To Security Functions
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-6(5) This control requires investigation because non-compliance has the potential to allow unauthorized individuals to modify security settings.
Privileged Accounts
NIST SP 800-53
Revision 4
AC-6(8) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If not prevented from elevating privileges, authorized AND
UNAUTHORIZED
users can easily subvert protections and modify information or processes, potentially gaining even higher levels of access. This is a common method adversaries use to get root access once they gain normal user access.
Privilege Levels For Code Execution
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-7 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Unsuccessful Logon Attempts
NIST SP 800-53
Revision 4
Access Control
Baseline AC-10 Concurrent Session Control
NIST SP 800-53
Revision 4
Access Control
Baseline AC-11(1) Pattern-hiding Displays
NIST SP 800-53
Revision 4
AC-12(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Without a distinct logout notification to the user, user sessions could be left hanging, and adversaries could hi-jack the session.
User-initiated Logouts / Message Displays
NIST SP 800-53
Revision 4
Access Control
Baseline AC-16(6)
Maintenance Of Attribute Association By Organization
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-17(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Managed Access Control Points
NIST SP 800-53
Revision 4
AC-17(4) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Privileged Commands / Access
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-17(6) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Protection Of Information
NIST SP 800-53
Revision 4
Access Control
Baseline AC-17(9) Disconnect / Disable Access
NIST SP 800-53
Revision 4
Access Control
Baseline AC-18 Wireless Access
NIST SP 800-53
Revision 4
Access Control
Baseline
AC-18(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Disable Wireless Networking
NIST SP 800-53
Revision 4
AC-18(4) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Restrict Configurations By Users
NIST SP 800-53
Revision 4
Access Control
Baseline AC-20(2) Portable Storage Devices
NIST SP 800-53
Revision 4
Access Control
Baseline AT-2(2) Insider Threat
NIST SP 800-53
Revision 4
Awarenes s and Training
Baseline AT-3(2) Physical Security Controls
NIST SP 800-53
Revision 4
Awarenes s and Training
Baseline AT-3(4)
Suspicious Communications And Anomalous System Behavior
NIST SP 800-53
Revision 4
Awarenes s and Training
Baseline AU-2(3) Reviews And Updates
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-3(1) Additional Audit Information
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline
AU-5 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Response To Audit Processing Failure
NIST SP 800-53
Revision 4
Audit and Accountab ility
AU-5(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Audit Storage Capacity
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline
AU-6(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Process Integration
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-6(4) Central Review And Analysis
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-8 Time Stamps
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-8(1) Synchronization with Authoritative Time Source
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-11 Audit Record Retention
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-12(1) System-Wide / Time-Correlated Audit Trail
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline AU-14(1) System Start-Up
NIST SP 800-53
Revision 4
Audit and Accountab ility
Baseline CA-2(1) Independent Assessors
NIST SP 800-53
Revision 4
Security Assessme nt and Authorizat ion
Baseline
CA-3(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Unclassified National Security System Connections
NIST SP 800-53
Revision 4
Security Assessme nt and Authorizat ion
Baseline CA-5 Plan Of Action And Milestones
NIST SP 800-53
Revision 4
Security Assessme nt and Authorizat ion
Baseline CA-7(1) Independent Assessment
NIST SP 800-53
Revision 4
Security Assessme nt and Authorizat ion
Baseline CM-1
Configuration Management Policy & Procedures
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-2 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Baseline Configuration
NIST SP 800-53
Revision 4
Configurat ion Managem ent
CM-2(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Reviews And Updates
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-2(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Retention of Previous Configurations
NIST SP 800-53
Revision 4
Configurat ion
CM-2(7) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Given the enhancement is required for systems in high-risk environments, and given the systems are appropriately configured (i.e., locked down more than systems used in typical environments), the risk of sudden non-compliance is high, in that we would have unacceptable vulnerabilities exposed to
Configure Systems, Components, or Devices for High- Risk Areas
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-3 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Configuration Change Control
NIST SP 800-53
Revision 4
Configurat ion
CM-3(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Test / Validate / Document Changes
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-3(4) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Security Representative
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-5 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Access Restrictions For Change
NIST SP 800-53
Revision 4
Configurat ion
CM-5(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If access restrictions are not enforced, unauthorized users will have access to information or processes to which they have no need to/for and may be able to elevate privileges and gain a stronger foothold.
Automated Access Enforcement / Auditing
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-5(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Review System Changes
NIST SP 800-53
Revision 4
Configurat ion
CM-5(5) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Limit Production / Operational Privileges
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-5(6) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Limit Library Privileges
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-6 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Configuration Settings
NIST SP 800-53
Revision 4
Configurat ion
CM-6(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Automated Central Management / Application/Verific ation
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-7 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Least Functionality
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-7(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Periodic Review
NIST SP 800-53
Revision 4
Configurat ion
CM-7(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Prevent Program Execution
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline CM-7(3) Registration Compliance
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-7(5) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure of the deny-all, permit-by-exception function will (unbeknownst to system/security admin) allow users the ability to install unauthorized and potentially dangerous software, thereby introducing vulnerabilities that can be exploited to elevate privileges and/or gain access to the system or its components.
Authorized Software / Whitelisting
NIST SP 800-53
Revision 4
Configurat ion
CM-8 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Information System Component Inventory
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline CM-8(2) Automated Maintenance
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-8(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Automated Unauthorized Component Detection
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline CM-8(5) No Duplicate Accounting Of Components
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline
CM-9 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Configuration Management Plan
NIST SP 800-53
Revision 4
Configurat ion
CM-10 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure to track software licenses does not typically jeopardize the security posture of the system; it is mostly related to the legality of using software. However, failure of this control could result in criminal prosecution.
Software Usage Restrictions
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline CM-10(1) Open Source Software
NIST SP 800-53
Revision 4
Configurat ion
CM-11 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. While sudden non-compliance in the policy portion in paragraph "A" is not so alarming, sudden failure of the enforcement methods may allow users to install software at will, some of which may contain malware and allow unauthorized access to the system.
User-Installed Software
NIST SP 800-53
Revision 4
Configurat ion
CM-11(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If the prohibition to privileged status suddenly fails, normal users can install software at will, some of which could contain malware.
Prohibit Installation without Privileged Status
NIST SP 800-53
Revision 4
Configurat ion Managem ent
Baseline CP-3 Contingency Training
NIST SP 800-53
Revision 4
Contingen cy Planning
Baseline
CP-4 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Contingency Plan Testing
NIST SP 800-53
Revision 4
Contingen cy Planning
Baseline CP-9(1) Testing For Reliability / Integrity
NIST SP 800-53
Revision 4
Contingen cy Planning
Baseline CP-10(2) Transaction Recovery
NIST SP 800-53
Revision 4
Contingen cy Planning
Baseline IA-1
Identification And Authentication Policy And Procedures
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(1) Network Access to Privileged Accounts
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(2) Network Access to Non-Privileged Accounts
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(3) Local Access to Privileged Accounts
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(4) Local Access to Non-Privileged Accounts
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(5) Group Authentication
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(8)
Network Access to Privileged Accounts - Replay Resistant
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(9)
Network Access to Non-Privileged Accounts - Replay Resistant
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-2(12) Acceptance of PIV Credentials
NIST SP 800-53
Revision 4
Identificat ion and
IA-3 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Device Identification and Authentication
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-3(1) Cryptographic Bidirectional Authentication
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-4(4) Identify User Status
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(1) Password-Based Authentication
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(2) PKI-Based Authentication
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(3) In-Person Or Trusted Third- Party Registration
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(4)
Automated Support for Password Strength Determination
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(7)
No Embedded Unencrypted Static Authenticators
NIST SP 800-53
Revision 4
Identificat ion and
Baseline IA-5(8) Multiple Information System Accounts
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(11) Hardware Token- Based Authentication
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(13) Expiration Of Cached Authenticators
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-5(14) Managing Content of PKI Trust Stores
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-8(1) Acceptance of PIV Credentials from Other Agencies
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-8(2) Acceptance of Third-Party Credentials
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-8(3) Use Of FICAM- Approved Products
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IA-8(4) Use Of FICAM- Issued Profiles
NIST SP 800-53
Revision 4
Identificat ion and Authentic ation
Baseline IR-3 Incident Response Testing
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-3(2) Coordination With Related Plans
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-4(1) Automated Incident Handling Processes
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-4(3) Continuity Of Operations
NIST SP 800-53
Revision 4
Incident Response
Baseline
IR-4(4) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Information Correlation
NIST SP 800-53
Revision 4
Incident Response
Baseline
IR-4(6) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Due to the current exploitation of the insider threat concern, its necessary to have special procedures to identify, manage, thwart and prosecute the insider threat.
Insider Threats - Specific Capabilities
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-4(7) Insider Threats - Intra-organization Coordination
NIST SP 800-53
Revision 4
Baseline IR-4(8) Correlation With External Organizations
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-6(1) Automated Reporting
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-6(2) Vulnerabilities Related To Incidents
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-7 Incident Response Assistance
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-7(1)
Automation Support For Availability Of Information / Support
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-7(2) Coordination With External Providers
NIST SP 800-53
Revision 4
Incident Response
Baseline
IR-9 Spillage implies the potential for loss of confidentiality for classified information. Failure to identify, alert, isolate, eradicate, etc. will undoubtedly lead to compromise of classified information.
Information Spillage Response
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-9(1) Responsible Personnel
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-9(2) Training
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-9(4) Exposure To Unauthorized Personnel
NIST SP 800-53
Revision 4
Incident Response
Baseline IR-10
Integrated Information Security Analysis Team
NIST SP 800-53
Revision 4
Baseline MA-2 Controlled Maintenance
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-3 Maintenance Tools
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-3(1) Inspect Tools
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-3(2) Inspect Media
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-3(3) Prevent Unauthorized Removal
NIST SP 800-53
Revision 4
Maintena nce
Baseline
MA-4 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Maintenance conducted through network must be secured with proper authentication occurring by maintenance persons.
Nonlocal Maintenance
NIST SP 800-53
Revision 4
Maintena nce
MA-4(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Granted, this is an after the fact procedure, but it might identify suspicious activity of maintainers who may be more or less trusted with access to the system. This is especially concerning, because it is non-local maintenance.
Failure to audit could fail to identify activities that could lead to unauthorized access
Auditing And Review
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-4(2) Document Nonlocal Maintenance
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-4(3) Comparable Security / Sanitization
NIST SP 800-53
Revision 4
Maintena nce
Baseline MA-4(7) Remote Disconnect Verification
NIST SP 800-53
Revision 4
Maintena nce
MP-7 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure to prevent the use of dangerous media types (e.g., thumb drives, personally owned mobile devices) on the system can easily lead to introduction of malware and compromise of the system.
Media Use
NIST SP 800-53
Revision 4
Media Protection
Baseline MP-7(1) Prohibit Use Without Owner
NIST SP 800-53
Revision 4
Media Protection
Baseline PE-1
Physical And Environmental Protection Policy And Procedures
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-3(1) Information System Access
NIST SP 800-53
Revision 4
Physical and Environm ental Security
PE-6 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If it is not done or done correctly, how do we ensure unauthorized access is not occurring.
Monitoring Physical Access
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-6(1) Intrusion Alarms / Surveillance Equipment
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-8 Visitor Access Records
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-12 Emergency Lighting
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-13 Fire Protection
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-14 Temperature And Humidity Controls
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-15 Water Damage Protection
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PE-16 Delivery And Removal
NIST SP 800-53
Revision 4
Physical and Environm ental Security
Baseline PL-1 Security Planning Policy And Procedures
NIST SP 800-53
Revision 4
Planning
Baseline PL-2(3)
Plan / Coordinate With Other Organizational Entities
NIST SP 800-53
Revision 4
Planning
Baseline PL-4(1) Social Media and Networking Restrictions
NIST SP 800-53
Revision 4
Planning
Baseline PL-8(1) Defense-In-Depth
NIST SP 800-53
Revision 4
Planning
Baseline PL-8(2) Supplier Diversity
NIST SP 800-53
Revision 4
Planning
Baseline PM-4 Plan Of Action And Milestones Process
NIST SP 800-53
Revision 4
Program Managem ent
Baseline PM-5 Information System Inventory
NIST SP 800-53
Revision 4
Program Managem ent
Baseline PM-6 Information Security Measures Of Performance
NIST SP 800-53
Revision 4
Program Managem ent
Baseline PM-8 Critical Infrastructure Plan
NIST SP 800-53
Revision 4
Program Managem ent
Baseline PM-12 Insider Threat Program
NIST SP 800-53
Revision 4
Program Managem ent
Baseline PM-15 Contacts With Security Groups And Associations
NIST SP 800-53
Revision 4
Program
Baseline PM-16 Threat Awareness Program
NIST SP 800-53
Revision 4
Program Managem ent
Baseline PS-4(1) Post-employment Requirements
NIST SP 800-53
Revision 4
Personnel Security
Baseline PS-6(3) Post-employment Requirements
NIST SP 800-53
Revision 4
Personnel Security
Baseline
RA-5 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Would need to investigate to determine if the unremediated vulnerabilities change the risk level.
Vulnerability Scanning
NIST SP 800-53
Revision 4
Risk Assessme nt
Baseline RA-5(1) Update Tool Capability
NIST SP 800-53
Revision 4
Risk Assessme nt
Baseline RA-5(2)
Update By Frequency / Prior To New Scan / When Identified
NIST SP 800-53
Revision 4
Risk Assessme nt
Baseline RA-5(4) Discoverable Information
NIST SP 800-53
Revision 4
Risk Assessme nt
Baseline RA-5(5) Privileged Access
NIST SP 800-53
Revision 4
Risk Assessme nt
Baseline SA-1
System And Services Acquisition Policy And Procedures
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-4(1) Functional Properties Of Security Controls
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline
SA-4(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure to comply with this control could lead to serious security concerns as critical system elements could go untested/ invalidated.
Design / Implementation Information For Security Controls
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-4(7) NIAP-approved Protection Profiles
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-4(9) Functions / Ports / Protocols / Services In Use
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-4(10) Use Of Approved PIV Products
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-5 Information System Documentation
NIST SP 800-53
Revision 4
System and Services
SA-9 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Critical information is located on any of these external services sites and must be monitored.
External Information System Services
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-9(1) Risk Assessments / Organizational Approvals
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline
SA-9(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If this control fails, capabilities will be limited for the system or service and could result in a DoS to it with a direct mission impact.
Identification Of Functions / Ports / Protocols / Services
NIST SP 800-53
Revision 4
System and Services
Baseline SA-10 Developer Configuration Management
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-10(1) Software / Firmware Integrity Verification
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-12 Supply Chain Protection
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline SA-15
Development Process, Standards, And Tools
NIST SP 800-53
Revision 4
System and Services Acquisitio n
Baseline
SA-19 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. As identified in the counterfeit Cisco routers, failure to ID fake products/parts could have undesirable consequences in the loss or compromise of data.
Component Authenticity
NIST SP 800-53
Revision 4
System and Services
Baseline SC-1
System And Communications Protection Policy And Procedures
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-5 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Denial Of Service Protection
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline SC-5(1) Restrict Internal Users
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-7 Ensures protection at the boundary. Publically accessible systems are provided protections by DMZ.
Boundary Protection
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline SC-7(3) Access Points
NIST SP 800-53
Revision 4
System and Communi cations Protection
SC-7(4) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Simply must tightly manage the firewalls to ensure they stay in compliance and do not open a window or door for our advanced adversaries.
External Telecommunicatio ns Services
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-7(5) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. The alternative is disastrous -that is allow all by default.
Allowing all allows our advanced adversaries to get in, and then all bets are off-systems are quickly compromised.
Deny By Default / Allow By Exception
NIST SP 800-53
Revision 4
System and Communi
SC-7(7) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. This is preventing split tunneling. A split tunnel in effect creates an external connection to the internal network resources, and that can be easily compromised.
Prevent Split Tunneling For Remote Devices
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline SC-7(8) Route Traffic To Authenticated Proxy Servers
NIST SP 800-53
Revision 4
System and Communi
SC-7(9) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure of this control allows malicious "insiders" to initiate an attack against other DoD systems. Note that these "insiders" may actually be outsiders who have gained access to DoD systems and are using the system as a launching pad for other attacks or to increase their foothold and impact.
Restrict Threatening Outgoing Communications Traffic
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-7(10) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure of this control allows malicious "insiders" to exfiltrate terabytes of information.
Prevent Unauthorized Exfiltration
NIST SP 800-53
Revision 4
System and Communi
SC-7(11) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure of this control means the firewall is not checking source/destination addresses, which is a low-tech means of thwarting attacks.
More sophisticated means exist to get around this control when it is working correctly.
Restrict Incoming Communications Traffic
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-7(12) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Based on the importance of host-based protection across the DoD.
Host-based Protection
NIST SP 800-53
Revision 4
System and Communi
Baseline SC-7(13)
Isolation Of Security Tools / Mechanisms / Support Components
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-7(14)
Unintended physical connections are the worst kind, far worse than a logical connection. With a physical connection, all bets are off, the outsider (could be a system the adversary has compromised) now has direct access to internal network components.
Protects Against Unauthorized Physical Connections
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-10 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Risk presented to the compromise of IS data through non-compliance warrants further investigation by the DAA/AO. The security control can be automated.
Network Disconnect
NIST SP 800-53
Revision 4
System and Communi
SC-15 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If collaborated devices are being used without the owners knowledge, potential compromise of information.
Collaborative Computing Devices
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-17 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Risk presented to the compromise of IS data through non-compliance warrants further investigation by the DAA/AO. The security control can be automated.
Public Key Infrastructure Certificates
NIST SP 800-53
Revision 4
System and Communi
Baseline SC-18 Mobile Code
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-18(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Reducing the ability to monitor mobile code reduces your ability to monitor technologies that allow adversary compromise.
Identify Unacceptable Code / Take Corrective Actions
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline SC-18(2) Acquisition / Development / Use
NIST SP 800-53
Revision 4
System and Communi
SC-18(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Allowing the implementation/ installation of prohibited mobile code allows for the installation of frequently used attack vectors.
Prevent Downloading / Execution
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-18(4) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Allowing the implementation/inst allation of prohibited mobile code allows for the installation of frequently used attack vectors.
Prevent Automatic Execution
NIST SP 800-53
Revision 4
System and Communi
Baseline SC-19 Voice Over Internet Protocol
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-20 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Risk presented to the compromise of IS data through non-compliance warrants further investigation by the
DAA/AO.
Secure Name / Address Resolution Service (authoritative Source)
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-21 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Risk presented to the compromise of IS data through non-compliance warrants further investigation by the
DAA/AO.
Secure Name / Address Resolution Service (recursive Or Caching Resolver)
NIST SP 800-53
Revision 4
System and Communi
Baseline SC-22
Architecture And Provisioning For Name / Address Resolution Service
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-23 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Risk presented to the compromise of IS data through non-compliance warrants further investigation by the
DAA/AO.
Session Authenticity
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline SC-23(1) Invalidate Session Identifiers At Logout
NIST SP 800-53
Revision 4
System and Communi
SC-23(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Risk presented to the compromise of IS data through non-compliance warrants further investigation by the
DAA/AO.
Unique Session Identifiers With Randomization
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SC-23(5) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure of this control means falsified certificates may be used. Given the intent of the control is to establish protected sessions, we could be unknowingly establishing sessions with adversaries wishing to exploit our systems or web applications.
Allowed Certificate Authorities
NIST SP 800-53
Revision 4
System and Communi
Baseline SC-38 Operations Security
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline SC-39 Process Isolation
NIST SP 800-53
Revision 4
System and Communi cations Protection
Baseline
SI-2 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Not updating or failure to update makes them vulnerable to known exploits.
Flaw Remediation
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-2(1) Central Management
NIST SP 800-53
Revision 4
System and Informatio n Integrity
SI-2(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Without automation in large enclaves, it would be nearly impossible to keep up with flaws, and they'd soon allow adversaries access and control.
Automated Flaw Remediation Status
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-2(3)
Time To Remediate Flaws / Benchmarks For Corrective Actions
NIST SP 800-53
Revision 4
System and
SI-2(6) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Leaving older versions of software/firmware could negatively impact the security posture, as older versions tend to be less secure than the most recent versions and the vulnerabilities could be exploited. The concern is that this failure may not be discovered, as it is a procedural control;
and the system becomes more and
Removal Of Previous Versions Of Software / Firmware
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-3 Core capability that if not running will not thwart even the less advanced adversary exploits.
Malicious Code Protection
NIST SP 800-53
Revision 4
System and
SI-3(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Central management allows situational awareness of all aspects, any of which could be an attack vector.
Central Management
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-3(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failing will allow signature definition files to quickly become out of date, and systems/networks will not catch latest exploits, which will allow access and control of systems.
Automatic Updates
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-3(10) Malicious Code Analysis
NIST SP 800-53
Revision 4
System and
SI-4(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. It is unrealistic to think that we could perceive and understand an attack if we don't monitor from a system wide perspective. Low and slow attacks would go unnoticed, and advanced adversaries would quickly own our systems/networks.
However, failure of the system-wide perspective does
System-wide Intrusion Detection System
NIST SP 800-53
Revision 4
System and
SI-4(2) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Without automation, it will be difficult to identify events or attacks and thwart adversary attempts to gain access and/or a foothold.
Automated Tools For Real-time Analysis
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-4(4) Failure to monitor at ingress/egress points is loss of core capability. This is where we are most likely to identify attacks. AO notification for disconnect is critical due to the compromise of integrity of the system.
Inbound And Outbound Communications Traffic
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-4(5) Failure of alerts means we do not know if we are under attack.
Adversary gains access and gets in deep before we have a chance to do anything about it.
System-generated Alerts
NIST SP 800-53
Revision 4
System and
SI-4(10) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If the traffic remains encrypted, it is not visible to monitoring tools; therefore, exploits and attacks would bypass the monitoring tools.
Visibility Of Encrypted Communications
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-4(11) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Needed for identification of exfiltration and data loss protection analyzes outbound communications traffic.
Analyze Communications Traffic Anomalies
NIST SP 800-53
Revision 4
System and
SI-4(12) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Without automation of alerts, we are left with manual means of reviewing logs, reports, etc., and it would allow more time for adversaries to get a foothold, making it more difficult to identify attacks, thwart them, or get adversaries out.
Automated Alerts
NIST SP 800-53
Revision 4
System and
SI-4(14) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Wireless attacks are easy and ever more present.
Undetected, adversaries can easily and quickly gain access without being noticed.
Wireless Intrusion Detection
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-4(15) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Wireless IDS is just as important as wired IDS. Without IDS, we have few, if any, means of knowing if/when we're under attack.
Wireless To Wireline Communications
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-4(16) Correlate Monitoring Information
NIST SP 800-53
Revision 4
System and
SI-4(19) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure to increase the monitoring of individuals known to pose an increased level of risk is the Ostrich in the sand scenario leaving the door open to an attack by those individuals.
Individuals Posing Greater Risk
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-4(20) Privileged User
NIST SP 800-53
Revision 4
System and
SI-4(22) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Failure to detect unauthorized services means we could be using unreliable services or allowing malicious rogue services to be used instead of valid services. Given this is a technical control, failure may not be evident;
therefore, the impact could be unrealized and prolonged.
Unauthorized Network Services
NIST SP 800-53
Revision 4
System and
SI-4(23) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. The presumption is that we had identified key components that need to be monitored, due to their asset value and the level of impact if compromised. As such, failure to monitor these key components means they could be compromised without out knowledge. This is very damaging for servers, and possibly
Host-based Devices
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline
SI-5 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. If they are not receiving and disseminating alerts, will be open to risk.
Security Alerts, Advisories, And Directives
NIST SP 800-53
Revision 4
System and
SI-7(1) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. Cannot rely on a static assessments; must reassess periodically to identify adversary activity over time.
Integrity Checks
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-7(7) Integration Of Detection And Response
NIST SP 800-53
Revision 4
System and
SI-7(8) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. This is an automated control that if not functioning correctly (and that would likely go unnoticed) will allow integrity violations to continue indefinitely, because there is no auditing or notification, thereby steadily increasing the risk of the system being compromised.
Auditing Capability For Significant Events
NIST SP 800-53
Revision 4
System and
SI-7(14) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. While this is an organizational/proc edural control, it can become noncompliant over time. If it does, the lack of the ability to assess the source code for vulnerabilities or malicious functions means the security posture of the system using the code will steadily decrease over time.
Assuming non-
Binary Or Machine Executable Code
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-8(1) Central Management
NIST SP 800-53
Revision 4
System and Informatio n Integrity
Baseline SI-8(2) Automatic Updates
NIST SP 800-53
Revision 4
System and
SI-10(3) The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm.
Submission of invalid inputs is a common means of attacking a system.
If the system does not recognize the invalid inputs and/or respond in a predictable manner, the attacks are more likely. Note that this capability must be engineered into the system from the start. Non-compliance after the fact will be
Predictable Behavior
NIST SP 800-53
Revision 4
System and
SI-16 The security control should be further investigated before escalating to the AO for a disconnect decision. Yellow security controls want to have an alert on them, not an alarm. It is common for adversaries to launch attacks by executing code in non-executable regions of memory or in memory locations that are prohibited. Doing so often allows adversaries to perform unauthorized functions and/or elevate privileges.
Memory Protection
NIST SP 800-53
Revision 4
System and
File details come from the government source that posted it. Updated .