This is a Request for Quote (RFQ) issued by DLA Maritime Pearl Harbor for ADHESIVE VERSALINK P 1000 OLIGOMERIC ADHESIVE in 55-gallon drums. The solicitation (SPMYM425Q0145) requires delivery of 5 drums to DLA Distribution at Joint Base Pearl Harbor-Hickam, with delivery due by January 3, 2025.
The RFQ is a 100% small business set-aside with FOB destination terms. Quotes are due by December 27, 2024 at 12:00 PM Hawaii Standard Time. Vendors must include pricing, delivery schedule, point of contact information, Tax ID, Unique Entity ID, CAGE code, GSA contract number if applicable, business size, and payment terms. The product requires manufacturer's product data sheet, SDS and COA certifications. Source inspection by DCMA is required, and the material must be certified mercury-free. Award will be made to the lowest-priced, technically acceptable offer that meets all requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P2. BRAND NAME JUSTIFICATION_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
SPMYM425Q0145 23-Dec-2024
b. TELEPHONE NUMBER
808-473-8000
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 27 Dec 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
SPMYM49. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ALBERT S. KING
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N322534346B851
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DLA MARITIME PEARL HARBOR
ALBERT S KING
COMPETITIVE SOURCING
667 SAFEGUARD ST.
JBPHH HI 96860 - 5023
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N32253 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DLA DISTRIBUTION
GOVERNMENT REPRESENTATIVE
RECEIVING DEPT, CODE Z0S
667 SAFEGUARD ST, BLDG 167-1
JBPHH HI 96860-5033
TEL: 808-473-8000 X4961 FAX:
FAX:
TEL: (808) 473-8000 EXT 4148 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
325520
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF68
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
SPMYM425Q0145
Section SF 1449 - CONTINUATION SHEET
IMPORTANT RFQ INFO
IMPORTANT RFQ INFO
**Trade Agreements apply and the vendor shall list the country of origin for each item**
CONTRACTING SPECIALIST: King, Albert S TEL: 808-473-8000 X2286 E-MAIL:albert.s.king.civ@us.navy.mil FAX: 808-471-1030
THE DOD AND NAVY REQUIRE PAPERLESS DISTRIBUTION OF PURCHASE ORDERS,
CONTRACTS, AND MODIFICATIONS.
PLEASE PROVIDE YOUR E-MAIL ADDRESS BELOW:
PLEASE PROVIDE THE FOLLOWING INFORMATION SO YOUR COMPANY CAN BE ENTERED INTO
OUR COMPUTER SYSTEM
CAGE Code (Commercial & Government Entity No.) _____________ DUNS (Dun & Bradstreet) No. _________________________ SAM (System for Award Management) Yes No (circle one)
TAX ID NO. (TIN) _________________________
WITHOUT THE ABOVE INFORMATION AN ORDER MAY NOT BE AWARDED AND YOUR QUOTE
MAY NOT BE FAIRLY EVALUATED. PLEASE CALL 808-473-8000 EXT 2286 WITH ANY QUESTIONS.
The Contractor shall be registered in the SAM database prior to submitting an invoice and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. The SAM registration shall be for the same name and address identified on the contract, with its associated CAGE code and DUNS or DUNS+4.
Contractors may obtain information on registration and annual confirmation requirements via the SAM accessed through https://www.acquisition.gov or by calling 866-606-8220, or 334-206-7828 for international calls. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specified otherwise in the offer.
THE FOLLOWING INFORMATION MUST BE PROVIDED OR YOUR QUOTE MAY NOT BE
ACCEPTED.
Provide your best delivery schedule:
Estimated delivery to Pearl Harbor days weeks months Business size (in accordance with Federal Government Standards)
□ Small □ Large □ Woman-Owned □ Disadvantaged □ Other
Prompt Payment Terms_______% _______Days NET ______
If on GSA Contract: [ ] GSA Contract #____________________Expiration Date: ______
IF PRICING IS ON “OR EQUAL” BRAND, PLEASE PROVIDE COPY OF
LITERATURE/SPECIFICATIONS, MAKE AND MODEL OF ITEM BEING OFFERED.
VENDOR SHALL COMPLETE AND RETURN THE FOLLOWING PRICE INFORMATION: PRICES ARE
BASED ON (Check one or more)
(1) [ ] Commercial catalog/published price list number _______________ date_________page________.
ATTACH APPLICABLE CATALOG/PRICE LIST PAGE.
Note: If quoted prices exceeds catalog/published price, explain
(2) Unpublished or internal Price List No. ______________
State means of verification:
Prices audited and approved by DCAA/DCASR ______________________ Last audit was on ________________________ (date).
(3) Sales history of this item for at least the last 12 months:
Government Commercial Sales dollar Volume:
Quantity of units sold:
Unite Price:
Contract number:
Award date:
METHOD OF PAYMENT IS GOVERNMENT PURCHASE CARD:
FAR Clause 52.232-36 is applicable to this solicitation. Please note that the Government wide purchase card will be used as the method of payment for supplies and/or services procured under this solicitation. If you are not able to accept payment by credit card, please provide reason(s) below:
METHOD OF PAYMENT IS WIDE AREA WORK FLOW (WAWF)
DFAR Clause 252.232-7003 (MAR 2008) ELECTRONIC SUBMISSION OF PAYMENT REQUEST AND RECEIVING REPORTS is applicable to this solicitation. Please note that the WAWF (Wide Area Work Flow) will be used as the method of payment for supplies and/or services procured under this solicitation. Information regarding WAWF is available on the internet at https://wawf.eb.mil. If you are not able to accept payment by WAWF please provide the reason(s) below:
REFERENCE: RFQ
MANUFACTURER:
PROCUREMENT NOTE L31
DLAD Procurement Notes C01 Superseded Part Numbered Items (SEP 2016) If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly. *****
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil. *****
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2020)
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. In addition, the contractor will obtain and supply any quality requirements necessary to prove the material meets the technical description. Evidence of quality consist of test results, material certifications, and manufacturing process sheets, identified by the technical data.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/).
(4) The contractor shall immediately make documentation available to the contracting officer upon request.
The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
C04 Unused Former Government Surplus Property (SEP 2021) To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer. (1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes [__] No [__] The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes [__] No __ The material conforms to the revision letter/number, if any is cited. Yes [__] No [__] Unknown __ If No, the revision does not affect form, fit, function, or interface. Yes__ No __ Unknown __ The material was manufactured by: (Name):
______________________________________________________________________ (Address):
___________________________________________________________________ (2) The offeror currently possesses the material Yes __ No __ If yes, the offeror purchased the material from a Government selling agency or other source. Yes __ No __ If yes, complete the following: Government Selling Agency:
___________________________________________________ Contract Number:
____________________________________________________________ Contract Date: (Month, Year):
__________________________________________________ Other Source:
________________________________________________________________ Address:
____________________________________________________________________ Date Acquired:
(Month/Year) ___________________________________________________ (3) The material has been altered or modified. Yes __ No __ If Yes, complete the following: Name of the company that performed the alternation or modification:
____________________________________________________________________________ [(Address):
__________________________________________________________________ Complete description of the alterations or modifications.
____________________________________________________________________________ (4) The material has been reconditioned. Yes __ No __ If Yes, complete the following: (i) The price offered includes the cost of reconditioning /refurbishment. Yes __ No __ (ii) Name of the company that reconditioned the material. ____________________________________________________________________ (iii) Description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
____________________________________________________________________________ The material contains cure-dated components. Yes __ No __ If Yes, complete the following: (i) The price includes replacement of cure-dated components. Yes __ No __ (ii) Cure date: ____________________ (5) The material has data plates attached. Yes __ No __ If Yes, insert all information contained on the data plate.
_____________________________________________________________________________ (6) The offered material is in its original package. Yes __ No __ If yes, complete the following: Contract Number NSN_________________________________________________________________________ CAGE Code__________________________________________________________________ Part Number __________________________________________________________________ Other Markings/Data___________________________________________________________ (7) The offeror has supplied this same material (National Stock Number) to the Government before. Yes __ No __ If Yes, complete the following: (i) The material being offered is from the same original Government contract number as that provided previously. Yes __ No __ (ii) State below the Government Agency and contract number under which the material was previously provided: Agency ______________________________________________________________________ Contract Number_______________________________________________________________ (8) The material is manufactured in accordance with a specification or drawing. Yes __ No __ If Yes, complete the following: (i) The specification/drawing is in the possession of the offeror. Yes __ No __ (ii) The offeror has stated the applicable information below: Yes __ No __ Specification/Drawing Number ___________________________________________________ Revision (if any) Date__________________________________________________________________________ (9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes __ No __ If Yes, complete the following: (i) Material has been re-preserved. Yes __ No __ (ii) Material has been repackaged. Yes __ No __ (iii) Percentage of material that has been inspected is ____%; and/or (iv) Number of items inspected is _______ (v) A written report was prepared. Yes __ No __ The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation, inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection. The offeror will forward one of the following, within 24 hours of request by the contracting officer, to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies): ___ For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document. ___ For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material. ___ When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (6) of this procurement note Yes __ No __) ___ When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe:
____________________________________________________________________________ This procurement note only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer’s overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items. If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted. In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract. *****
C08 Tailored Logistics Support Purchasing Reviews (FEB 2017)
(1) From the commencement of performance of this contract until 3 years after the final contract payment, the contractor must allow the contracting officer, ACO, Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and any other duly authorized representative of the contracting officer access to all records and information pertaining to those items or services for which the Government is relying on the contractor’s purchasing system to determine that competition was obtained or to justify that prices are fair and reasonable. The contractor must maintain records subject to this clause for not less than 3 years after the contract final payment.
(2) The contracting officer may conduct reviews of purchased items or services provided under this contract regardless of dollar value that meet the criteria in paragraph (1) to ascertain whether the contractor has obtained the best value. The contractor must obtain competition to the maximum extent practicable for all purchases. Prior to purchasing any supplies or services, the contractor must solicit a competitive quotation from at least two independently-competing firms. For other than sole source items, the request for quotations must, to the maximum extent practical, solicit offers from different manufacturers or producers. If the contractor is unable to obtain quotes for competing items from two or more independently-competing firms, the contractor must retain documentation supporting its rationale for selection of the suppliers solicited and selected and its determination that the price was fair and reasonable. The contractor is responsible for maintaining this documentation for all sole source/non-competitive actions. The following price reasonableness and documentation requirements are applicable to all purchases, regardless of dollar value:
(i) A price is reasonable if it does not exceed a price incurred by a prudent person in the conduct of competitive business. The contracting officer will examine the prices with particular care in connection with buys that may not be subject to effective competition restraints. The contractor’s price will not be presumed to be reasonable. If an initial review of the facts results in a challenge of a specific price by the contracting officer or the contracting officer’s representative, the burden of proof must be upon the contractor to establish that the price is reasonable under the standards in FAR Subpart 15.4 and FAR 31.201-3.
(ii) The contractor must keep the documentation to a minimum, but must retain data supporting the purchases either by paper or electronically. At a minimum, price quotations and invoices must be retained. Should the contractor receive an oral price quotation, the contractor must document who the supplier or subcontractor is by complete name, address, telephone number, price, terms and other conditions quoted by each vendor. Price quotes for supplies must be broken down by individual items, shipping costs, and any other included expenses. Price quotes for incidental services which are not pre-priced in the contract must include labor hours and costs or prices, as applicable, including the total price of the job, individual pricing for the portions of the work if applicable, materials, and all other elements of cost, overhead, and profit. This price breakdown documentation must be made for each subcontractor performing work on this contract.
(3) When applicable, if the contractor is purchasing from subcontractors or other sources and receives a discount or rebates, the contractor must immediately pass these savings to the Government in the contract price and invoice for payment. The contractor is required to use diligence in the selection of the most economical method of delivery of the product or services by selecting a best value method of delivery based on the urgency and nature of the work or product required. When labor hours are involved in the work to be accomplished and the contractor has not already pre-priced the effort to use its own labor force, the contractor must provide the labor at rates required by the contract (for example, Service Contract Act or Davis-Bacon Act rates) or at rates based on competition if mandatory rates are not required by the contract.
(4) If the contracting officer determines that the purchased product or service is unreasonably priced, the contractor must refund to the Government the amount the contracting officer determines is in excess of a reasonable price. The contracting officer must notify the contractor in writing in accordance with FAR 32.604 Demand for Payment, giving the basis for the determination and the amount to be refunded. The contractor must make the refund payment in accordance with directions from the contracting officer, and must provide proof of the refund payment to the contracting officer. The contracting officer may collect the amount due using all available means in accordance with FAR Subpart 32.6. FAR 52.232-17, Interest, is applicable to payments not made within 30 days of the demand for payment. Any disputes arising under this provision must be handled in accordance with the “Disputes” clause of this contract.
C14 Correction of Nonconforming Packaging or Marking (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLAowned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies. (2) If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
C18 Shipping Instructions for Export and U.S. Territories (AUG 2017)
(1) Mail instructions (Army Post Office (APO) or Fleet Post Office (FPO) addresses). Route shipments within mail limitations to the address cited with each contract line-item (CLIN) in the following manner, based on the TP (Transportation Priority) reflected in the "mark for" data with each CLIN: (a) U.S. mail is the only mode authorized for shipments to APO or FPO addresses. (b) Commercial small parcel carriers (e.g., UPS, RPS or
Federal Express) and Commercial Motor Carriers are never an acceptable mode to any APO/FPO address. A small parcel carrier may not be used for any destination in Alaska, Hawaii, or Puerto Rico, unless the carrier guarantees delivery to that specific consignee. (c) Address parcel post shipments to an APO/FPO address to the "Commander" or "Commanding Officer" if there is no title preceding the address. Annotate shipments under the return address as follows: "Contents for official use - exempt from customs requirements." (d) Contact the cognizant office prior to shipment for TP1, TP2, (IPD 01-08), 999, NMCS, regardless of distance from origin to the APO/FPO address. Package shipments for transportation by Military Air (MILAIR). (e) Use surface parcel post (fourth class) for TP3 (IPD 09-15). (f) The cost of parcel post insurance will not be paid by the Government. (2) Shipments to container consolidation points (CCPs): (a) Contact the Government Transportation Office for the Contract Administration Office: either DCMA for DCMA administered awards or DLA Distribution for awards administered by the issuing office. See Block 7 of Department of Defense (DD) form 1155 (page 1 of an order) to obtain shipping instructions for release to the carrier. (3) Shipments to container consolidation points (CCPs): (a) Prepare shipments directed to a CCP shown with each individual CLIN on Schedule Continuation Sheet(s) in accordance with instructions provided within this contract for Preparation for Delivery. (b) Contact the Transportation Officer for shipping instructions for the following CCP shipments: (i) Cargo requiring refrigeration/temperature control. (ii) Classified or sensitive items requiring signature control. (iii) When dimensions of an item or package exceed 456 inches (38 feet) long by 89 inches wide by 88 inches high, or weight exceeds 10,000 pounds. Cargo cannot exceed any one of the dimensions or the weight. (iv) When volume or weight constitutes a full SEAVAN load for each activity code.
(v) Hazardous material such as material which is flammable, corrosive, combustible, explosive, toxic, radioactive, unduly magnetic, or which contains oxidizing agents. (vi) Type 1 shelf life items, (vii) TP1 and 2 (IPD 01-08) with RDD of 999, 777, or 555. (4) The contractor shall furnish the above data no later than five
(5) days prior to the scheduled shipment date for shipments weighing less than 10,000 pounds which will not be tendered as a carload or truckload (5) The contractor may not ship prior to furnishing required data, regardless of weight. (6) The contractor must clearly identify in invoices when shipment is made by air. (7) The carrier must research the Transportation Facilities Guide (TFG) on the consignee to get information on who to contact to make delivery appointments. The carrier should schedule appointments as soon as they are given the load via the Carrier Appointment System (CAS)/prelodge desk prior to delivery of freight shipments (other than small parcels). Bills of Lading must be annotated with pertinent TFG data and carrier appointment times. (8) The contractor must include the mailing address of the ultimate Consignee and “Mark For” information required as part of the address for parcel post or freight shipments, as applicable, included with the data cited with each individual CLIN. The contractor will comply with the paragraph (7) and ship in accordance with instructions furnished by the Transportation office. The Transportation Officer will furnish the addresses of Aerial terminals, as required. (Parcel post shipments will not be made to water or air terminals).
C21 Shipping Instruction Request (SIR) (JUN 2020)
(1) The DCMA Shipping Instruction Request (SIR) is a web-based system that contractors and transportation specialists use to provide transportation management for contracts administered by
DCMA.
(2) The contractor shall use SIR for the following contracts:
(a) If the ultimate destination is outside the contiguous United States.
(b) Hazardous material (HAZMAT).
(c) Foreign Military Sales (FMS).
(d) If Transportation Protective Service requirements apply.
(3) Contractors shall submit information to DCMA via the DCMA Shipping Instruction Request (SIR) e-Tool (https://www.dcma.mil/WBT/sir/).
E01 Supplemental First Article Exhibit Disposition – Contractor Maintained (MAY 2020) –If applicable The Government will return approved first article units to the contractor. The contractor shall hold the approved first article units at the production facility until it has produced and the Government has accepted all production quantities. In the case of indefinite delivery contracts, the contractor shall hold the first article units until the Government has approved the final production run and accepted the first delivery order. The units shall serve as a production guide or manufacturing standard if the Government receives reports of defects on delivered material or problems encountered during production. When disposing of the first article units, the contractor shall follow DFARS 252.245-7004(d).
E02 Supplemental First Article Exhibit Disposition – Government Maintained (MAY 2020)- If applicable.
The Government will hold the first article units, either destroyed in testing or maintained as a manufacturing standard. The contractor shall produce/deliver the full quantity indicated on the contract order. The first article units will not be part of the production quantity.
E03 Production Lot Testing – Contractor (MAY 2020) – If applicable
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The contractor shall complete PLT on the production lot(s) after first article approval, if the contract requires first article testing. The contractor shall price the PLT CLIN to cover the cost of the final test report and any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT). (2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and discuss clarifications directly with contractors. If the Government and/or the contractor identify changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s). (3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to conducting the production lot test, the contractor shall provide written notice of the time and location of the test to the contracting officer and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA, so the Government may witness sample selection and the test. (4) Unless otherwise stated, the contractor shall select [contracting officer shall insert number of samples identified in material master] samples at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer. (5) The contractor shall perform all tests on the PLT samples needed to verify/validate the items meet the contract technical/quality requirements.
(6) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (7) The contractor shall prepare and disseminate the PLT report and applicable traceability documentation as follows: (a) Prepare the test report in accordance with data item description DI-NDTI-80809B, and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].”
(b) Present the PLT report to the contracting officer for review. (c) Include the following documentation with all shipments of PLT Reports: (i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250); (ii) Copy of the contract/order; (iii) Copy of all applicable test reports, showing actual results and tolerances specified in the technical data package; (iv) Material and process certifications; (v) Process operations and inspection method sheets; (vi) Copies of drawings used to manufacture the PLT sample, with proper marking to restrict public disclosure (if desired) and from Government use other than for evaluation to the extent consistent with the Government’s data rights under the contract; and (vii) Documents required under a contract deliverables requirements list, if applicable. (d) Submit all required documentation to the Government activity specified in the contract in time to allow for at least [contracting officer shall insert number of days as shown in material master] calendar days for review of the PLT report, and for the contracting officer to provide written notification of approval/disapproval to the contractor. (e) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. (f) Delivery. (i) Ship test report to [contracting officer insert address of the Government activity to receive the report]. (ii) Delivery Schedule Information: (A) _____ Total Delivery Days for FAT (If Applicable) (B) _____ Days: Completion of Production Units (to include PLT samples), PLT, and Submission of PLT Report (C) _____ Days: Government PLT Report Evaluation and Notification to Contractor (D) _____ Days: Delivery of final production quantity to Government (E) _____ Total Delivery Days (Sum of paragraph (ii)(A) through (D) above.
E04 Production Lot Testing – Government (MAY 2020) – If applicable
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The Government conducts PLT on the production lot(s) after first article approval, when a first article is required.
The contractor shall price the PLT CLIN to cover the cost of any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT). (2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and conduct clarifications directly with contractors. If this results in necessary changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s). (3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot for selection of PLT samples, the contractor shall provide written notice to the contracting officer (and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA). (4) Unless otherwise stated, the contractor shall select [contracting officer shall insert the number of samples identified in the material master] samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer. (5) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall propose corrective action, if appropriate. (6) The Government will return PLT samples to the contractor, with a copy of the test report, at contractor expense. (7) The contractor shall prepare and disseminate the samples as follows: (a) Ship the selected PLT samples by traceable means. [Mark the shipment “Production Lot Samples
– Do Not Post To Stock,” Contract Number [contractor insert] and Lot/Item Number [contractor insert]”. Place a copy of the system of record receiving report (i.e., WAWF or DD Form 250) on the exterior of the shipping container in accordance with DFARS Appendix F. Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11. (b) Include the following interior documentation: (i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250); (ii) Copy of contract/order;
(iii) Copy of test reports, showing actual results and tolerances specified in the technical data package; (iv) Material and process certifications; (v) Process operations and inspection method sheets; (vi) Copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility); (vii) Documents required under contract deliverables requirements list; and (viii) A prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government. (8) At the time of shipment, the contractor shall sign and provide copies of the DD Form 1222, system of record receiving report (i.e., WAWF or DD Form
250), transportation tracking information, and information for return of the PLT samples to the contracting officer. The Government testing time will be [contracting officer insert number of days for test, as shown in the material master calendar days for the test results to be provided to the contractor. (9) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.
(10) Delivery. (a) Ship samples to [contracting officer insert address of the Government activity to receive the samples]. (b) Delivery Schedule Information: (i)___ Total Delivery Days for FAT (If Applicable) (ii)___ Days: Completion of Production Units (to include PLT samples), and Submission of samples for Government Testing (iii)___ Days: Government PLT Report Evaluation and Notification to Contractor (iv)___ Days:
Delivery of final production quantity to Government (v)___ Total Delivery Days (Sum of paragraph (i) through (iv))
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory. (2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing. (3) The contractor shall provide and maintain an inspection system acceptable to the Governmentin accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples – Do Not Post to Stock," Contract Number [contractor insert] and Lot/Item Number [contractor insert]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph
5.11. The contractor shall send samples by traceable means (e.g.,certified or registered mail, United Parcel Service, Federal Express). The contractor shall includethe following in the interior package: (a) Hard copies of the contract; (b) Material certifications/process operation sheets; and (c) Drawings used to manufacture the units and return shipping information. (4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery. (5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
E07 Evaluation Factor for Origin Inspection (JAN 2018) This solicitation contemplates an award based on destination inspection. If an offeror proposes inspection and acceptance at origin, the Government will add an evaluation factor of $2,500 to the offeror’s quoted/offered price for each origin inspection required. If phased deliveries are required or offered, the Government will consider each phase of delivery to result in one inspection for evaluation purposes.
E08 First Article Testing Requirements (MAY 2020) – If applicable If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price. (2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price. The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs. (3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors.
However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.
(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a— (i) Major change to the technical data; (ii) Lapse in production for a period in excess of 90 days; or (iii) Change in the place of performance (manufacturing facility), manufacturing process, material used, drawing, specification or source of supply. (b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer;
who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government. (5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply: (a) The offeror requesting waiver has manufactured and delivered the item or a similar item within the last five (5) years, or within the last three (3) years for critical safety items. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer’s request: (i) Contract number(s), date(s), and issuing Government agency or agencies. (ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .