S1.3b ATTACHMENT 3 Required DELIVERY SCHEDULE.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Octans Fiber Optic Gyrocompass Overhaul/Manufacture
Solicitation number
70Z08023Q17001B00
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1

CLINPBPL OCTANS GYRO OVERHAUL CLIN & DELIVERY SCHEDULE 2023 - 2028
QTYDESIGNATIONDESCRIPTIONCLIN Delivery Timeline
11TROUBLE SHOOTING & DIAGNOSISO&A: NOTE: All Octans units submitted for repair under this maintenance contract are subject to Level 1 charges on a per unit basis and PO equal to Level 1 ($4,700) x Qty of units being sent is required to initiate the repair process.)30 days from receipt of government property for 15 or less OCTANS units received at the same time. Each additional 5 units above 15 units, USCG shall provide an additional 10 days(e.g., for 20 units, 40 days)
1HANDLING and MANAGEMENT
1SOFTWARE UPDATEthe software update is fixed with an USCG special version to allow all the units to have the same software version OCT 4/5. NOTE: Once Level 1 Open and Analysis (O&A) is complete on all units a repair estimate will be provided to the USCG showing which Levels are needed/recommended on a per unit Serial Number basis. Once USCG agrees to repairs a new repair PO will be issued and indicated repairs commenced. Any unit(s) for which repairs are not athorized for completition will be returned unrepaired.
Shipping box and Freight
1Outer boxIXBLUE boxing case white
1foam for cardboard box OCTANS/PHINS Surf + inner boxincludes bottom foam, top foam and accessories foam + Inner cardboard box
1FreightFreight round trip airport Lincoln, RI/St Germain en laye (NOTE: USCG responsible for shipping to/from Curtis Bay-Baltimore and Lincoln, RI (iXblue Defense Office)
290 days from receipt of government property for 15 or less OCTANS units received at the same time. Each additional 5 units above 15 units, USCG shall provide an additional 10 days(e.g., for 20 units, 100 days)
1Quick Start Guide OCTANSpaper copy of the quick start guide
1USB Key with software and user manual
1Power supply block 24VDC, Wired, Surface,
1Power supply cable (24 VDC)
1Power supply cable USA standard AC
1PC to OCTANS RS232 testcable (0.6m)Configuration and Repeater test cable
1Ethernet straight cableEthernet cable with a shell
1Digital I/O connectorDIGITAL CONNECTOR KIT
1DOCUMENTATION (NSBU)Acceptance test report (new one will come with calibration)
1Certificate of calibration (new one will come with calibration)
1Certificate of Warranty (1 year)
1Certificate of Ethernet compliance
1OCTANS CALIBRATIONMechanical alignments of all the sensors ACC and FOG in between each other. Sensor misalignment calibration, system HRP calibration, System HRP absolute accuracy FAT, System HRP stability FAT
31HOUSINGOCT4/5 SURFACE BOTTOM PLATE
OCT4/5 SURFACE TOP HOUSING
Shock absorber
1CONNECTOR CAPS SETWear and tear of protective caps is to be replaced in accordance with IP66 standard
1ETHERNET CONNECTORWear and tear bulkhead to avoid any loosen contacts
1CUSTOMER INTERFACE BOARD OCT4/5The motherboard makes the interface with the external devices, in this new design it is resistive to most of the input related issues when using RS422 communication levels
1PROCESSOR BOARD OCT4/5The processor board is updated to the latest standards to get benefits of the web interface and future updates
1DSP4 BOARDTo be changed when diagnosed defective
1POWER SUPPLY BOARD OCT4/5Power supply board with earlier design, with DCDC converter, as a result the unit consume more on start up.
41SENSOR1 BOARDTo be changed when diagnosed defective
1FOG TREATMENT BOARDTo be changed when diagnosed defective
1OPTICAL SOURCE BOARDTo be changed when diagnosed defective
1OPTICAL COUPLERTo be changed when diagnosed defective
1PUMP LASER DIODETo be changed when diagnosed defective
1FOG Optical fiber spliceloose of optical power on one of the axis as a result an oscillation on the fog signal. The dedicated optical fiber splice got weakness.
1ACC BIAS and SF THERMAL CALIBRATIONAccelerometer bias are generated form last calibration. We need to compensate again those bias and scale factor prior to a new calibration
1FOG BIAS and SF THERMAL CALIBRATIONCompensate again the FOGs for temperature changes (scale factor and bias, gradient,stability) after any optical repair prior to a new calibration
51FOG 90 SENSORloss of optical power on one of the axis as a result an oscillation on the fog signal. FOG is most probably not broken but will do soon.
1ACC SENSORACC data out of range
61Beyond Repair (Cost of New Octans V with 5 year warranty)Multiple issues including internal sensor damage make unit not economically repairable. Recommend replace with New OCTANS V (5 year warranty)60 days from receipt of purchase order
71OCTANS Gen IV Upgrade to Gen VUpgrade to OCTANS Gen V (Only Octans IV manufactured after 2014 eligible for this upgrade)90 days from receipt of government approval to upgrade
81TECHNICAL PHONE SUPPORTOEM TECHNICIAN remote support provided via telephone, video call or remote computer to USCG technicians in support of OCTANS troubleshooting, repair and installation oboard USCG vessels. RATE IS PER CALL UNTIL FAULT DIAGNOSIS HAS BEEN MADE AND IF POSSIBLE GYROCOMPASS FUNCTIONS ARE RESTORED.2 hour response time if request received within U.S. East Coast business hours 8:30AM – 5PM 4 hour response time outside of East Coast business hours
91TECHNICAL ONSITE SUPPORTOEM TECHNICIAN ONSITE support provided onboard USCG Vessel in support of OCTANS troubleshooting, repair and installation. RATE IS PER DAY TECHNICIAN IS ONSITE/ONBOARD VESSEL.Departure within 48 hours if request has been made during U.S. East Coast business hours (assuming no clearance, visa or any other delaying paperwork is needed) When request is made outside of business hours the 48 hours start on the next business day
101TECHNICAL SUPPORT TRAVELOEM TECHNICIAN TRAVEL time in transit portal to portal. RATE IS PER DAY(S) THE TECHNICIAN SPENDS IN TRANSIT TO AND FROM USCG VESSEL BERTH LOCATION IN ADDITION TO DAYS ONSITE PERFORMING WORK.N/A

Tab 2

Tab 3

File details come from the government source that posted it. Updated .