S06 - Request for Information Responses Attachment 1.pdf
PDF 398 KB Posted
- Solicitation number
- 36C24824R0103
About this file
This document is a set of responses from the Government to questions received regarding a Request for Information (RFI) for a roof replacement project at the Miami VA Medical Center. The key details are:
The project involves replacing the roof on Building 7, including the removal and reinstallation of the existing lightning protection system, roof drains, and other related components. The Government has specified the use of a Tremco roofing system or equivalent. Contractors must have a valid Florida Roofing Contractor License with at least 15 years of experience. The Government will not consider alternate roofing systems. Contractors can re-use good components of the existing lightning protection system, and retro roof drains can be used. The Government has clarified requirements for insulation, slope, coatings, and other technical aspects of the work. Fall protection around the roof perimeter is not required, but life safety railing on the parapet wall is. The Government has also specified that the legacy "fence frame" structure is to be removed along with the designated steel structures.
The related federal contract opportunity is Solicitation Number 36C24824R0103, titled "Replace Roof Building 7 at Miami VA Medical Center". The original proposals due date has been changed to April 26, 2024 at 11:00 AM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24824R0103 - Amendment 0001.pdf | ||
| S06 - Site Visit Roster_ Attachment 3.pdf | ||
| S06 - RFI responses Attachment 2.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Verify: 3” min. insula on with the vapor barrier and 2” minimum with the 1/8” tapper. Is the vapor barrier to go under the 3’’ min. insula on or over the 3’’ min. insula on. Is it going to be a total of 5” minimum insula on at the roof drains?
Govt Answer: Please follow SOW OEM recommenda ons.
2. Is the roofing system specified to be Tremco? Base sheet composite ply premium is a Tremco product.
Govt Answer: Yes.
3. Can any good components of the exis ng lightning protec on system be re-used?
Govt Answer: Yes, as long as it’s in good condi on.
4. Can retro roof drains (roof drain inserts) be used for roof drain replacement?
5. Is the 1/8” per foot tapered insula on stated on the scope of work due to height restric ons?
6. VA TILL and Most manufacturers specs ¼” per foot slope with cold process roofing systems.
7. Is there a minimum mill requirement on the roof coa ng or are we to use manufactures specifica on to meet the 12 year warranty?
Govt Answer: Please follow SOW OEM recommenda ons to meet warranty.
8. Will this project require approved A&E drawings?
Govt Answer: No.
9. Per sec on 4.10.1. The Contractor shall provide a valid Florida Roofing Contractor License with at least 15 years of experience. Is this a requirement of the Prime contractor or the Sub-contractor?
Govt Answer: Prime contractor or subcontractor, whoever is performing the job.
10. Will the VA consider an alternate roofing system?
11. Can you specify roofing manufacturer material.
Govt Answer: Tremco or equivalent.
12. On 4.2.1 of the statement of work. The lightning protec on statement of work states the removal and reinstalla on of the ligh ng system, however some of the components may not meet some of the criteria for recer fica on. Can the scope of work be changed to make sure that system is complaint and cer fiable.
Govt Answer: Provide a lightning protec on system that is in compliance.
13. What is going to be required once the metal structure is removed, regarding down spouts, gu ers, and roof drain?
Govt Answer: Convert to floor drains flush to roofing level.
14. The statement of work does not specify any fall protec on on the perimeter of the roofs. Please confirm that fall protec on around perimeter of roofs is not required.
Govt Answer: Not required.
15. Once the building structure is removed by the parapet wall are you going to require life safety railing on the parapet wall?
Govt Answer: Yes.
16. Please specify which equipment is to be removed from the roofs.
Govt Answer: Refer to 4.2.1.1. Contractor to remove current metal roofing system installed diagonally, also old metal framing plus the stand suppor ng an equipment located in the NW corner of the roof.
17. On 4.2.2 Item #5, #9, & #10 states the applica on of a primer ½ gal per sq , base coat of 1 gal per sq , and a er base coat another 1 gal per sq . Please clarify these statements and applica on methods.
18. On 4.2.3 Item #4, #8, please clarify the 2 gallons per sq on the coverage.
19. On 4.2.4 Item #4, please clarify the 2 gallons per sq on the coverage.
20. Please confirm that only that only 6 roof drains from the yellow highlighted roof are to be replaced. No other roofs to be addressed, correct?
Govt Answer: Replace all roof drains and overflow encountered in the roofing area that is part of the project.
21 . Are we only to replace the roof drain body? No piping below the body of drain is men oned to be removed.
Govt Answer: Yes.
22. On purple highlighted roofs it was only men oned that the sloped roofs are to be addressed.
How about the metal on the ver cal walls?
Govt Answer: Address all defec ve metal roof/wall areas.
23. Are any por ons of parapet wall(s) to be painted? If yes, what specifica on of paint and color?
24. Are any por ons of the rusty doors to be painted? If yes, what specifica on of paint and color?
25. Can we inspect any floors where current/previous leaks have occurred to document as baseline?
26. See a ached photo. Will the legacy “fence frame” structure stay in-place or be removed along with the steel structures (frames and panels) that are designated for removal along the North perimeter?
Govt Answer: Fence frame to be removed.