S02 SOW CON 531-24-101 Renovate T111 10.07.2025.pdf
PDF 211 KB Posted
- Attached to
- Y1DZ--531-24-101 | Renovate Building T111
- Solicitation number
- 36C26026R0013
About this file
This Statement of Work (SOW) details a construction project for the Boise Veterans Affairs Medical Center to renovate Building T 111. The project involves comprehensive renovation including new exterior walls, a sloped roof, concrete foundation, concrete ramps/porch, interior updates such as bathroom modifications, new walls, flooring, painting, door skins, and updating existing HVAC package units. The VA Project Number is 531-24-101, with the Contracting Officer's Representative Patrick Bird from the Facility Management Service.
The contract period of performance is 274 calendar days, with a Limited Notice to Proceed (LNTP) anticipated by January 31, 2026, focusing initially on submittals and material ordering, and a Construction Notice to Proceed (NTP) expected on May 1, 2026. The contractor will be responsible for all testing, material disposal, quality control, and site security, with strict requirements to minimize disruption to hospital operations. The work must prioritize the medical center's mission, with construction activities potentially restricted or curtailed to ensure patient care remains uninterrupted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26026R0013 0002.docx | DOCX document | |
| 31 63 21 Helical Piers.pdf | ||
| GeoTech Report used for T111.pdf | ||
| 36C26026R0013 SiteVisit Roster 15OCT2025.pdf | ||
| 36C26026R0013 0001.docx | DOCX document | |
| WD ID20250104 Building.pdf | ||
| S02 Boise Renovate Bldg T111_Bid Documents Drawings.pdf | ||
| 36C26026R0013 RFP.docx | DOCX document | |
| S02 EXHIBIT A Past Performance Reference Form.docx | DOCX document | |
| S02 Boise Renovate Building T111_BID Documents Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
CONSTRUCTION
06/02/2025
VA Project Number: 531-24-101
VA Project Name: Renovate Building T 111
FORCE Contracting UID Number: TBD
1. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
Name: Patrick Bird
Section: Facility Management Service (FMS)
Address: 500 W. Fort St., Boise, ID 83702
Phone Number: 208-422-1405
E-Mail Address: patrick.bird@va.gov
2. BACKGROUND
This project will renovate Building T 111 to make it more closely resemble existing campus architecture and provide minor updates to the interior of the building.
3. SCOPE
Contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the intent of project 531-24-101 in strict accordance with this SOW, contract drawings, and contract specifications. Any and all Work not specifically identified by the contract drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents.
Work includes, but is not limited to, demolition, site preparation, civil, structural, architectural, mechanical, plumbing, electrical, fire suppression, and fire alarm.
4. SPECIFIC TASKS
The Boise Veterans Affairs Medical Center is a Hospital First. Any and all construction activities shall be secondary to the mission of the Medical Center. This means that some activities shall only be performed outside of normal business hours, may be curtailed if they interfere with normal activities, and may be delayed for other times or conditions. Other potential issues include, but are not limited to noise pollution, noxious fumes, vibrations, parking and roadway restrictions, and limited utility tie-ins. Restrictions on activities may be imposed by the Contracting Officer (CO) even if they are below OSHA allowable limits. The CO or their designated representative shall have the final authority over the needs of the BVAMC.
Additionally, construction safety, infection control, and site security shall be prime requirements of the Work and as such any infraction may be considered a material breach of the Work and cause for termination for cause by the Government.
5. RENOVATE BUILDING T 111
Reference attached design drawings and specifications for project 531-24-101. The renovation of building T 111 will include new exterior walls to enclose the existing building and support a new sloped roof. This will include a new concrete foundation to support the gravity and lateral loads of the new structure. Work includes new concrete ramps/porch. The interior will have minor bathroom updates, new walls, new flooring, new painting, and new skins for existing doors. Work also includes updating existing HVAC package units.
6. TESTING
The Contractor shall be responsible for all testing and laboratory services in connection with this project as stated in the contract drawings and specifications. Testing and laboratory services include, but are not limited to concrete strength, compaction, and HVAC test and balance. The Contractor shall provide both paper and electronic copies of all test reports to the COR in a timely manner.
7. DISPOSAL OF MATERIALS AND EQUIPMENT
The Contractor is responsible for the correct disposal of all materials associated with this project. Details on documenting waste streams as well as a list of local recycling/disposal facilities will be provided to the Contractor at the start of work; compliance with disposal and documentation is required under the base bid contract.
8. COORDINATION OF WORK
If any questions or concerns arise, the Contractor shall contract the CO and/or the COR for direction. Any disruptions to the normal functions of the BVAMC (road closures, utility connections, etc.) shall be brought to the attention of the COR in writing at the earliest possible date. Refer to the contract specifications for allowable time frames of notification.
9. PERFORMANCE MONITORING
The Government is required to monitor contractor performance and certify the work was done in strict accordance with the contract. This monitoring will be done by the COR. At least weekly, the COR will perform Safety and Interim Life Safety inspection and Environmental inspections. In addition, the COR shall perform periodic inspections of the Work as further detailed in the Specifications. It is the Contractor’s responsibility to manage their schedule to allow adequate time for all inspections prior to proceeding with subsequent work.
A. Inspection and Acceptance Criteria
The COR is responsible for certifying that the work done under the contract is performed to time and standard. The COR is also responsible to assure the inspection and acceptance of in place products provided incidental to services. A demonstration period or trial period is not considered inspection of a product.
10. QUALITY CONTROL
The Contractor is responsible for their own quality control. Refer to specification 01 45 00 for expectations and reporting requirements related to quality control. Failure to comply with quality control requirements may result in removal of personnel from the jobsite and/or contract termination for cause by the Government.
11. SECURITY REQUIREMENTS
The Contractor shall only access BVAMC buildings directly associated with the Work. The Contractor shall not enter or attempt to enter any patient care area unless coordinated with the COR. Additionally, the Contractor shall provide construction site security as further identified in the Specifications or on the Drawings.
A. Contractor Parking and Material Laydown Area
Contractor parking and material laydown areas shall be within the dashed boundary “Approximate Limits of Work” as shown on contract drawings.
12. SPECIAL CONSIDERATIONS
Consideration for crane lift for installing roof trusses should be closely coordinated with the VA to minimize impacts to traffic on the entry road to the hospital for both patients and staff.
A. Phasing
There are no special phasing requirements for this contract.
B. Identification of Potential Conflicts of Interest
There are no known potential conflicts of interest.
C. Identification of Non-Disclosure Requirements
The Contractor shall not have access to sensitive and/or proprietary information. No non-disclosure agreements are anticipated for this contract.
D. Packaging, Packing, and Shipping Instructions
All deliveries shall be specifically addressed to the Contractor and not the BVAMC. The BVAMC shall make best efforts to refuse delivery of Contractor goods or materials. Any materials inadvertently received by the BVAMC will be identified to the Contractor for immediate pick-up.
The BVAMC takes no responsibility for the receipt of any goods or materials that are the Contractor’s. Additionally, the Contractor shall be responsible for receipt, offloading at the site, and storage of all delivered goods pertaining to this contract.
13. RISK CONTROL
The Contractor shall refer to division 01 specifications for guidelines on safety, risk, and infection control.
14. PERIOD OF PERFORMANCE
The contract period of performance shall be 274 calendar days from receipt of the Notice to Proceed. Refer to specification section 01 00 00 – 1.42 for detailed information on the contract
A Limited Notice to Proceed (LNTP) will be issued after completion of the project preconstruction meeting (NLT January 31, 2026):
Limited Notice to Proceed (LNTP) includes:
- Contractor submittal of required contract submittals.
- All material ordering submittals.
- Common administration functions but no physical work.
A Construction Notice To Proceed (NTP) with period of performance of 274 Calendar Days from issuance of Notice To Proceed, anticipated to be issued on May 1, 2026.
Construction Notice to Proceed (NTP) includes:
- All remaining project work not covered under the LNTP, including mobilization.
- NTP period of performance shall be no longer than 274 calendar days.
- All work under LNTP must be completed for Contractor to be issued Construction NTP.
- End of Section -