S02 Solicitation Attachment-Price Schedule.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- 36C24926R0074_1
About this file
This is a Price Schedule attachment for a design-build solicitation requiring comprehensive renovation of pharmacy spaces to achieve USP 800 compliance at Louisville VA Medical Center under Project #603-26-107, Solicitation #36C24926R0074.
The project involves renovating approximately 1,680 total square feet across two phases: the Inpatient Pharmacy area (approximately 800 square feet, including ante room DB1102B and admixture room DB1102C) and the D416 Satellite Pharmacy (approximately 740 square feet, including D416A Sterile Prep and D416B Chemo), with an additional 140 square feet for hazardous drug storage configuration in the Inpatient Pharmacy. Scope of work includes reconfiguration of preparation areas and ante space, HVAC modifications to provide proper air exchanges and pressure relationships, replacement of finishes for floors, ceilings, and walls, installation of pass-thru windows and doors, electrical modifications for lighting and power, plumbing changes, and replacement of casework cabinets and countertops. Existing laminar flow hoods will remain; existing fume hoods will be replaced. The contractor must complete all work within 300 calendar days from Notice to Proceed, with the option to propose an earlier completion date. The price schedule template provided shows a grand total of $176 and requires contractors to break down all costs by division (labor, materials, equipment) with detailed line items for each specification code, with lump sum pricing prohibited and all divisions requiring itemization regardless of applicability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926R0074 0001.docx | DOCX document | |
| S02 SCA Wage Determination 2015-4717.pdf | ||
| S02 010000 General Requirements.pdf | ||
| S02 DBA Wage Determination KY20260093 5-18-2026.pdf | ||
| S02 Past Performance Questionaire.pdf | ||
| S02 Floorplan 603-26-107.pdf | ||
| S02 000110 Table of Contents.pdf | ||
| 36C24926R0074_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offer-Breakdown
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $100.00 | ||||
| 10 14 00 | Signage | $7.00 | $5.00 | 66.00 | $78.00 | |
| 10 26 00 | Wall and Door Protection | $5.00 | $9.00 | 8.00 | $22.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 20 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 30 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 90 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $75.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $75.00 | $0.00 | $0.00 | $75.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $87.00
TOTAL MATERIALS $14.00
TAX FOR MATERIALS 6% $0.84
| TOTAL EQUIPMENT | $74.00 | |
| $175.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $175 |
| TAX FOR MATERIALS | $1 |
SUBTOTAL $176
| Overhead | 0% | $0 |
| Profit | $0 |
SUBTOTAL $176
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $176
| Offer Item | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| Scope of Work: Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here-in and other specific tasks as further defined by this request for proposal (RFP). |
This design build project “Renovate Building 1A D416 Satellite Pharmacy for USP 800” will renovate approximately 1,680 total square feet of existing Pharmacy space used for both sterile and hazardous drug compounding that must be brought into USP 800 compliance. This project will need to be performed in 2 phases, with the Inpatient Pharmacy area being renovated first and the D416 Satellite Pharmacy being renovated afterward. The existing D416 Satellite Pharmacy space (approximately 740 square feet), which includes D416A Sterile Prep and D416B Chemo, has to be reconfigured to provide the proper arrangement of preparation areas and ante space. The inpatient pharmacy compounding area (approximately 800 square feet), which includes the ante room DB1102B and admixture room DB1102C has to be reconfigured as well. A hazardous drug storage space needs to be configured in the Inpatient Pharmacy (approximately 140 square feet). HVAC also has to be reconfigured to provide the proper air exchanges and air pressure relationships between rooms. Work will also include the replacement of finishes for floors, ceilings, and walls; pass-thru windows, doors, frames; changes to electrical for lighting, power, and communication to accommodate the reconfiguration; changes to plumbing to accommodate the reconfiguration; and replacement of casework cabinets and countertops. The existing laminar flow hoods will remain. The existing fume hoods will be replaced as part of the design build contract.
Performance Period: The contractor shall complete the work required under this SOW within 300 calendar days from receipt of Notice To Proceed. If the contractor proposes an earlier completion date, and the Government accepts the contractor’s proposal, the contractor’s proposed completion date shall prevail.
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"Project 603-26-107 Design/Build Convert A-412 Into Bathroom &"-,Bold"LOUISVILLE VA MEDICAL CENTER
File details come from the government source that posted it. Updated .