S02 Solicitation Attachment E Specifications.pdf

PDF 29 MB Posted

Attached to
Z2DA--EHRM Infrastructures Upgrades Project 664-20-501 Federal contract opportunity
Solicitation number
36C26221B0010_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document provides details for a federal contract solicitation for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services for an Electronic Health Records Modernization Infrastructure Upgrades project at the VA San Diego Healthcare System, VA San Diego Medical Center located in San Diego, California. The project scope includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The procurement is set aside solely for Service-Disabled Veteran-Owned Small Businesses listed as verified on the Vendor Information Pages database. The North American Industry Classification Code is 236220 for Commercial and Institutional Building Construction with a size standard of $39.5 million. The estimated value of the construction project is between $10-20 million. The solicitation in the form of an Invitation for Bid will be issued on July 6, 2021 via sam.gov. A site visit will also be scheduled. The point of contact for the project is the named contracting specialist.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM Infrastructure Upgrades VA Medical Center San Diego

San Diego, CA

SPECIFICATIONS

Date: June 9, 2021

664-20-501 SAN DIEGO VA MEDICAL CENTER June 9, 2021

INFRASTRUCTURE UPGRADES

00 01 10-1

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES AUTHOR DATE

COVER VOLUME 1 – DIVISIONS 00 THRU 48

DIVISION 00 - SPECIAL SECTIONS

00 01 07 Seals Page* DAVY 06-21 00 01 10 Table of Contents DAVY 06-21 00 01 15 List of Drawing Sheets DAVY 06-21 00 31 26 Existing Hazardous Material Information* DAVY 06-21

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements DAVY 06-21 01 10 00 Summary* DAVY 06-21 01 32 16.15 Project Schedules DAVY 06-21 01 33 23 Shop Drawings, Product Data, and Samples DAVY 06-21 01 35 26 Safety Requirements DAVY 06-21 01 42 19 Reference Standards DAVY 06-21 01 45 00 Quality Control DAVY 06-21 01 45 29 Testing Laboratory Services DAVY 06-21 01 45 35 Special Inspections DAVY 06-21 01 57 19 Temporary Environmental Controls DAVY 06-21 01 58 16 Temporary Interior Signage DAVY 06-21 01 74 19 Construction Waste Management DAVY 06-21 01 81 13 Sustainable Construction Requirements DAVY 06-21 01 91 00 General Commissioning Requirements DAVY 06-21

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition DAVY 06-21 02 82 11 Traditional Asbestos Abatement Enc 06-21 02 82 13.13 Glovebag Asbestos Abatement Enc 06-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement Enc 06-21 02 83 33.13 Lead-Based Paint Removal and Disposal Enc 06-21

DIVISION 03 – CONCRETE (NOT USED)

DIVISION 04 – MASONRY (NOT USED)

DIVISION 05 – METALS

05 12 00 Structural Steel Framing WR 06-21 05 40 00 Cold-Formed Metal Framing WR 06-21 05 50 00 Metal Fabrications WR 06-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES AUTHOR DATE

06 16 63 Cementitious Sheathing WR 06-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation DAVY 06-21 07 22 00 Roof and Deck Insulation DAVY 06-21 07 24 00 Exterior Insulation and Finish Systems* DAVY 06-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor

Retarding

DAVY 06-21

07 54 23 Thermoplastic Polyolefin (TPO) Roofing DAVY 06-21 07 60 00 Flashing and Sheet Metal DAVY 06-21 07 71 00 Roof Specialties DAVY 06-21 07 84 13 Thru Penetration Firestopping* Davy 06-21 07 92 00 Joint Sealants Davy 06-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames Davy 06-21 08 71 00 Door Hardware Davy 06-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes Davy 06-21 09 06 00 Schedule for Finishes Davy 06-21 09 22 16 Non-Structural Metal Framing Davy 06-21 09 24 00 Portland Cement Plastering Davy 06-21 09 29 00 Gypsum Board Davy 06-21 09 51 00 Acoustical Ceilings Davy 06-21 09 65 13 Resilient Base and Accessories Davy 06-21 09 65 19 Resilient Tile Flooring Davy 06-21 09 91 00 Painting 06-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage Davy 06-21 10 44 13 Fire Extinguisher Cabinets Davy 06-21

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components

Davy 06-21

DIVISION 14– CONVEYING EQUIPMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 06-21

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES AUTHOR DATE

21 13 13 Wet-Pipe Sprinkler Systems CE 06-21

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing CE 06-21 22 05 23 General-Duty Valves for Plumbing Piping CE 06-21 22 07 11 Plumbing Insulation CE 06-21

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC CE 06-21 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

CE 06-21

23 05 93 Testing, Adjusting, and Balancing for HVAC CE 06-21 23 07 11 HVAC and Boiler Plant Insulation 06-21 23 08 00 Commissioning of HVAC Systems CE 06-21 23 09 23 Direct-Digital Control System for HVAC CE 06-21 23 21 13 Hydronic Piping CE 06-21 23 23 00 Refrigerant Piping CE 06-21 23 81 00 Decentralized Unitary HVAC Equipment CE 06-21 23 82 00 Convection Heating and Cooling Units CE 06-21

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations CE 06-21 26 05 19 Low-Voltage Electrical Power Conductors and Cables CE 06-21 26 05 26 Grounding and Bonding for Electrical Systems CE 06-21 26 05 33 Raceway and Boxes for Electrical Systems CE 06-21 26 08 00 Commissioning of Electrical Systems CE 06-21 26 09 23 Lighting Controls CE 06-21 26 24 16 Panelboards CE 06-21

26 26 00 Power Distribution Units for Static Uninterruptible Power Systems

06-21

26 27 26 Wiring Devices CE 06-21 26 29 21 Enclosed Switches and Circuit Breakers CE 06-21 26 51 00 Interior Lighting CE 06-21

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations CE 06-21 27 05 26 Grounding and Bonding for Communications Systems CE 06-21 27 05 33 Raceways and Boxes for Communications Systems CE 06-21

27 08 00 Commissioning of Communications Systems CE 06-21

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES AUTHOR DATE

27 10 00 Control, Communication and Signal Wiring CE 06-21 27 11 00 Telecommunications Room Fittings CE 06-21 27 15 00 Communications Structured Cabling CE 06-21

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security

CE 06-21

28 05 13 Conductors and Cables for Electronic Safety and Security

CE 06-21

28 05 26 Grounding and Bonding for Electronic Safety and Security

CE 06-21

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

CE 06-21

28 08 00 Commissioning of Electronic Safety and Security Systems

CE 06-21

28 16 00 Intrusion Detection System CE 06-21 28 23 00 Video Surveillance CE 06-21 28 31 00 Fire Detection and Alarm CE 06-21

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 48 – ELECTRICAL POWER (NOT USED)

APPENDIX

Appendix A Submittal Register (per section 01 33 23) Appendix B Asbestos and Lead-Based Inspection Report Appendix C Facility Master Plan of Departmental Areas

FOOTNOTES

* Asterisk denotes Spec Section from non-VA source

AUTHOR ABBREVIATIONS

DAVY Davy Architecture WR Wiseman+ Rohy Structural Engineers CE Coffman Engineers, Inc.

Enc Encorp. Environmental

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL INFORMATION

1. GI-00.00 COVER SHEET

2. GI-00.01 GENERAL INFORMATION

3. GI-00.02 GENERAL INFORMATION

4. GI-00.03 ACCESSIBILITY NOTES AND DETAILS

5. GI-01.01 ICRA & ILSM PLAN: CONSTRUCTION PATH

6. GI-01.02 ICRA & ILSM PLAN: MAIN BUILDING, EXISTING ROOMS

7. GI-01.03 ICRA & ILSM PLAN: MAIN BUILDING, NEW TOWER CONSTRUCTION

8. GI-01.04 ICRA & ILSM PLAN: BUILDING 11, 14, 23, 25, 27

9. GI-01.05 HAZARDOUS MATERIALS NOTES

10. GI-01.10 BUILDING 1 – BASEMENT PHASING PLAN

11. GI-01.11 BUILDING 1 - FIRST FLOOR PHASING PLAN

12. GI-01.12 BUILDING 1 - SECOND FLOOR PHASING PLAN

13. GI-01.13 BUILDING 1 - THIRD FLOOR PHASING PLAN

14. GI-01.14 BUILDING 1 - FOURTH FLOOR PHASING PLAN

15. GI-01.15 BUILDING 1 - FIFTH FLOOR PHASING PLAN

16. GI-01.16 BUILDING 1 - SIXTH FLOOR PHASING PLAN

17. GI-11.10 BUILDING 11 – BASEMENT PHASING PLAN

18. GI-11.11 BUILDING 11 - FIRST FLOOR PHASING PLAN

19. GI-11.12 BUILDING 11 - SECOND FLOOR PHASING PLAN

20. GI-14.11 BUILDING 14 - FIRST FLOOR PHASING PLAN

21. GI-23.11 BUILDING 23 - FIRST FLOOR PHASING PLAN

22. GI-25.11 BUILDING 25 - FIRST FLOOR PHASING PLAN

23. GI-27.11 BUILDING 27 - FIRST FLOOR PHASING PLAN

24. GI-27.12 BUILDING 27 - SECOND FLOOR PHASING PLAN

25. GI-27.13 BUILDING 27 - THIRD FLOOR PHASING PLAN

LIFE SAFETY

00 01 15 - 2

26. LS-00.00 LIFE SAFETY SYMBOLS AND ABBREVIATIONS

MAIN BUILDING 1

27. LS-01.10 BASEMENT OVERALL LIFE SAFETY PLAN

28. LS-01.11 FIRST FLOOR OVERALL LIFE SAFETY PLAN

29. LS-01.12 SECOND FLOOR OVERALL LIFE SAFETY PLAN

30. LS-01.13 THIRD FLOOR OVERALL LIFE SAFETY PLAN

31. LS-01.14 FOURTH FLOOR OVERALL LIFE SAFETY PLAN

32. LS-01.15 FIIFTH FLOOR OVERALL LIFE SAFETY PLAN

33. LS-01.16 SIXTH FLOOR OVERALL LIFE SAFETY PLAN

BUILDING 11

34. LS-11.10 BASEMENT OVERALL LIFE SAFETY PLAN

35. LS-11.11 FIRST FLOOR OVERALL LIFE SAFETY PLAN

36. LS-11.12 SECOND FLOOR OVERALL LIFE SAFETY PLAN

BUILDING 14

37. LS-14.10 FIRST FLOOR OVERALL LIFE SAFETY PLAN

BUILDING 23

38. LS-23.10 FIRST FLOOR OVERALL LIFE SAFETY PLAN

BUILDING 25

39. LS-25.10 FIRST FLOOR OVERALL LIFE SAFETY PLAN

BUILDING 27

40. LS-27.10 FIRST FLOOR OVERALL LIFE SAFETY PLAN

41. LS-27.11 SECOND FLOOR OVERALL LIFE SAFETY PLAN

42. LS-27.12 THIRD FLOOR OVERALL LIFE SAFETY PLAN

ARCHITECTURAL

43. AE-00.00 ABBREVIATIONS, LEGENDS & NOTES

44. AE-00.01 OVERALL SITE PLAN

45. AE-00.51 FRAMING DETAILS

46. AE-00.52 CEILING DETAILS

47. AE-00.53 MISCELLANEOUS

48. AE-00.60 DOOR AND WINDOW SCHEDULE & DETAILS

49. AE-00.61 FINISH PLANS & SCHEDULE

50. AE-00.62 FINISH PLANS & SCHEDULE

51. AE-00.63 FINISH PLANS & SCHEDULE

52. AE-00.64 FINISH PLANS & SCHEDULE

00 01 15 - 3

MAIN BUILDING 1

53. AE-01.10 BASEMENT FLOOR OVERALL PLAN

54. AE-01.11 BASEMENT FLOOR INTERSTITIAL PLAN

55. AE-01.12 FIRST FLOOR OVERALL PLAN

56. AE-01.13 FIRST FLOOR INTERSTITIAL PLAN

57. AE-01.14 SECOND FLOOR OVERALL PLAN

58. AE-01.15 SECOND FLOOR INTERSTITIAL PLAN

59. AE-01.16 THIRD FLOOR OVERALL PLAN

60. AE-01.17 THIRD FLOOR INTERSTITIAL PLAN

61. AE-01.18 FOURTH FLOOR OVERALL PLAN

62. AE-01.19 FOURTH FLOOR INTERSTITIAL PLAN

63. AE-01.20 FIFTH FLOOR OVERALL PLAN

64. AE-01.21 FIFTH FLOOR INTERSTITIAL PLAN

65. AE-01.22 SIXTH FLOOR OVERALL PLAN

66. AE-01.23 SIXTH FLOOR INTERSTITIAL PLAN

67. AE-01.40 BASEMENT: RM. B167 ENLARGED FLOOR PLANS, RCP, AND INTERIOR

ELEVATIONS

68. AE-01.41 BASEMENT: RM. B165 ENLARGED FLOOR PLANS, RCP, AND INTERIOR

ELEVATIONS

69. AE-01.42 BASEMENT: RM. B116, RM. B217B ENLARGED FLOOR PLANS, RCP,

AND INTERIOR ELEVATIONS

70. AE-01.43 FIRST FLOOR: RM. 1047, RM. 1190, RM. 1535/1535A ENLARGED

FLOOR PLANS, RCP, AND INTERIOR ELEVATIONS

71. AE-01.44 FIRST FLOOR: RM. 1251, RM. A1100 ENLARGED FLOOR PLANS, RCP,

AND INTERIOR ELEVATIONS

72. AE-01.45 SECOND FLOOR: RM. 2100, RM. 2505 ENLARGED FLOOR PLANS, RCP,

AND INTERIOR ELEVATIONS

73. AE-01.47 FOURTH FLOOR: RM. 4155, RM. 4044A ENLARGED FLOOR PLANS,

RCP, AND INTERIOR ELEVATIONS

74. AE-01.48 FIFTH FLOOR: RM. 5 EAST ENLARGED FLOOR PLANS, RCP, AND

INTERIOR ELEVATIONS

75. AE-01.49 SIXTH FLOOR: RM. 6135 ENLARGED FLOOR PLANS, RCP, AND

INTERIOR ELEVATIONS

76. AE-01.70 TOWER DEMOLITION FLOOR PLAN AND SECTION

77. AE-01.71 TOWER THIRD AND FOURTH FLOOR DEMOLITION PLANS AND

ELEVATIONS

78. AE-01.72 TOWER FIFTH AND SIXT FLOOR DEMOLITION PLANS AND ELEVATIONS

00 01 15 - 4

79. AE-01.80 TOWER SECOND FLOOR ENLARGED PLANS AND ELEVATION

80. AE-01.81 TOWER THIRD FLOOR ENLARGED PLANS AND ELEVATIONS

81. AE-01.82 TOWER FOURTH FLOOR ENLARGED PLANS AND ELEVATIONS

82. AE-01.83 TOWER FIFTH FLOOR ENLARGED PLANS AND ELEVATIONS

83. AE-01.84 TOWER SIXTH FLOOR ENLARGED PLANS AND ELEVATIONS

84. AE-01.85 TOWER PARTIAL ROOF PLAN

85. AE-01.86 TOWER ELEVATION

86. AE-01.87 TOWER ELEVATION

87. AE-01.88 TOWER SECTION

88. AE-01.89 TOWER SECTION

89. AE-01.90 TOWER DETAILS

BUILDING 11

90. AE-11.10 BLDG.11 - BASEMENT FLOOR OVERALL ARCHITECTURAL PLAN

91. AE-11.11 BLDG.11 - BASEMENT INTERSTITIAL PLAN

92. AE-11.12 BLDG.11 – FIRST FLOOR OVERALL ARCHITECTURAL PLAN

93. AE-11.13 BLDG.11 – FIRST FLOOR INTERSTITIAL PLAN

94. AE-11.14 BLDG.11 - SECOND FLOOR OVERALL ARCHITECTURAL PLAN

95. AE-11.40 BLDG 11, BASEMENT: RM. BB102 & BB102A ENLARGED FLOOR PLANS,

RCP, AND INTERIOR ELEVATIONS

96. AE-11.41 BLDG 11, BASEMENT: RM. BB115; FIRST FLOOR: RM. A116; FIRST

FLOOR INTERSTITIAL: RM. 1I ENLARGED FLOOR PLANS, RCP, AND INTERIOR

ELEVATIONS

97. AE-11.42 BLDG 11, SECOND FLOOR: RM. B2119, RM. 2A140 ENLARGED FLOOR

PLANS, RCP, AND INTERIOR ELEVATIONS

BUILDING 14

98. AE-14.11 BLDG. 14 - FIRST FLOOR OVERALL PLAN

99. AE-14.41 BLDG. 14, RM. 101 ENLARGED FLOOR PLANS, RCP, AND INTERIOR

ELEVATIONS

BUILDING 23

100. AE-23.11 BLDG.23 - FIRST FLOOR OVERALL ARCHITECTURAL PLAN

101. AE-23.41 BLDG.23, RM. 104 ENLARGED FLOOR PLANS, RCP, AND INTERIOR

ELEVATIONS

BUILDING 25

102. AE-25.11 BLDG.25 - FIRST FLOOR OVERALL ARCHITECTURAL PLAN

103. AE-25.41 BLDG.25, RM. 126 ENLARGED FLOOR PLANS, RCP, AND INTERIOR

ELEVATIONS

BUILDING 27

104. AE-27.11 BLDG.27 - FIRST FLOOR OVERALL ARCHITECTURAL PLAN

00 01 15 - 5

105. AE-27.12 BLDG.27 - SECOND FLOOR OVERALL ARCHITECTURAL PLAN

106. AE-27.13 BLDG.27 - THIRD FLOOR OVERALL ARCHITECTURAL PLAN

107. AE-27.41 BLDG.14, RM. 101; BLDG 23, RM. 104; BLDG 25, RM. 126

ENLARGED FLOOR PLANS, RCP, AND INTERIOR ELEVATIONS

STURCTURAL

108. SE-00.00 STRUCTURAL NOTES

109. SE-00.51 EQUIPMENT ANCHORAGE DETAILS

110. SE-00.52 TYPICAL DETAILS

MAIN BUILDING 1

111. SE-01.10 BUILDING 1 BASEMENT PLAN

112. SE-01.11 BUILDING 1 1ST FLOOR PLAN

113. SE-01.12 BUILDING 1 2ND FLOOR PLAN

114. SE-01.13 BUILDING 1 3RD FLOOR PLAN

115. SE-01.14 BUILDING 1 4TH FLOOR PLAN

116. SE-01.15 BUILDING 1 5TH FLOOR PLAN

117. SE-01.16 BUILDING 1 6TH FLOOR PLAN

118. SE-01.17 BUILDING 1 ROOF PLAN

119. SE-01.51 TOWER PLANS & FRAMING DETAILS

120. SE-01.52 FRAMING DETAILS

BUILDING 11

121. SE-11.10 BUILDING 11 BASEMENT PLAN

122. SE-11.11 BUILDING 11 1ST FLOOR PLAN

123. SE-11.12 BUILDING 11 1ST FLOOR INTERSTITIAL PLAN

124. SE-11.13 BUILDING 11 2ND FLOOR PLAN

125. SE-11.14 BUILDING 11 ROOF FRAMING PLAN

BUILDING 14

126. SE-14.11 BUILDING 14 1ST FLOOR PLAN

BUILDING 23

127. SE-23.11 BUILDING 23 1ST FLOOR PLAN

BUILDING 25

128. SE-25.11 BUILDING 25 1ST FLOOR PLAN

BUILDING 27

129. SE-27.11 BUILDING 27 1ST FLOOR PLAN

130. SE-27.12 BUILDING 27 2ND FLOOR FRAMING PLAN

131. SE-27.13 BUILDING 27 3RD FLOOR FRAMING PLAN

132. SE-27.14 BUILDING 27 ROOF FRAMING PLAN

00 01 15 - 6

MECHANICAL

133. M-00.00 GENERAL NOTES, SYMBOLS AND LEGENDS

134. M-00.01 SITE PLAN

135. M-00.O2 MECHANICAL SCHEDULES

136. M-00.50 MECHANICAL DETAILS

137. M-00.51 MECHANICAL DETAILS

138. M-00.60 MECHANICAL CONTROLS

MAIN BUILDING 1

139. M-01.10 BLDG 1 - BASEMENT OVERALL MECHANICAL PLAN

140. M-01.11 BLDG 1 – 1ST FLOOR OVERALL MECHANICAL PLAN

141. M-01.12 BLDG 1 – 2ND FLOOR OVERALL MECHANICAL PLAN

142. M-01.13 BLDG 1 – 3RD FLOOR OVERALL MECHANICAL PLAN

143. M-01.14 BLDG 1 – 4TH FLOOR OVERALL MECHANICAL PLAN

144. M-01.15 BLDG 1 – 5TH FLOOR OVERALL MECHANICAL PLAN

145. M-01.16 BLDG 1 – 6TH FLOOR OVERALL MECHANICAL PLAN

146. M-01.17 BLDG 1 - ROOF OVERALL MECHANICAL PLAN

147. M-01.40 BLDG 1 - ENLARGED EQUIPMENT ROOM PLAN

148. M-01.41 BLDG 1 – ENLARGED EQUIPMENT ROOM PLAN

149. M-01.42 BLDG 1 – ENLARGED EQUIPMENT ROOM PLAN

150. M-01.43 BLDG 1 – ENLARGED EQUIPMENT ROOM PLAN

151. M-01.44 BLDG 1 – ENLARGED EQUIPMENT ROOM PLAN

152. M-01.45 BLDG 1 – ENLARGED EQUIPMENT ROOM PLAN

153. M-01.46 BLDG 1 - ENLARGED ROOF EQUIPMENT LAYOUT PLAN

BUILDING 11

154. M-11.10 BLDG 11 - BASEMENT OVERALL MECHANICAL PLAN

155. M-11.11 BLDG 11 – 1ST FLOOR OVERALL MECHANICAL PLAN

156. M-11.12 BLDG 11 – 2ND FLOOR OVERALL MECHANICAL PLAN

157. M-11.13 BLDG 11 - ROOF OVERALL MECHANICAL PLAN

BUILDING 14

158. M-14.10 BLDG 14 – 1ST FLOOR OVERALL MECHANICAL PLAN

159. M-14.11 BLDG 14 - ROOF OVERALL MECHANICAL PLAN

BUILDING 23

160. M-23.10 BLDG 23 – 1ST FLOOR OVERALL MECHANICAL PLAN

BUILDING 25

161. M-25.10 BLDG 25 – 1ST FLOOR OVERALL MECHANICAL PLAN

BUILDING 27

00 01 15 - 7

162. M-27.10 BLDG 27 – 1ST FLOOR OVERALL MECHANICAL PLAN

163. M-27.11 BLDG 27 – 2ND FLOOR OVERALL MECHANICAL PLAN

164. M-27.12 BLDG 27 – 3RD FLOOR OVERALL MECHANICAL PLAN

165. M-27.13 BLDG 27 - ROOF OVERALL MECHANICAL PLAN

166. M-27.40 BLDG 27 – ENLARGED EQUIPMENT RM PLAN

PLUMBING

167. P-00.00 GENERAL NOTES SYMBOLS AND LEGENDS

168. P-00.01 SITE PLAN

169. P-00.50 PLUMBING DETAILS

MAIN BUILDING 1

170. P-01-10 BLDG 1 - BASEMENT OVERALL PLUMBING PLAN

171. P-01.11 BLDG 1 – 1ST FLOOR OVERALL PLUMBING PLAN

172. P-01-12 BLDG 1 – 2ND FLOOR OVERALL PLUMBING PLAN

173. P-01.13 BLDG 1 – 3RD FLOOR OVERALL PLUMBING PLAN

174. P-01.14 BLDG 1 – 4TH FLOOR OVERALL PLUMBING PLAN

175. P-01.15 BLDG 1 – 5TH FLOOR OVERALL PLUMBING PLAN

176. P-01.16 BLDG 1 – 6TH FLOOR OVERALL PLUMBING PLAN

177. P-01.40 BLDG 1 - ENLARGED EQUIPMENT RM PLUMBING PLAN

178. P-01.41 BLDG 1 - ENLARGED EQUIPMENT RM PLUMBING PLAN

179. P-01.42 BLDG 1 - ENLARGED EQUIPMENT RM PLUMBING PLAN

180. P-01.43 BLDG 1 - ENLARGED EQUIPMENT RM PLUMBING PLAN

181. P-01.44 BLDG 1 - ENLARGED EQUIPMENT RM PLUMBING PLAN

182. P-01.45 BLDG 1 - ENLARGED EQUIPMENT RM PLUMBING PLAN

BUILDING 11

183. P-11.10 BLDG 11 - BASEMENT OVERALL PLUMBING PLAN

184. P-11.11 BLDG 11 – 1ST FLOOR OVERALL PLUMBING PLAN

185. P-11.12 BLDG 11 – 2ND FLOOR OVERALL PLUMBING PLAN

BUILDING 14

186. P-14.10 BLDG 14 - 1ST FLOOR OVERALL PLUMBING PLAN

BUILDING 23

187. P-23.10 BLDG 23 – 1ST FLOOR OVERALL PLUMBING PLAN

BUILDING 25

188. P-25.10 BLDG 25 – 1ST FLOOR OVERALL PLUMBING PLAN

BUILDING 27

189. P-27.10 BLDG 27 – 1ST FLOOR OVERALL PLUMBING PLAN

190. P-27.11 BLDG 27 – 2ND FLOOR OVERALL PLUMBING PLAN

00 01 15 - 8

191. P-27.12 BLDG 27 – 3RD FLOOR OVERALL PLUMBING PLAN

192. P-27.40 BLDG 27 - ENLARGED EQUIPMENT RM PLUMBING PLAN

ELECTRICAL

193. E-00.00 GENERAL NOTES, SYMBOLS, AND LEGENDS

194. E-00.01 SINGLE LINE DIAGRAM

195. E-00.02 SINGLE LINE DIAGRAM

196. E-00.03 SINGLE LINE DIAGRAM

197. E-00.04 PANEL SCHEDULES

198. E-00.05 PANEL SCHEDULES

199. E-00.06 PANEL SCHEDULES

200. E-00.07 PANEL SCHEDULES

MAIN BUILDING 1

201. E-01.10 BLDG 1 - BASEMENT OVERALL ELECTRICAL PLAN

202. E-01.11 BLDG 1 – 1ST FLOOR OVERALL ELECTRICAL PLAN

203. E-01.12 BLDG 1 – 2ND FLOOR OVERALL ELECTRICAL PLAN

204. E-01.13 BLDG 1 – 3RD FLOOR OVERALL ELECTRICAL PLAN

205. E-01.14 BLDG 1 – 4TH FLOOR OVERALL ELECTRICAL PLAN

206. E-01.15 BLDG 1 – 5TH FLOOR OVERALL ELECTRICAL PLAN

207. E-01.16 BLDG 1 – 6TH FLOOR OVERALL ELECTRICAL PLAN

208. E-01.17 BLDG 1 - ROOF OVERALL ELECTRICAL PLAN

209. E-01.40 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

210. E-01.41 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

211. E-01.42 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

212. E-01.43 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

213. E-01.44 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

214. E-01.45 BLDG 1 – ENLARGED ROOF EQUIPMENT LAYOUT PLAN

BUILDING 11

215. E-11.10 BLDG 11 - BASEMENT OVERALL ELECTRICAL PLAN

216. E-11.11 BLDG 11 – 1ST FLOOR OVERALL ELECTRICAL PLAN

217. E-11.12 BLDG 11 – 2ND FLOOR OVERALL ELECTRICAL PLAN

218. E-11.13 BLDG 11 - ROOF OVERALL ELECTRICAL PLAN

219. E-11.40 BLDG 11 – ENLARGED EQUIPMENT ROOM PLAN

220. E-11.41 BLDG 11 – ENLARGED EQUIPMENT ROOM PLAN

BUILDING 14

221. E-14.10 BLDG 14 – 1ST FLOOR OVERALL ELECTRICAL PLAN

00 01 15 - 9

BUILDING 23

222. E-23.10 BLDG 23 – 1ST FLOOR OVERALL ELECTRICAL PLAN

BUILDING 25

223. E-25.10 BLDG 25 – 1ST FLOOR OVERALL ELECTRICAL PLAN

BUILDING 27

224. E-27.10 BLDG 27 – 1ST FLOOR OVERALL ELECTRICAL PLAN

225. E-27.11 BLDG 27 – 2ND FLOOR OVERALL ELECTRICAL PLAN

226. E-27.12 BLDG 27 - 3RD FLOOR OVERALL ELECTRICAL PLAN

227. E-27.13 BLDG 27 - ROOF OVERALL ELECTRICAL PLAN

TELECOM

228. T-00.00 TELECOMMUNICATION SYMBOLS AND ABBREVIATIONS

229. T-00.02 TELECOMMUNICATION SITE PLAN

230. T-00.40 TELECOMMUNICATION OVERVIEW TABLE

231. T-00.50 TELECOMMUNICATION DETAILS

232. T-00.51 TELECOMMUNICATION DETAILS

233. T-00.52 TELECOMMUNICATION DETAILS

234. T-00.53 TELECOMMUNICATION DETAILS

235. T-00.60 IT SYSTEM RISER DIAGRAM

236. T-00.61 IT SYSTEM RISER DIAGRAM

237. T-00.62 IT SYSTEM RISER DIAGRAM

238. T-00.63 SECURITY SYSTEM DETAILS

239. T-00.64 TELECOM GROUNDING SYSTEM DIAGRAM

240. T-00.65 TELECOM GROUNDING SYSTEM DIAGRAM

241. T-00.66 TELECOM GROUNDING SYSTEM DIAGRAM

242. T-00.67 FIBER CORE PATCH PANEL DETAILS

MAIN BUILDING 1 DEMOLITION PLANS

243. TD-01.10 BLDG 1 - BASEMENT OVERALL TELECOM DEMOLITION PLAN

244. TD-01.11 BLDG 1 – BSMNT INTER OVERALL TELECOM DEMOLITION PLAN

245. TD-01.12 BLDG 1 – 1ST FLOOR OVERALL TELECOM DEMOLITION PLAN

246. TD-01.13 BLDG 1 – 1ST FLOOR INTERSTITIAL TELECOM DEMOLITION PLAN

247. TD-01.14 BLDG 1 - 2ND FLOOR OVERALL TELECOM DEMOLITION PLAN

248. TD-01.15 BLDG 1 – 2ND FLOOR INTERSTITIAL TELECOM DEMOLITION PLAN

249. TD-01.16 BLDG 1 – 3RD FLOOR OVERALL TELECOM DEMOLITION PLAN

250. TD-01.17 BLDG 1 – 3RD FLOOR INTERSTITIAL TELECOM DEMOLITION PLAN

251. TD-01.18 BLDG 1 – 4TH FLOOR OVERALL TELECOM DEMOLITION PLAN

252. TD-01.19 BLDG 1 - 4TH FLOOR INTERSTITIAL TELECOM DEMOLITION PLAN

00 01 15 - 10

253. TD-01.20 BLDG 1 – 5TH FLOOR OVERALL TELECOM DEMOLITION PLAN

254. TD-01.21 BLDG 1 – 5TH FLOOR INTERSTITIAL TELECOM DEMOLITION PLAN

255. TD-01.22 BLDG 1 - 6TH FLOOR OVERALL TELECOM DEMOLITION PLAN

256. TD-01.23 BLDG 1 – 6TH FLOOR INTERSTITIAL TELECOM DEMOLITION PLAN

257. TD-01.40 BLDG 1 - ENLARGED TELECOM DEMOLITION PLANS

258. TD-01.41 BLDG 1 - ENLARGED TELECOM DEMOLITION PLANS

259. TD-01.42 BLDG 1 - ENLARGED TELECOM DEMOLITION PLANS

MAIN BLDG 1 PLANS

260. T-01.10 BLDG 1 - BASEMENT OVERALL TELECOM PLAN

261. T-01.11 BLDG 1 – BSMNT INTERSTITIAL OVERALL TELECOM PLAN

262. T-01.12 BLDG 1 – 1ST FLOOR OVERALL TELECOM PLAN

263. T-01.13 BLDG 1 – 1ST FLOOR INTERSTITIAL TELECOM PLAN

264. T-01.14 BLDG 1 – 2ND FLOOR OVERALL TELECOM PLAN

265. T-01.15 BLDG 1 – 2ND FLOOR INTERSTITIAL TELECOM PLAN

266. T-01.16 BLDG 1 – 3RD FLOOR OVERALL TELECOM PLAN

267. T-01.17 BLDG 1 – 3RD FLOOR INTERSTITIAL TELECOM PLAN

268. T-01.18 BLDG 1 – 4TH FLOOR OVERALL TELECOM PLAN

269. T-01.19 BLDG 1 – 4TH FLOOR INTERSTITIAL TELECOM PLAN

270. T-01.20 BLDG 1 – 5TH FLOOR OVERALL TELECOM PLAN

271. T-01.21 BLDG 1 – 5TH FLOOR INTERSTITIAL TELECOM PLAN

272. T-01.22 BLDG 1 – 6TH FLOOR OVERALL TELECOM PLAN

273. T-01.23 BLDG 1 – 6TH FLOOR INTERSTITIAL TELECOM PLAN

274. T-01.24 BLDG 1 – 6TH FLOOR INTERSTITIAL TELECOM PLAN

275. T-01.40 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

276. T-01.41 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

277. T-01.42 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

278. T-01.43 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

279. T-01.44 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

280. T-01.50 BLDG 1 - SECTION AND DETAILS

281. T-01.70 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

282. T-01.71 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

283. T-01.72 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

284. T-01.73 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

285. T-01.74 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

286. T-01.75 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

287. T-01.76 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

288. T-01.77 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

289. T-01.78 BLDG 1 - TELECOMMUNICATIONS RACK LAYOUT

00 01 15 - 11

BUILDING 11

290. T-11.10 BLDG 11 - BASEMENT OVERALL TELECOM PLAN

291. T-11.11 BLDG 11 - BASEMENT INTERSTITIAL TELECOM PLAN

292. T-11.12 BLDG 11 – 1ST FLOOR OVERALL TELECOM PLAN

293. T-11.13 BLDG 11 – 1ST FLOOR INTERSTITIAL TELECOM PLAN

294. T-11.14 BLDG 11 – 2ND FLOOR OVERALL TELECOM PLAN

295. T-11.40 BLDG 11 - ENLARGED EQUIPMENT ROOM PLAN

296. T-11.41 BLDG 11 - ENLARGED EQUIPMENT ROOM PLAN

297. T-11.70 BLDG 11 - TELECOMMUNICATIONS RACK LAYOUT

298. T-11.71 BLDG 11 - TELECOMMUNICATIONS RACK LAYOUT

BUILDING 14

299. T-14.11 BLDG 14 – 1ST FLOOR OVERALL TELECOM PLAN

300. T-14.70 BLDG 14 - TELECOMMUNICATIONS RACK LAYOUT

BUILDING 23

301. T-23.11 BLDG 23 - 1ST FLOOR OVERALL TELECOM PLAN

302. T-23.70 BLDG 23 - TELECOMMUNICATIONS RACK LAYOUT

BUILDING 25

303. T-25.11 BLDG 25 – 1ST FLOOR TELECOM PLAN

304. T-25.70 BLDG 25 - TELECOMMUNICATIONS RACK LAYOUT

BUILDING 27

305. T-27.11 BLDG 27 – 1ST FLOOR TELECOM PLAN

306. T-27.12 BLDG 27 – 2ND FLOOR TELECOM PLAN

307. T-27.13 BLDG 27 – 3RD FLOOR TELECOM PLAN

308. T-27.41 BLDG 27 - ENLARGED EQUIPMENT ROOM PLAN

309. T-27.70 BLDG 27 - TELECOMMUNICATIONS RACK LAYOUT

FIRE PROTECTION

310. FP-00.00 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

MAIN BUILDING

311. FP-01.10 BLDG 1 - BASEMENT OVERALL FIRE PROTECTION PLAN

312. FP-01.11 BLDG 1 – 1ST FLOOR OVERALL FIRE PROTECTION PLAN

313. FP-01.12 BLDG 1 – 1ST FLOOR INTERSTITIAL OVERALL FIRE PROTECTION PLAN

314. FP-01.13 BLDG 1 – 2ND FLOOR OVERALL FIRE PROTECTION PLAN

315. FP-01.15 BLDG 1 – 3RD FLOOR OVERALL FIRE PROTECTION PLAN

316. FP-01.17 BLDG 1 – 4TH FLOOR OVERALL FIRE PROTECTION PLAN

317. FP-01.19 BLDG 1 – 5TH FLOOR OVERALL FIRE PROTECTION PLAN

318. FP-01.21 BLDG 1 – 6TH FLOOR OVERALL FIRE PROTECTION PLAN

00 01 15 - 12

319. FP-01.40 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

320. FP-01.41 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

321. FP-01.42 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

322. FP-01.43 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

323. FP-01.44 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

324. FP-01.45 BLDG 1 - ENLARGED EQUIPMENT RM PLAN

BUILDING 11

325. FP-11.10 BLDG 11 - BASEMENT OVERALL FIRE PROTECTION PLAN

326. FP-11.11 BLDG 11 – 1ST FLOOR OVERALL FIRE PROTECTION PLAN

327. FP-11.13 BLDG 11 – 2ND FLOOR OVERALL FIRE PROTECTION PLAN

BUILDING 14

328. FP-14.10 BLDG 14 – 1ST FLOOR OVERALL FIRE PROTECTION PLAN

BUILDING 23

329. FP-23.10 BLDG 23 – 1ST FLOOR OVERALL FIRE PROTECTION PLAN

BUILDING 25

330. FP-25.10 BLDG 25 - FLOOR OVERALL FIRE PROTECTION PLAN

BUILDING 27

331. FP-27.10 BLDG 27 – 1ST FLOOR OVERALL FIRE PROTECTION PLAN

332. FP-27.11 BLDG 27 – 2ND FLOOR OVERALL FIRE PROTECTION PLAN

333. FP-27.12 BLDG 27 - 3RD FLOOR OVERALL FIRE PROTECTION PLAN

- - - E N D - - -

00 31 26-1

EXISTING HAZARDOUS MATERIAL INFORMATION

Section 00 31 26

1.1 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the

Procurement and Contracting Requirements for Project. They provide

Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations.

They are made available for Bidders' convenience and information but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. An environmental report: “Asbestos and Lead-Based Inspection Report”, prepared by Encorp Inc. dated May 2, 2021, is available for viewing as appended to this Document – see Appendix B.

C. Related Requirements:

1. Demolition specification sections.

2. Instructions to bidders.

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 664-20-501 San Diego VA

Medical Center EHRM Infrastructure Upgrades as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

VA Medical Center San Diego as identified in the Invitation for Bid

Notice.

C. Offices of Davy Architecture, 1053 10th Ave., San Diego, CA 92101, as

Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the

Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting

Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

01 00 00 -2

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, 664-20-501 San Diego VA Medical Center EHRM Infrastructure

Upgrades: Work includes general construction, alterations, necessary removal of existing structures and construction of certain other items as described in stipulated contract documents.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Per Office of Information Technology (OIT) regulations, All

Contractors, Sub-Contractors and their employees must be escorted by a facility OIT approved representative as all times, within existing telecom rooms, and other OIT sensitive areas.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security and/or escort can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

01 00 00 -3

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national and/or state emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR)for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

01 00 00 -4

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon

01 00 00 -5 completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center Cemetery areas required to remain in operation.

01 00 00 -6

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

F*. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to: Work as described in the Contract Documents.

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor, as follows:

For phasing information see plan sheets GI – 01.17 thru GI – 01.32.

01 00 00 -7

H. Building(s) No.(s) All buildings identified in the contract document will be occupied during performance of work; but immediate areas of alterations will be vacated.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

01 00 00 -8

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. (Department of Veterans Affairs or municipal).

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 21 days in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 21 calendar days prior to the desired time and shall be performed as directed by the COR.

01 00 00 -9

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

01 00 00 -10

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

01 00 00 -11

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

01 00 00 -12

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

01 00 00 -13

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within…

This is the start of the file's text. The full file is on GovTribe.