S02 Solicitation Attachment C Drawings Part 3.pdf
PDF 47 MB Posted
- Attached to
- Z2DA--EHRM Infrastructures Upgrades Project 664-20-501 Federal contract opportunity
- Solicitation number
- 36C26221B0010_1
About this file
This document provides details for a federal solicitation for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services for Project 664-20-501 Electronic Health Records Modernization Infrastructure Upgrades at the VA San Diego Healthcare System, VA San Diego Medical Center located in San Diego, California. Work includes general construction, alterations, mechanical, electrical and utility systems work, necessary demolition and removal of existing structures. The project magnitude is between $10,000,000 to $20,000,000. The solicitation will be issued on July 6, 2021 via sam.gov as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses listed as verified in Vendor Information Pages. The point of contact is James Barber, Contracting Specialist, Network Contracting Office 22 Long Beach who can be reached at james.barber@va.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 Solicitation 36C26221B0010.pdf | ||
| Amendment 0002 Attachment 1 RFI Questions and Answers.pdf | ||
| Amendment 0001 Attachment 1 Site Visit Sign-In Sheet.pdf | ||
| Amendment 0001 Solicitation 36C26221B0010.pdf | ||
| S02 Solicitation Attachment B Drawings Part 2.pdf | ||
| S02 Solicitation Attachment E Specifications.pdf | ||
| S02 Solicitation Attachment F Wage Determination.pdf | ||
| S02 Solicitation Attachment G VA San Diego Facility Map.pdf | ||
| S02 Solicitation 36C26221B0010.pdf | ||
| S02 Solicitation Attachment D Drawings Part 4.pdf | ||
| S02 Solicitation Attachment A Drawings Part 1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T G
B
EX. PANEL D4CEX
5-20R 5-20R
1-FCUC 8.2
M
1-FCUC 8.1
M
J
M
J
L01A L01A
TR124-2a TR124-2a b
5-20R
5-20R
5-20R
1-DX 8.3
1-DX 8.1
1-DX 8.2
PANEL TR124 TR124-1
TR124-3
TR124-5
TR124-7
TR124-7
TR124-9
TR124-9
TR124-11
TR124-13
M
J
M
J
M
J
TR124-4
TR124-4
TR124-4
L01AL01A
b TR104-2b
TR104-2b
5-20R
5-20R
5-20R
1-DX 7.1
PANEL TR104
TR104-1
TR104-3
TR104-5
TR104-7
TR104-7
TR104-9
TR104-9
TR104-11
TR104-13
M
J
1-DX 7.2
M
J
1-DX 7.3
M
J
TR104-4
TR104-4
TR104-4
T G
B
5-20R5-20R
1-FCUC 9.2
1-FCUC 9.1
M
5-20R
J
M
J
L02
L02 L023
L01AL01A
b
L01AL01A
TR125-2a TR125-2a b
5-20R
5-20R
5-20R
5-20R
PANEL TR125
TR125-3
TR125-1
TR125-5
TR125-7
TR125-9
TR125-11
TR125-11
TR125-9
TR125-13
TR125-15
1-DX 10.3
1-DX 10.1
1-DX 10.2
M
J
M
J
M
J
TR125-4
TR125-4
TR125-4
TR 10-5
L01AL01A
b TR105-2b 5-20R
5-20R
5-20R
5-20R
PANEL TR105
TR105-1
TR105-3
TR105-5
TR105-7 TR105-2b
TR105-9
TR105-9
TR105-11
TR105-11
TR105-15
TR105-13
1-DX 9.1
M
J
1-DX 9.2
M
J
1-DX 9.3
M
J
TR104-4
TR104-4
TR104-4
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
E-01.43
JC MC
BLDG 1 - ENLARGED EQUIPMENT RM PLAN
GENERAL NOTES
KEY NOTES
MAIN
BLDG 1 - RM TR 10-4 ENLARGED PLAN
SCALE: 3/8" = 1'-0"
BLDG 1 - RM TR 12-4 ENLARGED PLAN
SCALE: 3/8" = 1'-0"
BLDG 1 - RM 4044 ENLARGED PLAN
SCALE: 3/8" = 1'-0"
BLDG 1 - RM 4155 ENLARGED PLAN
SCALE: 3/8" = 1'-0"
BLDG 1 - RM TR 12-5 ENLARGED PLAN
SCALE: 3/8" = 1'-0"
BLDG 1 - RM TR 10-5 ENLARGED PLAN
SCALE: 3/8" = 1'-0"
EXISTING LIGHTING AND LIGHTING CONTROLS TO REMAIN.
SECURE COPPER GROUNDING STRAP FOR ESD FLOORING TO ELECTRICAL OUTLET LOCATED AT +18" AFF.
COORDINATE INSTALLATION WITH ARCHITECT AND FLOORING MANUFACTURER PRODUCT INFORMATION.
DISCONNECT AND REMOVE EXISTING LIGHTING. PROVIDE NEW LIGHTING AS INDICATED AND CONNECT TO
EXISTING LIGHTING CIRCUIT.
1. ALL ELECTRICAL DEVICES AND EQUIPMENT OUTSIDE OF SCOPE ARE NOT SHOWN FOR CLARITY.
AutoCAD SHX Text
TELECOM
http://www.coffman.com
5 EAST AREA
TGB
1-DX 11.1
1-DX 11.2
5-20R
5-20R
5-20R
M J
M
J
TR 12-6
L01A L01A
TR126-2a TR126-2a a
5-20R
1-DX 14.3
1-DX 14.2
1-DX 14.1
5-20R
5-20R
TR126-1
TR126-3
TR126-5
TR126-7
TR126-9
TR126-7
TR126-11
TR126-9
TR126-13
PANEL TR126
M
J
M
J M
J
TR126-4
TR126-4
TR126-4
TR 10-6
L01A L01A b TR106-2b TR106-2b
5-20R
1-DX 13.3
1-DX 13.2
1-DX 13.1
5-20R
5-20R
PANEL TR106
TR106-1
TR106-3
TR106-5
TR106-7
TR106-9
TR106-7
TR106-9
TR106-11
TR106-13
M
J
M
J
M
J
TR106-4
TR106-4
TR106-4
TGB
6CEXFA-20
6CEXFA
5-20R5-20R
1-DX 12.2
1-DX 12.1
M J
M J
6CEXFA-20
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
E-01.44
JC MC
BLDG 1 - ENLARGED EQUIPMENT RM PLAN
GENERAL NOTES
KEY NOTES
MAIN
BLDG 1 - RM 5 EAST AREA ENLARGED PLAN
SCALE: 1/2" = 1'-0"
EXISTING LIGHTING AND LIGHTING CONTROLS TO REMAIN.
SECURE COPPER GROUNDING STRAP FOR ESD FLOORING TO ELECTRICAL OUTLET LOCATED AT +18" AFF.
COORDINATE INSTALLATION WITH ARCHITECT AND FLOORING MANUFACTURER PRODUCT INFORMATION.
1. ALL ELECTRICAL DEVICES AND EQUIPMENT OUTSIDE OF SCOPE ARE NOT SHOWN FOR CLARITY.
BLDG 1 - RM TR 12-6 ENLARGED PLAN
SCALE: 1/2" = 1'-0"
BLDG 1 - RM TR 10-6 ENLARGED PLAN
SCALE: 1/2" = 1'-0"
BLDG 1 - RM 6135 ENLARGED PLAN
SCALE: 1/2" = 1'-0"
TELECOMMUNICATION DEVICES
SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
T
WORK DEFINITION
AC 3" ABOVE COUNTER BACKSPLASH
AFF ABOVE FINISHED FLOOR
AG ABOVE GRADE
AHJ AUTHORITY HAVING JURISDICTION
A/V AUDIO/VISUAL
CATV COMMUNITY ACCESS TELEVISION
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CEC CALIFORNIA ELECTRICAL CODE
CKT CIRCUIT
CLG CEILING
COMM COMMUNICATIONS
C CONDUIT
CO CONDUIT ONLY
COR CONTRACTING OFFICER'S REPRESENTATIVE
CTRL CONTROL
CU COPPER
D DATA, DEDICATED
DIST DISTRIBUTION
DOR DESIGNER OF RECORD
EG EQUIPMENT GROUND
ENT ELECTRIC NON-METALLIC CONDUIT
EX,EXIST. EXISTING
FA FIRE ALARM
FMC FLEXIBLE METAL CONDUIT
FO FIBER OPTIC(AL)
FOPP FIBER OPTIC PATCH PANEL
G,GND GROUND
IDF INTERMEDIATE DISTRIBUTION FRAME/FACILITY
ISP INSIDE PLANT
J-BOX JUNCTION BOX
LTG LIGHTING
MCC MOTOR CONTROL CENTER
MDF MAIN DISTRIBUTION FRAME/FACILITY
MTD MOUNTED
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
OC OBJECT CENTER
OSP OUTSIDE PLANT
PH PHASE
PNL PANEL, PANELBOARD
POC POINT OF CONNECTION
POTS PLAIN OLD TELEPHONE SYSTEM
RECEPT RECEPTACLE
RO RACEWAY ONLY
SM SINGLE MODE
TELECOM TELECOMMUNICATIONS
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
TV TELEVISION
TYP TYPICAL
UG UNDER GROUND
UON UNLESS OTHERWISE NOTED
V VOICE
W WIRE, WATT, WALLPHONE
WAP WIRELESS ACCESS POINT
XR EXISTING RELOCATED
ABBREVIATIONS
HEAVY LINEWORK INDICATES NEW WORK
LIGHT LINEWORK INDICATES EXISTING TO REMAIN
CROSS HATCHING INDICATES EXISTING DEVICE OR RACEWAY TO BE REMOVED -
MAINTAIN CIRCUIT CONTINUITY
CONDUIT: ROUTED BELOW FINISHED FLOOR LEVEL
NEW TELECOMMUNICATIONS SYSTEM RACEWAY
NEW SURFACE MOUNTED COMBINATION TELEPHONE/COMPUTER
DATA OUTLET 3 - RJ-45 JACKS. OUTLET SHALL BE MOUNTED 44"
AFF TO THE BOTTOM.
EXISTING CONDUIT: ROUTED UNDERGROUNDUG
KEYNOTE
NEW JUNCTION PULL BOX. MINIMUM SIZE FOR FIBER CABLE
24"Wx24"Hx6"D
CMH EXISTING COMMUNICATIONS MANHOLE
A
C
EXISTING WIRELESS ACCESS POINT. LOCATION OF NEW TELECOM
BISCUIT.
EXISTING SECURITY CAMERA
NEW TELECOMMUNICATIONS GROUNDING BAR
NEW KEY PAD / SCRAMBLE PAD
DS
CR
ES
TGB
NEW DOOR POSITION SWITCH (RECESSED IN DOOR FRAME)
NEW ELECTRIC STRIKE
NEW CLOSED CIRCUIT TELEVISION CAMERA
NEW CABLE TRAY (SNAKE TRAY TYPE)
MS EXISTING MOTION DETECTOR
NEW TELECOM RACK
NEW CONDUIT SLEEVE
1. PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION. MATERIALS AND WORKMANSHIP SHALL FULLY COMPLY WITH THE REQUIREMENTS OF OIT INFRASTRUCTURE STANDARD FOR TELECOM SPACES, BICSI/TDMM, AND TIA/EIA STANDARDS
UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
2. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH THE CURRENT NATIONAL ELECTRICAL CODE, NFPA 72, ASME A17.1, STATE AMENDMENTS, CURRENT VA STANDARDS AND NECA STANDARDS OF
INSTALLATION.
3. ALL BACKBONE CABLE RUNS SHALL HAVE 10' MAINTENANCE LOOPS AT BOTH ENDS. ALL HORIZONTAL
CABLE RUNS SHALL HAVE 10' MAINTENANCE LOOPS AT THE TR END.
4. ALL ELECTRICAL / TELECOM / SECURITY EQUIPMENT AND MATERIALS SHALL BE LISTED AND LABELED
FOR THEIR INTENDED APPLICATION BY A NATIONALLY RECOGNIZED TESTING LABORATORY
ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION.
5. PLANS DO NOT REFLECT ALL EXISTING UTILITIES AND STRUCTURES. VERIFY LOCATION OF ALL EXISTING UTILITIES AND STRUCTURES AFFECTING THE WORK. NOTIFY THE CONTRACTING OFFICER IN
WRITING OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THOSE SHOWN IN THE
CONTRACT DOCUMENTS WHICH ADVERSELY IMPACT THE WORK.
6. EXISTING EQUIPMENT INFORMATION SHOWN ON THESE DRAWINGS SHOULD BE FIELD VERIFIED.
CONFIRM NEW EQUIPMENT LOCATIONS WITH OWNER AND ADJUST AS REQUIRED.
7. MAINTAIN A MINIMUM 6" CLEARANCE BETWEEN CONDUIT AND PIPING. MAINTAIN A MINIMUM 12" CLEARANCE BETWEEN CONDUIT AND HEAT SOURCES SUCH AS FLUES, HEATING PIPES, AND HEATING
APPLIANCES.
8. ANY PENETRATION OF THE BUILDING VAPOR BARRIER SYSTEM SHALL BE APPROPRIATELY SEALED TO RETAIN THE INTEGRITY OF THE WALL SYSTEM. THIS INCLUDES, BUT IS NOT LIMITED TO, CONDUITS AND
RECESSED BACK BOXES.
9. DRAWINGS ARE SCHEMATIC ONLY AND DO NOT SHOW ALL EXISTING AND NEW CONDUIT AND
CONNECTIONS BETWEEN RESPECTIVE DEVICES AND FIXTURES. CONTRACTOR SHALL DETERMINE THE EXACT ROUTING OF CONDUIT, CABLE TRAY, CABLE, AND WIRING CONNECTIONS BETWEEN RESPECTIVE
DEVICES AND FIXTURES FOR A COMPLETE AND OPERATIONAL SYSTEM.
10. IDS AND ACS ENCLOSURES, CABINETS, HOUSINGS, BOXES, AND FITTINGS HAVING HINGED DOORS OR REMOVABLE COVERS WHICH CONTAIN CIRCUITS OR CONNECTIONS OF THE SYSTEM AND ITS POWER SUPPLIES SHALL BE PROVIDED WITH COVER OPERATED, CORROSION RESISTANT TAMPER SWITCHES ARRANGED TO INITIATE AN ALARM SIGNAL WHEN THE DOOR OR COVER IS REMOVED. PROVIDE TAMPER
SWITCHES IN ACCORDANCE WITH SPECIFICATION SECTION 28 16 00.
11. COORDINATE DOOR HARDWARE SELECTION AND INSTALLATION REQUIREMENTS BETWEEN
ARCHITECTURAL, SECURITY, TELECOM, FIRE ALARM, AND ELECTRICAL. DOOR PROCUREMENT AND INSTALLATIONS SHALL BE COORDINATED TO FACILITATE IDS AND ACS SYSTEM INSTALLATION. REFER
TO DRAWINGS AND SPECIFICATION 28 05 00 FOR ADDITIONAL INFORMATION.
12. COORDINATE CABLE TRAY ROUTING AND INSTALLATION TO AVOID CONFLICTS BETWEEN ALL TRADES.
MAINTAIN A MINIMUM 12" WORKING CLEARANCE ABOVE TOP OF CABLE TRAY.
13. CONTRACTOR SHALL VERIFY THE SIZE OF ALL CONDUCTORS, CONDUIT, AND JUNCTION BOXES (40 % MAXIMUM FILL). INSTALLATION SHALL BE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE (NEC)
AND ALL LOCAL CODES HAVING JURISDICTION.
14. CONTRACTOR SHALL PROVIDE AND INSTALL EQUIPMENT AND HARDWARE IN ORDER TO MEET THE INTENT OF THE DESIGN AND TO PROVIDE THE OWNER WITH A COMPLETE AND FULLY OPERATIONAL SYSTEM AS SPECIFIED. QUESTIONS REGARDING THE INTENT OF THE DESIGN SHALL BE PROMPTLY
BROUGHT TO THE ATTENTION OF THE DOR.
15. ALL CONDUIT RUNS AND CABLE TRAY SHOWN ARE DIAGRAMMATICAL. REPORT ANY MAJOR DEVIATION
TO DOR FOR REVIEW.
16. THE GENERAL LOCATION OF THE BACKBONE CONDUIT FOR THE TELECOM ROOMS HAS BEEN ON THESE DRAWINGS. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF THE CONDUIT(S) AND LADDER RACK
TYPE CABLE TRAY(S).
17. PROVIDE PHASING PLAN TO VA COR. REFER TO PLANS AND SPECIFICATIONS FOR DETAILS OF ALL
WORK REQUIRED FOR EACH COVERAGE AREA AND TELECOM ROOM/AREA.
18. BUILDING 1 NOTE ONLY - DEMOLITION OF EXISTING CABLE TRAY, AS SHOWN, SHALL BE PERFORMED AFTER ALL NEW CABLE HAS BEEN INSTALLED AND EXISTING ABANDONED CABLE IS REMOVED. A SURVEY SHALL BE PERFORMED WITH THE VA COR TO CONFIRM THE CABLE TRAY TO BE REMOVED.
REFER TO DIVISION 1 SPECIFICATIONS FOR ADDITIONAL BIDDING REQUIREMENTS FOR THIS WORK.
19. ALL DATA CONNECTIONS (MODIFIED IN THIS SCOPE OF WORK) ARE REQUIRED TO BE FIELD VERIFIED AND DOCUMENTED IN AS-BUILT DRAWINGS. A TONER, OR SIMILAR APPROVED DEVICE/METHOD, SHALL
BE USED TO TRACE EXISTING DATA CONNECTIONS PRIOR TO DEMOLITION.
20. WHERE THE TERM "DATA DROP" IS USED THROUGHOUT THIS PACKAGE, THIS TERM IS INCLUSIVE OF
DATA AND PHONE CONNECTIONS.
21. NOT ALL DIMENSIONS ARE SHOWN ON THESE PLANS. REFER TO ARCHITECTURAL PLANS FOR
ADDITIONAL DIMENSIONS .
GENERAL NOTES
EXISTING REQUEST TO EXITREX
EXISTING CABLE TRAY
EXISTING CABLE TRAY (CABLE LADDER RACK)
EXISTING ACCESS CONTROL PANEL
* - INDICATES WHERE MULTIPLE PANELS ARE LOCATED IN AN
AREA. FOR EXAMPLE X3 WOULD INDICATE THERE ARE THREE (3)
ACCESS CONTROL PANELS IN THIS AREA
ACP
NEW CABLE TRAY (CABLE LADDER RACK)
EXISTING CABLE TROUGH / GUTTER
WORKING CLEARANCE
EXISTING COMBINATION TELEPHONE/COMPUTER DATA
OUTLET, 3 - RJ-45 JACKS
EXISTING TELECOMMUNICATIONS GROUNDING BAR
EXISTING KEY PAD / SCRAMBLE PADCR
ES
TGB
EXISTING ELECTRIC STRIKE
EXISTING TELECOM RACK
NEW VERTICAL CABLE MANAGER
EXISTING VERTICAL CABLE MANAGER
NEW PROTECTED ENTRANCE TERMINALPET
NEW TELECOMMUNICATIONS MAIN GROUNDING BAR (TMGB)TMGB
DS EXISTING DOOR POSITION SWITCH (RECESSED IN DOOR FRAME)
EXISTING JUNCTION PULL BOX
WORK AREA CLEARANCE
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.00
JD MC
TELECOMMUNICATION SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
MAIN,11,14,23,25,27
Fire Lane
Pedestrian Bridge
South Road
N o r t h
R o a d
G i l m a n
D r i v e
E a s t
R o a d
COURTYARD
UCSD OWNED
S
A
N
D
A
G
M
C
C o l l e y
S a t i o n
C
O M
M
C
O N
D U
I T
D
I A
P
V
U R
F A
C E
CALL BOX
D
U
E
L
E
N
T
R
A
L
O
N
T
R
O
L
F
A
D
I A
P
V
M
I N
UG
4-5" DUCTS
UG
D
U
C
T
S
CALL BOX
UG
CMHCMH
UG
UG
UG
CMH
CMH
T T
T T
T
CMH
T T
T
CMH
T
T
T
T
T
T
T
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
DI S A B L E D V E T E R A N + E M P L OY E E OW N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.02
JC MC
TELECOMMUNICATION SITE PLAN
GENERAL NOTES
TELECOMMUNICATION SITE PLAN
SCALE: 1" = 40'
1. EXISTING UNDERGROUND AND ABOVE GROUND TELECOM INFRASTRUCTURE SHOWN IS BASED ON AS
BUILT DATA. PRIOR TO CONSTRUCTION, ALL UNDERGROUND AND ABOVE GROUND ROUTING SHALL BE
CONFIRMED AND PRESENTED TO THE VA COR.
2. ALL OUTSIDE PLANT FIBER SHALL BE PULLED IN EXISTING INFRASTRUCTURE.
3. PROVIDE PULL STRING WITH NEW FIBER CABLE PULLS.
4. REFER TO SHEETS T-00.60, T-00.61, AND T-00.62 FOR IT SYSTEM RISER DIAGRAMS.
MAIN,11,14,23,25,27
SEE SHEETS T-11.1* FOR
OVERALL FLOOR PLANS
SEE SHEETS T-27.1* FOR
OVERALL FLOOR PLANS
MDF ROOM 1119.B
1ST FLOOR
MDF ROOM BB102A IN
BASEMENT
MDF ROOM B165 IN
BASEMENT
MDF ROOM 126
1ST FLOOR
MDF ROOM 104
1ST FLOOR
SEE SHEET T-23.11 FOR
OVERALL FLOOR PLAN
SEE SHEET T-25.11 FOR
OVERALL FLOOR PLAN
MDF ROOM 101 (FOR
BLDG 14) 1ST FLOOR
SEE SHEET T-14.11 FOR
OVERALL FLOOR PLAN
SEE SHEETS T-01.1* FOR
OVERALL FLOOR PLANS
KEY NOTES
PROVIDE SIX (6) 2" INNERDUCTS FOR NEW BACKBONE FIBER FROM BUILDING 11 ROOM BB102A TO TELECOM
ROOMS IN BUILDINGS 1, 14, 23, AND 25. INNERDUCT SHALL BE SECURED TO EXISTING PIPE RACK. LOCATION
OF NEW INNERDUCT SHALL NOT IMPEDE ACCESS TO EXISTING PIPING ON RACK.
INNERDUCT 1 - TWO (2) 96 STRAND FIBER TO BUILDING 1 ROOM B165.
INNERDUCT 2 - ONE (1) 96 STRAND FIBER AND ONE (1) 72 STRAND FIBER TO BUILDING 1 ROOM B165.
INNERDUCT 3 - SEVEN (7) 24 STRAND FIBER TO BUILDING 1 TELECOM ROOMS.
INNERDUCT 4 - SEVEN (7) 24 STRAND FIBER TO BUILDING 1 TELECOM ROOMS.
INNERDUCT 5 - SIX (6) 24 STRAND FIBER TO BUILDING 1 TELECOM ROOMS.
INNERDUCT 6 - THREE (3) 24 STRAND FIBER TO BUILDINGS 14, 23, AND 25 TELECOM ROOMS.
FOR CONTINUATION, REFER TO SHEET T-01.10.
FOR CONTINUATION, REFER TO SHEET T-11.10.
EXISTING PATHWAY BETWEEN BUILDING 27 AND BUILDING 11. PROVIDE ONE (1) 24 STRAND OS2 FIBER CABLE
IN EXISTING INFRSTRUCTURE. EXISTING SINGLE MODE AND MULTIMODE FIBER CABLE SHALL BE REMOVED
BACK TO SOURCE ONCE NEW FIBER CABLE IS INSTALLED. BUILDING 27 SHALL REMAIN OPERATIONAL DURING
THIS FIBER UPGRADE. CONTACT VA COR IMMEDIATELY IF SHUT DOWN IS REQUIRED.
EXISTING PATHWAY BETWEEN BUILDING 14 AND BUILDING 1. PROVIDE ONE (1) 24 STRAND OS2 FIBER CABLE
IN AND ONE (1) 25 PAIR CAT 3 COPPER CABLE IN EXISTING INFRASTRUCTURE. EXISTING FIBER CABLE AND
COPPER CABLE SHALL BE REMOVED BACK TO SOURCE ONCE NEW FIBER CABLE IS INSTALLED. BUILDING 14
SHALL REMAIN OPERATIONAL DURING THIS FIBER UPGRADE. CONTACT VA COR IMMEDIATELY IF SHUT DOWN
IS REQUIRED.
EXISTING PATHWAY BETWEEN BUILDING 23 AND BUILDING 1. PROVIDE ONE (1) 24 STRAND OS2 FIBER CABLE
IN EXISTING INFRASTRUCTURE. EXISTING FIBER CABLE SHALL BE REMOVED BACK TO SOURCE ONCE NEW
FIBER CABLE IS INSTALLED. BUILDING 23 SHALL REMAIN OPERATIONAL DURING THIS FIBER UPGRADE.
CONTACT VA COR IMMEDIATELY IF SHUT DOWN IS REQUIRED.
EXISTING PATHWAY BETWEEN BUILDING 25 AND BUILDING 1. PROVIDE ONE (1) 24 STRAND OS2 FIBER CABLE
IN EXISTING INFRASTRUCTURE. EXISTING FIBER CABLE SHALL BE REMOVED BACK TO SOURCE ONCE NEW
FIBER CABLE IS INSTALLED. BUILDING 25 SHALL REMAIN OPERATIONAL DURING THIS FIBER UPGRADE.
CONTACT VA COR IMMEDIATELY IF SHUT DOWN IS REQUIRED.
ROOM B135
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.40
JC MC
TELECOMMUNICATIONS OVERVIEW TABLE
MAIN,11,14,23,25,27
GENERAL NOTES
1. THIS TABLE REFLECTS MAJOR TELECOMMUNICATIONS WORK UNDER THIS SCOPE. NOT ALL
SCOPE ITEMS ARE SHOWN.
NOTES:
* CATEGORY CABLE SHALL BE REPLACED FOR FEEDS TO ROOMS IN THE COVERAGE AREAS OF B165. CABLE FEEDING DEVICES WITHIN THIS ROOM ARE EXISTING TO REMAIN.
** OUTLETS INCLUDE NEW FACEPLATES AND CAT6A RJ-45 JACKS. FOR WIRELESS ACCESS POINTS, THE OUTLETS INCLUDE BISCUITS AND CAT6A RJ-45 JACKS.
DETAIL NOTES:
TO DATA OUTLETS
CA
T6
A
CA
T6
LADDER TRAY
SINGLEMODE OR MULTIMODE
FIBER OPTIC CABLE
REFER TO RISER FOR
QUANTITY AND TYPE
1. PROVIDE WIRING IN ACCORDANCE WITH T568A.
2. ONLY RACK 1 AND RACK 2 ARE SHOWN. REFER
TO RACK RISERS FOR ADDITIONAL RACKS.
3. TELECOM RACK ELEVATIONS ARE DIAGRAMMATIC
AND DO NOT REPRESENT EXACT EQUIPMENT
LOCATIONS. SEE TELECOM PLANS FOR
EQUIPMENT LOCATIONS.
4. THIS DETAIL APPLIES TO NEW AND EXISTING
TELECOM ROOMS. HOWEVER, EXISTING
TELECOM ROOMS MAY NOT REQUIRE NEW
CONDUIT SLEEVES, DATA RACKS, AND LADDER
TRAY. REFER TO ENLARGED PLANS OF EACH
TELECOM ROOM FOR REQUIREMENTS.
KEY NOTES:
REFER TO RACK LAYOUTS ON SHEETS T-01.70 - T-01.78,
T-11.70 - T-11.71, T-14.70, T-23.70, T-25.70, AND T-27.70 FOR
TOTAL NUMBER OF PATCH PANELS AND WIRE
MANAGEMENT FOR RACK 2 AND ADDITIONAL RACKS (IF
APPLICABLE) IN EACH TELECOM ROOM.
2U HORIZONTAL CABLE MANAGER.
7 FOOT VERTICAL WIRE MANAGEMENT. REQUIRED ON EACH
SIDE OF THE RACK AND BETWEEN RACKS.
TWO POST RACK.
2U, 48 PORT COPPER PATCH PANEL WITH CAT 6A
KEYSTONES.
1U, 24 LC CONNECTOR FIBER OPTIC PATCH PANEL. LC
CONNECTORS SHALL BE PROVIDED.
5 FOOT, VERTICAL RACK MOUNTED POWER DISTRIBUTION
UNIT (PDU).
2U UNINTERRUPTIBLE POWER SUPPLY(UPS). PROVIDE ONE
(1) UPS IN EACH RACK 1 AND RACK 2. IF THERE ARE RACKS
1A AND 1B, PROVIDE UPS IN THESE RACKS AND OMIT THE
UPS IN RACK 2.
8 FOOT, 3/4 INCH FIRE RATED PLYWOOD BACKBOARD.
BOARD MUST BE PAINTED BUT ALLOW FOR FIRE RATING
LABELS TO BE VISIBLE.
CONDUIT SLEEVES FOR NEW TELECOM ROOMS ONLY.
REFER TO PLAN SHEETS FOR QUANTITY. REUSE EXISTING
SLEEVES FOR EXISTING TELECOM ROOMS.
1U, 24 PORT, 110-STYLE COPPER PATCH PANEL WITH CAT6
KEYSTONES. PROVIDE ONE PAIR PER JACK. PAIRS 24 AND
25 WILL BE A SINGLE TWO PAIR JACK IN POSITION 24
ALL HORIZONTAL CABLE SHALL BE CAT6A EXCEPT WHERE
EXISTING CABLE IS CAT6 TO BE REUSED.
WHERE RACK 1 IS SPLIT INTO RACKS 1A AND 1B, ALL
COMPONENTS SHOWN SHALL BE PROVIDED. HOWEVER,
ONLY ONE (1) FIBER PATCH PANEL AND ONE (1) 110-TYPE
PATCH PANEL SHALL BE PROVIDED PER TELECOM ROOM
LISTED IN THIS SCOPE UNLESS OTHERWISE INDICATED IN
THESE PLANS.
RACK 2 REPRESENTS ALL RACKS BEYOND RACK 1.
THEREFORE, IF RACKS 3, 4, 5, AND BEYOND ARE INDICATED
ON THESE PLANS, PROVIDE ALL COMPONENTS FOR
AFOREMENTIONED RACKS AS SHOWN FOR RACK 2. WITH
THE EXCEPTION OF THE UPS AND PDU WHICH ARE ONLY
PROVIDED FOR RACKS 1 AND 2.
EZ PATH FIRE STOPPING MATERIAL. REFER TO ENLARGED
PLANS FOR FILL REQUIREMENTS. PROVIDED ONLY FOR NEW
TELECOMMUNICATIONS ROOMS.
PROVIDE ONE (1) CABLE WATERFALL / DROPOUT FOR EACH
RACK.
REFER TO ENLARGED PLANS FOR LADDER RACK
DIMENSIONS.
INSTALL CLIENT PROVIDED CISCO SWITCHES. INSTALLATION
INCLUDES PLACING EQUIPMENT ON THE RACK,
CONNECTING PATCH CABLE, AND STACKING SWITCHES.
SWITCHES SHALL BE STACKED USING THE CISCO RING
TOPOLOGY. WHERE EXISTING SWITCHES ARE REMOVED
DURING CONSTRUCTION AND REINSTALLED, DOCUMENT
STACKING WIRING PRIOR TO REMOVAL. RECONNECT AS
PREVIOUSLY INSTALLED. STACKING CABLE FOR NEW
SWITCHES SHALL BE PROVIDED BY THE CONTRACTOR.
WIRE MANAGEMENT
LOOP (10 FT MINIMUM)
RACK 1
TYPICAL
RACK 1 OR 1A
FIBER OPTIC PATCH PANEL
SPACE ALLOCATED FOR VA EQUIPMENT
4" CONDUIT SLEEVES
(TYP)
UPS
2U HORIZONTAL CABLE MANAGER
SPACE
DEDICATED
FOR VA
PROVIDED
EQUIPMENT
UPS UPS
CA
T3
ST
CA
T6
A CA
T6
A
RACK 2
INTERSTITIAL SPACE
CABLE TRAY
(SNAKE TRAY TYPE)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
25 PR
24 PORT 110 STYLE PATCH PANEL
(TYP.)
CA
T3
ST
REFER TO RISER DIAGRAMS
FOR CABLE QUANITITY
AND TYPE
(TYP.)
TGB
"D" RING (TYP.)
4" CONDUIT SLEEVES
(TYP)
LADDER TRAY
TYPICAL
RACK 1B (IF APPLICABLE)
UPS
SPACE
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
AND ADDITIONAL CABLE MANAGERS AS
NEEDED. REFER TO THE TABLE ON THIS
SHEET.
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE ALLOCATED FOR VA EQUIPMENT
2U HORIZONTAL CABLE MANAGER
SPACE
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E OW N E D
www.davyarchitecture.com
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.50
JC MC
TELECOMMUNICATIONS DETAILS
GENERAL NOTES
MAIN,11,14,23,25,27
1. ALL PATCH CORDS SHALL BE CAT6A TYPE. PATCH CORD LENGTH SHALL BE
DETERMINED BASED ON THE WIRE MANAGEMENT PATH AND LOCATION OF
PORT CONNECTIONS. CABLE LENGTH SHALL NOT BE EXCESSIVE.
STRUCTURED CABLING SHALL HAVE SLACK, BUT ALSO SHALL BE
PRESENTABLE AND ORGANIZED.
2. WHERE IT IS UNCLEAR WHICH CABLE TO COLOR TO USE FOR HORIZONTAL
AND PATCH CABLE, CONTACT THE VA COR FOR DIRECTION.
3. EXISTING TO REMAIN CAT6 AND CAT6A CABLE SHALL BE DISCONNECTED
FROM EXISTING PATCH PANELS DURING DEMOLITION OF TELECOM
EQUIPMENT IN THIS ROOM. CABLE SHALL BE PROTECTED DURING
DEMOLITION. THE EXISTING CAT6 CABLE SHALL BE RECONNECTED TO NEWLY
INSTALLED PATCH PANELS. CAT6 CABLE SHALL BE CONNECTED TO PATCH
PANELS LOCATED CLOSEST TO THE TOP OF THE TELECOM RACK. WHERE
EXISTING CAT6 CABLE LENGTHS CANNOT REACH NEW PATCH PANEL
LOCATIONS, THE ENTIRE CABLE RUN SHALL BE REPLACED WITH CAT6A
CABLE.
4. REFER TO ARCHITECTURAL PLANS FOR TELECOMMUNICATIONS ROOM
DIMENSIONS.
5. ALL TELECOMMUNICATIONS ROOMS (NEW AND EXISTING) SHALL HAVE RACK
LAYOUTS PRESENTED TO THE VA COR FOR FINAL APPROVAL.
6, CABLE COLOR CODING TABLES ARE APPLICABLE FOR NEW CABLE ONLY.
EXISTING CABLE COLORS MAY OR MAY NOT FOLLOW THE INFORMATION ON
THESE TABLES. EXISTING TO REMAIN CABLE CONNECTIONS SHALL BE
VERIFIED AS NEEDED.
TYPICAL RACK RISER DETAIL FOR TELECOMMUNICATIONS ROOMS
SCALE: 3/4" = 1'-0"
TYPICAL LAYOUT FOR RACK 1 (1A / 1B)
SCALE: N.T.S.
NOTE:
1. WHERE ONLY ONE RACK/CABINET IS PROVIDED, FOR
SPECIFIC TELECOMMUNICATIONS ROOMS, PROVIDE A
MINIMUM SIX (6) 2U HORIZONTAL CABLE MANAGERS IN
RACK/CABINET 1.
2. THE QUANTITY OF 2U HORIZONTAL CABLE MANAGERS
PROVIDED IN RACK 2 SHALL BE PROVIDED FOR RACK 1.
A MINIMUM OF SIX (6) IS REQUIRED FOR BOTH
RACKS/CABINETS.
NOTES:
1. NOT ALL EQUIPMENT / DEVICES ARE SHOWN IN THIS TABLE. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL ITEMS REQUIRED TO ENSURE
SYSTEMS ARE FULL FUNCTIONAL AND CODE COMPLIANT.
2. WHERE MODEL NUMBERS ARE NOT SHOWN, PROVIDE EQUIPMENT / DEVICES THAT ARE UL OR NTL COMPLIANT.
3. REFER TO SPECIFICATION AND DETAIL SHEETS FOR ADDITIONAL EQUIPMENT, DEVICES, ACCESSORIES, ETC. THAT MAY NOT BE LISTED IN THIS
TABLE.
F
G B
F
M G
B
24 [610]
FRONT VIEW
1.12 [28] (x3)
INSULATION
MOUNTING
HOLES
UNITS: INCHES [MM]
SIZING OF TELECOM BONDING BACKBONE
TBB LENGTH
LINEAR FT
<=52
53-66
67-84
85-105
106-125
INSULATOR POST
STANDOFF BRACKET
2" MINIMUM
SIDE VIEW
126-150
151-175
176-250
1/0
2/0
3/0
4/0
250 kcmil
300 kcmil
350 kcmil
500 kcmil
4.2790
5.8 [147]
6.75 [171]
MOUNT
4" MINIMUM
TWO HOLE COMPRESSION LUG
CONNECTOR WITH INSPECTION WINDOW
1.5000
M
I N
END VIEW
12.5
LABELING:
EXAMPLE CONDUCTOR ROUTING
Ø
Ø x
Ø
Ø
P
C
S
Ø
Ø
P
C
S
TBB SIZE (AWG)
NO RADIUS
BENDS >90°
TGB IN
ADJACENT TR
CABLE TRAY
STRUCTURAL STEEL
12.2
12.6
DO NOT OBSTRUCT
HOLES
DO NOT ROUTE
ENTRANCE BEHIND
BAR
DUCT (IF
APPLICABLE)
ACEG
TGB OR TMGB
12.1
12.3
A. "TGB" OR "TMGB" ON BUSBAR.
B. EACH TBC SHALL BE GREEN OR MARKED WITH GREEN.
C. EACH CONDUCTOR SHALL BE LABELED AS SHOWN IN THIS
DETAIL.
BEVELED
ENTRY
DIE AND COLOR CODE
INSPECTION WINDOW
ELECTRO-TIN PLATED
IF THIS CONNECTOR OR CABLE IS
LOOSE OR MUST BE REMOVED,
PLEASE CALL THE BUILDING
TELECOMMUNICATIONS MANAGER
FROM
MAIN
GROUND
BAR (FOR TMGB)
OR
TMGB
(FOR TGB)
12.4
TGB AND TMGB BONDING DETAIL
SCALE: N.T.S.
RACKS
12.7
251-300
>=301
600 kcmil
750 kcmil
A
4" ID RGS CONDUIT
FIRESTOP MATERIAL
5" ID RGS SLEEVE
4" ID RGS CONDUIT
1" ABOVE SLAB
FINISHED CONCRETE
FLOOR SLAB
TYP. FOUR CONCRETE
ANCHORS
FIRESTOP MATERIAL
SEE NOTE BELOW
5" ID RGS SLEEVE
SECTION A
CONDUIT SLEEVES BETWEEN FLOORS
SCALE: N.T.S.
NOTE: COORDINATE WITH ARCHITECTURAL PLANS AND FIRE STOPPING SPECIFICATION FOR FIRE STOP RATING REQUIREMENTS.
FRONT VIEW
SIDE VIEW
INTUMESCENT MATERIAL
EZ-PATH FIRESTOP DEVICE
STEEL WALL PLATE
AND GASKET
TELECOMMUNICATIONS
COPPER AND OPTICAL
FIBER CABLES
EZ-PATH FIRESTOP DEVICE TELECOMMUNICATIONS
COPPER AND OPTICAL
FIBER CABLES
STEEL WALL PLATE
AND GASKET (TYPICAL)
AFFIX CABLE TRAY TO
WALL THAT SHALL BE
NO MORE THAN 2" FROM
BOTTOM OF SLEEVE
GYPSUM BOARD OPENING
SHALL
BE 3-1/4"Wx3-1/4"H MAX.
GYPSUM BOARD
OPENING SHALL
BE AS SHOWN ON
ARCHITECTURAL
DETAILS.
SCALE: N.T.S.
THROUGH WALL FIRE STOPPING (EZ PATH) DETAIL
FOR NEW TELECOM ROOMS
PET
(IF APPLICABLE)
12.8
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.51
JC MC
TELECOMMUNICATIONS DETAILS
GENERAL NOTES
MAIN,11,14,23,25,27
1. THE COMPLETED INSTALLATION SHALL COMPLY WITH THE VA TELECOMMUNICATIONS AND SPECIAL
TELECOMMUNICATIONS SYSTEMS DESIGN MANUAL, SPECIFICATION SECTION 27 05 26, AND ANSI/TIA-607-B.
2. PROVIDE ALL TELECOMMUNICATION SPACES AND CABLING PATHWAYS IN ACCORDANCE WITH TIA-569-B.
3. TGB SHALL HAVE MINIMUM DIMENSION OF 2"W X 24"L X 1/4" THICK.
TMGB SHALL HAVE MINIMUM DIMENSION OF 4"W X 24"L X 1/4" THICK.
PROVIDE LENGTH SO AS TO PROVIDE NO. OF CONDUCTOR MOUNTING HOLES FOR CURRENT PROJECT PLUS
100% SPARES.
4. TGB/TMGB SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY.
5. TGB/TMGB SHALL BE INSULATED FROM ITS SUPPORT BY A MINIMUM OF 2".
6. TGBTMGB SHALL BE PREDRILLED WITH 2-HOLE PATTERN.
7. TGB/TMBG SHALL BE LOCATED SO THAT IT IS ACCESSIBLE TO TELECOMMUNICATIONS PERSONNEL WHILE
PROVIDING SHORTEST PATH TO GROUND.
8. THE BUSBAR SHALL BE CLEANED PRIOR TO FASTENING OF CONDUCTORS AND AN ANTI-OXIDANT SHALL BE
APPLIED TO THE LUG CONTACT AREA TO CONTROL CORROSION AND REDUCE CONTACT RESISTANCE.
9. PROVIDE TWO HOLE COMPRESSION LUGS ON CONDUCTORS.
10. PROVIDE ONE CONDUCTOR PER SET OF HOLES UTILIZING BOLTS MATCHING HOLE SIZE.
11. REFER TO SPECIFICATION 27 05 26 FOR GROUND BAR MATERIALS.
12. TGB CONNECTIONS:
12.1. ENTRANCE DUCT/CONDUIT.
12.2. BUILDING STRUCTURAL STEEL.
12.3. PANEL BOARD ALTERNATING CURRENT ELECTRICAL GROUND (ACEG).
12.4. TELECOM BONDING CONDUCTOR (TBC).
12.5. TELECOM BONDING BACKBONE (TBB).
12.6. TELECOM CABLE TRAY, LADDER, RACEWAY.
12.7. TELECOM RACKS & ELECTRONIC EQUIPMENT .
12.8. TELECOM PROTECTED ENTRANCE TERMINALS (PET).
CABLE TRAY
CABLE TRAY TO OUTLET DETAIL (CAT6A)
SCALE: N.T.S.
INTERSTITIAL SPACE
WALL OUTLET
OR END DEVICE
INSTALL CAT6A TO
TELECOM OUTLET VIA
EXISTING CONDUIT IF
CABLE REQUIRES
UPGRADE.
THREE (3) NEW CAT6A
CABLE IN EXISTING
CONDUIT.
TO ROOM
PATCH RACK
DATA
CONNECTOR TYPE
DATA
RJ45
RJ45
CABLE TERMINATION SCHEDULE
RJ-45 CAT 6A
DATA
MODULE
(TYP OF 3)
TYPICAL DATA/TELEPHONE
OUTLET
XX-XXXXX-X-XX
BUILDING NUMBER
IDF ROOM NUMBER
PATCH PANEL PORT NUMBER
PATCH PANEL
BLANK COVER
RJ45
COLOR
WHITE
BLUE
GRAY
TELECOMMUNICATION ROOM XXX
TELECOM OUTLET DETAIL (TYPICAL)
SCALE: N.T.S.
(WHITE)
(BLUE)
(GRAY)
NOTE: FOR EXISTING OUTLETS TO BE REPLACED, OUTLET HEIGHT AND LOCATION SHALL MATCH EXISTING
TELECOMMUNICATION ROOM XXX
TELECOMMUNICATION ROOM XXX
W-BR
PAIR 4
31 2 4 65
W-O
G W-BL OBL
PAIR 3
PAIR 1
PAIR 2
7 8
BR
RJ-45 CONNECTOR
8 POSITION/8 CONDUCTOR, CATEGORY 6A
W-G
EIA/TIA - 568A WIRING
SCALE: N.T.S.
ENCLOSURE IS EQUIPPED TO HOUSE SPLICE TRAYS (NOT SHOWN)
IN REAR COMPARTMENT AND MODULAR LC CONNECTOR PLATES
ON FRONT.
TYP. 1 RMU FIBER OPTIC
SPLICING/PATCHING
ENCLOSURE
TYP. FO CONNECTOR PLATE.
(24 STRAND, 12 DUPLEX LC
CONNECTORS SHOWN)
TYPICAL 1U RACK-MOUNTED FIBER OPTIC PATCH PANEL
SCALE: N.T.S.
DETAIL 3 NOTES:
1. DATA DROPS WILL BE IN A THREE JACK CONFIGURATION ON A FOUR PORT
FACEPLATE MOUNTED ON A SINGLE GANG BOX OR MUD RING.
2. ALL DROPS SHALL BE WIRED TO A T568A STANDARD.
3. ONLY WHITE, SINGLE GANG WITH FOUR (4) OPENINGS, FLUSH MOUNT VERTICAL
CLASSIC SERIES FACEPLATES SHALL BE USED.
4. FACEPLATES MUST BE MOUNTED WITH RJ45 TABS FACING DOWN.
5. FACEPLATES WILL BE LABELED IN ACCORDANCE WITH VA SPECIFICATIONS
5.1. NUMBERING CONVENTION
5.1.1. BUILDING NUMBER (WHERE APPLICABLE).
5.1.2. FLOOR, TO INCLUDE WING DESIGNATION IF APPLICABLE
5.1.3. PANEL
5.2. JACKS ARE TO BE LABELED AS: BUILDING – IDF – PATCH PANEL – JACK PORT
NUMBER. FOR EXAMPLE, IN A TYPICAL 3 JACK FACEPLATE BUILDING 1, IDF
ROOM NUMBER B116, PATCH PANEL C, JACK LOCATION 07 IS TO BE
IDENTIFIED AS 1-B116-C-07. FROM THIS IT WILL BE ASSUMED THAT THE BLUE
AND WHITE JACKS ARE C-08 AND C-09 RESPECTIVELY.
6. PRIOR TO LABELING, CONTRACTOR SHALL OBTAIN APPROVAL FROM VA COR TO
ENSURE PROPOSED NUMBERING SCHEME MEETS OIT STANDARDS.
7. ALL 48-PORT PATCH PANELS SHALL HAVE GRAY, BLUE, AND WHITE. TERMINATE
THE WORKSTATION END WITH GRAY, BLUE, AND WHITE KEYSTONE JACKS IN THE
LAYOUT SHOWN, AND TERMINATE THE IDF END WITH THE CORRESPONDING
GRAY, BLUE, OR WHITE RJ45 PORT ON THE PATCH PANEL
DATA
DETAIL 6 NOTES:
1. ALL 48-PORT PATCH PANELS SHALL HAVE GRAY, BLUE,
AND WHITE.
2. PATCH PANELS SHALL BE LABELED ALPHABETICALLY IN
SEQUENTIAL ORDER FROM THE TOP POSITION DOWN,
STARTING WITH “A” BUT SKIPPING “I” AND “O.”
3. SINGLE CABLE DROPS (WALL PHONES, WALL MOUNTED
DISPLAY SCREENS, ETC.) SHOULD BE TERMINATED AT THE
BOTTOM OF THE LAST PANEL, SO AS TO NOT DISRUPT THE
THREE-JACK CONSECUTIVE NUMBERING SCHEME.
4. JACKS ON THE PATCH PANELS DO NOT NEED TO BE
INDIVIDUALLY LABELED, PROVIDED THEY FOLLOW THE
THREE-JACK SEQUENCE NUMBERING SCHEME AS
INDICATED ON DETAIL 3 ON SHEET T-00.52 AND
CORRESPOND TO THE FACEPLATES IN WHICH THEY ARE
CONNECTED.
5. PATCH PANELS MUST BE MOUNTED WITH RJ45 TABS
FACING DOWN.
CAT6A PATCH PANEL
SCALE: N.T.S.
CORE SWITCH RACK (BB102A) FIBER PATCH PANEL RACK (BB102)
FIBER PATCH PANEL RACK (B165) TYPICAL TELECOM ROOM RACK 1
PRIMARY CORE SWITCH
(NIC)
SECONDARY CORE SWITCH
(NIC)
24 PORT FIBER PATCH PANEL
72 PORT FIBER PATCH PANEL
96 PORT FIBER PATCH PANEL
72 PORT FIBER PATCH PANEL
96 PORT FIBER PATCH PANEL
24 PORT FIBER PATCH PANEL
48 PORT SWITCH (NIC)
DIAGRAMMATIC DETAIL OF FIBER CABLE CONNECTIONS
SCALE: N.T.S.
DETAIL 4 NOTES:
1. PROVIDE ONE (1) 2 STRAND FIBER CABLE WITH SFP
TRANSCEIVER CONNECTOR FOR CONNECTION TO SWITCH.
LC CONNECTORS SHALL BE PROVIDED ON OPPOSITE END.
ALL CONNECTIONS TO THE CORE SWITCHES SHALL BE
COORDINATED WITH THE VA COR.
2. PROVIDE ONE (1) 72 STRAND FIBER CABLE WITH LC
CONNECTORS ON BOTH ENDS.
3. PROVIDE ONE (1) 96 STRAND FIBER CABLE WITH LC
CONNECTORS ON EACH END.
4. PROVIDE ONE (1) 24 STRAND FIBER CABLE WITH LC
CONNECTORS ON EACH END.
5. PROVIDE ONE (1) 2 STRAND FIBER CABLE WITH SFP
TRANSCEIVER CONNECTOR FOR CONNECTION TO SWITCH.
LC CONNECTORS SHALL BE PROVIDED ON OPPOSITE END.
THI CONNECTION SHALL BE FROM THE PRIMARY CORE
SWITCH.
6. PROVIDE ONE (1) 2 STRAND FIBER CABLE WITH SFP
TRANSCEIVER CONNECTOR FOR CONNECTION TO SWITCH.
LC CONNECTORS SHALL BE PROVIDED ON OPPOSITE END.
THI CONNECTION SHALL BE FROM THE SECONDARY CORE
SWITCH.
7. TWO (2) 48 PORT SWITCHES SHALL BE CONNECTED
DIRECTLY TO THE FIBER PATCH PANEL. ONE SWITCH
SHALL CONNECTED TO THE PRIMARY CORE, ONE SWITCH
SHALL CONNECT TO THE SECONDARY CORE. WHERE
MORE THAN TWO (2) SWITCHES ARE PROVIDED, THEY
SHALL BE "STACKED" WITH CONNECTIONS TO THE TWO
MAIN CORE SWITCHES.
48 PORT SWITCH (NIC)
TYP. 2 RMU FIBER OPTIC
SPLICING/PATCHING
ENCLOSURE
NOTE:
NOT ALL FIBER CONNECTIONS ARE SHOWN. THE INTENT OF THIS DIAGRAM IS TO SHOW GENERAL CONNECTIONS
BETWEEN DIFFERENT PATCH PANEL SIZES. ALL CONNECTIONS TO THE CORE SWITCHES SHALL BE VERIFIED WITH
THE VA COR.
1" (TYP) TO CABLE
TRAY/ LADDER RACK
INSULATED THROAT
COMPRESSION TYPE
STEEL CONNECTOR
4-11/16" (119mm) SQUARE x 2-1/8" (54mm)
DEEP OUTLET BOX
DOUBLE GANG
PLASTER REDUCTION
RING
8P8C JACK
KEYSTONE MODULE
SINGLE GANG
FACEPLATE, KEYSTONE
COMP.
CAT 6A UTP
NOTES:
1. EACH DEVICE PLATE SHALL BE 4 PORT.
2. FILL ACTIVE PORTS IN FACEPLATE FROM LEFT TO
RIGHT AND TOP TO BOTTOM.
3. TERMINATE EACH CAT 6A CABLE ON RJ-45 CAT 6A
RATED JACK WITH T568A CONFIGURATION.
4. PROVIDE BLANK SPARE PORT COVER ON TOP
RIGHT.
5. ALL LABELS SHALL BE PRINTED WITH THERMAL OR
LASER PRINTER SYSTEM,.
TELECOMMUNICATION RJ45 OUTLET TYPE
SCALE: N.T.S.
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.52
JC MC
TELECOMMUNICATIONS DETAILS
MAIN,11,14,23,25,27
CORNER BRACKET
DETAIL 2 NOTES:
1. CABLE TRAY MAY BE SUPPORTED WITH OTHER SUPPORT
MECHANISMS THAT THE APPROVED MANUFACTURER HAS
TO OFFER.
2. CABLE TRAY SHALL BE ROUTED AROUND, OVER OR UNDER
ANY OBSTACLES THAT INTERFERE WITH THE DECLARED
PATH. CONTRACTOR SHALL FOLLOW CUTTING AND
BENDING RECOMMENDATIONS FROM THE
MANUFACTURER'S INSTALLATION GUIDE AS WELL AS THE
MINIMUM CABLE BEND RADIUS ALLOWED PER ANSI/TIA/EIA
STANDARDS. CABLE TRAY SHALL NOT IMPEDE ANY
MECHANICAL DUCT SYSTEMS. STRIVE TO MAINTAIN
MINIMUM 12" OF CLEARANCE OVER CABLE TRAY FROM
ANY OBSTRUCTION. CABLE TRAY SHALL MAINTAIN A 36"
HORIZONTAL CLEARANCE FROM SPRINKLER HEADS AND
SHALL NOT BE PLACED ABOVE SPRINKLER HEADS.
3. PROVIDE GROUNDING JUMPER BETWEEN EACH SECTION
OF TRAY (MOUNTED ON SIDE) AND FROM TRAY TO EACH
HORIZONTAL DISTRIBUTION CONDUIT.
4. NOT ALL PARTS ARE SHOWN. THE CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE WORKING INSTALLATION
INCLUDING MISCELLANEOUS APPURTENANCES.
5. PROVIDE A CABLE TRAY SHOP DRAWING PRIOR TO
INSTALLATION.
6. CATWALKS SHALL REMAIN UNOBSTRUCTED. COORDINATE
DETAILS FOR CABLE TRAY CROSSING CATWALKS TO
ENSURE CATWALK ACCESS IS NOT COMPROMISED.
TRAPEZE HANGING CLIPS WITH THREADED ROD
AT 5 FOOT INTERVALS, STARTING AT 1 FOOT
OFF THE FIRST AND LAST SEGMENTS OF CABLE TRAY.
MAINTAIN 12" MIN CLEARANCE ABOVE
TRAY TO OBSTRUCTIONS OR CEILING
DETAIL 3 NOTES:
1. POSITION ERICO CAT64HPAB STYLE ONTO JOIST, WALL
OR CONCRETE.
2. PROVIDE
INCH DIA. HILTI 'KH-EZ' SCREW ANCHOR
(ESR-3027) WITH 1
INCH EMBED TO THE 5 INCH
EXISTING FLOOR SLAB ABOVE (150# MAX PER HOOK).
3. MAXIMUM CABLE CAPACITY - 140 CAT6A
4. FOR WALL MOUNTED APPLICATIONS, USE ERICO
CAT64HP STYLE J-HOOK.
CABLE LADDER RETAINING POST
LOCKING NUT
WASHER
WASHER
CLAMP
GALVANIZED
THREADED ROD
PER STRUCTURAL
12 INCH OR 30 INCH
WIDE
HOT DIPPED
GALVANIZED STEEL
CABLE RUNWAY
RUNWAY DROPS
NOTE:
SUPPORT RUNWAY AT 5 FOOT
INTERVALS. CABLE LADDER FOR USE IN
COMMUNICATIONS ROOMS ONLY.
LADDER TYPE CABLE TRAY
90° RETURN
LADDER TYPE CABLE TRAY
TEE INTERSECTION
NOTE:
PROVIDE RETAINING POST EVERY 12
INCHES ON BOTH SIDES OF THE CABLE
LADDER.
PERPENDICULAR MOUNTING ON RACK WITH 3"Ø CHANNEL
PARALLEL MOUNTING ON RACK WITH 3"Ø CHANNEL VERTICAL WALL BRACKETS
GENERAL NOTES
1. REFER TO SHEET T-00.00 FOR "TELECOMMUNICATION GENERAL NOTES."
2. PROVIDE ALL TELECOMMUNICATION SPACES AND CABLING PATHWAYS IN
ACCORDANCE WITH TIA-569-B.
3. REFER TO STRUCTURAL DRAWINGS/DETAILS FOR MOUNTING OF CABLE TRAY
AND LADDER RACK.
WALL ANGLE SUPPORT
NOTE:
TWO (2) ¼” SMS EACH BRACKET TO STUDS (OR
TO BACKING PLATE PER 4/SE-00.52).
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.53
JC MC
TELECOMMUNICATIONS DETAILS
MAIN,11,14,23,25,27
OVERHEAD CABLE TRAY (SNAKE TRAY) DETAIL
SCALE: NOT TO SCALE
J-HOOK ANGLE BRACKET DETAIL
SCALE: NOT TO SCALE
CABLE RUNWAY (LADDER RACK) DETAILS
SCALE: NOT TO SCALE
24ST
25PR
6TH FLR
R1
FIBER PP
COPPER PP
RM 6135
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
24ST
25PR
PR
x2
24ST
25PR
PR
x3
24ST
25PR
PR
x4
24ST
25PR
PR
x5
24ST
25PR
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
R1
FIBER PP
COPPER PP
24ST
25PR
PR
x2
24ST
25PR
PR
x3
24ST
25PR
PR
x4
ST
x3
24ST
25PR
PR
x5
RM 5 EAST
R1
FIBER PP
COPPER PP
24ST
5TH FLR
RM 4155
R1
FIBER PP
COPPER PP
24ST
RM 4044A
R1
RM 3136
R1
FIBER PP
COPPER PP
3RD FLR
4TH FLR
2ND FLR
RM 2100
R1
FIBER PP
COPPER PP
24ST
RM 2505A
R1
FIBER PP
COPPER PP
24ST
2 2
OS2
OS2
1 1
OM4 OM4
1 3
CAT3
OS2
CAT3
RM 12-6
RM 12-5
RM 12-4
RM 12-3
RM 12-2
RM 10-6
RM 10-5
RM 10-4
RM 10-3
RM 10-2
ST
x5
ST
x5
ST
x6
ST
x6
ST
x5
ST
x4
CAT3
OM4
OS2
OM4
CAT3
CAT3
OS2
OS2
CAT3
CAT3
OS2
OS2
CAT3
CAT3
OS2
CAT3
CAT3
OS2
OM4
CAT3
OS2
CAT3
OS2
CAT3
ST
x3
ST
x3
OS2 OS2
CAT3 CAT3
CAT3
OS2
CAT3
6TH FLR INTERSTITIAL
5TH FLR INTERSTITIAL
4TH FLR INTERSTITIAL
2ND FLR INTERSTITIAL
3RD FLR INTERSTITIAL
ST
x2
OS2
OS2 OS2OS2
24ST
OS2
FIBER PP
COPPER PP
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.60
JC MC
IT SYSTEM RISER DIAGRAM
PULL EXISTING FIBER CABLE BACK TO SOURCE. PULL NEW FIBER CABLE FROM BB102 TO FIBER PATCH
PANEL.
EXISTING BACKBONE COPPER CABLE TO REMAIN. REFER TO ENLARGED PLANS FOR ROOMS THAT REQUIRE
REMOVAL OF WALL MOUNTED 110 BLOCKS. ALL EXISTING BACKBONE COPPER CABLE SHALL LAND ON NEW 24
PORT, 110-STYLE PATCH PANEL IN RACK 1 OF THE TELECOM ROOM/AREA. REFER TO ENLARGED PLANS AND
T-00.50 FOR ADDITIONAL DETAILS.
EXISTING BACKBONE FIBER TO REMAIN.
GENERAL NOTES
KEY NOTES
BLDG 1 - IT SYSTEM RISER DIAGRAM
SCALE: NONE
1. ALL NEW 25 PAIR COPPER CABLE SHALL BE CAT3 TYPE.
2. NEW FIBER CABLE SHALL BE OF TYPE SHOWN ON RISER, OM4 OR OS2.
3. RACK LAYOUTS ARE SHOWN FOR CONNECTION CLARIFICATION ONLY. REFER TO SHEET T-00.50 FOR
TYPICAL RACK LAYOUT FOR RACK 1 IN NEW TELECOM ROOMS.
4. NOT ALL RACKS AND PATCH PANELS ARE SHOWN IN DESIGNATED ROOMS. REFER TO ENLARGED PLANS
AND RACK LAYOUTS FOR MORE DETAILS.
5. RACKS AND DEVICES SHOWN IN GRAY ARE CONSIDERED EXISTING TO REMAIN.
MAIN,11,14,23,25,27
MATCH LINE - SEE DRAWING NUMBER T-00.61
RM B165 RM B167 RM B116
R1
FIBER PP
COPPER PP
24ST
BUILDING 1 BASEMENT
RM B217B
R1
FIBER PP
COPPER PP
24ST
PBX PUNCH DOWN AREA
R1
FIBER PP
FIBER PP
FIBER PP
FIBER PP
2 2
RM BB102
R2
FIBER PP
RM 104
R1
FIBER PP
COPPER PP
24ST
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
R3
FIBER PP
FIBER PP
FIBER PP
FIBER PP
BLDG 23BLDG 11
OS2
RM 1535A
R1
FIBER PP
COPPER PP
RM 1190
R1
FIBER PP
COPPER PP
RM 1047
R1
FIBER PP
COPPER PP
24ST
1ST FLR
RM 1251
R1
FIBER PP
COPPER PP
24ST24ST
2 2 2 2
ST
x6
PR
x5
ST
x1
PR
x5
25PR x10
24ST x2
ST
X
CAT3
OM4
OS2
ST
x6
OS2
OM4
OM4
OM4
OM4
OM4
CAT3
OM4
OM4
CAT3
R1
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
1ST FLR INTERSTITIAL
RM A1100
R1
FIBER PP
COPPER PP
ST
x9
ST
x1
OS2
OM4
EXISTING 110 PUNCH DOWN BLOCKS
FOR 300 PAIR
110- PUNCH DOWN BLOCKS
24ST x2
RM 126
R1
FIBER PP
COPPER PP
24ST
BLDG 25
OS2
RM 101
R1
FIBER PP
COPPER PP
24ST
BLDG 14
24ST x124ST x1
25PRX1
25PR
ST
x3
OS2
CAT3
OS2
TO CAN 3
ST
x1
CAT3
OS2 OS2
OS2
24ST
OM4
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.61
JC MC
IT SYSTEM RISER DIAGRAM
MAIN,11,14,23,25,27
PULL EXISTING FIBER CABLE BACK TO SOURCE. PULL NEW FIBER CABLE FROM BB102 TO FIBER PATCH
PANEL.
EXISTING BACKBONE COPPER CABLE TO REMAIN. REFER TO ENLARGED PLANS FOR ROOMS THAT REQUIRE
REMOVAL OF WALL MOUNTED 110 BLOCKS. ALL EXISTING BACKBONE COPPER CABLE SHALL LAND ON NEW 24
PORT, 110-STYLE PATCH PANEL IN RACK 1 OF THE TELECOM ROOM/AREA. REFER TO ENLARGED PLANS AND
T-00.50 FOR ADDITIONAL DETAILS.
EXISTING BACKBONE FIBER TO REMAIN.
PULL EXISTING COPPER CABLE BACK TO SOURCE. PULL NEW COPPER CABLE FROM B167 TO COPPER
(110-STYLE) PATCH PANEL. ALL NEW BACKBONE COPPER CABLE SHALL LAND ON NEW 24 PORT, 110-STYLE
PATCH PANEL IN RACK 1 OF THE TELECOM ROOM/AREA. REFER TO ENLARGED PLANS AND T-00.50 FOR
ADDITIONAL DETAILS.
NEW 25 PAIR COPPER CABLE FOR NEW TELECOM ROOMS IN BUILDING 1 SHALL BE CONNECTED TO THE
EXISTING 110 BLOCKS ALLOCATED AS SPARE FOR THIS PROJECT SCOPE. NEW 25 PAIR FOR EXISTING ROOMS
101 (BLDG 14) AND 1i (BLDG 11) SHALL BE RECONNECTED TO THE EXISTING PUNCH DOWNS IN THIS ROOM.
GENERAL NOTES
KEY NOTES
IT SYSTEM RISER DIAGRAM
SCALE: NONE
1. ALL NEW 25 PAIR COPPER CABLE SHALL BE CAT3 TYPE.
2. NEW FIBER CABLE SHALL BE OF TYPE SHOWN ON RISER, OM4 OR OS2.
3. RACK LAYOUTS ARE SHOWN FOR CONNECTION CLARIFICATION ONLY. REFER TO SHEET T-00.50 FOR
TYPICAL RACK LAYOUT FOR RACK 1 IN NEW TELECOM ROOMS.
4. NOT ALL RACKS ARE AND PATCH PANELS SHOWN IN DESIGNATED ROOMS. REFER TO ENLARGED PLANS
AND RACK LAYOUTS FOR MORE DETAILS.
5. RACKS AND DEVICES SHOWN IN GRAY ARE CONSIDERED EXISTING TO REMAIN.
MATCH LINE - SEE DRAWING NUMBER T-00.60
RM 2A140
R1
FIBER PP
COPPER PP
RM 1A116
R1
FIBER PP
COPPER PP
RM 2B119
R1
FIBER PP
COPPER PP
RM 1i (INTERSTITIAL SPACE)
R1
FIBER PP
COPPER PP
1ST FLR
24ST
24ST
24ST24ST
RM BB115
R1
FIBER PP
COPPER PP
24ST
BLDG 11 BASEMENT
2 2
OM4
BLDG 27
2ND FLR
RM 1119B
R1
FIBER PP
COPPER PP
24ST
OS2
OM4
OM4
OM4
OM4
1ST FLR INTERSTITIAL
RM BB102
R2
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
R1
FIBER PP
FIBER PP
FIBER PP
FIBER PP
R3
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
FIBER PP
RM 2119B
R1
FIBER PP
COPPER PP
24ST
OS2
RM 3119B
R1
FIBER PP
COPPER PP
24ST
OS2
24ST X2
ST OM4
ST OM4
ST OM4
25PR
CAT3
EXISTING 110
BLOCKS
1 1
1 1
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL ESTATE
MANAGEMENT
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 5 6 7 8 9 10
664-20-501
F
BUILDING NUMBER
PROJECT NUMBERPROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT PHASE
BUILDING CONSTRUCTION
SHEET TITLE
APPROVED PROJECT DIRECTOR
U.S. Department of Veterans Affairs
ARCHITECT/ DESIGNER OF RECORD
REVISIONS DATE
1 0 5 3 T E N T H A V E N U E
S A N D I E G O , C A 9 2 1 0 1
P H O N E 6 1 9 . 2 3 8 . 3 8 1 1
D I S A B L E D V E T E R A N + E M P L OY E E O W N E D
www.davyarchitecture.com
NORTH
VASDHCS PLANNING AND ENGINEERING
1455 Frazee Rd., Suite 600
San Diego, CA 92108 ph 619.232.4673 www.coffman.com
CEI Project # 201794
ENGINEER/DESIGNER OF RECORD
TYPE IA - FULLY SPRINKLERED
VA SAN DIEGO
EHRM INFRASTRUCTURE UPGRADES
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
JUNE 09, 2021
100% CONSTRUCTION DOCUMENTS
T-00.62
JC MC
IT SYSTEM RISER DIAGRAM
IT SYSTEM RISER DIAGRAM
SCALE: NONE
MAIN,11,14,23,25,27
PULL EXISTING FIBER CABLE BACK TO SOURCE. PULL NEW FIBER CABLE FROM BB102TO FIBER PATCH
PANEL.
EXISTING BACKBONE COPPER CABLE TO REMAIN. REFER TO ENLARGED PLANS FOR ROOMS THAT REQUIRE
REMOVAL OF WALL MOUNTED 110 BLOCKS. ALL EXISTING BACKBONE COPPER CABLE SHALL LAND ON NEW 24
PORT, 110-STYLE PATCH PANEL IN RACK 1 OF THE TELECOM ROOM/AREA. REFER TO ENLARGED PLANS AND
T-00.50 FOR ADDITIONAL DETAILS.
PULL EXISTING COPPER CABLE BACK TO SOURCE. PULL NEW COPPER CABLE FROM 1A116 TO COPPER
(110-STYLE) PATCH PANEL. ALL NEW BACKBONE COPPER CABLE SHALL LAND ON NEW 24 PORT, 110-STYLE
PATCH PANEL IN RACK 1 OF THE TELECOM ROOM/AREA. REFER TO ENLARGED PLANS AND T-00.50 FOR
ADDITIONAL DETAILS.
GENERAL NOTES
KEY NOTES
1. ALL NEW 25 PAIR COPPER CABLE SHALL BE CAT3 TYPE.
2. NEW FIBER CABLE SHALL BE OF TYPE SHOWN ON RISER, OM4 OR OS2.
3. RACK LAYOUTS ARE SHOWN FOR CONNECTION CLARIFICATION ONLY. REFER TO SHEET T-00.50 FOR
TYPICAL RACK LAYOUT FOR RACK 1 IN NEW TELECOM ROOMS.
4. NOT ALL RACKS AND PATCH PANELS ARE SHOWN IN DESIGNATED ROOMS. REFER TO ENLARGED PLANS
AND RACK LAYOUTS FOR MORE DETAILS.
5. RACKS AND DEVICES SHOWN IN GRAY ARE CONSIDERED EXISTING TO REMAIN.
CAT6A
PATCH PANEL
115VAC
DOOR XXX TELECOM
ROOM XXX
HIRSCH MX-8 CONTROL PANEL
J
CR ES
PATCH PANEL
OIT RACK
(LOCATED IN
TELECOM
ROOM/AREA)
DS
ALTRONIX
POWER
SUPPLY
AL600ULPD8
115VAC
1" C, CAT6A (TYP)
CAT6A
NOTE:
1. COORDINATE ALL DEVICE ROUGH-IN LOCATIONS.
6"x6" SURFACE MOUNTED
J-BOX LOCATED ABOVE
CEILING SECURED SIDE
WALL
SCRAMBLEPAD (CR) AT 48" AFF
OC, UON
LOCKSET
2-1" CONDUIT
HOMERUN TO
HIRSCH CONTROLLER
3/4" CONDUITS
6"x6" SURFACE MOUNTED J-BOX
LOCATED ABOVE CEILING
SECURED SIDE
ELECTRIC DOOR STRIKE
TO HIRSCH CONTROLLER
3/4" CONDUITS
SCRAMBLEPAD (CR)
NON-SECURE SIDE
PLAN ELEVATION
FLOOR
CEILING
REQUEST TO EXIT INTEGRAL
WITH DOOR HANDLE
REQUEST TO EXIT CONTROLLER
1 - 2C/14 STP
1- 4C/22 STP
1 - 2C/18 STP
IN 1"C
1 - 4C/22 STP
IN 3 4"C
1 - 2C/18 STP
IN 3 4"C
ELECTRIC DOOR STRIKE
(ES)
DOOR POSITION SWITCH (DS)
3/4" CONDUITS
DOOR POSITION SWITCH (DS)
1 - 2C/14 STP
POE SWITCH
(CISCO 9300)
OIT RACK
(LOCATED IN
TELECOM
ROOM/AREA)
EXISTING NVR
EXISTING HTM
RACK
CAT6A PATCH CORD
DRAWING NUMBER
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION AND
REAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .