S02 - SOLICITATION 36C24823R0004.pdf

PDF 881 KB Posted

Attached to
Emergency Chiller Redundancy for AHU-1, AHU-2 and AHU-7 Serving all Operating Rooms
Solicitation number
36C24823R0004
Issued by

About this file

This federal solicitation requests proposals for an emergency chiller redundancy project at a Department of Veterans Affairs medical center. The project requires three backup chillers supplying chilled water to existing air handling units and operating rooms. Proposals are due by November 9th, 2022, with requests for information due by November 1st. The set-aside is for Service-Disabled Veteran-Owned Small Businesses. The scope of work includes furnishing and installing new outdoor chillers, electrical and structural support work, and associated testing, training and documentation. The design phase is 120 calendar days followed by 245 days for construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 74

36C24823R0004

X

546-23-128

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 1201 NW 16 Street

Miami FL 33125

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 1201 NW 16 Street

Miami FL 33125

Apolinar Vargas 786-790-5241

Project Title: D/B Emergency Chiller Redundancy for AHU-1, AHU-2, and AHU-7 Project Number: 546-23-128 IAW VAAR 836.204 the magnitude of construction VA project is: between $1,000,000.00 and $5,000,000.00 NAICS: 238220 – Plumbing, Heating, and Air Conditioning Contractors Service Code: 1711 – Plumbing, Heating and Air-Conditioning This solicitation will be evaluated on a Trade-Off basis. As stated elsewhere in this solicitation, this procurement is a two (2) Phase Design/Build IAW FAR 36.3 One solicitation will be issued covering both phases. In Phase I proposals will be evaluated to determine which offerors will submit proposals in Phase II. Block 13 A refers to Phase I proposals.

This requirement is set-aside for VIP certified, Service-Disabled Veteran Owned Small Businesses (SDVOSB) Vendor verification for SDVOSB can be found here at https://www.vetbiz.va.gov/ THIS ACQUISITION IS SET-ASIDE 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) ONLY, UNDER THE AUTHORITY OF 38 U.S.C PART 74. ANY PERSON OR BUSINESS ENTITY SUSPECTED OF MISREPRESENTATION FOR THE PURPOSE OF THE SECURING A GOVERVERMENT CONTRACT MAY BE CRIMINALLY INVESTIGATED AND PROSECUTED FOR FRAUD AGAINST THE UNITED STATES GOVERMENT.

Miami VAMC is a smoke free facility. Contractors, in order to enter the campus, you must have picture ID.

All contractors are required to wear a face covering (covering nose and mouth per CDC guidelines) while on campus.

All contractors will be screened at the entrance of the campus. A series of questions will be asked, and temperature taken. While working on the Medical Center (both inside of outside) the contractor will be responsible to wear a face covering at all times. PPE is not provided.

Refer to solicitation instructions for Phase One cutoff date for submission of Requests for Information (RFIs), or questions (if any). No Site Visit will be conducted during Phase One of this solicitation.

All Offerors must comply with all solicitation terms and conditions.

Please refer to solicitation 36C24823R0004 package for further requirements.

It shall be known that funds are not currently available. No contract award will be made until appropriated funds are made available.

15 365

X X 52.211-10

X 10

VIA EMAIL 11:00 AM

11/09/2022

X

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont.-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

SEE PRICE SCHEDULE

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 1201 NW 16TH Street

Miami FL 33125

Department of Veterans Affairs Financial Services Center

P.O. Box 149971 Austin TX 78714-9971

Apolinar Vargas VA-VHA-2020-CB96-F94D Contracting Officer

Table of Contents

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 DELIVERY SCHEDULE

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

52.216-1 TYPE OF CONTRACT (APR 1984)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY

2014)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

52.228-1 BID GUARANTEE (SEP 1996)

52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)

52.233-2 SERVICE OF PROTEST (SEP 2006)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED

SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

GENERAL CONDITIONS

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC

2014)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (OCT 2018)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT

(DEC 2010)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEP 2013)

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021)

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS

SET-ASIDE (JUL 2019) (DEVIATION)

VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL

2018)(DEVIATION)

VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF

COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION)

VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)

VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)

VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)

IT CONTRACT SECURITY

GENDER

CONTRACTOR'S COST BREAKDOWN

SCHEDULE OF PAYMENTS FOR DESIGN SERVICES

OWNERSHIP OF ORIGINAL DOCUMENTS

RETENTION OF REVIEW DOCUMENTS

CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING

INFORMATION

COORDINATION WITH MEDICAL CENTER

RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR

LIST OF DOCUMENTS-EXHIBITS-AND-OTHER-ATTACHMENTS

INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION

I. GENERAL PROPOSAL INFORMATION

II. PROPOSAL PREPARATION AND EVALUATION INFORMATION

PROPOSAL PREPARATION INSTRUCTION

PROPOSAL SUBMISSION

BASIS FOR AWARD

SELECTION AND EVALUATION PROCEDURES

PROPOSAL REQUIREMENTS AND FORMATTING (PHASE ONE AND PHASE TWO)

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

DESIGN/BUILD SERVICES: DESIGN/BUILD SERVICES FOR PROJECT

675-22-116 " D/B Emergency Chiller Redundancy for AHU-1, AHU-2, and AHU-7." THE SELECTED CONTRACTOR WILL BE

REQUIRED TO PERFORM ALL NECESSARY DESIGN/BUILD WORK

PER THE DRAWINGS AND SPECIFICATIONS.

PRINCIPAL NAICS CODE: 238220 – Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: N045 – Installation of Equipment- Plumbing, Heating and Waste Disposal Equipment Period of Performance: 365 Calendar Days

GRAND TOTAL __________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER QUANTITY DELIVERY DATE

0001 SHIP TO: Miami VA Medical Center 1201 NW 16TH Street Miami, FL 32125

USA

1.00

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

Statement of Work

DESIGN-BUILD

Emergency Chiller Redundancy for AHU-1, AHU-2, and AHU-7 Serving all Operating Rooms Project No. 546-23-128

I. DEFINITIONS AND ACRONYMS:

A. Air Handling Unit (AHU) B. Design-Build (DB): as defined by the Department of Veterans Affairs (DVA) is the procurement by the Government, under one contract, with one firm (which may be a joint venture) for both design and construction services on a specific project.

C. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control, and approval of the Contracting Officer.

D. Chiller Motor Control Center (CMCC3): Located in existing Mechanical Room MEA-43 roof at 3rd-floor roof level on Building 1.

E. Project Manager (PM)/Contracting Officers Representative (COR): The Contracting Officer's representative is responsible for administering contracts under the immediate direction of the Contracting Officer.

F. Design Build Contract: This term, as used herein, refers to the Contract(s) to perform the design and construction of the project.

G. Contractor: This term, as used herein, refers to the contractor under this contract.

H. A/E: This term, as used herein, refers to the Architect-Engineer firm(s) that are a part of the DB team, also referred to as DB A/E.

I. Design-Build Team A/E: This term, as used herein, refers to the entire Design-Build Team

(Contractor, A/E, and any sub-contractors) all-inclusive.

J. Pre-Construction Risk Assessment (PRCA): Used to identify potential risks associated with the renovation, construction, and some maintenance & repair activities and to develop risk mitigation strategies to minimize these risks. Prior to beginning work, this assessment will be completed.

K. Interim Life Safety Measures (ILSM): Measures that are instituted to compensate for significant hazards posed by existing life safety (fire) code deficiencies or construction/renovation activities.

L. Certified Independent Third-Party Safety Professional (CITP): Certified Independent Third- Party Safety Professional for the review of the design documents for compliance with national and local codes, standards, federal and state regulations.

M. National Fire Protection Association (NFPA): The world's leading advocate of fire prevention and an authoritative source on public safety, NFPA develops, publishes, and disseminates codes and standards intended to minimize the possibility and effects of fire and other risks.

N. National Electrical Manufacturer’s Association (NEMA): Develops ratings and standards to ensure enclosures with the right level of protection.

O. The Joint Commission (TJC): The Joint Commission provides evaluation, accreditation, and disease-specific certification programs for healthcare facilities.

P. Veterans Affairs Medical Center (VAMC): Specifically, the Bruce W. Carter Department of Veterans Affairs Medical Center.

Q. Competent Person (CP): One who is capable of identifying existing and predictable hazards in the surroundings or working conditions that are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them.

II. COPE OF WORK:

General Requirements:

Provide all labor, materials, tools, equipment, and design-build services necessary for the design and construction of the project described herein and other specific tasks as further defined by this Request for Proposal (RFP). All proposals are to provide both design and construction services for this project. The contractor shall not match existing materials but shall use hospital-grade materials as designated in the Department of Veterans Affairs (DVA) technical information library (TIL) and/or industry standards for healthcare facilities relevant to space usage. Reference section VII, Resources, below.

Introduction:

The project requires three (3) back up chillers for the existing Chiller 4 and Chiller 5 supplying chilled water to all existing Operating Room (OR) Rooms, located on the existing roof on the 3rd floor of the Miami VA Medical Center, building 1. The condition of the existing Chillers 4 and 5 is critical right now. There is no redundancy and if the Miami VA Medical Center (MVAMC) loses any of the existing chillers, the hospital will lose all the Operating Rooms. Losing any of these existing Chillers will automatically force a shutdown of Patient Care Services, preventing the Main Hospital form performing OR procedures.

Project Overview:

The contractor shall be required to furnish three (3) new Chillers Outdoor type. Two (2) for AHU- 1 and AHU-2 and another for AHU-7. Since most of the Chillers are manufactured by Trane, the MVAC Operations preference is to continue with TRANE Manufacturer with a 5 Year warranty on the compressor OR approved equal. Chillers shall be approved for Outdoor type NEMA 3R enclosure with high saltwater/rustproof protection.

Existing Substation SUBBN-3AC shall feed the two new chillers using two 300 A/3P amp breakers for the 250 Ton chiller and one 200-A/3P circuit breaker for the other 200 Ton chiller. A new cubicle will be added to the existing Substation SUBN-3AC for these breakers. Provide two (2) ea.

300A/3P and one (1) ea. 150A/3P breakers, also provide 3-60A/3P for the additional pumps.

All breakers shall be rated at 65,000 AIC as required for this project. All Chillers Pumps disconnects shall be stainless-steel on outdoor connections. Include structural steel support base of each Chiller.

Chiller 4A, Chiller A, and 5B shall be connected from only one source of power by the existing Substation SUBN-3 AC.

The new Chillers location will be located next to the existing Chiller 5 extending the existing structural support platform if structural calculations support it. See attached Riser Sketch E-AC-

1AR.

Chiller 4A setpoint temperature shall be 38-degree Fahrenheit and chiller 5A (Air-cooled) setpoint temperature shall be 41-degree Fahrenheit.

Specific Project Requirements:

Startup and Testing

1. Contractor shall perform an equipment startup in accordance with the manufacturer’s specifications.

2. Contractor shall perform testing of all operational controls and safety devices to ensure proper operation.

3. Contractor shall perform testing of the equipment’s remote capabilities.

4. Contractor shall provide VAMC personnel with documentation of all testing.

Training.

1. Contractor shall provide training to VAMC personnel in the proper Startup, Operation, and Shutdown of the equipment to include manufacturers’ recommendations.

2. Contractor shall provide training on the maintenance requirements and performance.

Additional Contractor requirements

1. The contractor shall be responsible for all installation of Chillers (mechanical, electrical, structural, and controls) located on the roof next to Mechanical Room MEA-43. This includes all operational testing required by VA Directive and any other applicable codes and VA regulations.

Emergency Response

1. The contractor’s technician shall arrive on site within two (2) hours when notified by the COR of an emergency. This will apply 24 hours a day, 7 days a week including holidays.

2. Contractor shall be responsible to maintain the work area in a neat and orderly condition.

3. Contractor shall provide a dumpster for disposal of old materials and any debris generated during the work.

4. Contractor shall ensure the work area is broom clean at the end of each shift.

5. Only VAMC personnel is authorized to turn On or Off any electrical circuits or to Open or

Shut any valves.

Inspection/Acceptance

1. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in the contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services.

The Government must exercise its post-acceptance rights within a reasonable time after the defect was discovered or should have been discovered; and before any substantial change occurs in the condition of the item unless the change is due to the defect in the item.

2. The DB contractor will be given written information (As Build and Existing Drawings);

participate in project planning meetings, pre-bid meetings, and pre-construction meetings as required; communicate with VA personnel via telephone or email.

3. The entire work must be Tested and Certified by Mechanical Professional Engineer (PE)

Chillers License Repair and meets the National Fire Protection Association (NFPA), Environmental Protection Agency (EPA), American National Standards Institute (ANSI), Occupational Safety and Health Administration (OSHA), National Plumbing Code, National Electric Code (NEC), American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), National Safety Code, VA Specifications, VA Construction Standards, VA Repair Handbooks and VA Fire Protection Manual available in the Technical Information Library (https://www.cfm.va.gov/TIL).

4. The detailed project shall begin with an intense on-site physical survey and collection of previous project data.

5. All installation or demolition shall be documented on the As Build Drawings and comply with all applicable requirements of, NFPA, ANSI OSHA, National Electric Code (NEC), National Safety Code (NSC), VA Specifications, VA Demolition Standards, VA Repair Handbooks, etc. and all applicable Local, State, and Federal Regulations and Standards.

Existing AS Build Drawings will be made available to the DB/Contractor; however, their accuracy shall be field verified by the DB/Contractor and all consulting firms as part of investigative services.

6. The DB/Contractor shall be required to perform all necessary site survey work such as verifying record drawings.

Investigative Work

The following investigative work shall be included within the scope of this project:

1. Provide all Engineer investigative work for application to this project including but not limited to electrical and mechanical testing, vibration studies, structural analysis, and any other test or study required to complete this project. Verify existing conditions to ensure the accuracy of the Replacement/Installation.

2. Field verifies VA furnished drawings to ensure DB/Contractor As Build Drawings are accurate. It is the DB/Contractor’s responsibility to determine existing conditions and to base the construction on this information.

3. Materials to be furnished to the DB/Contractor by the VA

3.1. The following shall be Furnished to the DB /Contractor upon request:

a. VA Engineering Service will provide the DB/Contractor with all available As Build and Existing

Drawings. The following documents will be provided to the Contractors in a link format as part of the supporting documents (Site Plan, Miami VA Asbestos & Lead Survey; Electrical Plans, VA Construction Policy, Mechanical Drawings, One Line, and As Build Drawings).

Note: The accuracy of any paper copy or Drawings is not guaranteed and shall be used only for general information. Actual conditions must be field verified by the DB/Contractor and all consulting firms.

b. All VA standards, specifications, Space Planning Criteria, Equipment & Design Guides List, and Design Submission Guidelines can be obtained by accessing the World Wide Web at the following address:

http://www.cfm.va.gov/TIL/

3.2. The following laws, regulations, policies, and procedures in effect on the date of contract issuance and all subsequent changes or updates apply:

FAR Federal Acquisition Regulation VAAR Veterans Administration Acquisition Regulation SCA DOL Website Service Contract Act (SCA) Directory of Occupations (Fifth Edition) http://www.dol.gov/whd/contracts/sca.htm VA Technical Information Library http://www.cfm.va.gov/TIL/

Federal, State, Local, Industry

Performance in accordance with any and all legal standards, codes, policies, permits, procedures, and or otherwise governing legal doctrine.

III. SCHEDULING, PHASING, AND WORKING HOURS:

A. All work hours MUST be coordinated with the project’s COR. All work shall be performed during WHEN hours (Weekends, Holidays, Evenings, and Nights) so as not to interfere with normal hospital functions. However, some VA areas may be conducive to work being completed DURING normal business hours (7:00 am to 4:00 pm), Monday through Friday). All requests for work during normal business hours shall be requested by the Contractor at least 14 calendar days in advance. Additionally, construction shall be performed (scheduled and phased) to ensure that exterior egress/ingress areas are completely operational by normal business hours the following workday.

B. Length of Project

1. Project will have a 120-calendar day design phase. Please refer to Program Guide PG-18-15, Volume C for document requirements.

a) From Notice to Proceed, Design-Build Team A/E shall submit Schematic Design drawings to 25% within 30 calendar days. Allow 15 calendar days for VA review.

b) Design-Build Team A/E shall submit Construction Document drawings to 75%, which incorporates the VA’s comments on the 75% submission within 60 calendar days. Allow 15 calendar days for VA review.

c) Design-Build Team A/E shall submit Final Document drawings to 100% (Signed & Sealed), which incorporates the VA’s comments on the 75% submission within 30 calendar days.

Allow 15 calendar days for VA review.

2. Design-Build Team A/E shall schedule a Pre-Construction Meeting with all pertinent VA personnel for final drawing approval before construction started. The submission shall be within 15 calendar days of receiving Government acceptance of 100% drawings.

3. Project will have 245 calendar days of construction. The project is completed after 2 new backup Chillers for AHU-1, AHU-2, and AHU-7 are fully installed, tested, certified, and up and running in accordance with VA Standards.

4. Contractor shall submit a Critical Path Method (CPM) schedule for BOTH Design phase and Construction phase with estimated dates and itemized cost of work to the Contracting Officer for review and approval before Notice to Proceed.

http://www.dol.gov/whd/contracts/sca.htm

C. Utility Outages, including disruption of fire alarms, must be requested by the Contractor at least

15 calendar days in advance.

IV. PROJECT CLASSIFICATION:

This project has been classified per the Construction Infection Control Risk Assessment as a Type C, Low Risk, Class II, and Type C Medium /High-Risk Group, Class III Project.

V. SAFETY REQUIREMENTS:

All Contractor personnel is required to have completed an OSHA-approved 10-hour construction worker course prior to working on the site. The On-site general superintendent/supervisor is required to have completed an OSHA-approved 30-hour construction course prior to working on the site. Every worker must provide the Contracting Officer a copy of current certificates identifying successful completion of the training prior to executing work for the Veterans Administration. In addition, the Contractor shall provide submittals for contract construction or renovation work which include the names, qualifications, and training dates for the Contractor’s Competent Persons (CP), who have been designated to administer the site-specific safety program, as well as the CP for other activities as required by OSHA regulation 29 CFR 1926.32 (such as scaffolds, cranes, excavations, etc.). Contractors’ CP is required to implement and maintain effective safety programs that identify and control hazards that may cause injury or illness to VA patients, staff, visitors, and contractor employees.

The VA CP does not take the place of the Contractor’s CP nor acts on their behalf. The VA CP determines if the Contractor is meeting VA standards and contractual requirements for safety and OSHA compliance. When these standards and contract requirements are not being met, the VA COR and/or CP will take immediate action to prevent injury, non-compliance, and/or property damage.

The Contractor shall submit an Activity Hazard Analysis (AHA) and an Accident Prevention Plan (APP) as per FAR 52.236-13 prior to the commencement of site activities. The Government shall have 21 calendar days to review the AHA and APP.

VI. GOVERNMENT FURNISHED INFORMATION:

All available record drawings will be provided upon request to the Design-Build Team A/E. They should not, however, be considered “as-built”. These drawing files are provided without warranty or obligation as to the accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the VA harmless from any and all claims, damages, losses, and expenses, including, but not limited to, attorney fees arising out of the use of the Computer-Aided Design and Drafting (CADD) drawing files.

A. Records Management

1. Citation to pertinent laws, codes, and regulations such as 44 U.S.C chapters 21,29,31 and 33;

Freedom of Information Act (5 U.S.C); Privacy Act (5 u.sc. 552a); 36 CFR Part 122 and Part 1228.

2. Contractor shall treat all deliverables under the contract as the property of the US Government for which the Government Agency shall have unlimited rights to use, dispose of or disclose such data contain therein as it is determined to be in the public interest.

3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.

4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act (FOIA).

5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.

6. The VA owns the rights to all data/records produced as part of this contract.

7. The VA owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

8. Contractor shall comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.], or state of completion [draft, final, etc.].

9. No disposition of documents shall be allowed without the prior written consent of the CO. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.

VII. RESOURCES:

All designs shall comply with applicable sections of VA standards and publications, and all references therein. Ensure that construction documents comply with the latest edition of these VA construction and design standards.

VA standards can be found on the World Wide Web at http://www.cfm.va.gov/TIL/. VA publications and standards shall include but shall not be limited to the following:

1. Office of Construction & Facilities Management Site Map:

http://www.cfm.va.gov/sitemap.asp

2. The Technical Information Library (TIL): http://www.cfm.va.gov/TIL/

a) Master Construction Specifications Index (PG-18-1)

b) Design and Construction Procedures (PG-18-3)

c) VA Standard Details and CAD Standards (PG-18-4)

d) Equipment Guide List (PG-18-5)

e) Equipment Inspection Manual (Program Guide 7610.2)

f) Equipment Reference Manual (PG-18-6) http://www.cfm.va.gov/TIL/ http://www.cfm.va.gov/sitemap.asp

g) Space Planning Criteria (PG-18-9)

h) Design Manuals (by discipline) (PG-18-10)

i) Design Guides (graphical, by function) (PG-18-12)

j) Barrier Free Design Guide (PG-18-13)

k) Room Finishes, Door and Hardware Schedules (PG-18-14)

l) Minimum Requirements for A/E Submissions (PG-18-15)

m) Environmental Planning Guidance (PG-18-17)

n) HVAC Design Manual for Hospitals Amendment B

o) Lighting Study

p) Design Alerts

q) Quality Alerts

r) VA Signage Design Guide

s) Fire Protection Design Manual – Latest Edition

t) Cost Estimating

u) Physical Security Design Manuals for VA Facilities – Mission Critical Facilities (VA

Handbook 0730)

v) Information Security Handbook VA 6500

w) Energy Reduction Manual (First Draft)

3. TIL - Master Construction Specifications: http://www.cfm.va.gov/TIL/

4. Department of Veterans Affairs Utilities Design Manual.

B. Office of Construction & Facilities Management: http://www.cfm.va.gov/index.asp

1. VA Office of Facilities Management citations of the AIA design standards found on the world wide web at http://cfm.va.gov.TIL/

2. VA Office of Health and Safety (OHS): http://www1.va.gov/vasafety/

3. Construction Infection Control Risk Assessment Memorandum

C. Other design and construction standards and publications that shall be applied to this work include, but are not limited to:

1. American Society of Heating, Refrigerating and Air-Conditioning Engineers Manual (ASHRAE)

2. National Fire Protection Association (NFPA) Codes & Standards - www.nfpa.org

3. OSHA Rules and Regulations/

4. International Building Code (ICC) latest edition.

5. Life Safety Code (NFPA 101) latest edition

6. The Joint Commission (TJC) Accreditation manual (latest edition)

7. Sustainable Design Requirements (01 81 11)

8. Construction Waste Management (01 74 19)

D. Applicable sections of the VA Master Construction Specifications shall be prepared by the

Architect/Engineer, including all the necessary adaptations.

E. Particular attention is called to CD4, Symbol Identification of Contract Drawings.

F. Equipment symbols shall be in accordance with PG-18-6, Equipment Reference Manual (previously List of Equipment Symbols, H-08-6).

http://www.cfm.va.gov/index.asp http://cfm.va.gov.til/ http://www1.va.gov/vasafety/ http://www.nfpa.org/

G. Standard Drawing Details, in accordance with PG-18-4, shall be utilized to the greatest extent practicable.

H. Cost estimates shall be developed in strict conformance with VA’s Manual for Preparation of Cost Estimates & Related Documents for VA Facilities (March 8, 2011).

http://www.cfm.va.gov/til/dManual/dmCost.pdf

I. Guidelines for Design and Construction of Health Care Facilities, Latest Edition, published by The

Facilities Guidelines Institute (FGI). http://www.fgiguidelines.org/

J. Physical Security Standard, compliance with Medical Center Policy 138-3 and VHA Handbook 0730/2 dated May 27, 2010 “Space Key Control”.

K. Plumbing System Design & Water Treatment/Design to prevent Legionnaires. VA Plumbing Design Manual and VHA Directive 2008-010, PREVENTION OF LEGIONEELA DISEASE, and VHA Directive 2009-009, DOMESTIC HOT WATER TEMPERATURE LIMITS FOR LEGIONELLA PREVENTION

AND SCALD CONTROL.

VIII. DESIGN and DOCUMENT REQUIREMENTS:

A. Design Requirements - Compliance with codes and standards.

1. Project design shall be in compliance with applicable standards and codes described in VA Program Guides and design materials included or referenced in the solicitation materials.

See “Resources” above.

2. See “Approved Construction documents”, below, for the required inclusion of design review comments.

3. In the design of new building and alteration work under this contract, the Design-Build Team A/E shall consider all requirements (other than procedural requirements) of:

a) Zoning laws:

b) Environmental and erosion control regulations; and

c) Laws relating to landscaping, open space, the minimum distance of a building from the property line, maximum height of a building, historic preservation, and esthetic qualities of a building. Also, similar laws, of the State and local political division, would apply to the building if it, were not to be constructed or altered by the U.S. Government. The Design- Build Team A/E shall consult with appropriate officials of the Federal, state, and political subdivisions, and submit plans under the rules prescribed by those reviewing authorities. The Design-Build Team A/E and VA shall give due consideration to the recommendations of the referenced building officials. VA will also permit inspection by the officials described above during the construction period in accordance with the customary schedule of inspections in the locality of the building construction.

Such officials shall provide VA with a copy of the schedule before construction begins or give reasonable notice of their intention to inspect before conducting an inspection.

http://www.cfm.va.gov/til/dManual/dmCost.pdf http://www.fgiguidelines.org/

4. The Design-Build Team A/E shall provide prompt, written notification to the Contracting Officer concerning conflicts with, or recommended deviations from codes, laws, regulations, standards, and opinions of review officials as described above. No work altering OR increasing the scope of this contract shall be undertaken prior to receipt of written approval from the Contracting Officer.

5. No action may be brought against the VA and no fine or penalty may be imposed for failure to carry out any of the previously described recommendations of Federal, state, or local officials. VA and its contractors, including A/E, shall not be required to pay any amount for any action taken by a state or political division of a state in carrying out functions described in this article, including reviewing plans, carrying out on-site inspections, issuing permits, and making recommendations.

6. The Design-Build Team A/E shall advise the Contracting Officer of any variances with the applicable Department of Labor, Occupational Safety and Health Standards, for occupancy requirements.

B. Design Review Meetings:

1. A review meeting to resolve design issues will be held for each design review package submitted. The meeting will include a discussion of VA comments on functional relationships and technical peer review comments (by others).

2. Participants will include VA Staff and Design-Build Team A/E members as appropriate for the specific package to be reviewed and others. The Design-Build Team A/E members will each allow for (1) full day for each package design review meeting. Design-Build Team A/E management shall be present at each review meeting.

3. The DB team shall allow a minimum of fifteen (15) calendar days for each review cycle. A cycle includes:

a. The VA’s receipt of the design review submission package.

b. The review meeting.

c. DB teams’ receipt of comments from the VA, either electronically, by fax, or by hard copy delivery.

4. Coordination of the review meeting schedules will be the responsibility of the VA Project Manager/COR (for the VA) and the Design-Build Team A/E Project Manager (for the Design- Build Team A/E). See Quality Assurance/Quality Control.

C. Design Review Submissions:

1. The Design-Build Team A/E shall prepare and submit complete construction documents for review and approval by the VA in accordance with standard professional practice and prevailing codes.

2. The documents may be divided into multiple review submission packages. The VA will review as many as six (6) package submissions (examples: demolition, civil, architectural, structural, mechanical, Electrical, plumbing, etc.) to facilitate the start of construction.

3. All submission packages will be reviewed at Schematic Design (25%), Design Development (75%), Construction Documents (75%), and Final Documents (100%) completion stages. The (100%) review submission packages will incorporate the final review comments from the (75%) review. If any package is not complete for the required stage a post review may be required, the cost of which will be borne by the DB Team. The (100%) set of drawings will be the final set of drawings that will be used for construction and stamped by the engineer and architect of record.

4. Each review submission package shall include 3 hard copy sets (2 Full Size & 1 Half Size) and 1 PDF set on CD-ROM. The package will include an index of drawings (by sheet number and title) and specifications (by section number and title) submitted. The packages will be distributed to the VA Project’s COR, the VA Contracting Officer (CO), and others as determined to be appropriate by the VA.

5. Upon Contractor review of the TIL Specifications and Design Guidelines associated with the Project Scope of Work, the Design-Build Team A/E shall be responsible to prepare and submit for Government review and acceptance a full set of specifications (2 hard copies, 2 electronic), specific to the project, from the Master Specifications located in the TIL.

The Specifications shall be contractor modified to include VA Guidelines and Code requirements consistent with NFPA, IBC, FBC, FGI Guidelines for Design and Construction of Health Care Facilities, 2010 edition.

6. In addition to the Project Specific Specifications, the Contractor shall submit a binder of product cut sheets, MSDSs, and all required Contract submittals.

7. Contractor shall be responsible to submit as-build CAD drawings at the end of the project reflecting the new floor layout changes to the VA Engineering office as part of the closeout documents.

D. Electronic Media:

1. Design review submission drawings and final Construction Document submission drawings will be executed in electronic format AutoCAD version 2020 or backward compatible format.

2. The drawings included will be available to the Design-Build Team A/E team in electronic format in AutoCAD version 2020 or PDF format for use in preparing the construction drawings if possible.

Since data stored on electronic media can deteriorate undetected or be modified without the Architect/Engineer’s knowledge, the CAD drawing files are provided without warranty or obligation on the part of the Architect/Engineer as to the accuracy or information contained in the files. The user shall independently verify all information in the files. Any user shall agree to indemnify and hold the Architect Engineer harmless from any and all claims, damages, losses, and expenses including, but not limited to, attorney’s fees arising out of the use of the CAD drawing files.

3. Design review submission specifications, final Construction Document submission specifications, and other 8 1/2 by 11 formatted material will be executed in electronic format Microsoft Word.

4. The specifications included shall be available to the Design-Build Team A/E in electronic format in Microsoft Word, for use in preparing the construction specifications.

Since data stored on electronic media can deteriorate undetected or be modified without the Architect/Engineer’s knowledge, the CAD version 2020 drawing files are provided without warranty or obligation on the part of the Architect/Engineer as to the accuracy or information contained in the files. The design-builder shall independently verify all information in the files and shall agree to indemnify and hold the Architect Engineer harmless from any and all claims, damages, losses, and expenses including, but not limited to, attorney’s fee arising out of the use of the electronic files.

5. The construction record drawings shall be completed in at least AutoCAD version 2020 and backward compatible format. The designer/contractor will submit an AUTOCAD copy (as build drawings) after the completion of the project and before closeout to the VA for engineering records and update tracking purposes.

6. Construction shop drawings are not required to be completed in AutoCAD.

E. Professional Licensing:

1. The Design-Build Team A/E who prepares the construction documents shall be a professional architect or engineer licensed in the State of Florida.

2. The professional seal indicating such license by the state shall appear on the final construction documents.

The architect whose seal is shown will be known as the Architect of Record. The Design-Build Team A/E shall certify compliance with the VA RFP and all applicable codes.

F. Approved Construction Documents:

1. The final construction document submission package will be submitted by the Design-Build Team A/E for approval by the VA after completion of the 75% review cycle for the final package to be submitted by the Design-Build Team A/E. The VA will have 15 calendar days to take approval action.

2. The final construction documents submission package will include a full set of construction documents including all disciplines/packages.

3. The final construction documents submission package will incorporate all VA-supplied comments from the earlier 25%, 75%, and 100% submission package reviews and will comply with the VA requirements.

4. If the final construction documents submission package is not complete a post submittal may be required, the cost of which will be borne by the Design-Build Team A/E.

5. The approved final construction documents include such details that the project can be constructed and will be used for the construction of the project.

6.

G. Construction Drawing Preparation - Mandatory material and equipment schedules and details may be indicated either on the drawings or in the specifications, at the option of the Design- Build Team A/E. The construction drawings shall include a coordinated set of the following.

(Reference Program Guide, PG-18-15, Volume C)

1. Structural drawings: including foundation plans, framing plans, schedules, and details, including general notes and all calculations.

2. Architectural drawings: including floor plans, building elevations, building sections, wall sections, reflected ceiling plans, stair details, toilet and bath details, door schedules and details, window schedules and details, room finish schedules, auto transport, and other details.

3. Fire protection drawings: including floor and roof plans, riser diagrams, equipment schedules, and details, including general notes calculations and all related calculations.

4. Plumbing drawings: including floor and roof plans, riser diagrams equipment schedules, plumbing fixture schedules, and details, including general notes, and all related calculations.

5. HVAC drawings: including floor and roof plans, one-line flow diagrams, equipment schedules, and details, including general notes and all related calculations. Also, provide sections for mechanical equipment rooms and sequence of operation for all HVAC equipment.

6 Electrical drawings: including site demolition plans, site, floor, and roof plans (power, lighting, and other systems), one-line diagrams, panel schedules, equipment schedules, light fixture schedules calculations, and details

7 Asbestos abatement: drawings including site demolition plans and floor plans indicating asbestos abatement method.

H. Construction Specifications - Project specifications shall include specifications for all products, materials, equipment, methods, and systems shown on the construction drawings in accordance with standard professional practice and the VA requirements. The specification submitted for review shall include:

1. The name of the manufacturer, the product name, model number, or other identification as appropriate to clearly identify the product that will be used in the construction of the project.

2. Other data as appropriate to clearly identify the product that will be used in the construction of the project i.e. shop drawings, product data, and samples as required by the VA documents; and

3. The required stamp of the licensed architect or engineer of record will be considered as certification of compliance with the project’s requirements.

I. Design Requirements – Compliance with codes and standards.

Project design shall be in compliance with applicable standards and codes described in VA Program Guides and design materials included or referenced in the solicitation materials.

The Design-Build Team A/E shall provide prompt, written notification to the Contracting Officer concerning conflicts with, or recommended deviations from codes, laws, regulations, standards, and opinions of review officials as described above. No work altering the scope of this contract shall be undertaken prior to receipt of written approval from the CO.

5. No action may be brought against the Design-Build Team A/E or VA and no fine or penalty may be imposed for failure to carry out any of the previously described recommendations of Federal, state, or local officials. The VA and its contractors, shall not be required to pay any amount for any action taken by a state or political division of a state in carrying out functions described in this article, including reviewing plans, carrying out on-site inspections, issuing permits, and making recommendations.

6. The Design-Build Team A/E shall advise the CO of any variances with the applicable

Department of Labor, Occupational Safety and Health Standards, for occupancy requirements.

IX. QUALITY ASSURANCE (QA)/QUALITY CONTROL(QC):

A. To reduce design errors and omissions, the Design-Build Team A/E shall develop and execute a QA/QC plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.

B. Within 2 weeks of receipt of Notice to Proceed, the Design-Build Team A/E shall submit a detailed QA/QC plan describing each QA/QC task that will be taken during the development of the various design submission packages and the name of the Design-Build Team A/E member responsible for QA/QC.

1. Upon its completion each task shall be initialed and dated by the responsible Design-Build Team A/E member.

2. A 100% completed QA/QC plan shall be submitted with the final construction document submission package.

X. CONSTRUCTION PERIOD SERVICES:

A. Pre-Construction Meeting

The DB A/E, as part of the Design-Build Team A/E, shall participate in the pre-construction meeting with the VA and DB Contractor. The DB A/E shall be prepared to respond to the VA concerns and shall provide an overview of the design.

B. Site Visits & Inspections

1. During Construction Period Services, the DB A/E shall visit the job site as appropriate to the stage of construction to determine in general if the work is being performed in a manner indicating that the work, when completed, will be in accordance with the working drawings.

2. During the construction period the DB A/E shall make weekly visits to the project site when…