This document is the Offeror's Self-Performed Work Calculations instructions for a federal contract opportunity. It provides guidance on how offerors should calculate the percentage of work they plan to self-perform versus subcontract to non-SDVOSB firms.
The key details are:
- The contract is for Services (except construction), General Construction, or Special Trade Construction.
- For Services contracts, the SDVOSB prime contractor can only pay up to 50% of the contract price to non-SDVOSB firms.
- For General Construction contracts, the SDVOSB prime can only pay up to 85% of the contract price, excluding materials, to non-SDVOSB firms.
- For Special Trade Construction contracts, the SDVOSB prime can only pay up to 75% of the contract price, excluding materials, to non-SDVOSB firms.
- Offerors are required to calculate and provide the percentage of work they plan to self-perform versus subcontract to non-SDVOSB firms as part of their proposal.
The related federal contract opportunity is for Parking Lot Storm Drain Repairs, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C25724Q0947 0003 Amendment.pdf | ||
| S02 PCRA Storm Drain.pdf | ||
| S05 QA with Clarification.docx | DOCX document | |
| S02 36C25724Q0947 CTX Storm Drain 9.9.2024.pdf | ||
| 36C25724Q0947 0002.docx | DOCX document | |
| S04 Site Walk Sign in Sheet.pdf | ||
| S05 Question and Answer.docx | DOCX document | |
| S06 36C25724Q0947 0001 Amendment.pdf | ||
| P07 Wage Determination TX20240230 07.12.2024.pdf | ||
| P09 SOW CTX Storm Drain.pdf | ||
| PPQ Past Performance.pdf | ||
| S02 36C25724Q0947 CTX Storm Drain.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR’S SELF PERFORMED CALCULATIONS
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to Non-VetCert listed SDVOSBs: $ __________ (not including materials)
c) Offeror’s percentage of estimated Non-VetCert work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
A/E-Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified VetCert SDVOSBs.
General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified VetCert SDVOSBs.
Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified VetCert SDVOSBs.