- The existing storm drain line is to be partially removed, with the remaining portion plugged on both ends. The extent of the line removal is not clearly specified, with the RFI response indicating the entire line should be removed, while the site visit explanation stated the line would only be removed a short distance.
- Clarification is needed on whether the existing line is to be pulled back from the manhole enough to allow installation of the new line, or if a specific length of the existing line must be removed.
- This Q&A document provides clarification on the handling of the existing storm drain line, but does not contain details on the overall scope of work, response dates, pricing, or other key contract information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C25724Q0947 0003 Amendment.pdf | ||
| S02 PCRA Storm Drain.pdf | ||
| S02 36C25724Q0947 CTX Storm Drain 9.9.2024.pdf | ||
| 36C25724Q0947 0002.docx | DOCX document | |
| S04 Site Walk Sign in Sheet.pdf | ||
| S05 Question and Answer.docx | DOCX document | |
| S06 36C25724Q0947 0001 Amendment.pdf | ||
| P07 Wage Determination TX20240230 07.12.2024.pdf | ||
| P09 SOW CTX Storm Drain.pdf | ||
| PPQ Past Performance.pdf | ||
| S02 36C25724Q0947 CTX Storm Drain.pdf | ||
| S02 Self-Performed Work Calculations 02.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer
1) Drain to existing manhole?
As the new drain line will be routed to a new location the old line will need to be removed and the manhole sealed where pipe was removed.
Clarification to question 1 It was explained in the site visit that the old line was to be demoed a short distance, plugged, and abandoned in place. However, the RFI response was to remove the old line. This could be interpreted that the entire existing line is to be removed and this will cause wild differences in bids.
0. Is the existing line to be pulled back from the manhole far enough to allow the new line installation and plugged? YES. On both ends must be plugged.
0. Or, if the existing line is to be removed further, how many feet of existing line are to be removed?