S02 - PRESOL Attachment 07 - Hospital Inspection Data Summary AE 672-25-107 - 2 pages.pdf
PDF 59 KB Posted
- Attached to
- C1DZ--Replace Cast Iron and Malleable Fittings
- Solicitation number
- 36C24825R0120
About this file
This document is a two-page Hospital Inspection Data Summary listing 44 steam system components across multiple building locations. The comprehensive inventory details specific component identifiers, KSM inspection item numbers, component types (including valves, elbows, tees, flanges, and unions), and their precise floor/location within the facility. Components are primarily located in the Boiler Room, Laundry, Basement, South Tower, and Mechanical Room, with all items categorized under the Steam System.
The document appears to be part of a pre-solicitation for VA project 672-25-107, which involves replacing cast iron and malleable fittings. The project is set aside as 100% Service-Disabled Veteran Owned Small Business (SDVOSB), with an estimated construction value between $2-5 million and a projected completion timeline of 580 calendar days from the Notice to Proceed. The solicitation (36C24825R0120) is specifically seeking Architect-Engineer (AE) qualification packages under NAICS code 541330 with a small business size standard of $25.5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Component Identifier KSM Inspection Item # Component Type Building Floor/Location Steam System
1-BOILER-VALVE 5 VALVE-HPS E-1Q Boiler Room, GROUND STEAM
2-BOILER-TEE-FLANGE 4 FLANGE E-1Q Boiler Room, GROUND STEAM 3-BOILER-TEE-PUP 4 PUP E-1Q Boiler Room, GROUND STEAM
4-BOILER-TEE 4 TEE E-1Q Boiler Room, GROUND STEAM
5-BOILER-VALVE 2 VALVE E-1Q Boiler Room, GROUND STEAM
6-LAUNDRY-ELBOW 7 ELBOW LAUNDRY LAUNDRY, GROUND STEAM
7-LAUNDRY-ELBOW 8 ELBOW LAUNDRY LAUNDRY, GROUND STEAM
8-LAUNDRY-ELBOW 13 ELBOW 45 DEGREE LAUNDRY LAUNDRY, BASEMENT STEAM
9-LAUNDRY-WYE 14 WYE LAUNDRY LAUNDRY, BASEMENT STEAM
10-LAUNDRY-UNION 11 UNION LAUNDRY LAUNDRY, BASEMENT STEAM
11-PENTHOUSE-ELBOW 38 ELBOW SOUTH TOWER JPH-3, Mechanical Room STEAM SUPPLY 12-PENTHOUSE-ELBOW 39 ELBOW SOUTH TOWER JPH-3, Mechanical Room STEAM
13-PENTHOUSE-VALVE 37 VALVE SOUTH TOWER JPH-3, Mechanical Room MPS
14-BASEMENT-TEE 18 TEE BASEMENT BASEMENT, THERAPY POOL STEAM
15-BASEMENT-ELBOW 16 ELBOW BASEMENT BASEMENT, THERAPY POOL STEAM
16-BASEMENT-VALVE 17 VALVE BASEMENT BASEMENT, THERAPY POOL STEAM
17-BASEMENT-VALVE 24 VALVE BASEMENT BASEMENT, K13 STEAM
18-BASEMENT-VALVE 21 VALVE BASEMENT BASEMENT, L12 (L SIDE) STEAM
19-BASEMENT-VALVE 22 VALVE BASEMENT BASEMENT, L12 (M SIDE) STEAM
20-BASEMENT-VALVE 30 VALVE BASEMENT BASEMENT, P7 STEAM
21-BOILER-VALVE 3 VALVE e-1Q BOILER ROOM, GROUND STEAM
22-BOILER-ELBOW 1 ELBOW E-1Q BOILER ROOM, GROUND STEAM
23-BOILER-ELBOW 6 ELBOW E-1Q BOILER ROOM, GROUND STEAM
24-LAUNDRY-ELBOW 9 ELBOW LAUNDRY LAUNDRY ROOM, GROUND STEAM
25-LAUNDRY-ELBOW 10 ELBOW LAUNDRY LAUNDRY ROOM, GROUND STEAM
26-LAUNDRY-ELBOW 12 ELBOW LAUNDRY BASEMENT LAUNDRY, BASEMENT STEAM
27-BASEMENT-TEE 23 TEE BASEMENT BASEMENT, J-16 STEAM
28-BASEMENT-ELBOW 24 ELBOW BASEMENT BASEMENT, H-16 STEAM
29-BASEMENT-ELBOW 25 ELBOW BASEMENT BASEMENT, H-14 STEAM
30-BASEMENT-ELBOW 26 ELBOW BASEMENT BASEMENT, H-14 STEAM
31-BASEMENT-ELBOW 27 ELBOW 45 DEG BASEMENT BASEMENT, G-13 STEAM
32-BASEMENT-ELBOW 28 ELBOW BASEMENT BASEMENT, J-12 STEAM
33-BASEMENT-ELBOW 40 ELBOW BASEMENT BASEMENT, H-18 STEAM
34-BASEMENT-ELBOW 19 ELBOW BASEMENT BASEMENT, K-18 STEAM
35-BASEMENT-ELBOW 15 ELBOW BASEMENT BASEMENT, L-19 STEAM
36-BASEMENT-TEE 29 TEE BASEMENT BASEMENT, M-11 STEAM
Component Identifier KSM Inspection Item # Component Type Building Floor/Location Steam System
37-BASEMENT-ELBOW 31 ELBOW BASEMENT BASEMENT, L-6 STEAM
38-BASEMENT-ELBOW 20 ELBOW BASEMENT BASEMENT, R-19 STEAM
39-BASEMENT-ELBOW 32 ELBOW BASEMENT BASEMENT, E-5 STEAM
40-BASEMENT-ELBOW 33 ELBOW BASEMENT BASEMENT, E-5 STEAM
41-BASEMENT-ELBOW 34 ELBOW BASEMENT BASEMENT, A-23 STEAM
42-BASEMENT-ELBOW 35 ELBOW BASEMENT BASEMENT, P-4 STEAM
43-BASEMENT-ELBOW 36 ELBOW BASEMENT BASEMENT, S-23 STEAM
44-BASEMENT-VALVE 41 VALVE-DRAIN BASEMENT BASEMENT, G-16 STEAM
File details come from the government source that posted it. Updated .