S02 - EXHIBIT J - TICS Pricing.pdf

PDF 197 KB Posted

Attached to
X1DZ--Aberdeen Vet Center Outstation
Solicitation number
36C24525R0018
Issued by

About this file

The document is a Tenant Improvements Cost Summary (TICS) template for the Aberdeen Vet Center Outstation project (Solicitation 36C24525R0018) issued by the Department of Veterans Affairs. The template is structured using the Masterformat CSI system, categorizing potential construction and improvement costs across 33 divisions, including general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, electrical, plumbing, HVAC, communications, and other infrastructure elements.

The template is designed to capture detailed cost breakdowns for both tenant improvements (TI) and shell construction, with placeholders for trade costs, general contractor fees, architectural and engineering fees, and other lessor costs. The document includes sections for calculating total project costs per ABOA (Assignable Building Office Area) and RSF (Rentable Square Feet), with notes indicating that subcontractor costs are to be included and shell work will provide a "warm lit shell" configuration. All cost fields are currently blank, suggesting this is a standardized pricing template for potential bidders to complete.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version Oct. 2024

For: - ABOA SF= -

Agency: - TIA PER ABOA SF= -$

Location: - TOTAL TIA= -$

Common Area Factor: - RSF= -

Masterformat

CSI

System Elements TI* SHELL**

Div 1 General Requirements -$ -$ Div 2 Existing Conditions -$ -$ Div 3 Concrete -$ -$ Div 4 Masonry -$ -$ Div 5 Metals -$ -$ Div 6 Wood, Plastics, Composites -$ -$ Div 7 Thermal and Moisture Protection -$ -$ Div 8 Openings -$ -$ Div 9 Finishes -$ -$ Div 10 Specialties -$ -$ Div 11 Equipment -$ -$ Div 12 Furnishings -$ -$ Div 13 Special Construction -$ -$ Div 14 Conveying Equipment -$ -$ Div 21 Fire Suppression -$ -$ Div 22 Plumbing -$ -$ Div 23 Heating, Ventilating, and Air Conditioning (HVAC) -$ -$ Div 26.1 Electrical -$ -$ Div 26.2 Lighting -$ -$ Div 27 Communications -$ -$ Div 28.1 Electronic Safety -$ -$ Div 28.2 Electronic Security (TI - Non-BSAC) -$ -$ Div 31 Earthwork -$ -$ Div 32 Exterior Improvements -$ -$ Div 33 Utilities -$ -$

Subtotal -$ -$

General Contractor Fee Percent -$ -$ Subtotal Construction Costs -$ -$

Architectural & Engineering Fees (NIC DID costs) *** Percent -$ -$ Other Lessor Costs Established Under the Lease -$ -$

Subtotal Lessor's Costs: -$ -$ Lessor's Project Management Fee Percent -$

Total Price to Government: GRAND TOTAL -$ Cost per ABOA SF -$ -$

Cost per RSF -$ -$ Notes:

* Include all subcontractors' costs.

Trade Costs

Not subject to Lessor's project management fee.

Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.

TENANT IMPROVEMENTS COST SUMMARY (TICS)

File details come from the government source that posted it. Updated .