This solicitation requests design-build services for a Pharmacy Clean Room project at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The selected prime contractor will partner with an architecture/engineering firm to complete designs and construction of the clean room project. The total anticipated budget is between $250,000 and $500,000.

The solicitation will utilize a two-phase selection process. Phase I submissions will be evaluated to determine which offerors will be invited to submit proposals for Phase II. Phase II will be conducted as a request for proposal in accordance with FAR Parts 36.3 and 15, with final selection made on a best value basis considering evaluation factors and price. Only service-disabled veteran-owned small businesses may submit proposals for Phase I. The Department of Veterans Affairs Veterans Health Administration VISN 4 is the contracting agency overseeing this project.

View the file

Other files

File Type Posted
36C24422R0058 0001.pdf PDF
SOW - Pharmacy Clean Room Design Build - REV 1 - 03.11.2022.pdf PDF
36C24422R0058 0001_1.docx DOCX document
36C24422R0058_2.docx DOCX document
36C24422R0058 Pharmacy Clean Room.pdf PDF
Wage Determination PA20220093.pdf PDF
RM Language for Contracts.pdf PDF
S02 EXHIBIT A - Project Example.docx DOCX document
SOW - Pharmacy Clean Room Design Build.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT B - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO Request For Proposal 36C24422R0058

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %