This document is a federal solicitation for preventative maintenance elevator services at the Minneapolis VA Healthcare System (MVAHCS). The solicitation (Number 36C26325Q0529) is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a base period from June 1, 2025 to May 31, 2026 and four potential option years through May 31, 2030. The contract covers maintenance services for 40 elevators across multiple buildings, including passenger and freight elevators with various speeds, capacities, and types (gearless, hydraulic, roped hydro).

Key requirements include providing a qualified elevator technician on-site 8 hours daily, Monday through Friday, performing preventive maintenance, repairs, testing, lubrication, cleaning, and parts replacement. The contractor must maintain detailed maintenance logs, comply with ASME elevator standards, conduct annual testing, and maintain machine rooms and equipment. The solicitation includes a pre-quote assessment on March 24, 2025, at 10:00 AM, and requires technical submissions demonstrating the contractor's preventive maintenance program, safety procedures, and technician qualifications. Offerors must submit electronic proposals by March 27, 2025, at 5:00 PM CST, with the contract to be awarded using a Lowest Price Technically Acceptable (LPTA) evaluation method.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

618-25-1-6023-0004

36C26325Q0529 3/12/2025 Theresa (Tess) Thunder 701-239-3700 ext. 2422 3/272025 17:00

CST

36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK 23 CONTRACTING OFFICE

2101 ELM STREET (04-S)

FARGO ND 58102

X

Y 238290 $22 Million

N/A

DEPARTMENT OF VETERAN AFFAIRS

MINNEAPOLIS VA HEALTHCARE SYSTEM

One Veteran Drive

Minneapolis MN 55417 04-S

DEPARTMENT OF VETERANS AFFAIRS

NETWORK 23 CONTRACTING OFFICE

2101 North Elm Street Building 30 (04-S)

FARGO ND 58102

Y

DEPARTMENT OF VETERANS AFFAIRS

FINANCIAL SERVICES CENTER

FMS-VA-2 (101)

P.O. BOX 149971

AUSTIN TX 78714-9971

877-353-9791 512-460-5540

See CONTINUATION Page This solicitation is for preventative maintenance elevator services at the Minneapolis VAMC in accordance with the Statement of Work and Schedule.

This solicitation is a set-aside for SDVOSB.

Prior to submitting a quote, please review all documentation within.

Review and follow INSTRUCTIONS TO OFFERORS in Clause 52.212-1 Addendum.

Wage determination 2015-4945 is attached.

See CONTINUATION Page

Jeffrey Brown

VA-VHA-RPOC-2024-0033

Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES1
SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2 STATEMENT OF WORK6
B.3 PRICE/COST SCHEDULE19
ITEM INFORMATION19
SECTION C - CONTRACT CLAUSES21
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)21
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)26
C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)27
C.4 SUPPLEMENTAL INSURANCE REQUIREMENTS27
C.5 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)28
C.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)31
C.7 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)32
C.8 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)33
C.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)34
C.10 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)34
C.11 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)35
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS44
SECTION E - SOLICITATION PROVISIONS45
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)45
ADDENDUM to 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services.49
E.2 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)51
E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)51
E.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)54
E.5 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)55
E.6 52.233-2 SERVICE OF PROTEST (SEP 2006)56
E.7 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)57
E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)57
52.212-2 Evaluation—Commercial Products and Commercial Services. (November 2021)58
E.9 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024)59

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C263 Jeffrey Brown

DEPARTMENT OF VETERANS AFFAIRS

NETWORK 23 CONTRACTING OFFICE

2101 ELM STREET (04-S)

FARGO ND 58102

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] Monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

36C26324Q1168

Page 1 of Page 1 of

B.2 STATEMENT OF WORK

REQUIREMENT

1. Provide elevator maintenance at the Minneapolis VA Health Care System (MVAHCS) facility. The Contractor shall provide all labor, material, and equipment to conduct preventive maintenance and repairs in accordance with all terms, conditions, provisions, specifications and Schedule listed in Statement of Work.

ELEVATOR LIST:

Number
LOCATION OF
PASSENGER/
CONTROL
SPEED
CAPACITY
TYPE
ELEVATORS
FREIGHT
Manufacturer
1
A1
Passenger
MCE Controls
500 FPM
4000 lbs.
Gearless
2
A2
Passenger
MCE Controls
500 FPM
4000 lbs.
Gearless
3
A3
Passenger
MCE Controls
500 FPM
4000 lbs.
Gearless
4
A4
Passenger
MCE Controls
500 FPM
4000 lbs.
Gearless
5
B1
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
6
B2
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
7
B3
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
8
B4
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
9
C1
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
10
C2
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
11
C3
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
12
D1
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
13
D2
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
14
D3
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
15
L1
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
16
L2
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
17
L3
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
18
FREIGHT F
1 FREIGHT
MCE Controls
350 FPM
10,000 lbs.
GEAR
19
G1
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
20
G2
Passenger
MCE Controls
500 FPM
5000 lbs.
Gearless
21
M7a
ATS Freight
MCE Controls
350 FPM
2500 lbs.
GEAR
22
M7b
ATS Freight
MCE Controls
350 FPM
2500 lbs.
GEAR
23
M8a
ATS Freight
MCE Controls
350 FPM
2500 lbs.
GEAR
24
M8b
ATS Freight
MCE Controls
350 FPM
2500 lbs.
GEAR
25
M1
1 PASSENGER
MCE Controls
100 FPM
2500 lbs.
Hydro
26
M2
ATS SERV FR
MCE Controls
350 FPM
3500 lbs.
GEAR
27
M11
1 PASSENGER
MCE Controls
100 FPM
4000 lbs.
Hydro
28
Cart Lift
M3
MCE Controls
100 FPM
1000 lbs.
Hydro
29
Cart Lift
M9
MCE Controls
100 FPM
1000 lbs.
Hydro
30
Bldg. 49
S1
MCE Controls
125 FPM
5000 lbs.
Hydro
31
Bldg. 49
S2
MCE Controls
125 FPM
4000 lbs.
Hydro
32
Bldg. 49
S3
MCE Controls
125 FPM
4000 lbs.
Hydro
33
Bldg. 9
LOBBY
MCE Controls
125 FPM
2500 lbs.
Hydro
34
Bldg. 10
LOBBY
MCE Controls
125 FPM
2500 lbs.
Hydro
35
Bldg. 68
LOBBY
MCE Controls
100 FPM
4000 lbs.
Hydro
36
Bldg. 222
FREIGHT 22
MCE Controls
100 FPM
4000 lbs.
GEAR
37
Bldg. 222
Passenger 21
SAVARIA
30 FPM
1400 lbs.
Roped Hydro
38
Bldg. 75
Fisher House #2
TAC 20
100 FPM
2500 lbs.
Roped Hydro
39
Bldg. 76
SCI
TAC 20
100 FPM
2500 lbs.
Hydro
40
Bldg. 78
Parking Ramp
MRL
150 FPM
2500 lbs.
Gearless

a. Contractor will provide a qualified elevator technicians to be on site 8 hours daily Monday through Friday (except federal holidays).

b. The Contractor shall have a program in place to regularly and systematically examine clean lubricate, adjust and, when conditions warrant, repair or replace parts, devices and components including but not limited to the following:

1.

Page 1 of

2. Hoisting motors

3. Selector components

4. Solid state motor drive

5. Ejection equipment

6. Worms and gears

7. Controller Components

8. Bearings

9. Dispatch Units

10. All Rotating elements

11. Relay panels

12. Brake magnet coils

13. Machine brake

14. Brushes and commutators

15. Door rollers & equipment

16. Door Operators

17. Brake shoes, linings, and pins

18. Windings and coils

19. Car station components

20. Contacts and relays

21. Selector reading systems

22. Resistors and transformers

23. Cable tension

24. Solid State Boards

25. Solid state devices / Power supplies

26. SCR’S

27. Cables (hoist / traveling)

28. Belts

29. Sheaves

30. Motors

31. Door Protection devices

32. Lights Page 1 of Page 1 of Page 1 of

Page 1 of Page 1 of Page 1 of

a. Contract shall provide all labor, tools, permits and material necessary to satisfy the requirement of this contract.

c. The Contractor shall provide a copy of their preventive maintenance program to the MVAHCS including any tasking schedule, maintenance log, computerized labor detail and other related documentation.

d. The Contractor shall keep guide rails properly lubricated except where roller guides are used. Excess oil will be cleaned up and disposed of properly. The dirt and fuzz generated in the hoist-way and on the rails, counterweights, buffers, ropes, switches, and other equipment will be cleaned down periodically to eliminate the fire hazard.

e. The Contractor shall replace guide shoe inserts, gibs or rollers when conditions warrant in order to provide reasonable smooth and quiet operations. Ride Quality parameters shall be maintained per reasonable performance requirements.

f. The Contractor shall repair or replace hoist cables, and traveling cables when conditions warrant. The replacement of these and other major items shall be scheduled in advance with MVAHCS to provide minimal inconvenience. All replacement traveling cables will include at least two spare twisted pair.

g. The Contractor shall re-lamp signals as needed, during regular examinations. Whenever possible, LED Style bulbs will be utilized. If neon or LED bulbs are used, the entire fixture or all the devices requiring a bulb in that fixture will be changed at the same time to maintain a consistent and similar cosmetic appearance.

h. The Contractor shall be responsible for the replacement of non-functioning elevator light ballasts, light tubes and bulbs.

i. The Contractor shall furnish lubricants, cleaners, solvents and all other chemicals required to conform to the specifications. The Contractor shall also supply and post MSDS forms for all solvents and lubricants at a location identified by the MVAHCS or where the solvents or chemicals are stored.

j. The Contractor shall keep the machine rooms, hoistways, pits and car tops and bottoms clean and dispose of all waste, oil, wipes (whether rag or disposable), old parts and debris generated during or part of the performance of this contract in a proper legal manner. It will not use the building’s disposal means unless approved in advance from the MVAHCS. The Contractor shall comply with Environmental Protection Agency (EPA) and environmental requirements.

2. TESTING:

a. The Contractor shall conduct all tests for compliance with ASME 17.1 and 17.2 and local prevailing code requirements. This includes all Fire Fighters and Emergency Power testing required by code. The Contractor shall document the test results and forward a copy to the MVAHCS for review and as needed to meet the governing authority’s filing procedures. This includes any permits or associated charges. The documentation shall be forwarded to all respective parties within 10 working days of the test completion. Any fines incurred for failure to complete required testing or filing irregularities shall be paid by the Contractor.

3. ANNUAL HYDRAULIC ELEVATOR RELIEF VALVE:

a. Contractor shall perform an annual no load test on the relief valve and entire system Pressure Test conforming to the requirements outlined in ASME 17.1. One Year Inspection and Test Requirements on all hydraulic units including material lift units covered under this contract. Even if the Prevailing Code Authority only enforces the three-year or five-year test, Annual No Loads must be performed in addition to the Prevailing Code Authorities requirements.

4. ANNUAL NO LOAD TEST FOR TRACTIONS:

a. Contractor shall perform a no-load Safety Test conforming to the requirements contained in ASME 17.1. One year Inspection and Test requirements on all traction elevators covered under this contract.

5. FIVE-YEAR FULL LOAD TEST:

a. Contractor shall perform all Five-Year Load Tests conforming to the requirements contained in ASME 17.1. Five-year inspection and Test requirements on all traction units covered under this contract. This test was last completed in 2021.

6. PHONE / PHONE LINE TESTING:

a. The Contractor shall check the phone line and connection in each elevator at least quarterly. The phones shall be programmed to the MVAHCS Police Department 24-hour number at no additional cost. The alarm bell shall be checked quarterly at a minimum. All other testing including fire service phase one and two, emergency power operation and all other tests shall be performed per the prevailing code requirements and properly documented during regular hours.

7. SOLID STATE REQUIREMENTS:

a. The Contractor shall keep all solid-state printed circuit boards in a clean condition at all times. Those boards that tend to accrue normal dust levels may be cleaned to a satisfactory level by brushing, vacuuming and dry air. Depending on the environment, if high levels of contamination are conductive, then solid-state boards should be cleaned by other means. It should be remembered that liquid cleaning should not have an aggressive action injurious to the components.

b. The Contractor shall maintain copies of the main E-proms of the systems exclusively for use by the MVAHCS and shall be able to immediately supply them if needed.

8. PAINTING REQUIREMENTS:

a. It is the Contractor's responsibility that all equipment is properly painted with high grade enamel. All equipment shall appear to be clean at all times.

9. MOTOR REQUIREMENTS:

a. Motors will be megged every two years and written results or findings given to the MVAHCS. The motors may be required to be cleaned and reinsulated if meg readings fall below industry benchmarks. Any value below the 800 K reading to ground shall require some action. This action may be limited to simple cleaning, washing, re-baking or rewinding. The action will be agreed to by both parties to obtain the minimum acceptable reading. The motor windings and armatures are to be cleaned and painted with insulating varnish as needed. Documentation is required and will be maintained in a computer file available to the MVAHCS or in a separate section of a procedure manual on site.

10. HYDRAULIC FLUID:

a. The hydraulic fluid shall be filtered every third year and as needed. A schedule of filtering each unit will be provided to the Operations Center to be compliant with a policy of not to exceed three years. The fluid may require more frequent filtering depending on use and surrounding activity and will be performed as needed as part of preventive maintenance. Documentation is required and shall be maintained in a computer file available to the MVAHCS or in a separate section of a procedure manual on site.

11. SERVICE MEETING REQUIREMENTS:

a. The Contractor Technician shall be required to attend semi-annual meetings or as deemed necessary by the MVAHCS to be held in the MVAHCS facilities.

b. A Contractor Representative is expected to be available to address escalated issues including, but not limited to, proposed work and invoices. If representative cannot be available for a specific time, a back-up must be assigned, and the MVAHCS notified of the person’s name and cell phone number.

c. A complete, permanent record of arrival and departure times, maintenance, inspections, lubrication and call back service shall be kept in the machine room or other designated location at the property. These records shall be available for review at all times. “Routine service” or “serviced equipment” will not be acceptable notations for the documentation. Contractor is expected to use the normal vertical transportation log-in sheets used by the Contractor. If the Contractor does not have a specific sign in log sheet, one will be provided that is acceptable to the MVAHCS. On site documentation is mandatory.

d. Internet only documentation will not fulfill all of the requirements and may warrant additional written support documentation.

e. The Contractor shall provide the MVAHCS a summary of all call-back resolutions at the end of each quarter or on request for cause and do a review and analysis of the quarter’s performance. The callback report will identify each unit separately.

12. EXPECTATIONS AND TRAINING:

a. The contractor shall provide staff with the necessary training required to maintain the elevators for the MVHAHCS.

13. RECORD RETENTION/REPORTING REQUIREMENTS:

a. In the event the Contractor is notified of deficiencies or repair items identified by MVAHCS Consultant, the Prevailing Code Authority, Contractor shall provide timely responses, including a timing and action plan and, when complete, Contractor shall provide prompt notification to the MVAHCS.

b. Contractor shall provide the MVAHCS with the following reports on a monthly basis. A summary of all callbacks for the month that includes the facility number, equipment number or identification, date of service, hours spent, reason for callback, service performed, number and identity of mechanic(s) involved, and any recommendations to reduce future problems.

c. Documentation as required within the specifications may be reviewed as needed including but not limited to hoist-way cleaning, filtering oil, testing status of fire service, etc.

14. WORKING HOURS:

a. The contract shall provide an on-site Technician forty (40) hours each week.

All normal work under this contract shall be provided during regular working hours of regular working days of the elevator trade. For the purpose of this contract, regular working hours are defined as 6:30 a.m. to 3:00 p.m., Monday through Friday, excluding Federal Holidays.

b. Observed Federal Holidays:

New Year’s DayMartin Luther King Birthday
Washington’s BirthdayMemorial Day
JuneteenthIndependence Day
Labor DayColumbus Day
Veteran’s DayThanksgiving Day
Christmas Day

c. The minimum hours are excluding call-backs, repairs, or other issues unrelated to preventive maintenance.

d. Call-back service shall be included for all units during the normal workdays and during overtime hours on the vertical transportation units.

e. A MVAHCS representative must be notified of any identified intentional abuse or intentional damage.

f. Contractor must be able to properly troubleshoot and diagnose all aspects of the elevator system failures. Technician’s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the elevator system failure and that they have verified the elevator system has been properly diagnosed and concur with the technician’s assessment. The VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert’s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert’s points that contradict the Contractor’s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert’s opinion.

15. SECURITY/BADGING:

a. Contractor’s personnel will utilize a temporary vendor’s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.

b. The Contractor shall comply with the MVAHCS security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge.

c. All employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.

d. Contractor will submit all required security badging documents for each employee within 5 business days from the award date of contract. All documents must be legible. The following documents will be sent to Contractor via email after contract is awarded.

1. OF 306- Must be Typed. Handwritten will not be acceptable.

2. Self-Certification

3. VA 10-2417

4. Employee Fingerprint Resource Form

16. PERFORMACE REQUIREMENTS:

b. The Contractor shall maintain a reasonable, acceptable or the original designed contract speeds for each elevator, and performance time, which include acceleration and deceleration, as designed and installed by the manufacturer. The Contractor shall perform all the necessary adjustments as required to maintain the Performance Criteria as specified, within the limits of the applicable codes.

c. System designed floor-to-floor times shall be maintained and are measured from the time the doors begin to close, including a typical one-floor travel and until the elevator is approximately level with the next successive floor, either up or down, and the doors are 3/4 open.

d. Appropriate door opening times shall be maintained and are measured from the start of a car door opening until doors are 1" from the fully open position.

e. Door closing force shall not exceed the code requirements of 30 pounds and will be measured at rest with the doors between 1/3 and 2/3 closed.

f. Stopping accuracy shall be maintained to the manufacturer’s standards at all times and shall be measured and monitored under all load conditions.

g. Variance from rated contract speed, regardless of load, shall not exceed +5 %.

h. Door close speed reduced (nudging) and code parameters. All scanners to be in a fail-safe mode.

i. Door dwell time for car calls shall meet Americas with Disabilities Act (ADA) parameters and to each facilities special requirements.

j. Door dwell time for hall calls shall meet Americas with Disabilities Act (ADA) parameters and to each facilities special requirements.

k. Sound parameters – equipment producing abnormal or excessive noise shall be repaired to OEM original standards. Includes mufflers, guide shoes, SCR drives, VVVF equipment, rollers, bearings or other replaceable parts determined to be the cause. The sound limits shall not exceed 70 dba for hydraulics and 65 dba for tractions.

l. Ride Quality: The equipment shall be maintained, lubricated to provide and maintain ride quality parameters specified or designed within the equipment base. If roller guide rollers, step rollers, guide devices, rails or supporting equipment and normally replaceable or adjustable parts are determined to be the cause of poor ride quality, it will be the Contractors responsibility to replace or adjust those parts at no additional cost.

m. System Supervisory: The group supervisory and individual control system shall be maintained to provide satisfactory service levels per OEM design criteria. The MVAHCS may request computerized traffic studies with a summary report that details hall waiting times, floor to floor times and average response times. The report will have documentation for a minimum of one weeks’ time. The

n. Contractor may use their analyzer of choice as long as it satisfies the documentation required.

o. Fault Logs: Contractor shall provide fault logs if the equipment has the capability for review when requested. The fault along with the definition shall be used to assist in understanding the specific equipment or problem.

p. In accomplishing the above requirements, the Contractor shall maintain a comfortable elevator ride with smooth acceleration, retardation and a soft stop. Power door operation when used shall be quiet and positive with smooth checking at the extremes of travel. Performance requirements indicated are minimum standards and are not the sole criteria for judging the Contractor's performance.

17. REPAIR PARTS INVENTORY:

a. The Contractor shall maintain a supply of solid-state boards, contacts, coils, leads, fuses, motor and generator brushes, hanger rollers, clutch rollers, lubricants, wiping cloths, rollers, button parts, at least one spare door protective device, drive belts, chains, switches and other minor parts for the performance of routine preventive maintenance and to minimize down time on emergency call backs after hours.

b. The Contractor shall maintain a supply of replacement parts in their warehouse inventory. This inventory shall include, but is not limited to; door operator motors, controller switch contacts, selector switch contacts, coils, clutch parts and chains, solid state components, generator brushes, selector inductors, door hangers, guide shoe inserts and roller guides, emergency light fixture batteries, and hoistway limit switches.

18. ACCIDENT REPORTS:

a. In the event of accidents of any kind, the Contractor and/or MVAHCS shall contact the other party immediately and furnish the other party with copies of all accident reports. The reports shall be sent without delay and at the same time that they are forwarded to any other parties. The Contractor shall assist the MVAHCS in proper reporting to the Prevailing Code Authority as required in the time frame mandated by local codes.

b. The Contractor shall assist and provide all technical expertise as needed in any accident investigation. The findings, procedures and testing in any investigative effort will be documented and a copy made for the MVAHCS.

c. The Contractor shall not turn any equipment over for use without authorization by the Prevailing Code Authority and by a MVAHCS after an accident has been reported.

19. SAFETY:

a. The Contractor is responsible for its own safety program in accordance with applicable provisions of the Occupational Safety and Health Act.

b. The Contractor shall be responsible for payment of all fines and/or claims for damages levied against the MVAHCS, for environmental, health and safety deficiencies relating to conduct of the Contractor's work.

c. The Contractor shall comply with all applicable local, State, and Federal environmental, safety and health regulations and with the MVAHCSs’ rules and regulations for safety requirements for all outside Contractors and construction crews.

d. The Contractor shall comply with all provisions of the Right-to Know and Resource Conservation and Recovery Act, and shall additionally provide to the MVAHCS the following substantiation of same:

1. Maintain a copy all MSDS and SDS on site for all chemicals used at the facility.

2. Shall provide HAZCOM training as required to its employees.

3. Submit a copy of its written hazard communication program

4. Shall identify one person who is in charge of the program.

5. Shall properly label and store all containers of chemicals on site or used in performance of the contract.

6. Shall dispose of all chemicals used in performance of the contract in a manner prescribed by the Resource Conservation and Recovery Act and/or other applicable laws and regulations

20. SAFETY PROCEDURES FOR CONTRACTORS:

a. As a Contractor and employer, you are required by Federal and State Occupational Safety and Health Regulations, Standards, Codes, Rules and Regulations, in addition to your contract with the MVAHCS to provide protection for customers, employees and the public who may come into contact with your operations.

1. Duties of Employer:

a. Safety Program: Prior to commencing work, the Contractor shall submit its written safety program to the MVAHCSs’ representative for review and approval. The minimum content of the program will be the "Safety Item Checklist”. All applicable items on the "list” are to be addressed to the satisfaction of the MVAHCS. This shall include an applicable plan for conveying the information to employees, implementing the policy on the jobsite, monitoring compliance with the policy, and enforcing corrective action as required.

b. Safety item checklist:

i. ADMINISTRATION

a. Emergency Numbers Posted

b. Conducted Inspections

c. OSHA Postings of Employee’s Rights

d. Safety Manual on Site

e. Work Comp Procedures Followed

f. Oil Monitoring Program for All Hydraulic Units

g. Safety Data Sheets (SDS) located on-site

21. MVAHCS RIGHT TO INSPECT AND REQUIRE WORK:

a. An elevator consultant may be retained by MVAHCS to review maintenance procedures, performance, etc. The designated or approved Vehicle Transportation (VT) consultant may provide audit reports, to the VT vendor, by a paper-based system or electronically. The Contractor shall be provided with a secure password to access any report if a web site is used.

b. Upon request, Contractor shall assist the consultant or Prevailing Code Authority in making routine and periodic inspections to ensure the requirements of this contract are being fulfilled.

c. The service mechanic and/or the supervisor shall be responsible for meeting with the representative of the consultant on resolving deficiencies and scheduling as a result of any Periodic, Routine or Performance inspection performed by the Consultant or their representative. If a mutual contract cannot be resolved, the MVAHCS shall determine the extent of compliance.

22. CONTRACTOR TO COMPLY WITH LAWS:

a. In the performance of this specification, the Contractor shall abide by all existing laws, codes, rules and regulations set forth by all appropriate authorities having jurisdiction in the location where the work is to be performed.

b. Contractor shall make periodic tests and maintenance inspections of all equipment as required by current applicable safety codes for elevators. Contractor shall make annual pressure test on hydraulic elevators; and Firefighter's Recall tests; all as required by ASME A17.1. Written reports of all tests shall be submitted to the MVAHCS, and, in the case of safety tests, prior notification shall be given so that a representative of MVAHCS may witness the test if warranted.

c. All safety tests, scheduled repairs or other scheduled work that requires an elevator to be out of service longer than 2 hours shall be scheduled, in advance, with the MVAHCS.

23. EMPLOYEES OF CONTRACTOR:

a. Contractor agrees that all work shall be performed by a skilled, experienced, elevator service and repair personnel directly employed by the Contractor. Contractor's employees shall not work if they are intoxicated or impaired during working hours while on the building property.

24. LICENSING AND CERTIFICATION EXPERIENCE:

a. Contractor personnel performing elevator maintenance for this contract shall possess a National Association of Elevator Contractors (NAEC) or National Industry Education (NEIE) Program or equivalent licensing and certification and 5 years or more experience. A copy of their licenses and certifications required by local, state or industry standards for technicians, shall be provide to the COR at the contract start date, as well as upon recertification or renewal of licensing.

b. Contractors must provide two certified technician, one primary to maintain 40 hour requirement of the contract and one as a secondary back up.

25. MECHANICAL ROOM HOUSEKEEPING:

a. The Contractor is to prevent unnecessary dust, or accumulated debris to interfere with the functioning of the elevators.

b. Contractor shall maintain the machine room, machinery spaces, hoist-ways, pits and equipment in reasonably clean condition at all times.

c. The Contractor shall clean the pits as needed to be reasonably clean of dirt and debris. The pits shall also be kept oil free. If the pits or machine room floor are oil stained, effective measures will be undertaken to dry up the oil residue to assist in oil monitoring all hydraulics.

d. Contractor shall keep clean rags in a metal container at each location to comply with minimum fire codes and safety.

e. Contractor shall keep all solvents stored onsite in a metal cabinet. SDS sheets shall be provided on site for all lubricants and any hydraulic oils. The hydraulic oil SDS sheets shall be inserted into a plastic holder adhered to the tank unit.

f. The Contractor shall incorporate the safety routine or procedure and safety signage for all maintenance procedures outlined by the Contractor’s own safety policies and applicable codes.

g. The MVAHCS may request a walk-through of the elevator areas with the service manager or supervisory personnel of the Contractor. The request shall be complied with in a reasonable time frame.

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

Provide Elevator Maintenance in accordance with the Statement of Work.

Contract Period: Base POP Begin: 06-01-2025 POP End: 05-31-2026 PRINCIPAL NAICS CODE: 238290 - Other Building Equipment Contractors PRODUCT/SERVICE CODE: J039 - Maintenance, Repair, and Rebuilding of Equipment - Materials Handling Equipment

12.00
MO
__________________
__________________

Provide Elevator Maintenance in accordance with the Statement of Work.

Contract Period: Option 1 POP Begin: 06-01-2026 POP End: 05-31-2027

PRODUCT/SERVICE CODE: J039 - Maintenance, Repair, and Rebuilding of Equipment - Materials Handling Equipment

12.00
MO
__________________
__________________

Provide Elevator Maintenance in accordance with the Statement of Work.

Contract Period: Option 2 POP Begin: 06-01-2027 POP End: 05-31-2028

PRODUCT/SERVICE CODE: J039 - Maintenance, Repair, and Rebuilding of Equipment - Materials Handling Equipment

12.00
MO
__________________
__________________

Provide Elevator Maintenance in accordance with the Statement of Work.

Contract Period: Option 3 POP Begin: 06-01-2028 POP End: 05-31-2029

PRODUCT/SERVICE CODE: J039 - Maintenance, Repair, and Rebuilding of Equipment - Materials Handling Equipment

12.00
MO
__________________
__________________

Provide Elevator Maintenance in accordance with the Statement of Work.

Contract Period: Option 4 POP Begin: 06-01-2029 POP End: 05-31-2030

PRODUCT/SERVICE CODE: J039 - Maintenance, Repair, and Rebuilding of Equipment - Materials Handling Equipment

GRAND TOTAL
__________________

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .