S06 Amendment-Elevator Maintenance MLPS 36C26325Q0529 0004.docx
DOCX document 158 KB Posted
- Solicitation number
- 36C26325Q0529
About this file
This document is an Amendment to Solicitation 36C26325Q0529 for Preventative Maintenance Elevator Services at the Minneapolis VA Health Care System (MVAHCS). The amendment extends the offer deadline to May 30, 2025, and revises the Statement of Work for elevator maintenance services. The solicitation covers maintenance for 40 elevators manufactured by MCE Controls, including passenger, freight, and specialized lift elevators with varying speeds (100-500 FPM) and capacities (1,000-10,000 lbs).
Key requirements include providing a full-time on-site technician (40 hours/week), performing comprehensive preventive maintenance, conducting annual and five-year testing, maintaining equipment performance standards, and adhering to strict safety and documentation protocols. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and requires technicians to have National Association of Elevator Contractors (NAEC) or equivalent certification with at least 5 years of experience. Offers must be submitted electronically to theresa.thunder@va.gov in Microsoft Word, Adobe PDF, or Excel formats, with separate technical and pricing volumes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Amendment-Elevator Maintenance MPLS 36C26325Q0529 0006.docx | DOCX document | |
| S06 Amendment-Elevator Maintenance MPLS 36C26325Q0529 0005.docx | DOCX document | |
| S06 Elevator Maintenance MLPS 36C26325Q0529 0003.docx | DOCX document | |
| S02 Elevator Maintenance MLPS 36C26325Q0529.docx | DOCX document | |
| S06 Elevator Maintenance MLPS 36C26325Q0529 0002.docx | DOCX document | |
| S06 Elevator Maintenance MLPS 36C26325Q0529 0001.docx | DOCX document | |
| S02 Elevator Maintenance MLPS 36C26325Q0529.docx | DOCX document | |
| S02 Elevator Maintenance MLPS 36C26325Q0529.docx | DOCX document | |
| S02 DOL WG 2015-4945 075R 12.23.2024.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
05-23-2025
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK 23 CONTRACTING OFFICE
2101 ELM STREET (04-S)
FARGO ND 58102
04-S
DEPARTMENT OF VETERANS AFFAIRS
NETWORK 23 CONTRACTING OFFICE
2101 North Elm Street Building 30 (04-S)
FARGO ND 58102
To all Offerors/Bidders
36C26325Q0529
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 05-30-2025 17:00 CDT See CONTINUATION Page
See following page.
Jeffrey Brown Contracting Officer
VA-VHA-RPOC-2024-0033
The purpose of this amendment is to:
1. Reopen the solicitation and extend the offer deadline to the date listed above.
2. Edit the Statement of Work.
3. Edit the Addendum to FAR 52.212-1 Instructions to Offerors
Edited sections highlighted below.
B.3 STATEMENT OF WORK
REQUIREMENT
1. Provide elevator maintenance at the Minneapolis VA Health Care System (MVAHCS) facility. The Contractor shall provide all labor, material, and equipment to conduct preventive maintenance and repairs in accordance with all terms, conditions, provisions, specifications and Schedule listed in Statement of Work.
ELEVATOR LIST:
| Number |
| LOCATION OF |
| PASSENGER/ |
| CONTROL |
| SPEED |
| CAPACITY |
| TYPE |
| ELEVATORS |
| FREIGHT |
| Manufacturer |
| 1 |
| A1 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 4000 lbs. |
| Gearless |
| 2 |
| A2 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 4000 lbs. |
| Gearless |
| 3 |
| A3 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 4000 lbs. |
| Gearless |
| 4 |
| A4 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 4000 lbs. |
| Gearless |
| 5 |
| B1 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 6 |
| B2 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 7 |
| B3 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 8 |
| B4 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 9 |
| C1 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 10 |
| C2 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 11 |
| C3 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 12 |
| D1 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 13 |
| D2 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 14 |
| D3 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 15 |
| L1 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 16 |
| L2 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 17 |
| L3 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 18 |
| FREIGHT F |
| 1 FREIGHT |
| MCE Controls |
| 350 FPM |
| 10,000 lbs. |
| GEAR |
| 19 |
| G1 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 20 |
| G2 |
| Passenger |
| MCE Controls |
| 500 FPM |
| 5000 lbs. |
| Gearless |
| 21 |
| M7a |
| ATS Freight |
| MCE Controls |
| 350 FPM |
| 2500 lbs. |
| GEAR |
| 22 |
| M7b |
| ATS Freight |
| MCE Controls |
| 350 FPM |
| 2500 lbs. |
| GEAR |
| 23 |
| M8a |
| ATS Freight |
| MCE Controls |
| 350 FPM |
| 2500 lbs. |
| GEAR |
| 24 |
| M8b |
| ATS Freight |
| MCE Controls |
| 350 FPM |
| 2500 lbs. |
| GEAR |
| 25 |
| M1 |
| 1 PASSENGER |
| MCE Controls |
| 100 FPM |
| 2500 lbs. |
| Hydro |
| 26 |
| M2 |
| ATS SERV FR |
| MCE Controls |
| 350 FPM |
| 3500 lbs. |
| GEAR |
| 27 |
| M11 |
| 1 PASSENGER |
| MCE Controls |
| 100 FPM |
| 4000 lbs. |
| Hydro |
| 28 |
| Cart Lift |
| M3 |
| MCE Controls |
| 100 FPM |
| 1000 lbs. |
| Hydro |
| 29 |
| Cart Lift |
| M9 |
| MCE Controls |
| 100 FPM |
| 1000 lbs. |
| Hydro |
| 30 |
| Bldg. 49 |
| S1 |
| MCE Controls |
| 125 FPM |
| 5000 lbs. |
| Hydro |
| 31 |
| Bldg. 49 |
| S2 |
| MCE Controls |
| 125 FPM |
| 4000 lbs. |
| Hydro |
| 32 |
| Bldg. 49 |
| S3 |
| MCE Controls |
| 125 FPM |
| 4000 lbs. |
| Hydro |
| 33 |
| Bldg. 9 |
| LOBBY |
| MCE Controls |
| 125 FPM |
| 2500 lbs. |
| Hydro |
| 34 |
| Bldg. 10 |
| LOBBY |
| MCE Controls |
| 125 FPM |
| 2500 lbs. |
| Hydro |
| 35 |
| Bldg. 68 |
| LOBBY |
| MCE Controls |
| 100 FPM |
| 4000 lbs. |
| Hydro |
| 36 |
| Bldg. 222 |
| FREIGHT 22 |
| MCE Controls |
| 100 FPM |
| 4000 lbs. |
| GEAR |
| 37 |
| Bldg. 222 |
| Passenger 21 |
| SAVARIA |
| 30 FPM |
| 1400 lbs. |
| Roped Hydro |
| 38 |
| Bldg. 75 |
| Fisher House #2 |
| TAC 20 |
| 100 FPM |
| 2500 lbs. |
| Roped Hydro |
| 39 |
| Bldg. 76 |
| SCI |
| TAC 20 |
| 100 FPM |
| 2500 lbs. |
| Hydro |
| 40 |
| Bldg. 78 |
| Parking Ramp |
| MRL |
| 150 FPM |
| 2500 lbs. |
| Gearless |
a. Contractor will provide a qualified elevator technicians to be on site 8 hours daily Monday through Friday (except federal holidays).
b. The Contractor shall have a program in place to regularly and systematically examine, clean, lubricate, adjust, repair or replace (irreparable or obsolete) parts, devices, and components, including but not limited to the following:
1.
Page 1 of Page 1 of Page 1 of
Page 1 of Page 1 of Page 1 of
2. Hoisting motors
3. Selector components
4. Solid state motor drive
5. Ejection equipment
6. Worms and gears
7. Controller Components
8. Bearings
9. Dispatch Units
10. All Rotating elements
11. Relay panels
12. Brake magnet coils
13. Machine brake
14. Brushes and commutators
15. Door rollers & equipment
16. Door Operators
17. Brake shoes, linings, and pins
18. Windings and coils
19. Car station components
20. Contacts and relays
21. Selector reading systems
22. Resistors and transformers
23. Cable tension
24. Solid State Boards
25. Solid state devices / Power supplies
26. SCR’S
27. Cables (hoist / traveling)
28. Belts
29. Sheaves
30. Motors
31. Door Protection devices
32. Lights Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of
Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of
a. Contract shall provide all labor, tools, permits and material necessary to satisfy the requirement of this contract.
c. The Contractor shall provide a copy of their preventive maintenance program to the MVAHCS including any tasking schedule, maintenance log, computerized labor detail and other related documentation.
d. The Contractor shall keep guide rails properly lubricated except where roller guides are used. Excess oil will be cleaned up and disposed of properly. The dirt and fuzz generated in the hoist-way and on the rails, counterweights, buffers, ropes, switches, and other equipment will be cleaned down periodically to eliminate the fire hazard.
e. The Contractor shall replace guide shoe inserts, gibs or rollers when conditions warrant in order to provide reasonable smooth and quiet operations. Ride Quality parameters shall be maintained per reasonable performance requirements.
f. The Contractor shall repair or replace hoist cables, and traveling cables when conditions warrant. The replacement of these and other major items shall be scheduled in advance with MVAHCS to provide minimal inconvenience. All replacement traveling cables will include at least two spare twisted pair.
g. The Contractor shall re-lamp signals as needed, during regular examinations. Whenever possible, LED Style bulbs will be utilized. If neon or LED bulbs are used, the entire fixture or all the devices requiring a bulb in that fixture will be changed at the same time to maintain a consistent and similar cosmetic appearance.
h. The Contractor shall be responsible for the replacement of non-functioning elevator light ballasts, light tubes and bulbs.
i. The Contractor shall furnish lubricants, cleaners, solvents and all other chemicals required to conform to the specifications. The Contractor shall also supply and post MSDS forms for all solvents and lubricants at a location identified by the MVAHCS or where the solvents or chemicals are stored.
j. The Contractor shall keep the machine rooms, hoistways, pits and car tops and bottoms clean and dispose of all waste, oil, wipes (whether rag or disposable), old parts and debris generated during or part of the performance of this contract in a proper legal manner. It will not use the building’s disposal means unless approved in advance from the MVAHCS. The Contractor shall comply with Environmental Protection Agency (EPA) and environmental requirements.
2. TESTING:
a. The Contractor shall conduct all tests for compliance with ASME 17.1 and 17.2 and local prevailing code requirements. This includes all Fire Fighters and Emergency Power testing required by code. The Contractor shall document the test results and forward a copy to the MVAHCS for review and as needed to meet the governing authority’s filing procedures. This includes any permits or associated charges. The documentation shall be forwarded to all respective parties within 10 working days of the test completion. Any fines incurred for failure to complete required testing or filing irregularities shall be paid by the Contractor.
3. ANNUAL HYDRAULIC ELEVATOR RELIEF VALVE:
a. Contractor shall perform an annual no load test on the relief valve and entire system Pressure Test conforming to the requirements outlined in ASME 17.1. One Year Inspection and Test Requirements on all hydraulic units including material lift units covered under this contract. Even if the Prevailing Code Authority only enforces the three-year or five-year test, Annual No Loads must be performed in addition to the Prevailing Code Authorities requirements.
4. ANNUAL NO LOAD TEST FOR TRACTIONS:
a. Contractor shall perform a no-load Safety Test conforming to the requirements contained in ASME 17.1. One year Inspection and Test requirements on all traction elevators covered under this contract.
5. FIVE-YEAR FULL LOAD TEST:
a. Contractor shall perform all Five-Year Load Tests conforming to the requirements contained in ASME 17.1. Five-year inspection and Test requirements on all traction units covered under this contract. At least two-person team, not including the on-site technician, shall perform the five-year full load test. This test was last completed in 2021.
6. PHONE / PHONE LINE TESTING:
a. The Contractor shall check the phone line and connection in each elevator at least quarterly. The phones shall be programmed to the MVAHCS Police Department 24-hour number at no additional cost. The alarm bell shall be checked quarterly at a minimum. All other testing including fire service phase one and two, emergency power operation and all other tests shall be performed per the prevailing code requirements and properly documented during regular hours.
7. SOLID STATE REQUIREMENTS:
a. The Contractor shall keep all solid-state printed circuit boards in a clean condition at all times. Those boards that tend to accrue normal dust levels may be cleaned to a satisfactory level by brushing, vacuuming and dry air. Depending on the environment, if high levels of contamination are conductive, then solid-state boards should be cleaned by other means. It should be remembered that liquid cleaning should not have an aggressive action injurious to the components.
b. The Contractor shall maintain copies of the main E-proms of the systems exclusively for use by the MVAHCS and shall be able to immediately supply them if needed.
8. PAINTING REQUIREMENTS:
a. It is the Contractor's responsibility that all equipment is properly painted with high grade enamel. All equipment shall appear to be clean at all times.
9. MOTOR REQUIREMENTS:
a. Motors will be megged every two years and written results or findings given to the MVAHCS. The motors may be required to be cleaned and reinsulated if meg readings fall below industry benchmarks. Any value below the 800 K reading to ground shall require some action. This action may be limited to simple cleaning, washing, re-baking or rewinding. The action will be agreed to by both parties to obtain the minimum acceptable reading. The motor windings and armatures are to be cleaned and painted with insulating varnish as needed. Documentation is required and will be maintained in a computer file available to the MVAHCS or in a separate section of a procedure manual on site.
10. HYDRAULIC FLUID:
a. The hydraulic fluid shall be filtered every third year and as needed. A schedule of filtering each unit will be provided to the Operations Center to be compliant with a policy of not to exceed three years. The fluid may require more frequent filtering depending on use and surrounding activity and will be performed as needed as part of preventive maintenance. Documentation is required and shall be maintained in a computer file available to the MVAHCS or in a separate section of a procedure manual on site.
11. SERVICE MEETING REQUIREMENTS:
a. The Contractor Technician shall be required to attend semi-annual meetings or as deemed necessary by the MVAHCS to be held in the MVAHCS facilities.
b. A Contractor Representative is expected to be available to address escalated issues including, but not limited to, proposed work and invoices. If representative cannot be available for a specific time, a back-up must be assigned, and the MVAHCS notified of the person’s name and cell phone number.
c. A complete, permanent record of arrival and departure times, maintenance, inspections, lubrication and call back service shall be kept in the machine room or other designated location at the property. These records shall be available for review at all times. “Routine service” or “serviced equipment” will not be acceptable notations for the documentation. Contractor is expected to use the normal vertical transportation log-in sheets used by the Contractor. If the Contractor does not have a specific sign in log sheet, one will be provided that is acceptable to the MVAHCS. On site documentation is mandatory.
d. Internet only documentation will not fulfill all of the requirements and may warrant additional written support documentation.
e. The Contractor shall provide the MVAHCS a summary of all call-back resolutions at the end of each quarter or on request for cause and do a review and analysis of the quarter’s performance. The callback report will identify each unit separately.
12. EXPECTATIONS AND TRAINING:
a. The contractor shall provide staff with the necessary training required to maintain the elevators for the MVHAHCS.
13. RECORD RETENTION/REPORTING REQUIREMENTS:
a. In the event the Contractor is notified of deficiencies or repair items identified by MVAHCS Consultant, the Prevailing Code Authority, Contractor shall provide timely responses, including a timing and action plan and, when complete, Contractor shall provide prompt notification to the MVAHCS.
b. Contractor shall provide the MVAHCS with the following reports on a monthly basis. A summary of all callbacks for the month that includes the facility number, equipment number or identification, date of service, hours spent, reason for callback, service performed, number and identity of mechanic(s) involved, and any recommendations to reduce future problems.
c. Documentation as required within the specifications may be reviewed as needed including but not limited to hoist-way cleaning, filtering oil, testing status of fire service, etc.
14. WORKING HOURS:
a. The contract shall provide an on-site Technician forty (40) hours each week.
All normal work under this contract shall be provided during regular working hours of regular working days of the elevator trade. For the purpose of this contract, regular working hours are defined as 6:30 a.m. to 3:00 p.m., Monday through Friday, excluding Federal Holidays.
b. Observed Federal Holidays:
| New Year’s Day | Martin Luther King Birthday | ||
| Washington’s Birthday | Memorial Day | ||
| Juneteenth | Independence Day | ||
| Labor Day | Columbus Day | ||
| Veteran’s Day | Thanksgiving Day | ||
| Christmas Day |
c. The minimum hours are excluding call-backs, repairs, or other issues unrelated to preventive maintenance.
d. Call-back service shall be included for all units during the normal workdays and during after hours on the vertical transportation units.
e. A MVAHCS representative must be notified of any identified intentional or unintentional damage. Additionally, the MVAHCS reserves the right per section 14f of this Statement of Work to request a quote for repairs of any of the identified damage, unintentional or intentional.
f. Contractor must be able to properly troubleshoot and diagnose all aspects of the elevator system failures. Technician’s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the elevator system failure and that they have verified the elevator system has been properly diagnosed and concur with the technician’s assessment. The VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert’s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert’s points that contradict the Contractor’s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert’s opinion.
15. SECURITY/BADGING:
a. Contractor’s personnel will utilize a temporary vendor’s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.
b. The Contractor shall comply with the MVAHCS security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge.
c. All employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.
d. Contractor will submit all required security badging documents for each employee within 5 business days from the award date of contract. All documents must be legible. The following documents will be sent to Contractor via email after contract is awarded.
1. OF 306- Must be Typed. Handwritten will not be acceptable.
2. Self-Certification
3. VA 10-2417
4. Employee Fingerprint Resource Form
16. PERFORMACE REQUIREMENTS:
b. The Contractor shall maintain a reasonable, acceptable or the original designed contract speeds for each elevator, and performance time, which include acceleration and deceleration, as designed and installed by the manufacturer. The Contractor shall perform all the necessary adjustments as required to maintain the Performance Criteria as specified, within the limits of the applicable codes.
c. System designed floor-to-floor times shall be maintained and are measured from the time the doors begin to close, including a typical one-floor travel and until the elevator is approximately level with the next successive floor, either up or down, and the doors are 3/4 open.
d. Appropriate door opening times shall be maintained and are measured from the start of a car door opening until doors are 1" from the fully open position.
e. Door closing force shall not exceed the code requirements of 30 pounds and will be measured at rest with the doors between 1/3 and 2/3 closed.
f. Stopping accuracy shall be maintained to the manufacturer’s standards at all times and shall be measured and monitored under all load conditions.
g. Variance from rated contract speed, regardless of load, shall not exceed +5 %.
h. Door close speed reduced (nudging) and code parameters. All scanners to be in a fail-safe mode.
i. Door dwell time for car calls shall meet Americas with Disabilities Act (ADA) parameters and to each facilities special requirements.
j. Door dwell time for hall calls shall meet Americas with Disabilities Act (ADA) parameters and to each facilities special requirements.
k. Sound parameters – equipment producing abnormal or excessive noise shall be repaired to OEM original standards. Includes mufflers, guide shoes, SCR drives, VVVF equipment, rollers, bearings or other replaceable parts determined to be the cause. The sound limits shall not exceed 70 dba for hydraulics and 65 dba for tractions.
l. Ride Quality: The equipment shall be maintained, lubricated to provide and maintain ride quality parameters specified or designed within the equipment base. If roller guide rollers, step rollers, guide devices, rails or supporting equipment and normally replaceable or adjustable parts are determined to be the cause of poor ride quality, it will be the Contractors responsibility to replace or adjust those parts at no additional cost.
m. System Supervisory: The group supervisory and individual control system shall be maintained to provide satisfactory service levels per OEM design criteria. The MVAHCS may request computerized traffic studies with a summary report that details hall waiting times, floor to floor times and average response times. The report will have documentation for a minimum of one weeks’ time. The
n. Contractor may use their analyzer of choice as long as it satisfies the documentation required.
o. Fault Logs: Contractor shall provide fault logs if the equipment has the capability for review when requested. The fault along with the definition shall be used to assist in understanding the specific equipment or problem.
p. In accomplishing the above requirements, the Contractor shall maintain a comfortable elevator ride with smooth acceleration, retardation and a soft stop. Power door operation when used shall be quiet and positive with smooth checking at the extremes of travel. Performance requirements indicated are minimum standards and are not the sole criteria for judging the Contractor's performance.
17. REPAIR PARTS INVENTORY:
a. The Contractor shall maintain a supply of solid-state boards, contacts, coils, leads, fuses, motor and generator brushes, hanger rollers, clutch rollers, lubricants, wiping cloths, rollers, button parts, at least one spare door protective device, drive belts, chains, switches and other minor parts for the performance of routine preventive maintenance and to minimize down time on emergency call backs after hours.
b. The Contractor shall maintain a supply of replacement parts in their warehouse inventory. This inventory shall include, but is not limited to; door operator motors, controller switch contacts, selector switch contacts, coils, clutch parts and chains, solid state components, generator brushes, selector inductors, door hangers, guide shoe inserts and roller guides, emergency light fixture batteries, and hoistway limit switches.
18. ACCIDENT REPORTS:
a. In the event of accidents of any kind, the Contractor and/or MVAHCS shall contact the other party immediately and furnish the other party with copies of all accident reports. The reports shall be sent without delay and at the same time that they are forwarded to any other parties. The Contractor shall assist the MVAHCS in proper reporting to the Prevailing Code Authority as required in the time frame mandated by local codes.
b. The Contractor shall assist and provide all technical expertise as needed in any accident investigation. The findings, procedures and testing in any investigative effort will be documented and a copy made for the MVAHCS.
c. The Contractor shall not turn any equipment over for use without authorization by the Prevailing Code Authority and by a MVAHCS after an accident has been reported.
19. SAFETY:
a. The Contractor is responsible for its own safety program in accordance with applicable provisions of the Occupational Safety and Health Act.
b. The Contractor shall be responsible for payment of all fines and/or claims for damages levied against the MVAHCS, for environmental, health and safety deficiencies relating to conduct of the Contractor's work.
c. The Contractor shall comply with all applicable local, State, and Federal environmental, safety and health regulations and with the MVAHCSs’ rules and regulations for safety requirements for all outside Contractors and construction crews.
d. The Contractor shall comply with all provisions of the Right-to Know and Resource Conservation and Recovery Act, and shall additionally provide to the MVAHCS the following substantiation of same:
1. Maintain a copy all MSDS and SDS on site for all chemicals used at the facility.
2. Shall provide HAZCOM training as required to its employees.
3. Submit a copy of its written hazard communication program
4. Shall identify one person who is in charge of the program.
5. Shall properly label and store all containers of chemicals on site or used in performance of the contract.
6. Shall dispose of all chemicals used in performance of the contract in a manner prescribed by the Resource Conservation and Recovery Act and/or other applicable laws and regulations.
20. SAFETY PROCEDURES FOR CONTRACTORS:
a. As a Contractor and employer, you are required by Federal and State Occupational Safety and Health Regulations, Standards, Codes, Rules and Regulations, in addition to your contract with the MVAHCS to provide protection for customers, employees and the public who may come into contact with your operations.
1. Duties of Employer:
a. Safety Program: Prior to commencing work, the Contractor shall submit its written safety program to the MVAHCSs’ representative for review and approval. The minimum content of the program will be the "Safety Item Checklist”. All applicable items on the "list” are to be addressed to the satisfaction of the MVAHCS. This shall include an applicable plan for conveying the information to employees, implementing the policy on the jobsite, monitoring compliance with the policy, and enforcing corrective action as required.
b. Safety Item Checklist:
i. ADMINISTRATION
a. Emergency Numbers Posted
b. Conducted Inspections
c. OSHA Postings of Employee’s Rights
d. Safety Manual on Site
e. Work Comp Procedures Followed
f. Oil Monitoring Program for All Hydraulic Units
g. Safety Data Sheets (SDS) located on-site
21. MVAHCS RIGHT TO INSPECT AND REQUIRE WORK:
a. An elevator consultant may be retained by MVAHCS to review maintenance procedures, performance, etc. The designated or approved Vehicle Transportation (VT) consultant may provide audit reports, to the VT vendor, by a paper-based system or electronically. The Contractor shall be provided with a secure password to access any report if a web site is used.
b. Upon request, Contractor shall assist the consultant or Prevailing Code Authority in making routine and periodic inspections to ensure the requirements of this contract are being fulfilled.
c. The service mechanic and/or the supervisor shall be responsible for meeting with the representative of the consultant on resolving deficiencies and scheduling as a result of any Periodic, Routine or Performance inspection performed by the Consultant or their representative. If a mutual contract cannot be resolved, the MVAHCS shall determine the extent of compliance.
22. CONTRACTOR TO COMPLY WITH LAWS:
a. In the performance of this specification, the Contractor shall abide by all existing laws, codes, rules and regulations set forth by all appropriate authorities having jurisdiction in the location where the work is to be performed.
b. Contractor shall make periodic tests and maintenance inspections of all equipment as required by current applicable safety codes for elevators. Contractor shall make annual pressure test on hydraulic elevators; and Firefighter's Recall tests; all as required by ASME A17.1. Written reports of all tests shall be submitted to the MVAHCS, and, in the case of safety tests, prior notification shall be given so that a representative of MVAHCS may witness the test if warranted.
c. All safety tests, scheduled repairs or other scheduled work that requires an elevator to be out of service longer than 2 hours shall be scheduled, in advance, with the MVAHCS.
23. EMPLOYEES OF CONTRACTOR:
a. Contractor agrees that all work shall be performed by a skilled, experienced, elevator service and repair personnel directly employed by the Contractor. Contractor's employees shall not work if they are intoxicated or impaired during working hours while on the building property.
24. LICENSING AND CERTIFICATION EXPERIENCE:
a. Contractor personnel performing elevator maintenance for this contract shall possess a National Association of Elevator Contractors (NAEC) or National Industry Education (NEIE) Program or equivalent licensing and certification and 5 years or more experience. A copy of their licenses and certifications required by local, state or industry standards for technicians, shall be provide to the COR at the contract start date, as well as upon recertification or renewal of licensing.
b. Contractors must provide two certified technician, one primary to maintain 40 hour requirement of the contract and one as a secondary back up.
25. MECHANICAL ROOM HOUSEKEEPING:
a. The Contractor is to prevent unnecessary dust, or accumulated debris to interfere with the functioning of the elevators.
b. Contractor shall maintain the machine room, machinery spaces, hoist-ways, pits and equipment in reasonably clean condition at all times.
c. The Contractor shall clean the pits as needed to be reasonably clean of dirt and debris. The pits shall also be kept oil free. If the pits or machine room floor are oil stained, effective measures will be undertaken to dry up the oil residue to assist in oil monitoring all hydraulics.
d. Contractor shall keep clean rags in a metal container at each location to comply with minimum fire codes and safety.
e. Contractor shall keep all solvents stored onsite in a metal cabinet. SDS sheets shall be provided on site for all lubricants and any hydraulic oils. The hydraulic oil SDS sheets shall be inserted into a plastic holder adhered to the tank unit.
f. The Contractor shall incorporate the safety routine or procedure and safety signage for all maintenance procedures outlined by the Contractor’s own safety policies and applicable codes.
g. The MVAHCS may request a walk-through of the elevator areas with the service manager or supervisory personnel of the Contractor. The request shall be complied with in a reasonable time frame.
Edited update highlighted below.
E.2 ADDENDUM to 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services.
SUBMISSION OF SOLICITATION PACKAGE: The Government reserves the right to establish a competitive range. Your offer may become a part of the official contract file. Offerors failure to submit complete information in the manner described below shall be considered a “no response” and will exclude the offer from further consideration.
The offer must be submitted electronically to the contracting officer as follows. Faxed and mailed offers will not be accepted.
Send offers by email to theresa.thunder@va.gov. Offers shall be submitted in Microsoft Word or Adobe PDF format for text documents and Microsoft Excel format for spreadsheet documents.
The Pricing portion of your offer shall be in a file labeled Volume I which will include: The completed Price/Cost Schedule from the solicitation with each line item filled in, a filled in copy of FAR provision 52.212-3, Offeror’s Representations and Certifications (unless Offeror’s Representations and Certifications are available online at the SAM website, www.sam.gov) and the completed Standard Form 1449 from the solicitation with blocks 12, 17a (if offered by the Offeror), 30a, 30b and 30c filled in. The Offeror’s UEI number must be shown on the SF 1449.
The Technical portion of your offer and Past Performance reference information shall be in a single file labeled Volume II and shall contain:
| Technical Portion |
| The technical portion of your offer will primarily determine the qualifications and ability of the offeror to furnish the services called for by this solicitation. The technical portion should be concise and provide sufficient information to demonstrate the offeror’s capability to satisfactorily perform the tasks outlined in the Statement of Work. The Government shall evaluate offers on the basis of those factors set forth in FAR 52.212-2, Evaluation—Commercial Items. |
All required items stipulated in the Statement of Work or Performance Work Statement and those listed immediately below must be included:
| 1. |
| The Contractor shall provide a copy of their preventive maintenance |
program to the MVAHCS including any tasking schedule, maintenance log, computerized labor detail and other related documentation.
This should include a plan in place for regularly and systematically examine clean lubricate, adjust and, when conditions warrant, repair or replace parts, devices and components (See Statement of Work for what to include in program).
| 2. |
| Contractor shall include a copy of their Safety Program that includes safety procedures for contractors (See Statement of Work Section 20 for what to include in program). |
| 3. |
| Contractor shall include resumes of two or more elevator technicians currently employed by the contractor or subcontractor who will be performing this contract. Must include licensing and certifications with resumes. |
Page 1 of
File details come from the government source that posted it. Updated .