About this file

This document provides details on a federal contract opportunity for roof replacement and solar upgrades project services. The solicitation is number 36C24124R0034 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. It is a request for SF330 qualifications under a full and open competition for an A-E project involving roof replacement and solar upgrades at location 689-22-209. Interested parties are sought to provide qualifications for the design and construction administration of this project. The response deadline is not specified. The contract award date is also not included. The document relates to drawings for the project that are 10MB in size but their content is not listed.

View the file

Other files

File Type Posted
36C24124R0034.docx DOCX document
S02 Drawings - Existing .pdf PDF
S02 Past Performance Questionnaire.pdf PDF
S02 Statement of Work .pdf PDF
S02 Project Specifications .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWN BY

CGS

APPROVED

A HALL

DATE

P R

O J E

C T

C a m p b e l l

A v e n u e

A1.0

S e l e c t i v e

R o o f

R e p l a c e m e n t s R e s t o r a t i o n s

Roof Plan

DRAWING NAME:

DRAWING NUMBER:

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

C a m p b e l l

A v e n u e

W e s t

H a v e n

C

T

DATE No. REVISIONS

Issued for Review:

17 MAY 2021

17 MAY 2021

V A

C

M

P U

S

B

L D

G

A1.0

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.

AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE

AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL

AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO

AutoCAD SHX Text

BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.

AutoCAD SHX Text

NOTE #2

AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A

AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON

AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE

AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR

AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR

AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL

AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY

AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND

AutoCAD SHX Text

WITHOUT ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

NOTE #5

AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL

AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.

AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.

AutoCAD SHX Text

NOTE #6

AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS

AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)

AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE SOMERVILLE FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES

AutoCAD SHX Text

FOR THESE SERVICES WILL BE CHARGED TO THE CONTRACTOR.

AutoCAD SHX Text

NOTE #7

AutoCAD SHX Text WHENEVER OBSOLETE ROOFTOP PENETRATIONS OR OTHER SIMILAR ITEMS ARE TARGETED FOR REMOVAL FROM THE ROOF SYSTEM, THE

AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR PROVIDING INTERIOR PROTECTION TO PROPERTY AND BUILDING-OCCUPANTS. COORDINATE ALL SUCH ACTIVITIES

AutoCAD SHX Text AT LEAST 48 HOURS IN-ADVANCE, WITH THE OWNER, SO THAT APPROPRIATE ACCESS/CLEARANCE AND STAFF CAN BE DEDICATED.

AutoCAD SHX Text

NOTE #8

AutoCAD SHX Text THE CONTRACTOR MUST CONTROL THEIR ACTIVITIES AT ALL TIMES. THE OWNER IS PARTICULARLY-CONCERNED ABOUT THE POSSIBILITY OF

AutoCAD SHX Text HIGH-WINDS DELIVERING DEBRIS, MATERIALS AND OTHER JOB-RELATED DEBRIS TO THE SIDEWALKS/STREETS AND OTHER ADJACENT CAMPUS BUILDINGS.

AutoCAD SHX Text TO MIGRATE FROM THE SITE. THE OWNER, AT ANY TIME, RESERVES THE RIGHT TO TERMINATE THE CONTRACTOR'S ACTIVITIES IF JOBSITE

AutoCAD SHX Text DEBRIS/MATERIAL IS IMPROPERLY-SECURED. PRIOR TO COMMENCING THE WORK, THE OWNER WILL REQUIRE THE SUCCESSFUL CONTRACTOR TO

AutoCAD SHX Text PROVIDE A DETAILED DESCRIPTION OF ALL STEPS/MEASURES BEING TAKEN TO CONTROL THE JOBSITE THROUGHOUT CONSTRUCTION ACTIVITIES.

AutoCAD SHX Text ERECT DEBRIS FENCING AND TAKE ALL OTHER NECESSARY STEPS TO ENSURE THAT PROJECT-RELATED DEBRIS/MATERIALS ARE NOT ALLOWED

AutoCAD SHX Text

NOTE #9

AutoCAD SHX Text CONTRACTOR IS REQUIRED TO EXECUTE ALL WORK IN STRICT ACCORDANCE WITH STATE, FEDERAL AND OWNER'S SAFETY REGULATIONS.

AutoCAD SHX Text OSHA COMPLIANCE IS MANDATORY THROUGHOUT ALL ASPECTS OF THE PROJECT. USE OF FALL-PROTECTION DAVITS, PERIMETER WARNING

AutoCAD SHX Text LINES AND ANY OTHER CONTROLS NEEDED TO PROTECT THE SAFETY OF WORKERS, BUILDING-OCCUPANTS AND GROUND-BASED PERSONNEL

AutoCAD SHX Text IS THE SOLE AND COMPLETE RESPONSIBILITY OF THE ROOFING CONTRACTOR. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO PROVIDE

AutoCAD SHX Text THE OWNER'S SAFETY OFFICER WITH A SITE-SPECIFIC SAFETY-PLAN FOR REVIEW/APPROVAL, PRIOR TO COMMENCING ANY WORK.

AutoCAD SHX Text

NOTE #10

AutoCAD SHX Text ALL PROJECT-RELATED DEBRIS, AS WELL AS NEW MATERIALS/SUPPLIES, ARE TO BE DELIVERERD TO/FROM THE ROOF SURFACES VIA CRANE/HOISTS

AutoCAD SHX Text DURING DESIGNATED HOURS. HOURS OF CRANE/HOIST ACTIVITY WILL BE DESIGNATED IN ADVANCE BY THE OWNER ALL CRANE SERVICE TO THE

AutoCAD SHX Text ROOF AREAS WILL TAKE-PLACE FROM THE PRE-DESIGNATED STAGING AREA AS INDICATED. THE PERIMETER OF THE GROUND-BASED

AutoCAD SHX Text STAGING-AREA IS TO BE CORDONED-OFF WITH FLAGS/CONES/BARRICADES (BY THE ROOFING CONTRACTOR) TO HELP PREVENT UNAUTHORIZED

AutoCAD SHX Text ACCESS. ROOFING CONTRACTOR WILL IMMEDIATELY CEASE CRANE/HOISTING OPERATIONS IF UNAUTHORIZED, GROUND-BASED PERSONNEL ARE IN THE

AutoCAD SHX Text VICINITY OF THE CONTRACTOR'S STAGING-AREA. IMMEDIATELY-NOTIFY THE OWNER FOR ASSISTANCE IF ACCESS-CONTROL ISSUES ARISE.

AutoCAD SHX Text

NOTE #11

AutoCAD SHX Text DIRECTION. THE SUCCESSFUL ROOFING CONTRACTOR IS EXPECTED TO CONTRACT WITH A TAPERED INSULATION MANUFACTURER TO PROVIDE A FIELD

AutoCAD SHX Text TAPERED INSULATION WILL BE REQUIRED FOR PROPER DRAINAGE IN LOCATIONS AS DESIGNATED. A PLAN HAS BEEN PROVIDED TO PROVIDE DESIGN

AutoCAD SHX Text VERIFED LAYOUT AND DESIGN THROUGH A SHOP DRAWING REVIEW AND APPROVAL PROCESS TO ENSURE THAT PROPER DRAINAGE IS BEING PROVIDED.

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES:

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

ROOF A

AutoCAD SHX Text

ROOF B

AutoCAD SHX Text

46 LF SLIMLINE RAILING

AutoCAD SHX Text

SITE LOCUS PLAN

AutoCAD SHX Text

ROOF WORK PLAN

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text D1.1

AutoCAD SHX Text

DEMOLITION GENERAL WORK NOTES::

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS

AutoCAD SHX Text D1

AutoCAD SHX Text

ROOFING/FLASHING

AutoCAD SHX Text D1.2

AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 1/A2.1 FOR NEW PERIMETER FASCIA DETAILS. SEE BID FORM UNIT COST FOR DAMAGED WOOD BLOCKING REMOVAL & REPLACEMENT

AutoCAD SHX Text R&D EXISTING MOD-BIT ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - ALL LAYERS OF THERMAL INSULATION AND FIBERBOARD TO EXISTING STRUCTURAL DECK TO REMAIN. SEE DRAWING A1.0 FOR EXISTING ROOF CONSTRUCTION CORE INFORMATION

AutoCAD SHX Text D15

AutoCAD SHX Text

PLUMBING AND HVAC PENETRATIONS

AutoCAD SHX Text D15.2

AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO BE DISCONNECTED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- NEW PITCH POCKETS + SUPPORT BLOCKING TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DETAILS 2&4/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET / WORK BOX DETAILS

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.1

AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. - ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- REFER TO DETAIL 7/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR

AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 3/A2.1 FOR VENT FLASHING DETAIL

AutoCAD SHX Text D15.4

AutoCAD SHX Text ALL ROOF DRAINS ARE TO BE REMOVED AND REPLACED WITH NEW CAST IRON ROOF DRAIN ASSEMBLY, INCLUDING TOP SET DECK PLATE AND ADJUSTABLE DECK CLAMP AND CAST IRON STRAINER - TO TIE INTO EXISTING ROOF DRAIN PIPING BY THE ROOFING CONTRACTOR - REFER TO DRAWING 5-6/A2.1 FOR ROOF DRAIN DETAIL

AutoCAD SHX Text D1.3

AutoCAD SHX Text EXISTING HATCH & CURB CONSTRUCTION TO BE REMOVED AND NEW WEATHERTIGHT ROOF HATCH & PERIMETER OSHA SAFETY RAIL BE INSTALLED OVER EXIST. OPENING PER DETAIL 11/A2.1 (KEE HATCH W/ SELF CLOSING GATE OR EQUAL) - VERIFY EXISTING OPENING AND MODIFY AS REQUIRED PRIOR TO ORDERING HATCH

AutoCAD SHX Text D15.5

AutoCAD SHX Text ALL ROOF MOUNTED GAS PIPING SYSTEMS ARE TO BE DISCONNECTED, RE-LOCATED OR REPLACED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. NEW PIPE FLASHING, PIPE SUPPORT BLOCKING AND PADS TO BE F&I BY THE ROOFING CONTRACTOR

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16

AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES.

AutoCAD SHX Text

ELECTRICAL AND COMMUNICATIONS SYSTEMS

AutoCAD SHX Text D1.1

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

AutoCAD SHX Text D15.4

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text NOTE: VERIFY ALL CONDITIONS IN FIELD & REFER TO DETAIL SHEET FOR ALL SPECIALIZED CONDITIONS

APPROVED

A HALL

DATE

P R

O J E

C T

C a m p b e l l

A v e n

A1.1 e l e c t i v e

R o o f

R e p l a c e m e n t s R e s t o r a t i o

DRAWING NUMBER:

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

C a m p b e l l

A v e n u e

W e s t

H a v e n

C

T

DATE No. REVISIONS

Issued for Review:

17 May 2021

17 MAY 2021

M

P U

S

B

L D

G

A1.0

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.

AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE

AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL

AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO

AutoCAD SHX Text

BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.

AutoCAD SHX Text

NOTE #2

AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A

AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON

AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE

AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR

AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR

AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL

AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY

AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND

AutoCAD SHX Text

WITHOUT ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

NOTE #5

AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL

AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.

AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.

AutoCAD SHX Text

NOTE #6

AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS

AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)

AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE SOMERVILLE FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES

AutoCAD SHX Text

FOR THESE SERVICES WILL BE CHARGED TO THE CONTRACTOR.

AutoCAD SHX Text

NOTE #7

AutoCAD SHX Text WHENEVER OBSOLETE ROOFTOP PENETRATIONS OR OTHER SIMILAR ITEMS ARE TARGETED FOR REMOVAL FROM THE ROOF SYSTEM, THE

AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR PROVIDING INTERIOR PROTECTION TO PROPERTY AND BUILDING-OCCUPANTS. COORDINATE ALL SUCH ACTIVITIES

AutoCAD SHX Text AT LEAST 48 HOURS IN-ADVANCE, WITH THE OWNER, SO THAT APPROPRIATE ACCESS/CLEARANCE AND STAFF CAN BE DEDICATED.

AutoCAD SHX Text

NOTE #8

AutoCAD SHX Text THE CONTRACTOR MUST CONTROL THEIR ACTIVITIES AT ALL TIMES. THE OWNER IS PARTICULARLY-CONCERNED ABOUT THE POSSIBILITY OF

AutoCAD SHX Text HIGH-WINDS DELIVERING DEBRIS, MATERIALS AND OTHER JOB-RELATED DEBRIS TO THE SIDEWALKS/STREETS AND OTHER ADJACENT CAMPUS BUILDINGS.

AutoCAD SHX Text TO MIGRATE FROM THE SITE. THE OWNER, AT ANY TIME, RESERVES THE RIGHT TO TERMINATE THE CONTRACTOR'S ACTIVITIES IF JOBSITE

AutoCAD SHX Text DEBRIS/MATERIAL IS IMPROPERLY-SECURED. PRIOR TO COMMENCING THE WORK, THE OWNER WILL REQUIRE THE SUCCESSFUL CONTRACTOR TO

AutoCAD SHX Text PROVIDE A DETAILED DESCRIPTION OF ALL STEPS/MEASURES BEING TAKEN TO CONTROL THE JOBSITE THROUGHOUT CONSTRUCTION ACTIVITIES.

AutoCAD SHX Text ERECT DEBRIS FENCING AND TAKE ALL OTHER NECESSARY STEPS TO ENSURE THAT PROJECT-RELATED DEBRIS/MATERIALS ARE NOT ALLOWED

AutoCAD SHX Text

NOTE #9

AutoCAD SHX Text CONTRACTOR IS REQUIRED TO EXECUTE ALL WORK IN STRICT ACCORDANCE WITH STATE, FEDERAL AND OWNER'S SAFETY REGULATIONS.

AutoCAD SHX Text OSHA COMPLIANCE IS MANDATORY THROUGHOUT ALL ASPECTS OF THE PROJECT. USE OF FALL-PROTECTION DAVITS, PERIMETER WARNING

AutoCAD SHX Text LINES AND ANY OTHER CONTROLS NEEDED TO PROTECT THE SAFETY OF WORKERS, BUILDING-OCCUPANTS AND GROUND-BASED PERSONNEL

AutoCAD SHX Text IS THE SOLE AND COMPLETE RESPONSIBILITY OF THE ROOFING CONTRACTOR. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO PROVIDE

AutoCAD SHX Text THE OWNER'S SAFETY OFFICER WITH A SITE-SPECIFIC SAFETY-PLAN FOR REVIEW/APPROVAL, PRIOR TO COMMENCING ANY WORK.

AutoCAD SHX Text

NOTE #10

AutoCAD SHX Text ALL PROJECT-RELATED DEBRIS, AS WELL AS NEW MATERIALS/SUPPLIES, ARE TO BE DELIVERERD TO/FROM THE ROOF SURFACES VIA CRANE/HOISTS

AutoCAD SHX Text DURING DESIGNATED HOURS. HOURS OF CRANE/HOIST ACTIVITY WILL BE DESIGNATED IN ADVANCE BY THE OWNER ALL CRANE SERVICE TO THE

AutoCAD SHX Text ROOF AREAS WILL TAKE-PLACE FROM THE PRE-DESIGNATED STAGING AREA AS INDICATED. THE PERIMETER OF THE GROUND-BASED

AutoCAD SHX Text STAGING-AREA IS TO BE CORDONED-OFF WITH FLAGS/CONES/BARRICADES (BY THE ROOFING CONTRACTOR) TO HELP PREVENT UNAUTHORIZED

AutoCAD SHX Text ACCESS. ROOFING CONTRACTOR WILL IMMEDIATELY CEASE CRANE/HOISTING OPERATIONS IF UNAUTHORIZED, GROUND-BASED PERSONNEL ARE IN THE

AutoCAD SHX Text VICINITY OF THE CONTRACTOR'S STAGING-AREA. IMMEDIATELY-NOTIFY THE OWNER FOR ASSISTANCE IF ACCESS-CONTROL ISSUES ARISE.

AutoCAD SHX Text

NOTE #11

AutoCAD SHX Text DIRECTION. THE SUCCESSFUL ROOFING CONTRACTOR IS EXPECTED TO CONTRACT WITH A TAPERED INSULATION MANUFACTURER TO PROVIDE A FIELD

AutoCAD SHX Text TAPERED INSULATION WILL BE REQUIRED FOR PROPER DRAINAGE IN LOCATIONS AS DESIGNATED. A PLAN HAS BEEN PROVIDED TO PROVIDE DESIGN

AutoCAD SHX Text VERIFED LAYOUT AND DESIGN THROUGH A SHOP DRAWING REVIEW AND APPROVAL PROCESS TO ENSURE THAT PROPER DRAINAGE IS BEING PROVIDED.

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES:

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text EXIST STRUCTURAL DUNNAGE TO REMAIN (LAYOUT & CLEARANCE VARY V.I.F.) - FLASH COLUMNS PER DETAIL 8/A2.1 (TYP)

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

ROOF I

AutoCAD SHX Text

ROOF K

AutoCAD SHX Text

ROOF H

AutoCAD SHX Text

ROOF G

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

NEW DYNA-ROUND RAILING SYSTEM

AutoCAD SHX Text

FIBERGRATE CUSTOM LADDER/PLATFORM

AutoCAD SHX Text

FIBERGRATE CUSTOM LADDER

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

DOOR THRESHOLD DETAIL 9/A2.1

AutoCAD SHX Text

SITE LOCUS PLAN

AutoCAD SHX Text

ROOF WORK PLAN

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text D1.1

AutoCAD SHX Text

DEMOLITION GENERAL WORK NOTES::

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS

AutoCAD SHX Text D1

AutoCAD SHX Text

ROOFING/FLASHING

AutoCAD SHX Text D1.2

AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 1/A2.1 FOR NEW PERIMETER FASCIA DETAILS. SEE BID FORM UNIT COST FOR DAMAGED WOOD BLOCKING REMOVAL & REPLACEMENT

AutoCAD SHX Text R&D EXISTING MOD-BIT ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - ALL LAYERS OF THERMAL INSULATION AND FIBERBOARD TO EXISTING STRUCTURAL DECK TO REMAIN. SEE DRAWING A1.0 FOR EXISTING ROOF CONSTRUCTION CORE INFORMATION

AutoCAD SHX Text D15

AutoCAD SHX Text

PLUMBING AND HVAC PENETRATIONS

AutoCAD SHX Text D15.2

AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO BE DISCONNECTED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- NEW PITCH POCKETS + SUPPORT BLOCKING TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DETAILS 2&4/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET / WORK BOX DETAILS

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.1

AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. - ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- REFER TO DETAIL 7/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR

AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 3/A2.1 FOR VENT FLASHING DETAIL

AutoCAD SHX Text D15.4

AutoCAD SHX Text ALL ROOF DRAINS ARE TO BE REMOVED AND REPLACED WITH NEW CAST IRON ROOF DRAIN ASSEMBLY, INCLUDING TOP SET DECK PLATE AND ADJUSTABLE DECK CLAMP AND CAST IRON STRAINER - TO TIE INTO EXISTING ROOF DRAIN PIPING BY THE ROOFING CONTRACTOR - REFER TO DRAWING 5-6/A2.1 FOR ROOF DRAIN DETAIL

AutoCAD SHX Text D1.3

AutoCAD SHX Text EXISTING HATCH & CURB CONSTRUCTION TO BE REMOVED AND NEW WEATHERTIGHT ROOF HATCH & PERIMETER OSHA SAFETY RAIL BE INSTALLED OVER EXIST. OPENING PER DETAIL 11/A2.1 (KEE HATCH W/ SELF CLOSING GATE OR EQUAL) - VERIFY EXISTING OPENING AND MODIFY AS REQUIRED PRIOR TO ORDERING HATCH

AutoCAD SHX Text D15.5

AutoCAD SHX Text ALL ROOF MOUNTED GAS PIPING SYSTEMS ARE TO BE DISCONNECTED, RE-LOCATED OR REPLACED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. NEW PIPE FLASHING, PIPE SUPPORT BLOCKING AND PADS TO BE F&I BY THE ROOFING CONTRACTOR

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16

AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES.

AutoCAD SHX Text

ELECTRICAL AND COMMUNICATIONS SYSTEMS

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

NOTE: VERIFY ALL CONDITIONS IN FIELD & REFER TO DETAIL SHEET FOR ALL SPECIALIZED CONDITIONS

APPROVED

A HALL

DATE

P R

O J E

C T

C a m p b e l l

A v e n

A1.2 e l e c t i v e

R o o f

R e p l a c e m e n t s R e s t o r a t i o

DRAWING NUMBER:

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

C a m p b e l l

A v e n u e

W e s t

H a v e n

C

T

DATE No. REVISIONS

Issued for Review:

17 May 2021

17 MAY 2021

M

P U

S

B

L D

G

A1.0

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.

AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE

AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL

AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO

AutoCAD SHX Text

BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.

AutoCAD SHX Text

NOTE #2

AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A

AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON

AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE

AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR

AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR

AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL

AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY

AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND

AutoCAD SHX Text

WITHOUT ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

NOTE #5

AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL

AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.

AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.

AutoCAD SHX Text

NOTE #6

AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS

AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)

AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE SOMERVILLE FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES

AutoCAD SHX Text

FOR THESE SERVICES WILL BE CHARGED TO THE CONTRACTOR.

AutoCAD SHX Text

NOTE #7

AutoCAD SHX Text WHENEVER OBSOLETE ROOFTOP PENETRATIONS OR OTHER SIMILAR ITEMS ARE TARGETED FOR REMOVAL FROM THE ROOF SYSTEM, THE

AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR PROVIDING INTERIOR PROTECTION TO PROPERTY AND BUILDING-OCCUPANTS. COORDINATE ALL SUCH ACTIVITIES

AutoCAD SHX Text AT LEAST 48 HOURS IN-ADVANCE, WITH THE OWNER, SO THAT APPROPRIATE ACCESS/CLEARANCE AND STAFF CAN BE DEDICATED.

AutoCAD SHX Text

NOTE #8

AutoCAD SHX Text THE CONTRACTOR MUST CONTROL THEIR ACTIVITIES AT ALL TIMES. THE OWNER IS PARTICULARLY-CONCERNED ABOUT THE POSSIBILITY OF

AutoCAD SHX Text HIGH-WINDS DELIVERING DEBRIS, MATERIALS AND OTHER JOB-RELATED DEBRIS TO THE SIDEWALKS/STREETS AND OTHER ADJACENT CAMPUS BUILDINGS.

AutoCAD SHX Text TO MIGRATE FROM THE SITE. THE OWNER, AT ANY TIME, RESERVES THE RIGHT TO TERMINATE THE CONTRACTOR'S ACTIVITIES IF JOBSITE

AutoCAD SHX Text DEBRIS/MATERIAL IS IMPROPERLY-SECURED. PRIOR TO COMMENCING THE WORK, THE OWNER WILL REQUIRE THE SUCCESSFUL CONTRACTOR TO

AutoCAD SHX Text PROVIDE A DETAILED DESCRIPTION OF ALL STEPS/MEASURES BEING TAKEN TO CONTROL THE JOBSITE THROUGHOUT CONSTRUCTION ACTIVITIES.

AutoCAD SHX Text ERECT DEBRIS FENCING AND TAKE ALL OTHER NECESSARY STEPS TO ENSURE THAT PROJECT-RELATED DEBRIS/MATERIALS ARE NOT ALLOWED

AutoCAD SHX Text

NOTE #9

AutoCAD SHX Text CONTRACTOR IS REQUIRED TO EXECUTE ALL WORK IN STRICT ACCORDANCE WITH STATE, FEDERAL AND OWNER'S SAFETY REGULATIONS.

AutoCAD SHX Text OSHA COMPLIANCE IS MANDATORY THROUGHOUT ALL ASPECTS OF THE PROJECT. USE OF FALL-PROTECTION DAVITS, PERIMETER WARNING

AutoCAD SHX Text LINES AND ANY OTHER CONTROLS NEEDED TO PROTECT THE SAFETY OF WORKERS, BUILDING-OCCUPANTS AND GROUND-BASED PERSONNEL

AutoCAD SHX Text IS THE SOLE AND COMPLETE RESPONSIBILITY OF THE ROOFING CONTRACTOR. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO PROVIDE

AutoCAD SHX Text THE OWNER'S SAFETY OFFICER WITH A SITE-SPECIFIC SAFETY-PLAN FOR REVIEW/APPROVAL, PRIOR TO COMMENCING ANY WORK.

AutoCAD SHX Text

NOTE #10

AutoCAD SHX Text ALL PROJECT-RELATED DEBRIS, AS WELL AS NEW MATERIALS/SUPPLIES, ARE TO BE DELIVERERD TO/FROM THE ROOF SURFACES VIA CRANE/HOISTS

AutoCAD SHX Text DURING DESIGNATED HOURS. HOURS OF CRANE/HOIST ACTIVITY WILL BE DESIGNATED IN ADVANCE BY THE OWNER ALL CRANE SERVICE TO THE

AutoCAD SHX Text ROOF AREAS WILL TAKE-PLACE FROM THE PRE-DESIGNATED STAGING AREA AS INDICATED. THE PERIMETER OF THE GROUND-BASED

AutoCAD SHX Text STAGING-AREA IS TO BE CORDONED-OFF WITH FLAGS/CONES/BARRICADES (BY THE ROOFING CONTRACTOR) TO HELP PREVENT UNAUTHORIZED

AutoCAD SHX Text ACCESS. ROOFING CONTRACTOR WILL IMMEDIATELY CEASE CRANE/HOISTING OPERATIONS IF UNAUTHORIZED, GROUND-BASED PERSONNEL ARE IN THE

AutoCAD SHX Text VICINITY OF THE CONTRACTOR'S STAGING-AREA. IMMEDIATELY-NOTIFY THE OWNER FOR ASSISTANCE IF ACCESS-CONTROL ISSUES ARISE.

AutoCAD SHX Text

NOTE #11

AutoCAD SHX Text DIRECTION. THE SUCCESSFUL ROOFING CONTRACTOR IS EXPECTED TO CONTRACT WITH A TAPERED INSULATION MANUFACTURER TO PROVIDE A FIELD

AutoCAD SHX Text TAPERED INSULATION WILL BE REQUIRED FOR PROPER DRAINAGE IN LOCATIONS AS DESIGNATED. A PLAN HAS BEEN PROVIDED TO PROVIDE DESIGN

AutoCAD SHX Text VERIFED LAYOUT AND DESIGN THROUGH A SHOP DRAWING REVIEW AND APPROVAL PROCESS TO ENSURE THAT PROPER DRAINAGE IS BEING PROVIDED.

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES:

AutoCAD SHX Text

ROOF M

AutoCAD SHX Text

ROOF N

AutoCAD SHX Text

ROOF O

AutoCAD SHX Text

ROOF B5

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

DOOR THRESHOLD DETAIL 9/A2.1

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

RD

AutoCAD SHX Text

NEW C.I. ROOF DRAIN SEE 5-6/A2.1 (TYP)

AutoCAD SHX Text

DOOR THRESHOLD DETAIL 9/A2.1

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

PV

AutoCAD SHX Text

NEW FIBERGRATE LADDER SYSTEM

AutoCAD SHX Text

NEW FIBERGRATE LADDER SYSTEM

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

AutoCAD SHX Text A2.1

AutoCAD SHX Text

SITE LOCUS PLAN

AutoCAD SHX Text

ROOF WORK PLAN

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text D1.1

AutoCAD SHX Text

DEMOLITION GENERAL WORK NOTES::

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS

AutoCAD SHX Text D1

AutoCAD SHX Text

ROOFING/FLASHING

AutoCAD SHX Text D1.2

AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 1/A2.1 FOR NEW PERIMETER FASCIA DETAILS. SEE BID FORM UNIT COST FOR DAMAGED WOOD BLOCKING REMOVAL & REPLACEMENT

AutoCAD SHX Text R&D EXISTING MOD-BIT ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - ALL LAYERS OF THERMAL INSULATION AND FIBERBOARD TO EXISTING STRUCTURAL DECK TO REMAIN. SEE DRAWING A1.0 FOR EXISTING ROOF CONSTRUCTION CORE INFORMATION

AutoCAD SHX Text D15

AutoCAD SHX Text

PLUMBING AND HVAC PENETRATIONS

AutoCAD SHX Text D15.2

AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO BE DISCONNECTED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- NEW PITCH POCKETS + SUPPORT BLOCKING TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DETAILS 2&4/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET / WORK BOX DETAILS

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.1

AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. - ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- REFER TO DETAIL 7/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR

AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 3/A2.1 FOR VENT FLASHING DETAIL

AutoCAD SHX Text D15.4

AutoCAD SHX Text ALL ROOF DRAINS ARE TO BE REMOVED AND REPLACED WITH NEW CAST IRON ROOF DRAIN ASSEMBLY, INCLUDING TOP SET DECK PLATE AND ADJUSTABLE DECK CLAMP AND CAST IRON STRAINER - TO TIE INTO EXISTING ROOF DRAIN PIPING BY THE ROOFING CONTRACTOR - REFER TO DRAWING 5-6/A2.1 FOR ROOF DRAIN DETAIL

AutoCAD SHX Text D1.3

AutoCAD SHX Text EXISTING HATCH & CURB CONSTRUCTION TO BE REMOVED AND NEW WEATHERTIGHT ROOF HATCH & PERIMETER OSHA SAFETY RAIL BE INSTALLED OVER EXIST. OPENING PER DETAIL 11/A2.1 (KEE HATCH W/ SELF CLOSING GATE OR EQUAL) - VERIFY EXISTING OPENING AND MODIFY AS REQUIRED PRIOR TO ORDERING HATCH

AutoCAD SHX Text D15.5

AutoCAD SHX Text ALL ROOF MOUNTED GAS PIPING SYSTEMS ARE TO BE DISCONNECTED, RE-LOCATED OR REPLACED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. NEW PIPE FLASHING, PIPE SUPPORT BLOCKING AND PADS TO BE F&I BY THE ROOFING CONTRACTOR

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16

AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES.

AutoCAD SHX Text

ELECTRICAL AND COMMUNICATIONS SYSTEMS

AutoCAD SHX Text NOTE: VERIFY ALL CONDITIONS IN FIELD & REFER TO DETAIL SHEET FOR ALL SPECIALIZED CONDITIONS

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text D1.2

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16.1

D16.1

APPROVED

A HALL

DATE

P R

O J E

C T

C a m p b e l l

A v e n

A1.3 e l e c t i v e

R o o f

R e p l a c e m e n t s R e s t o r a t i o

DRAWING NUMBER:

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

C a m p b e l l

A v e n u e

W e s t

H a v e n

C

T

DATE No. REVISIONS

Issued for Review:

17 May 2021

17 MAY 2021

M

P U

S

B

L D

G

A1.0

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.

AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE

AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL

AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO

AutoCAD SHX Text

BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.

AutoCAD SHX Text

NOTE #2

AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A

AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON

AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE

AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR

AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR

AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL

AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY

AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND

AutoCAD SHX Text

WITHOUT ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

NOTE #5

AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL

AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.

AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.

AutoCAD SHX Text

NOTE #6

AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS

AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)

AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE SOMERVILLE FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES

AutoCAD SHX Text

FOR THESE SERVICES WILL BE CHARGED TO THE CONTRACTOR.

AutoCAD SHX Text

NOTE #7

AutoCAD SHX Text WHENEVER OBSOLETE ROOFTOP PENETRATIONS OR OTHER SIMILAR ITEMS ARE TARGETED FOR REMOVAL FROM THE ROOF SYSTEM, THE

AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR PROVIDING INTERIOR PROTECTION TO PROPERTY AND BUILDING-OCCUPANTS. COORDINATE ALL SUCH ACTIVITIES

AutoCAD SHX Text AT LEAST 48 HOURS IN-ADVANCE, WITH THE OWNER, SO THAT APPROPRIATE ACCESS/CLEARANCE AND STAFF CAN BE DEDICATED.

AutoCAD SHX Text

NOTE #8

AutoCAD SHX Text THE CONTRACTOR MUST CONTROL THEIR ACTIVITIES AT ALL TIMES. THE OWNER IS PARTICULARLY-CONCERNED ABOUT THE POSSIBILITY OF

AutoCAD SHX Text HIGH-WINDS DELIVERING DEBRIS, MATERIALS AND OTHER JOB-RELATED DEBRIS TO THE SIDEWALKS/STREETS AND OTHER ADJACENT CAMPUS BUILDINGS.

AutoCAD SHX Text TO MIGRATE FROM THE SITE. THE OWNER, AT ANY TIME, RESERVES THE RIGHT TO TERMINATE THE CONTRACTOR'S ACTIVITIES IF JOBSITE

AutoCAD SHX Text DEBRIS/MATERIAL IS IMPROPERLY-SECURED. PRIOR TO COMMENCING THE WORK, THE OWNER WILL REQUIRE THE SUCCESSFUL CONTRACTOR TO

AutoCAD SHX Text PROVIDE A DETAILED DESCRIPTION OF ALL STEPS/MEASURES BEING TAKEN TO CONTROL THE JOBSITE THROUGHOUT CONSTRUCTION ACTIVITIES.

AutoCAD SHX Text ERECT DEBRIS FENCING AND TAKE ALL OTHER NECESSARY STEPS TO ENSURE THAT PROJECT-RELATED DEBRIS/MATERIALS ARE NOT ALLOWED

AutoCAD SHX Text

NOTE #9

AutoCAD SHX Text CONTRACTOR IS REQUIRED TO EXECUTE ALL WORK IN STRICT ACCORDANCE WITH STATE, FEDERAL AND OWNER'S SAFETY REGULATIONS.

AutoCAD SHX Text OSHA COMPLIANCE IS MANDATORY THROUGHOUT ALL ASPECTS OF THE PROJECT. USE OF FALL-PROTECTION DAVITS, PERIMETER WARNING

AutoCAD SHX Text LINES AND ANY OTHER CONTROLS NEEDED TO PROTECT THE SAFETY OF WORKERS, BUILDING-OCCUPANTS AND GROUND-BASED PERSONNEL

AutoCAD SHX Text IS THE SOLE AND COMPLETE RESPONSIBILITY OF THE ROOFING CONTRACTOR. THE SUCCESSFUL CONTRACTOR WILL BE REQUIRED TO PROVIDE

AutoCAD SHX Text THE OWNER'S SAFETY OFFICER WITH A SITE-SPECIFIC SAFETY-PLAN FOR REVIEW/APPROVAL, PRIOR TO COMMENCING ANY WORK.

AutoCAD SHX Text

NOTE #10

AutoCAD SHX Text ALL PROJECT-RELATED DEBRIS, AS WELL AS NEW MATERIALS/SUPPLIES, ARE TO BE DELIVERERD TO/FROM THE ROOF SURFACES VIA CRANE/HOISTS

AutoCAD SHX Text DURING DESIGNATED HOURS. HOURS OF CRANE/HOIST ACTIVITY WILL BE DESIGNATED IN ADVANCE BY THE OWNER ALL CRANE SERVICE TO THE

AutoCAD SHX Text ROOF AREAS WILL TAKE-PLACE FROM THE PRE-DESIGNATED STAGING AREA AS INDICATED. THE PERIMETER OF THE GROUND-BASED

AutoCAD SHX Text STAGING-AREA IS TO BE CORDONED-OFF WITH FLAGS/CONES/BARRICADES (BY THE ROOFING CONTRACTOR) TO HELP PREVENT UNAUTHORIZED

AutoCAD SHX Text ACCESS. ROOFING CONTRACTOR WILL IMMEDIATELY CEASE CRANE/HOISTING OPERATIONS IF UNAUTHORIZED, GROUND-BASED PERSONNEL ARE IN THE

AutoCAD SHX Text VICINITY OF THE CONTRACTOR'S STAGING-AREA. IMMEDIATELY-NOTIFY THE OWNER FOR ASSISTANCE IF ACCESS-CONTROL ISSUES ARISE.

AutoCAD SHX Text

NOTE #11

AutoCAD SHX Text DIRECTION. THE SUCCESSFUL ROOFING CONTRACTOR IS EXPECTED TO CONTRACT WITH A TAPERED INSULATION MANUFACTURER TO PROVIDE A FIELD

AutoCAD SHX Text TAPERED INSULATION WILL BE REQUIRED FOR PROPER DRAINAGE IN LOCATIONS AS DESIGNATED. A PLAN HAS BEEN PROVIDED TO PROVIDE DESIGN

AutoCAD SHX Text VERIFED LAYOUT AND DESIGN THROUGH A SHOP DRAWING REVIEW AND APPROVAL PROCESS TO ENSURE THAT PROPER DRAINAGE IS BEING PROVIDED.

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES:

AutoCAD SHX Text

ROOF B6

AutoCAD SHX Text

ROOF B7

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

FLASH EXIST CURBS PER 7/A2.1 (TYP)

AutoCAD SHX Text

*VERIFY DRAIN LOCATIONS IN FIELD

AutoCAD SHX Text

*VERIFY DRAIN LOCATIONS IN FIELD

AutoCAD SHX Text

AutoCAD SHX Text A2.2

AutoCAD SHX Text

AutoCAD SHX Text A2.2

AutoCAD SHX Text

AutoCAD SHX Text A2.2

AutoCAD SHX Text

AutoCAD SHX Text A2.2

AutoCAD SHX Text

AutoCAD SHX Text A2.2

AutoCAD SHX Text

NEW SAFETY LADDER

AutoCAD SHX Text

SITE LOCUS PLAN

AutoCAD SHX Text

ROOF WORK PLAN

AutoCAD SHX Text

SCALE: NTS

AutoCAD SHX Text D1.1

AutoCAD SHX Text

DEMOLITION GENERAL WORK NOTES::

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITHOUT ARROW INDICATE ENTIRE SPACE/AREA

AutoCAD SHX Text

XXX

AutoCAD SHX Text

NOTES WITH ARROWS INDICATE SPECIFIC AREAS &/OR ITEMS

AutoCAD SHX Text D1

AutoCAD SHX Text

ROOFING/FLASHING

AutoCAD SHX Text D1.2

AutoCAD SHX Text R&D EXISTING FASCIA AND RELATED FLASHING. REFER TO DETAIL 3/A2.2 FOR NEW PERIMETER FASCIA DETAILS. SEE BID FORM UNIT COST FOR DAMAGED WOOD BLOCKING REMOVAL & REPLACEMENT

AutoCAD SHX Text R&D EXISTING MOD-BIT ROOFING SYSTEM INCLUDING ALL RELATED FLASHING IN ITS ENTIRETY - ALL LAYERS OF THERMAL INSULATION AND FIBERBOARD TO EXISTING STRUCTURAL DECK TO REMAIN. SEE DRAWING A1.0 FOR EXISTING ROOF CONSTRUCTION CORE INFORMATION

AutoCAD SHX Text D15

AutoCAD SHX Text

PLUMBING AND HVAC PENETRATIONS

AutoCAD SHX Text D15.2

AutoCAD SHX Text ALL ROOF MOUNTED HVAC UNITS & CONDENSER UNITS ARE TO BE DISCONNECTED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- NEW PITCH POCKETS + SUPPORT BLOCKING TO BE F&I BY THE ROOFING CONTRACTOR - REFER TO DETAILS 2&4/A2.1 FOR EQUIPMENT SUPPORT AND PITCH POCKET / WORK BOX DETAILS

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.1

AutoCAD SHX Text EXISTING CURB MOUNTED HVAC UNITS / FAN UNIT / DUCT PENETRATIONS TO REMAIN. - ROOFER SHALL PROVIDE ALL ASSOCIATED HOISTING AND MODIFICATIONS REQUIRED TO PROVIDE 8" MIN. CLEARANCE TO NEW ROOF SURFACE- REFER TO DETAIL 7/A2.1 FOR CURB FLASHING DETAIL. DISCONNECT AND RE-CONNECT BY OWNER'S DESIGNATED CONTRACTOR

AutoCAD SHX Text EXISTING VENT STACKS TO REMAIN UNLESS NOTED OTHERWISE - ALL VENT PIPE FLASHING F&I BY THE ROOFING CONTRACTOR - REFER TO DRAWING 3/A2.1 FOR VENT FLASHING DETAIL

AutoCAD SHX Text D15.4

AutoCAD SHX Text ALL ROOF DRAINS ARE TO BE REMOVED AND REPLACED WITH NEW CAST IRON ROOF DRAIN ASSEMBLY, INCLUDING TOP SET DECK PLATE AND ADJUSTABLE DECK CLAMP AND CAST IRON STRAINER - TO TIE INTO EXISTING ROOF DRAIN PIPING BY THE ROOFING CONTRACTOR - REFER TO DRAWING 5-6/A2.1 FOR ROOF DRAIN DETAIL

AutoCAD SHX Text D1.3

AutoCAD SHX Text EXISTING HATCH & CURB CONSTRUCTION TO BE REMOVED AND NEW WEATHERTIGHT ROOF HATCH & PERIMETER OSHA SAFETY RAIL BE INSTALLED OVER EXIST. OPENING PER DETAIL 11/A2.1 (KEE HATCH W/ SELF CLOSING GATE OR EQUAL) - VERIFY EXISTING OPENING AND MODIFY AS REQUIRED PRIOR TO ORDERING HATCH

AutoCAD SHX Text D15.5

AutoCAD SHX Text ALL ROOF MOUNTED GAS PIPING SYSTEMS ARE TO BE DISCONNECTED, RE-LOCATED OR REPLACED, AND RE-CONNECTED BY THE OWNER'S DESIGNATED CONTRACTOR. NEW PIPE FLASHING, PIPE SUPPORT BLOCKING AND PADS TO BE F&I BY THE ROOFING CONTRACTOR

AutoCAD SHX Text D16.1

AutoCAD SHX Text D16

AutoCAD SHX Text UNLESS NOTED OTHERWISE ALL EXISTING ROOF MOUNTED ELECTRICAL AND COMMUNICATIONS CONDUIT AND RELATED WORK BOXES, CONTROL PANELS, SECURITY CAMERAS, ETC. IS TO BE REMOVED AND/OR RE-WORKED TO ALLOW FOR INSTALLATION OF NEW ROOFING AND FLASHING SYSTEMS BY THE OWNER'S DESIGNATED ELECTRICAL CONTRACTOR. THE ROOFING CONTRACTOR SHALL CAREFULLY COORDINATE AND FACILITATE WORK BETWEEN THE TWO TRADES.

AutoCAD SHX Text

ELECTRICAL AND COMMUNICATIONS SYSTEMS

AutoCAD SHX Text NOTE: VERIFY ALL CONDITIONS IN FIELD & REFER TO DETAIL SHEET FOR ALL SPECIALIZED CONDITIONS

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D16.1

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D16.1

AutoCAD SHX Text D1.1

AutoCAD SHX Text D15.1

AutoCAD SHX Text D15.2

AutoCAD SHX Text D15.3

AutoCAD SHX Text D15.5

AutoCAD SHX Text D16.1

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

AutoCAD SHX Text D1.2

D1.2

APPROVED

A HALL

DATE

P R

O J E

C T

C a m p b e l l

A v e n

A1.4 e l e c t i v e

R o o f

R e p l a c e m e n t s R e s t o r a t i o

DRAWING NUMBER:

P r o j e c t

O w n e r

L O

C A

T I O

N

DRAWING STATUS:

C a m p b e l l

A v e n u e

W e s t

H a v e n

C

T

DATE No. REVISIONS

Issued for Review:

17 May 2021

17 MAY 2021

M

P U

S

B

L D

G

A1.0

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text ACCESS TO ALL ROOF AREAS SHALL BE VIA EXTENSION LADDER OR STAIR-TOWER, ERECTED & MAINTAINED BY THE ROOFING CONTRACTOR.

AutoCAD SHX Text ALL STAIR-TOWERS SHALL BE FENCED-OFF AND SECURED AGAINST UNAUTHORIZED ACCESS AT ALL TIMES. ALL EXTENSION LADDERS SHALL BE

AutoCAD SHX Text TAKEN-DOWN AT THE END OF EACH DAY AND SECURED TO PREVENT UNAUTHORIZED ACCESS, AS DIRECTED BY THE OWNER. ALL POTENTIAL

AutoCAD SHX Text LADDER AND/OR STAIR-TOWER STAGING AREAS ARE TO BE APPROVED BY THE OWNER, PRIOR-TO PROCEEDING. DO NOT RESTRICT ACCESS TO

AutoCAD SHX Text

BUILDING ENTRANCES, DOORS AND OTHER SIMILAR AREAS, AS DETERMINED BY THE OWNER.

AutoCAD SHX Text

NOTE #2

AutoCAD SHX Text ALL PROVIDED MEASUREMENTS, DRAWINGS, EQUIPMENT LOCATIONS, CORE-SAMPLE DATA AND OTHER SIMILAR INFORMATION IS PROVIDED AS A

AutoCAD SHX Text COURTESY TO BIDDERS. CERTAIN PIECES OF EQUIPMENT, PENETRATIONS AND/OR OTHER ITEMS MAY NOT BE FULLY/ACCURATELY-DEPICTED ON

AutoCAD SHX Text SUPPLIED DRAWINGS. EACH BIDDER IS REQUIRED TO THOROUGHLY-INSPECT THE PROJECT AND FIELD-VERIFY ALL EXISTING CONDITIONS. THE

AutoCAD SHX Text OWNER WILL NOT BE HELD RESPONSIBLE FOR A BIDDER'S FAILURE TO ADEQUATELY-ASSESS FIELD CONDITIONS, LOGISTICAL CHALLENGES OR

AutoCAD SHX Text OTHER VARIABLES WHICH AFFECT THE WORK. FIELD-VERIFY ALL DIMENSIONS, DETAILS & RELATED ITEMS, PRIOR TO BID-SUBMISSION.

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING PORTABLE SANITARY FACILITIES (ON THE ROOF SURFACE) FOR THEIR

AutoCAD SHX Text WORKFORCE THROUGHOUT THE COMPLETION OF THE WORK. SITE PORTABLE TOILETS IN LOCATIONS APPROVED BY THE OWNER.

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text ONCE ONSITE, THE ROOFING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EXISTING ROOFING SYSTEMS IN A WATERTIGHT CONDITION. ALL

AutoCAD SHX Text BIDDERS ARE NOTIFIED THAT THE EXISTING ROOFING SYSTEMS ARE IN GENERALLY-POOR CONDITION AND HIGHLY-SUSCEPTIBLE TO DAMAGE. ANY

AutoCAD SHX Text LEAKAGE-RELATED PROBLEMS IN THE EXISTING ROOF SYSTEMS (REGARDLESS OF SOURCE) SHALL BE REPAIRED IN A TIMELY-FASHION AND

AutoCAD SHX Text

WITHOUT ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

NOTE #5

AutoCAD SHX Text AREAS BENEATH THE ROOF SECTIONS IMPACTED BY THIS PROJECT WILL BE OCCUPIED THROUGHOUT CONSTRUCTION. ALL

AutoCAD SHX Text WORK IS TO BE CONDUCTED IN A SAFE, CONTROLLED AND ORDERLY-FASHION TO ENSURE THE SAFETY OF ALL BUILDING-OCCUPANTS/STAFF.

AutoCAD SHX Text TAKE ALL NECESSARY MEASURES TO MINIMIZE THE INCONVENIENCE TO BUILDING OCCUPANTS AND OPERATIONS.

AutoCAD SHX Text

NOTE #6

AutoCAD SHX Text THE UNSUPERVISED USE OF OPEN-FLAMES, TORCHES AND/OR SMOKING IS STRICTLY-FORBIDDEN THROUGHOUT THE COMPLETION OF THIS

AutoCAD SHX Text PROJECT. IF CUTTING-TORCHES OR SPARK-PRODUCING SAWS ARE REQUIRED, THE CONTRACTOR MUST NOTIFY THE OWNER (WELL IN-ADVANCE)

AutoCAD SHX Text TO OBTAIN THE NECESSARY PERMITS/APPROVALS FOR SUCH WORK. IF WORKERS ARE FOUND TO BE VIOLATING ANY ASPECT OF THIS POLICY, AutoCAD SHX Text THE OWNER WILL ENLIST THE FULL-TIME SERVICES OF THE SOMERVILLE FIRE-DEPARTMENT TO PROVIDE FIRE-PROTECTION. ANY/ALL EXPENSES

AutoCAD SHX Text

FOR…