About this file

This document is a Solicitation (Request for Proposals) for a construction project to install tempered emergency eyewash stations in 24 housekeeping aid closets across 12 buildings at the Sheridan, Wyoming Veterans Affairs Medical Center. The project includes associated electrical, plumbing, shelving, and finish work. The contract has a 122-day period of performance and the contractor must follow strict infection control, safety, and phasing requirements. There are no bid alternates for this project. The Department of Veterans Affairs Veterans Integrated Service Network 19 is the issuing agency. Contractors must submit proposals by the stated deadline and follow all other solicitation requirements.

View the file

Other files

File Type Posted
36C25924R0121 0004.docx DOCX document
S04 - Site Visit - Sign-In Sheet - Correction from Amend 2.pdf PDF
S05 - RFI Responses from Site Visit - 2nd Set - FE.docx DOCX document
36C25924R0121 0003.docx DOCX document
36C25924R0121 0002.docx DOCX document
S05 - RFI Responses - FE.docx DOCX document
36C25924R0121 0001.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
S04 - Site Visit Attendance - FE.docx DOCX document
S02 - ICRA NON-Patient Care Areas.pdf PDF
S02 - ICRA Patient Care Areas.pdf PDF
S02 - Construction Safety Handout.pdf PDF
S02 - Specs.pdf PDF
S22 - LOS - Attachment - 852.219-75 Blank.docx DOCX document
S02 - Lockout-Tagout Program.pdf PDF
S02 - FMS Safety Plan 2023.pdf PDF
PPQ Blank - Past Performance Questionnaire.docx DOCX document
36C25924R0121_1.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHADED BUILDINGS 1, 2, 3, 4, 5, 6, 8,

9, 71, 71N, 86, 87 PROJECT SCOPE

71N

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/2

/2

:3

:3

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

G-001

COVER

1 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

INSTALL TEMPERED EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801

VA PROJECT #: 666-22-107

RC

SHEET LIST

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

G-001 COVER 1 24

G-002 GENERAL INFORMATION 2 24

G-003 ICRA INFORMATION AND DETAILS 3 24

GC101 GENERAL SITE PLAN 4 24

1.G-100 BUILDING 1 BASEMENT FLOOR PLAN 5 24

2.G-101 BUILDING 2 FIRST FLOOR PLAN 6 24

3.G-100 BUILDING 3 BASEMENT FLOOR PLAN 7 24

4.G-101 BUILDING 4 FIRST FLOOR PLAN 8 24

4.G-102 BUILDING 4 SECOND FLOOR PLAN 9 24

5.G-101 BUILDING 5 FIRST FLOOR PLAN 10 24

6.G-102 BUILDING 6 SECOND FLOOR PLAN 11 24

8.G-101 BUILDING 8 FIRST FLOOR PLAN 12 24

8.G-102 BUILDING 8 SECOND FLOOR PLAN 13 24

9.G-103 BUILDING 9 THIRD FLOOR PLAN 14 24

71.G-101 BUILDING 71 FIRST FLOOR PLAN 15 24

71.G-102 BUILDING 71 SECOND FLOOR PLAN 16 24

71.G-103 BUILDING 71 THIRD FLOOR PLAN 17 24

71N.G-101 BUILDING 71N FIRST FLOOR PLAN 18 24

71N.G-102 BUILDING 71N SECOND FLOOR PLAN 19 24

86.G-101A BUILDING 86 FIRST FLOOR PLAN - AREA A 20 24

86.G-101B BUILDING 86 FIRST FLOOR PLAN - AREA B 21 24

86.G-102A BUILDING 86 SECOND FLOOR PLAN - AREA A 22 24

86.G-103A BUILDING 86 THIRD FLOOR PLAN - AREA A 23 24

87.G-101 BUILDING 87 FIRST FLOOR PLAN 24 24

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 8

A-100 BASEMENT FLOOR PLAN (MULTIPLE BUILDINGS) 2 8

A-101 FIRST FLOOR PLAN (MULTIPLE BUILDINGS) 3 8

A-102 FIRST FLOOR PLAN CONT. (MULTIPLE BUILDINGS) 4 8

A-103 SECOND FLOOR PLAN (MULTIPLE BUILDINGS) 5 8

A-104 THIRD FLOOR PLAN (MULTIPLE BUILDINGS) 6 8

A-401 INTERIOR ELEVATIONS 7 8

A-402 INTERIOR ELEVATIONS, AND SCHEDULE 8 8

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 7

P-100 BASEMENT PLUMBING PLAN (MULTIPLE BUILDINGS) 2 7

P-101A FIRST FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 3 7

P-101B FIRST FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 4 7

P-102 SECOND FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 5 7

P-103 THIRD FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 6 7

P-501 PLUMBING DETAILS 7 7

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND

ABBREVIATIONS

1 7

E-100 BASEMENT ELECTRICAL PLAN (MULTIPLE BUILDINGS) 2 7

E-101A FIRST FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 3 7

E-101B FIRST FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 4 7

E-102 SECOND FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 5 7

E-103 THIRD FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 6 7

E-501 ELECTRICAL DETAILS 7 7

NORTH NORTH

VARIOUS

24514

LICENSED

ARCHITECT

DocuSign Envelope ID: B2D77FAE-4CA7-4D27-B8F9-38DB0FE28D8F

5/22/2024

S SS

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

MOP BASIN

MOP SHELF

M

A X

M

IN

TYPICAL JANITORS CLOSET

EMERGENCY

EYE WASH

ANSI Z358.1

• 0.4 GPM FLUSHING

• TEMPERATURE BETWEEN 60°F AND 100°F

• PRESSURE 30 PSI

• LOCATE HEAD OF EYE WASHER SO FLOW

PATTERN BETWEEN 33" AND 53" AFF

* SEE PLUMBING DRAWINGS FOR ALL EYE WASHER

REQUIREMENTS

A. PROJECT BASE BID IS THE INSTALLATION OF NEW EYE WASHERS IN 24 HAC SPACES IN THE 12 BUILDINGS INDICATED.

# ALTERNATE DEDUCTS

ALTERNATE DEDUCT #1

INSTALLATION OF EYEWASHER IN ROOM 100 OF BULDING 71N.

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

G-002

GENERAL INFORMATION

2 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

GENERAL SYMBOL LEGEND

STANDARD MOUNTING HEIGHTS

VARIOUS

WALL RATING LEGEND

24514

LICENSED

ARCHITECT

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

3 5/8" INSULATED WALL WITH

METAL STUDS @ 16" O.C.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

A B

3 5/8" INSULATED WALL WITH

METAL STUDS @ 16" O.C. (2)

LAYERS 5/8" GYPSUM BOARD

EACH SIDE. WALL TO

EXTEND TO UNDERSIDE OF

DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/8"

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

1-HR RATED

U.L. DESIGN NO. U419

NON RATED

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY MATS

(CHANGED END OF

SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT

IN OPERATION DURING

PROJECT - COORDINATE

W/ COR

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL STATION

WITH AUDIO /

VISUAL

EXISTING WALL

BARRIER

NOTE:

1. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL

VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS

FOR DISTANCE PRIOR TO STARTING WORK.

EXHAUST LOCATION

- SEE NOTE A

G-003

_____3

G-003

G-003

FLEX DUCT

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

DESIGN INSTALL EMERGENCY EYEWASH IN HACS

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS

PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION

CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA

INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL

AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND

ACTIVE.

2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND

LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE

SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO

CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE

AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL

PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF

THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE,

DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST

AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE

BEFORE REMOVAL OF A PERMANENT BARRIER. AFTER EACH PHASE, PERFORM TASKS

STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS NOTE 2.

3. PROVIDE STICKY MATS AT THE ICRA BARRIER ENTRANCE SPACES AND CHANGE DAILY

OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO

ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED.

EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED

DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE

ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT

PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND

OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART

SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP

AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED

COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE

USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD

OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE

VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY

PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE

CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND

SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE

CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT

PRIOR APPROVAL OF THE COR.

5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM

ANY ADJACENT EXCAVATION DEBRIS.

6. ALL FURNISHINGS AND EQUIPMENT REMAIN IN THE IMPACTED ROOMS SHALL BE

COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: VERIFY WITH THE COR WHETHER THE CONSTRUCTION AREA USES

FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS

COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM

CLEAN TO DIRTY AREAS.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE

NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR

SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN

THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE,

PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER

MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC.

IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND

HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE

DUCTS.

3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-

FLANGE HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM

OF 7'-2" A.F.F.

4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL

BE VERIFIED DAILY.

5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR

SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION

ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM

THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING

THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE

SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE

APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-

FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE

LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR

SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING

EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND

MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM

THE CONSTRUCTION ZONE OR WORK AREA.

2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION

UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A

TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND

APPROVED THE CLEANING.

ICRA NOTES

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories

(specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

A

.F .F

A P

P R

O X

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

HEPA NEGATIVE

AIR UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I

.F

E X

IS

T

IN

G

W A

L L

FLOOR SLAB ABOVE

CEILING

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING

CEILING

FLEX DUCT

1. CONTRACTOR TO COORDINATE WITH COR TO ENSURE THAT AT LEAST ONE HAC ON

EACH FLOOR REMAINS OPERATIONAL DURING CONSTRUCTION.

PHASING NOTES

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

G-003

ICRA INFORMATION AND DETAILS

3 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: No Scale

ICRA BARRIER WALL TYPE

Scale: No Scale

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: No Scale

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: No Scale

ICRA ROOM ELEVATION

Scale: No Scale

CROSS SECTION "A"

Scale: No Scale

ICRA MOBILE CONTAINMENT CART

VARIOUS

24514

LICENSED

ARCHITECT

71N

23 24

1 2

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

GC101

GENERAL SITE PLAN

4 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1" = 100'-0"

SITE PLAN

NORTH

0 10050 200

A. CONTRACTOR SHALL REPAIR ALL DAMAGE

CAUSED AS A RESULT OF CONSTRUCTION WORK

ASSOCIATED WITH THIS PROJECT TO THIS SITE ,

LANDSCAPING, BUILDINGS OR ANY OTHER AREA

BACK TO ORIGINAL CONDITION.

B. DUMPSTER LOCATIONS ARE TO BE

COORDINATED WITH THE COR PRIOR TO

LOCATION ON SITE. SEE SHEET GC101 FOR

SUGGESTED LOCATIONS OF LAY DOWN AREAS.

C. CONTRACTOR SHALL PREPARE A PLAN SHOWING

LAY DOWN AREA, SECURITY FENCE, DUMPSTER,

LOCATION, AND ACCESS FOR COR REVIEW AND

APPROVAL.

D. CONTRACTOR SHALL PARK IN AREAS

DESIGNATED BY THE COR. CONTRACTOR TO

COORDINATE PARKING WITH THE COR PRIOR TO

COMMENCING WORK.

1 POSSIBLE LOCATION OF DUMPSTERS AND TRASH

CHUTES, COORDINATE WITH COR PRIOR TO

LOCATING ITEMS.

2 POSSIBLE SUPPLY LAY DOWN AREA FOR

CONTRACTOR.

VARIOUS

24514

LICENSED

ARCHITECT

UP

A-100

CORRIDOR

C002

BREAK

ROOM

TELEWORK

TOUCHDOWN

OFFICE

005A

CORRIDOR

C004

MECHANICAL/

FIRE

SPRINKLER

MECHANICAL

ROOM

CORRIDOR

C003

HAC

CORRIDOR

C001

STAIR

ST001BUSINESS

OFFICE

ELEV.

E001

ELEVATOR

MACHINE

ROOM

HAC

STORAGE

ALCOVE

UNEXCAVATED

HEAT PIT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

1.G-100

BUILDING 1 BASEMENT FLOOR PLAN

5 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1/8" = 1'-0"

BUILDING 1 BASEMENT FLOOR

NORTH

0 4 8 16

N

AREA OF

WORK

SITE KEY PLAN

SCALE: NO SCALE

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE INSTALLATION OF ALL INFECTION CONTROL

BARRIERS AND EQUIPMENT REQUIRED. THE

CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS

ARE INSTALLED AND INSPECTED PRIOR TO

COMMENCING ANY WORK IN THE SPACES WHERE

PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK

THAT COULD CREATE DUST OR INFECTIOUS

MATERIAL INTO THE AIR.

B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING

WORK REQUIRE FOR THE INSTALLATION OF THE

NEW EYE WASHER UNITS IN EACH SPACE. THIS

INCLUDES ANY WORK REQUIRED IN THE ADJACENT

SPACES FOR PLUMBING CONNECTIONS.

C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL

WORK INCLUDED IN THE SPACES RECEIVING NEW

EYE WASHER UNITS. THIS INCLUDE THE

REPLACEMENT AND INSTALLATION OF GFCI

OUTLETS AND LIGHT FIXTURES.

D. SEE ARCHITECTURAL DRAWINGS FOR THE

INSTALLATION AND SIZES OF ALL NEW METAL

SHELVING AND REQUIRED REMOVAL OR

MODIFICATION OF EXISTING SHELVING IN THE

SPACES.

E. SEE ARCHITECTURAL DRAWINGS FOR ALL

FINISHES REQUIRED IN THE SPACES TO RECEIVE

THE NEW EYE WASHER UNIT.

F. CONTRACTOR'S PERSONNEL SHALL BE

RESPONSIBLE TO MAINTAIN STRICT CONTROL

OVER ALL TOOLS AND MATERIAL BROUGHT INTO

THE SPACE.

24514

LICENSED

ARCHITECT

A-101

UNISEX

ENTRY

HAC

EXERCISE

UNISEX

EDUCATION

LOUNGE

STORAGE/IT

STAIR

ST101

OFFICE

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

2.G-101

BUILDING 2 FIRST FLOOR PLAN

6 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1/8" = 1'-0"

BUILDING 2 FIRST FLOOR PLAN

NORTH0 4 8 16

N

AREA OF

WORK

SITE KEY PLAN

SCALE: NO SCALE

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE INSTALLATION OF ALL INFECTION CONTROL

BARRIERS AND EQUIPMENT REQUIRED. THE

CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS

ARE INSTALLED AND INSPECTED PRIOR TO

COMMENCING ANY WORK IN THE SPACES WHERE

PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK

THAT COULD CREATE DUST OR INFECTIOUS

MATERIAL INTO THE AIR.

B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING

WORK REQUIRE FOR THE INSTALLATION OF THE

NEW EYE WASHER UNITS IN EACH SPACE. THIS

INCLUDES ANY WORK REQUIRED IN THE ADJACENT

SPACES FOR PLUMBING CONNECTIONS.

C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL

WORK INCLUDED IN THE SPACES RECEIVING NEW

EYE WASHER UNITS. THIS INCLUDE THE

REPLACEMENT AND INSTALLATION OF GFCI

OUTLETS AND LIGHT FIXTURES.

D. SEE ARCHITECTURAL DRAWINGS FOR THE

INSTALLATION AND SIZES OF ALL NEW METAL

SHELVING AND REQUIRED REMOVAL OR

MODIFICATION OF EXISTING SHELVING IN THE

SPACES.

E. SEE ARCHITECTURAL DRAWINGS FOR ALL

FINISHES REQUIRED IN THE SPACES TO RECEIVE

THE NEW EYE WASHER UNIT.

F. CONTRACTOR'S PERSONNEL SHALL BE

RESPONSIBLE TO MAINTAIN STRICT CONTROL

OVER ALL TOOLS AND MATERIAL BROUGHT INTO

THE SPACE.

24514

LICENSED

ARCHITECT

A-100

STORAGE

WORK

ROOM

MECHANICAL

STAIR

ST001

BREAK

ROOM

WOMEN

HAC

CORR.

MEN

MECHANICAL

ELEV

E-1

ELE. EQ.

CORR.

COMM.

STOR

MECHANICAL CRAWLSPACE

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

3.G-100

BUILDING 3 BASEMENT FLOOR PLAN

7 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1/8" = 1'-0"

BUILDING 3 BASEMENT FLOOR PLAN

N O

R T

H0 4 8 16

N

AREA OF

WORK

SITE KEY PLAN

SCALE: NO SCALE

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE INSTALLATION OF ALL INFECTION CONTROL

BARRIERS AND EQUIPMENT REQUIRED. THE

CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS

ARE INSTALLED AND INSPECTED PRIOR TO

COMMENCING ANY WORK IN THE SPACES WHERE

PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK

THAT COULD CREATE DUST OR INFECTIOUS

MATERIAL INTO THE AIR.

B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING

WORK REQUIRE FOR THE INSTALLATION OF THE

NEW EYE WASHER UNITS IN EACH SPACE. THIS

INCLUDES ANY WORK REQUIRED IN THE ADJACENT

SPACES FOR PLUMBING CONNECTIONS.

C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL

WORK INCLUDED IN THE SPACES RECEIVING NEW

EYE WASHER UNITS. THIS INCLUDE THE

REPLACEMENT AND INSTALLATION OF GFCI

OUTLETS AND LIGHT FIXTURES.

D. SEE ARCHITECTURAL DRAWINGS FOR THE

INSTALLATION AND SIZES OF ALL NEW METAL

SHELVING AND REQUIRED REMOVAL OR

MODIFICATION OF EXISTING SHELVING IN THE

SPACES.

E. SEE ARCHITECTURAL DRAWINGS FOR ALL

FINISHES REQUIRED IN THE SPACES TO RECEIVE

THE NEW EYE WASHER UNIT.

F. CONTRACTOR'S PERSONNEL SHALL BE

RESPONSIBLE TO MAINTAIN STRICT CONTROL

OVER ALL TOOLS AND MATERIAL BROUGHT INTO

THE SPACE.

24514

LICENSED

ARCHITECT

TRAMWAYTRAMWAY

DN

A-101

UNISEX

RR

HAC

CORR

C101

UNISEX

RR

EXTERIOR

STAIR

ST103

HUD/VASH

EMPLOYEE

BREAK ROOM

SOCIAL WORK

OFFICE

INTERVIEW

ROOM

SOCIAL WORK

OFFICE

112A

INTERVIEW

ROOM

INTERVIEW

ROOM

TCM/VJO

MFH/HBPC

CHIEF

OF

SOCIAL

WORK

SUCIDE

PREVENTION

SOCIAL

WORK

AO

SOCIAL WORK

GROUP ROOM

PORCH

P101

REAR LOBBY

118C HBPC

SUPERVISOR

FRONT LOBBY

STAIR

ST101

HBPC

118B

IT CLOSET

118A

HR PIV OFFICE

STORAGE

115A

UNISEX

RR

115B

VENDING

ELEVATOR

E101

LOBBY

STAIR

ST102

STOR

131A

HUMAN

RESOURCES

HUMAN

RESOURCES

TOUCHDOWN

SPACE

RESTROOM

HR STAFF

ER

STOR

120B

KITCHENETTE

120A

BREAKROOM

CORR

C102

HR STAFF

EXTERIOR STAIR

ST104

ER/LR

HR LEAD

STORAGE

RESTROOM

HAC

STOR

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

4.G-101

BUILDING 4 FIRST FLOOR PLAN

8 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1/8" = 1'-0"

BUILDING 4 FIRST FLOOR PLAN

N O

R T

H0 4 8 16

N

AREA OF

WORK

SITE KEY PLAN

SCALE: NO SCALE

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE INSTALLATION OF ALL INFECTION CONTROL

BARRIERS AND EQUIPMENT REQUIRED. THE

CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS

ARE INSTALLED AND INSPECTED PRIOR TO

COMMENCING ANY WORK IN THE SPACES WHERE

PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK

THAT COULD CREATE DUST OR INFECTIOUS

MATERIAL INTO THE AIR.

B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING

WORK REQUIRE FOR THE INSTALLATION OF THE

NEW EYE WASHER UNITS IN EACH SPACE. THIS

INCLUDES ANY WORK REQUIRED IN THE ADJACENT

SPACES FOR PLUMBING CONNECTIONS.

C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL

WORK INCLUDED IN THE SPACES RECEIVING NEW

EYE WASHER UNITS. THIS INCLUDE THE

REPLACEMENT AND INSTALLATION OF GFCI

OUTLETS AND LIGHT FIXTURES.

D. SEE ARCHITECTURAL DRAWINGS FOR THE

INSTALLATION AND SIZES OF ALL NEW METAL

SHELVING AND REQUIRED REMOVAL OR

MODIFICATION OF EXISTING SHELVING IN THE

SPACES.

E. SEE ARCHITECTURAL DRAWINGS FOR ALL

FINISHES REQUIRED IN THE SPACES TO RECEIVE

THE NEW EYE WASHER UNIT.

F. CONTRACTOR'S PERSONNEL SHALL BE

RESPONSIBLE TO MAINTAIN STRICT CONTROL

OVER ALL TOOLS AND MATERIAL BROUGHT INTO

THE SPACE.

24514

LICENSED

ARCHITECT

A-103

MEN'S

RESTROOM

HAC

OFFICE

ACCT.

CORRIDOR

C204

WOMEN'S

RESTROOM

SUPERVISORY

ACCOUNTANT

EXTERIOR

STAIR

ST203

OFFICE

PROGRAM

SUPPORT

OFFICE

PAYROLL

CBOC

DIRECTOR

CORRIDOR

C203

CHIEF

FINANCE

OFFICER

CBOC

NURSE

MGT

CBOC AO

CORRIDOR

C202

CPAC OFFICES

CCHT OFFICES

PORCH

P201

CORRIDOR

C201

HBPC MEDICAL

DIR & AO

BREAKROOM

BUILDING 4

CONFERENCE

ROOM

UP STAIR TO

ATTIC

ST205

DN STAIR

ST202

ELEV LOBBY

ELEV

E201

LOBBY

CRED &

PRIVILEGING

QM - AO

CRED &

PRIVILEGING

QM - AO

QM-CAC/

PATIENT SAFETY

CORRIDOR

C205

QM-INFECTION

CONTROL/ NURSE

INFORMATICIST

CORRIDOR

C206

QM-INOVATION /

SYS REDESIGN /

DATA ANALYST

HAC

DIR-COMPLIANCE

QM-SYSTEMS

REDESIGN

CORRIDOR

C207

RESTROOM

STORAGE

217A

QUALITY

MANAGER

UNISEX

RESTROOM

EXTERIOR

STAIR

ST204

STAIR

ST201

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

4.G-102

BUILDING 4 SECOND FLOOR PLAN

9 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1/8" = 1'-0"

BUILDING 4 SECOND FLOOR PLAN

N O

R T

H0 4 8 16

N

AREA OF

WORK

SITE KEY PLAN

SCALE: NO SCALE

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE INSTALLATION OF ALL INFECTION CONTROL

BARRIERS AND EQUIPMENT REQUIRED. THE

CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS

ARE INSTALLED AND INSPECTED PRIOR TO

COMMENCING ANY WORK IN THE SPACES WHERE

PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK

THAT COULD CREATE DUST OR INFECTIOUS

MATERIAL INTO THE AIR.

B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING

WORK REQUIRE FOR THE INSTALLATION OF THE

NEW EYE WASHER UNITS IN EACH SPACE. THIS

INCLUDES ANY WORK REQUIRED IN THE ADJACENT

SPACES FOR PLUMBING CONNECTIONS.

C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL

WORK INCLUDED IN THE SPACES RECEIVING NEW

EYE WASHER UNITS. THIS INCLUDE THE

REPLACEMENT AND INSTALLATION OF GFCI

OUTLETS AND LIGHT FIXTURES.

D. SEE ARCHITECTURAL DRAWINGS FOR THE

INSTALLATION AND SIZES OF ALL NEW METAL

SHELVING AND REQUIRED REMOVAL OR

MODIFICATION OF EXISTING SHELVING IN THE

SPACES.

E. SEE ARCHITECTURAL DRAWINGS FOR ALL

FINISHES REQUIRED IN THE SPACES TO RECEIVE

THE NEW EYE WASHER UNIT.

F. CONTRACTOR'S PERSONNEL SHALL BE

RESPONSIBLE TO MAINTAIN STRICT CONTROL

OVER ALL TOOLS AND MATERIAL BROUGHT INTO

THE SPACE.

24514

LICENSED

ARCHITECT

DN

UP

UP

UPUP

A-101

HAC

RR

STOR

STORAGE

121A

MAILROOM

HSKPG

SUPER

118A

HSKPG

SUPPORT

CORR.

C103

CORR.

C104

STORAGE

INTERIOR

DESIGN/

EMERGENCY

MANAGEMENT

EXTERIOR

STAIR

ST103

OFFICE

HSKPG

CORR.

C102

HOUSEKEEPING

BREAKROOM

HAC

115A

LACTATION

ROOM

DAV

114A

SINK

116A

CONF/

BREAKROOM

RR-WOMEN

RR-WOMEN

VACANT

OFFICE

MENTAL

HEALTH

PROVIDER

OFFICE

HAC

CORR.

C101

PHARMACY

OFFICE

WAITING

NURSING

SERVICE

CHIEFS

NURSING

SERVICE

OFFICE

COPY

ROOM

NURSING

SERVICE

TOUCHDOWN

NURSE

MANAGER

CONFERENCE

ROOM

EXTERIOR

STAIR

ST102

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:4

P

M C

U s e rs

\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A

-1

-Q

-V A

S h e ri d a n

-E y e w a s h

-W Y d c o rd o n a c g

-p a

.c o m

.r v t

5.G-101

BUILDING 5 FIRST FLOOR PLAN

10 24DGC

INSTALL TEMPERED

EYEWASH IN HOUSING AID

CLOSETS

SHERIDAN VA MEDICAL CENTER

1898 FORT ROAD

SHERIDAN, WY 82801 MAY 22, 2024

100% BID DOCUMENTS

666-22-10722-196

RC

Scale: 1/8" = 1'-0"

BUILDING 5 FIRST FLOOR PLAN

N O

R T

H0 4 8 16

PORCH

N

AREA OF

WORK

SITE KEY PLAN

SCALE: NO SCALE

1 CONTRACTOR SHALL ASK COR IF VA DESIRES TO

KEEP THE SALVAGE EYEWASH. IF SO, CONTRACTOR

SHALL DELIVER IT TO A LOCATION ON-SITE AS

SPECIFIED BY THE COR. OTHERWISE, IF THE VA

DOES NOT DESIRE TO KEEP IT, CONTRACTOR SHALL

DISPOSE OF IT PROPERLY OFF-STATION.

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE INSTALLATION OF ALL INFECTION CONTROL

BARRIERS AND EQUIPMENT REQUIRED. THE

CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS

ARE INSTALLED AND INSPECTED PRIOR TO

COMMENCING ANY WORK IN THE SPACES WHERE

PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK

THAT COULD CREATE DUST OR INFECTIOUS

MATERIAL INTO THE AIR.

B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING

WORK REQUIRE FOR THE INSTALLATION OF THE

NEW EYE WASHER UNITS IN EACH SPACE. THIS

INCLUDES ANY WORK REQUIRED IN THE ADJACENT

SPACES FOR PLUMBING CONNECTIONS.

C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL

WORK INCLUDED IN THE SPACES RECEIVING NEW

EYE WASHER UNITS. THIS INCLUDE THE

REPLACEMENT AND INSTALLATION OF GFCI

OUTLETS AND LIGHT FIXTURES.

D. SEE ARCHITECTURAL DRAWINGS FOR THE

INSTALLATION AND SIZES OF ALL NEW METAL

SHELVING AND REQUIRED REMOVAL OR

MODIFICATION OF EXISTING SHELVING IN THE

SPACES.

E. SEE ARCHITECTURAL DRAWINGS FOR ALL

FINISHES REQUIRED IN THE SPACES TO RECEIVE

THE NEW EYE WASHER UNIT.

F. CONTRACTOR'S PERSONNEL SHALL BE

RESPONSIBLE TO MAINTAIN STRICT CONTROL

OVER ALL TOOLS AND MATERIAL BROUGHT INTO

THE SPACE.

24514

LICENSED

ARCHITECT

DNDN

S S

S S

S S

SS SS

S S

S S

S S

S S

S S

SS SSSSSSSS

S SS

A-103

GROUP

ROOM

STAIR

ST203

HAC

MH

PROVIDER

WOMEN'S RR

CORRIDOR

C202

SOCIAL WORK

OFFICE

MARRIAGE AND

FAMILY

THERAPIST

INTERVIEW

ROOM

ROOF BELOW

DAY

ROOM

STAIR

ST201

STORAGE

206A

ELEV

E201

UPPER LEVEL TRAMWAY

MEN'S RR

STOR

CORRIDOR

C201

CLOSET

207A

VACANT

OFFICE

VACANT

OFFICE

STOR

HAC

VACANT

MHRRTP

OFFICES

GROUP

ROOM

STAIR

ST202

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .