S02 - Drawings.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25924R0121
About this file
This document is a Solicitation (Request for Proposals) for a construction project to install tempered emergency eyewash stations in 24 housekeeping aid closets across 12 buildings at the Sheridan, Wyoming Veterans Affairs Medical Center. The project includes associated electrical, plumbing, shelving, and finish work. The contract has a 122-day period of performance and the contractor must follow strict infection control, safety, and phasing requirements. There are no bid alternates for this project. The Department of Veterans Affairs Veterans Integrated Service Network 19 is the issuing agency. Contractors must submit proposals by the stated deadline and follow all other solicitation requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924R0121 0004.docx | DOCX document | |
| S04 - Site Visit - Sign-In Sheet - Correction from Amend 2.pdf | ||
| S05 - RFI Responses from Site Visit - 2nd Set - FE.docx | DOCX document | |
| 36C25924R0121 0003.docx | DOCX document | |
| 36C25924R0121 0002.docx | DOCX document | |
| S05 - RFI Responses - FE.docx | DOCX document | |
| 36C25924R0121 0001.docx | DOCX document | |
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| S04 - Site Visit Attendance - FE.docx | DOCX document | |
| S02 - ICRA NON-Patient Care Areas.pdf | ||
| S02 - ICRA Patient Care Areas.pdf | ||
| S02 - Construction Safety Handout.pdf | ||
| S02 - Specs.pdf | ||
| S22 - LOS - Attachment - 852.219-75 Blank.docx | DOCX document | |
| S02 - Lockout-Tagout Program.pdf | ||
| S02 - FMS Safety Plan 2023.pdf | ||
| PPQ Blank - Past Performance Questionnaire.docx | DOCX document | |
| 36C25924R0121_1.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHADED BUILDINGS 1, 2, 3, 4, 5, 6, 8,
9, 71, 71N, 86, 87 PROJECT SCOPE
71N
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/2
/2
:3
:3
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
G-001
COVER
1 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
INSTALL TEMPERED EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801
VA PROJECT #: 666-22-107
RC
SHEET LIST
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
G-001 COVER 1 24
G-002 GENERAL INFORMATION 2 24
G-003 ICRA INFORMATION AND DETAILS 3 24
GC101 GENERAL SITE PLAN 4 24
1.G-100 BUILDING 1 BASEMENT FLOOR PLAN 5 24
2.G-101 BUILDING 2 FIRST FLOOR PLAN 6 24
3.G-100 BUILDING 3 BASEMENT FLOOR PLAN 7 24
4.G-101 BUILDING 4 FIRST FLOOR PLAN 8 24
4.G-102 BUILDING 4 SECOND FLOOR PLAN 9 24
5.G-101 BUILDING 5 FIRST FLOOR PLAN 10 24
6.G-102 BUILDING 6 SECOND FLOOR PLAN 11 24
8.G-101 BUILDING 8 FIRST FLOOR PLAN 12 24
8.G-102 BUILDING 8 SECOND FLOOR PLAN 13 24
9.G-103 BUILDING 9 THIRD FLOOR PLAN 14 24
71.G-101 BUILDING 71 FIRST FLOOR PLAN 15 24
71.G-102 BUILDING 71 SECOND FLOOR PLAN 16 24
71.G-103 BUILDING 71 THIRD FLOOR PLAN 17 24
71N.G-101 BUILDING 71N FIRST FLOOR PLAN 18 24
71N.G-102 BUILDING 71N SECOND FLOOR PLAN 19 24
86.G-101A BUILDING 86 FIRST FLOOR PLAN - AREA A 20 24
86.G-101B BUILDING 86 FIRST FLOOR PLAN - AREA B 21 24
86.G-102A BUILDING 86 SECOND FLOOR PLAN - AREA A 22 24
86.G-103A BUILDING 86 THIRD FLOOR PLAN - AREA A 23 24
87.G-101 BUILDING 87 FIRST FLOOR PLAN 24 24
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 8
A-100 BASEMENT FLOOR PLAN (MULTIPLE BUILDINGS) 2 8
A-101 FIRST FLOOR PLAN (MULTIPLE BUILDINGS) 3 8
A-102 FIRST FLOOR PLAN CONT. (MULTIPLE BUILDINGS) 4 8
A-103 SECOND FLOOR PLAN (MULTIPLE BUILDINGS) 5 8
A-104 THIRD FLOOR PLAN (MULTIPLE BUILDINGS) 6 8
A-401 INTERIOR ELEVATIONS 7 8
A-402 INTERIOR ELEVATIONS, AND SCHEDULE 8 8
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 7
P-100 BASEMENT PLUMBING PLAN (MULTIPLE BUILDINGS) 2 7
P-101A FIRST FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 3 7
P-101B FIRST FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 4 7
P-102 SECOND FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 5 7
P-103 THIRD FLOOR PLUMBING PLAN (MULTIPLE BUILDINGS) 6 7
P-501 PLUMBING DETAILS 7 7
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND
ABBREVIATIONS
1 7
E-100 BASEMENT ELECTRICAL PLAN (MULTIPLE BUILDINGS) 2 7
E-101A FIRST FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 3 7
E-101B FIRST FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 4 7
E-102 SECOND FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 5 7
E-103 THIRD FLOOR ELECTRICAL PLAN (MULTIPLE BUILDINGS) 6 7
E-501 ELECTRICAL DETAILS 7 7
NORTH NORTH
VARIOUS
24514
LICENSED
ARCHITECT
DocuSign Envelope ID: B2D77FAE-4CA7-4D27-B8F9-38DB0FE28D8F
5/22/2024
S SS
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
MOP BASIN
MOP SHELF
M
A X
M
IN
TYPICAL JANITORS CLOSET
EMERGENCY
EYE WASH
ANSI Z358.1
• 0.4 GPM FLUSHING
• TEMPERATURE BETWEEN 60°F AND 100°F
• PRESSURE 30 PSI
• LOCATE HEAD OF EYE WASHER SO FLOW
PATTERN BETWEEN 33" AND 53" AFF
* SEE PLUMBING DRAWINGS FOR ALL EYE WASHER
REQUIREMENTS
A. PROJECT BASE BID IS THE INSTALLATION OF NEW EYE WASHERS IN 24 HAC SPACES IN THE 12 BUILDINGS INDICATED.
# ALTERNATE DEDUCTS
ALTERNATE DEDUCT #1
INSTALLATION OF EYEWASHER IN ROOM 100 OF BULDING 71N.
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
G-002
GENERAL INFORMATION
2 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
GENERAL SYMBOL LEGEND
STANDARD MOUNTING HEIGHTS
VARIOUS
WALL RATING LEGEND
24514
LICENSED
ARCHITECT
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
3 5/8" INSULATED WALL WITH
METAL STUDS @ 16" O.C.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
A B
3 5/8" INSULATED WALL WITH
METAL STUDS @ 16" O.C. (2)
LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO
EXTEND TO UNDERSIDE OF
DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED
U.L. DESIGN NO. U419
NON RATED
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
NOTE:
1. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL
VERIFY LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
G-003
_____3
G-003
G-003
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
DESIGN INSTALL EMERGENCY EYEWASH IN HACS
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION
CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA
INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL
AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND
LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE
SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO
CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE
AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF
THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE,
DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST
AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE
BEFORE REMOVAL OF A PERMANENT BARRIER. AFTER EACH PHASE, PERFORM TASKS
STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS NOTE 2.
3. PROVIDE STICKY MATS AT THE ICRA BARRIER ENTRANCE SPACES AND CHANGE DAILY
OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO
ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED.
EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED
DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE
ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND
OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART
SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP
AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE
USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD
OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE
VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND
SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT
PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM
ANY ADJACENT EXCAVATION DEBRIS.
6. ALL FURNISHINGS AND EQUIPMENT REMAIN IN THE IMPACTED ROOMS SHALL BE
COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: VERIFY WITH THE COR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM
CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE
NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR
SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN
THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE,
PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER
MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC.
IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND
HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE
DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-
FLANGE HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM
OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL
BE VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR
SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION
ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM
THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE
SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE
APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-
FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE
LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR
SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING
EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM
THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION
UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A
TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND
APPROVED THE CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories
(specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
1. CONTRACTOR TO COORDINATE WITH COR TO ENSURE THAT AT LEAST ONE HAC ON
EACH FLOOR REMAINS OPERATIONAL DURING CONSTRUCTION.
PHASING NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: No Scale
ICRA BARRIER WALL TYPE
Scale: No Scale
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: No Scale
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: No Scale
ICRA ROOM ELEVATION
Scale: No Scale
CROSS SECTION "A"
Scale: No Scale
ICRA MOBILE CONTAINMENT CART
VARIOUS
24514
LICENSED
ARCHITECT
71N
23 24
1 2
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
GC101
GENERAL SITE PLAN
4 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1" = 100'-0"
SITE PLAN
NORTH
0 10050 200
A. CONTRACTOR SHALL REPAIR ALL DAMAGE
CAUSED AS A RESULT OF CONSTRUCTION WORK
ASSOCIATED WITH THIS PROJECT TO THIS SITE ,
LANDSCAPING, BUILDINGS OR ANY OTHER AREA
BACK TO ORIGINAL CONDITION.
B. DUMPSTER LOCATIONS ARE TO BE
COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE. SEE SHEET GC101 FOR
SUGGESTED LOCATIONS OF LAY DOWN AREAS.
C. CONTRACTOR SHALL PREPARE A PLAN SHOWING
LAY DOWN AREA, SECURITY FENCE, DUMPSTER,
LOCATION, AND ACCESS FOR COR REVIEW AND
APPROVAL.
D. CONTRACTOR SHALL PARK IN AREAS
DESIGNATED BY THE COR. CONTRACTOR TO
COORDINATE PARKING WITH THE COR PRIOR TO
COMMENCING WORK.
1 POSSIBLE LOCATION OF DUMPSTERS AND TRASH
CHUTES, COORDINATE WITH COR PRIOR TO
LOCATING ITEMS.
2 POSSIBLE SUPPLY LAY DOWN AREA FOR
CONTRACTOR.
VARIOUS
24514
LICENSED
ARCHITECT
UP
A-100
CORRIDOR
C002
BREAK
ROOM
TELEWORK
TOUCHDOWN
OFFICE
005A
CORRIDOR
C004
MECHANICAL/
FIRE
SPRINKLER
MECHANICAL
ROOM
CORRIDOR
C003
HAC
CORRIDOR
C001
STAIR
ST001BUSINESS
OFFICE
ELEV.
E001
ELEVATOR
MACHINE
ROOM
HAC
STORAGE
ALCOVE
UNEXCAVATED
HEAT PIT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
1.G-100
BUILDING 1 BASEMENT FLOOR PLAN
5 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1/8" = 1'-0"
BUILDING 1 BASEMENT FLOOR
NORTH
0 4 8 16
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NO SCALE
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE INSTALLATION OF ALL INFECTION CONTROL
BARRIERS AND EQUIPMENT REQUIRED. THE
CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS
ARE INSTALLED AND INSPECTED PRIOR TO
COMMENCING ANY WORK IN THE SPACES WHERE
PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK
THAT COULD CREATE DUST OR INFECTIOUS
MATERIAL INTO THE AIR.
B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING
WORK REQUIRE FOR THE INSTALLATION OF THE
NEW EYE WASHER UNITS IN EACH SPACE. THIS
INCLUDES ANY WORK REQUIRED IN THE ADJACENT
SPACES FOR PLUMBING CONNECTIONS.
C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL
WORK INCLUDED IN THE SPACES RECEIVING NEW
EYE WASHER UNITS. THIS INCLUDE THE
REPLACEMENT AND INSTALLATION OF GFCI
OUTLETS AND LIGHT FIXTURES.
D. SEE ARCHITECTURAL DRAWINGS FOR THE
INSTALLATION AND SIZES OF ALL NEW METAL
SHELVING AND REQUIRED REMOVAL OR
MODIFICATION OF EXISTING SHELVING IN THE
SPACES.
E. SEE ARCHITECTURAL DRAWINGS FOR ALL
FINISHES REQUIRED IN THE SPACES TO RECEIVE
THE NEW EYE WASHER UNIT.
F. CONTRACTOR'S PERSONNEL SHALL BE
RESPONSIBLE TO MAINTAIN STRICT CONTROL
OVER ALL TOOLS AND MATERIAL BROUGHT INTO
THE SPACE.
24514
LICENSED
ARCHITECT
A-101
UNISEX
ENTRY
HAC
EXERCISE
UNISEX
EDUCATION
LOUNGE
STORAGE/IT
STAIR
ST101
OFFICE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
2.G-101
BUILDING 2 FIRST FLOOR PLAN
6 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1/8" = 1'-0"
BUILDING 2 FIRST FLOOR PLAN
NORTH0 4 8 16
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NO SCALE
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE INSTALLATION OF ALL INFECTION CONTROL
BARRIERS AND EQUIPMENT REQUIRED. THE
CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS
ARE INSTALLED AND INSPECTED PRIOR TO
COMMENCING ANY WORK IN THE SPACES WHERE
PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK
THAT COULD CREATE DUST OR INFECTIOUS
MATERIAL INTO THE AIR.
B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING
WORK REQUIRE FOR THE INSTALLATION OF THE
NEW EYE WASHER UNITS IN EACH SPACE. THIS
INCLUDES ANY WORK REQUIRED IN THE ADJACENT
SPACES FOR PLUMBING CONNECTIONS.
C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL
WORK INCLUDED IN THE SPACES RECEIVING NEW
EYE WASHER UNITS. THIS INCLUDE THE
REPLACEMENT AND INSTALLATION OF GFCI
OUTLETS AND LIGHT FIXTURES.
D. SEE ARCHITECTURAL DRAWINGS FOR THE
INSTALLATION AND SIZES OF ALL NEW METAL
SHELVING AND REQUIRED REMOVAL OR
MODIFICATION OF EXISTING SHELVING IN THE
SPACES.
E. SEE ARCHITECTURAL DRAWINGS FOR ALL
FINISHES REQUIRED IN THE SPACES TO RECEIVE
THE NEW EYE WASHER UNIT.
F. CONTRACTOR'S PERSONNEL SHALL BE
RESPONSIBLE TO MAINTAIN STRICT CONTROL
OVER ALL TOOLS AND MATERIAL BROUGHT INTO
THE SPACE.
24514
LICENSED
ARCHITECT
A-100
STORAGE
WORK
ROOM
MECHANICAL
STAIR
ST001
BREAK
ROOM
WOMEN
HAC
CORR.
MEN
MECHANICAL
ELEV
E-1
ELE. EQ.
CORR.
COMM.
STOR
MECHANICAL CRAWLSPACE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
3.G-100
BUILDING 3 BASEMENT FLOOR PLAN
7 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1/8" = 1'-0"
BUILDING 3 BASEMENT FLOOR PLAN
N O
R T
H0 4 8 16
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NO SCALE
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE INSTALLATION OF ALL INFECTION CONTROL
BARRIERS AND EQUIPMENT REQUIRED. THE
CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS
ARE INSTALLED AND INSPECTED PRIOR TO
COMMENCING ANY WORK IN THE SPACES WHERE
PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK
THAT COULD CREATE DUST OR INFECTIOUS
MATERIAL INTO THE AIR.
B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING
WORK REQUIRE FOR THE INSTALLATION OF THE
NEW EYE WASHER UNITS IN EACH SPACE. THIS
INCLUDES ANY WORK REQUIRED IN THE ADJACENT
SPACES FOR PLUMBING CONNECTIONS.
C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL
WORK INCLUDED IN THE SPACES RECEIVING NEW
EYE WASHER UNITS. THIS INCLUDE THE
REPLACEMENT AND INSTALLATION OF GFCI
OUTLETS AND LIGHT FIXTURES.
D. SEE ARCHITECTURAL DRAWINGS FOR THE
INSTALLATION AND SIZES OF ALL NEW METAL
SHELVING AND REQUIRED REMOVAL OR
MODIFICATION OF EXISTING SHELVING IN THE
SPACES.
E. SEE ARCHITECTURAL DRAWINGS FOR ALL
FINISHES REQUIRED IN THE SPACES TO RECEIVE
THE NEW EYE WASHER UNIT.
F. CONTRACTOR'S PERSONNEL SHALL BE
RESPONSIBLE TO MAINTAIN STRICT CONTROL
OVER ALL TOOLS AND MATERIAL BROUGHT INTO
THE SPACE.
24514
LICENSED
ARCHITECT
TRAMWAYTRAMWAY
DN
A-101
UNISEX
RR
HAC
CORR
C101
UNISEX
RR
EXTERIOR
STAIR
ST103
HUD/VASH
EMPLOYEE
BREAK ROOM
SOCIAL WORK
OFFICE
INTERVIEW
ROOM
SOCIAL WORK
OFFICE
112A
INTERVIEW
ROOM
INTERVIEW
ROOM
TCM/VJO
MFH/HBPC
CHIEF
OF
SOCIAL
WORK
SUCIDE
PREVENTION
SOCIAL
WORK
AO
SOCIAL WORK
GROUP ROOM
PORCH
P101
REAR LOBBY
118C HBPC
SUPERVISOR
FRONT LOBBY
STAIR
ST101
HBPC
118B
IT CLOSET
118A
HR PIV OFFICE
STORAGE
115A
UNISEX
RR
115B
VENDING
ELEVATOR
E101
LOBBY
STAIR
ST102
STOR
131A
HUMAN
RESOURCES
HUMAN
RESOURCES
TOUCHDOWN
SPACE
RESTROOM
HR STAFF
ER
STOR
120B
KITCHENETTE
120A
BREAKROOM
CORR
C102
HR STAFF
EXTERIOR STAIR
ST104
ER/LR
HR LEAD
STORAGE
RESTROOM
HAC
STOR
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
4.G-101
BUILDING 4 FIRST FLOOR PLAN
8 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1/8" = 1'-0"
BUILDING 4 FIRST FLOOR PLAN
N O
R T
H0 4 8 16
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NO SCALE
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE INSTALLATION OF ALL INFECTION CONTROL
BARRIERS AND EQUIPMENT REQUIRED. THE
CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS
ARE INSTALLED AND INSPECTED PRIOR TO
COMMENCING ANY WORK IN THE SPACES WHERE
PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK
THAT COULD CREATE DUST OR INFECTIOUS
MATERIAL INTO THE AIR.
B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING
WORK REQUIRE FOR THE INSTALLATION OF THE
NEW EYE WASHER UNITS IN EACH SPACE. THIS
INCLUDES ANY WORK REQUIRED IN THE ADJACENT
SPACES FOR PLUMBING CONNECTIONS.
C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL
WORK INCLUDED IN THE SPACES RECEIVING NEW
EYE WASHER UNITS. THIS INCLUDE THE
REPLACEMENT AND INSTALLATION OF GFCI
OUTLETS AND LIGHT FIXTURES.
D. SEE ARCHITECTURAL DRAWINGS FOR THE
INSTALLATION AND SIZES OF ALL NEW METAL
SHELVING AND REQUIRED REMOVAL OR
MODIFICATION OF EXISTING SHELVING IN THE
SPACES.
E. SEE ARCHITECTURAL DRAWINGS FOR ALL
FINISHES REQUIRED IN THE SPACES TO RECEIVE
THE NEW EYE WASHER UNIT.
F. CONTRACTOR'S PERSONNEL SHALL BE
RESPONSIBLE TO MAINTAIN STRICT CONTROL
OVER ALL TOOLS AND MATERIAL BROUGHT INTO
THE SPACE.
24514
LICENSED
ARCHITECT
A-103
MEN'S
RESTROOM
HAC
OFFICE
ACCT.
CORRIDOR
C204
WOMEN'S
RESTROOM
SUPERVISORY
ACCOUNTANT
EXTERIOR
STAIR
ST203
OFFICE
PROGRAM
SUPPORT
OFFICE
PAYROLL
CBOC
DIRECTOR
CORRIDOR
C203
CHIEF
FINANCE
OFFICER
CBOC
NURSE
MGT
CBOC AO
CORRIDOR
C202
CPAC OFFICES
CCHT OFFICES
PORCH
P201
CORRIDOR
C201
HBPC MEDICAL
DIR & AO
BREAKROOM
BUILDING 4
CONFERENCE
ROOM
UP STAIR TO
ATTIC
ST205
DN STAIR
ST202
ELEV LOBBY
ELEV
E201
LOBBY
CRED &
PRIVILEGING
QM - AO
CRED &
PRIVILEGING
QM - AO
QM-CAC/
PATIENT SAFETY
CORRIDOR
C205
QM-INFECTION
CONTROL/ NURSE
INFORMATICIST
CORRIDOR
C206
QM-INOVATION /
SYS REDESIGN /
DATA ANALYST
HAC
DIR-COMPLIANCE
QM-SYSTEMS
REDESIGN
CORRIDOR
C207
RESTROOM
STORAGE
217A
QUALITY
MANAGER
UNISEX
RESTROOM
EXTERIOR
STAIR
ST204
STAIR
ST201
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
4.G-102
BUILDING 4 SECOND FLOOR PLAN
9 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1/8" = 1'-0"
BUILDING 4 SECOND FLOOR PLAN
N O
R T
H0 4 8 16
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NO SCALE
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE INSTALLATION OF ALL INFECTION CONTROL
BARRIERS AND EQUIPMENT REQUIRED. THE
CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS
ARE INSTALLED AND INSPECTED PRIOR TO
COMMENCING ANY WORK IN THE SPACES WHERE
PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK
THAT COULD CREATE DUST OR INFECTIOUS
MATERIAL INTO THE AIR.
B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING
WORK REQUIRE FOR THE INSTALLATION OF THE
NEW EYE WASHER UNITS IN EACH SPACE. THIS
INCLUDES ANY WORK REQUIRED IN THE ADJACENT
SPACES FOR PLUMBING CONNECTIONS.
C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL
WORK INCLUDED IN THE SPACES RECEIVING NEW
EYE WASHER UNITS. THIS INCLUDE THE
REPLACEMENT AND INSTALLATION OF GFCI
OUTLETS AND LIGHT FIXTURES.
D. SEE ARCHITECTURAL DRAWINGS FOR THE
INSTALLATION AND SIZES OF ALL NEW METAL
SHELVING AND REQUIRED REMOVAL OR
MODIFICATION OF EXISTING SHELVING IN THE
SPACES.
E. SEE ARCHITECTURAL DRAWINGS FOR ALL
FINISHES REQUIRED IN THE SPACES TO RECEIVE
THE NEW EYE WASHER UNIT.
F. CONTRACTOR'S PERSONNEL SHALL BE
RESPONSIBLE TO MAINTAIN STRICT CONTROL
OVER ALL TOOLS AND MATERIAL BROUGHT INTO
THE SPACE.
24514
LICENSED
ARCHITECT
DN
UP
UP
UPUP
A-101
HAC
RR
STOR
STORAGE
121A
MAILROOM
HSKPG
SUPER
118A
HSKPG
SUPPORT
CORR.
C103
CORR.
C104
STORAGE
INTERIOR
DESIGN/
EMERGENCY
MANAGEMENT
EXTERIOR
STAIR
ST103
OFFICE
HSKPG
CORR.
C102
HOUSEKEEPING
BREAKROOM
HAC
115A
LACTATION
ROOM
DAV
114A
SINK
116A
CONF/
BREAKROOM
RR-WOMEN
RR-WOMEN
VACANT
OFFICE
MENTAL
HEALTH
PROVIDER
OFFICE
HAC
CORR.
C101
PHARMACY
OFFICE
WAITING
NURSING
SERVICE
CHIEFS
NURSING
SERVICE
OFFICE
COPY
ROOM
NURSING
SERVICE
TOUCHDOWN
NURSE
MANAGER
CONFERENCE
ROOM
EXTERIOR
STAIR
ST102
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:4
P
M C
U s e rs
\d c o rd o n \D o c u m e n ts \R e v it l o c a l\ A
-1
-Q
-V A
S h e ri d a n
-E y e w a s h
-W Y d c o rd o n a c g
-p a
.c o m
.r v t
5.G-101
BUILDING 5 FIRST FLOOR PLAN
10 24DGC
INSTALL TEMPERED
EYEWASH IN HOUSING AID
CLOSETS
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WY 82801 MAY 22, 2024
100% BID DOCUMENTS
666-22-10722-196
RC
Scale: 1/8" = 1'-0"
BUILDING 5 FIRST FLOOR PLAN
N O
R T
H0 4 8 16
PORCH
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NO SCALE
1 CONTRACTOR SHALL ASK COR IF VA DESIRES TO
KEEP THE SALVAGE EYEWASH. IF SO, CONTRACTOR
SHALL DELIVER IT TO A LOCATION ON-SITE AS
SPECIFIED BY THE COR. OTHERWISE, IF THE VA
DOES NOT DESIRE TO KEEP IT, CONTRACTOR SHALL
DISPOSE OF IT PROPERLY OFF-STATION.
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE INSTALLATION OF ALL INFECTION CONTROL
BARRIERS AND EQUIPMENT REQUIRED. THE
CONTRACTOR SHALL ENSURE ALL ICRA BARRIERS
ARE INSTALLED AND INSPECTED PRIOR TO
COMMENCING ANY WORK IN THE SPACES WHERE
PLUMBING, GYPSUM BOARD, FINISHES, ETC. WORK
THAT COULD CREATE DUST OR INFECTIOUS
MATERIAL INTO THE AIR.
B. SEE MECHANICAL DRAWINGS FOR ALL PLUMBING
WORK REQUIRE FOR THE INSTALLATION OF THE
NEW EYE WASHER UNITS IN EACH SPACE. THIS
INCLUDES ANY WORK REQUIRED IN THE ADJACENT
SPACES FOR PLUMBING CONNECTIONS.
C. SEE ELECTRICAL DRAWING FOR ALL ELECTRICAL
WORK INCLUDED IN THE SPACES RECEIVING NEW
EYE WASHER UNITS. THIS INCLUDE THE
REPLACEMENT AND INSTALLATION OF GFCI
OUTLETS AND LIGHT FIXTURES.
D. SEE ARCHITECTURAL DRAWINGS FOR THE
INSTALLATION AND SIZES OF ALL NEW METAL
SHELVING AND REQUIRED REMOVAL OR
MODIFICATION OF EXISTING SHELVING IN THE
SPACES.
E. SEE ARCHITECTURAL DRAWINGS FOR ALL
FINISHES REQUIRED IN THE SPACES TO RECEIVE
THE NEW EYE WASHER UNIT.
F. CONTRACTOR'S PERSONNEL SHALL BE
RESPONSIBLE TO MAINTAIN STRICT CONTROL
OVER ALL TOOLS AND MATERIAL BROUGHT INTO
THE SPACE.
24514
LICENSED
ARCHITECT
DNDN
S S
S S
S S
SS SS
S S
S S
S S
S S
S S
SS SSSSSSSS
S SS
A-103
GROUP
ROOM
STAIR
ST203
HAC
MH
PROVIDER
WOMEN'S RR
CORRIDOR
C202
SOCIAL WORK
OFFICE
MARRIAGE AND
FAMILY
THERAPIST
INTERVIEW
ROOM
ROOF BELOW
DAY
ROOM
STAIR
ST201
STORAGE
206A
ELEV
E201
UPPER LEVEL TRAMWAY
MEN'S RR
STOR
CORRIDOR
C201
CLOSET
207A
VACANT
OFFICE
VACANT
OFFICE
STOR
HAC
VACANT
MHRRTP
OFFICES
GROUP
ROOM
STAIR
ST202
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S.
This is the start of the file's text. The full file is on GovTribe.