S02 - Drawings.pdf

PDF 4 MB Posted

Attached to
Y1DZ--620-14-108 l Building 17 Sprinklers
Solicitation number
36C24221B0002
Issued by

About this file

This presolicitation notice describes an upcoming federal contract opportunity to replace the sprinkler system in Building 17 at the Hudson Valley Healthcare System Montrose Campus in Montrose, New York. The contractor will furnish all materials, equipment, personnel and supervision to accomplish the work according to contract drawings, specifications and VA requirements. The contract completion time is 365 calendar days from notice to proceed. This is a 100% SDVOSB set-aside requiring registration in both the VetBiz and SAM databases. Bids will be accepted only from responsible and responsive SDVOSBs approved under NAICS 238220 with a size standard of $15 million. A bid bond is required and performance and payment bonds will be required upon award. The solicitation and specifications will be available on SAM.gov around October 20th with bid submission details included. Questions about the solicitation are due by October 16th. The cost range for the project is $250,000 to $500,000.

View the file

Other files

File Type Posted
S02 - Specs.pdf PDF
Commissioning Plan.pdf PDF
36C24221B0002_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

TITLE SHEET CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19

GI001

B17

620-18-109

SBV CJR

REV 0 CONTRACT DOCUMENTS 2020/08/19

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

NORTH ARROW

DETAIL NUMBER

DETAIL NUMBER

DRAWING REF NUMBER

DRAWING REF NUMBER

DETAIL NUMBER

DRAWING REF NUMBER

DETAIL NUMBER

DRAWING REF NUMBER

DETAIL NUMBER

DRAWING REF NUMBER

VIEWING

DIRECTION

VIEWING

DIRECTION

VIEW TITLE

BUILDING/WALL SECTION CUT

ELEVATION

DETAIL SECTION CUT

DETAIL CALLOUT

DRAWING SYMBOLS

SCALE: X" = 1'-0"

DETAIL TITLEXX

XXXXX

XXXXX

X

XXXXX

X

XXXXX

X

XXXXX

X

DRAWING LIST

DRAWING NUMBER DRAWING TITLE

GENERAL

GI001 TITLE SHEET

GC101 GENERAL SITE AND DEBRIS REMOVAL PLAN

HAZARDOUS MATERIALS

H-101 HAZARDOUS MATERIALS ABATEMENT PLAN - FIRST FLOOR

H-102 HAZARDOUS MATERIALS ABATEMENT PLAN - SECOND FLOOR

H-103 HAZARDOUS MATERIALS ABATEMENT PLAN - THIRD FLOOR

H-104 HAZARDOUS MATERIALS ABATEMENT PLAN - PENTHOUSE

FIRE PROTECTION

F-001 FIRE PROTECTION NOTES AND LEGENDS

FD101 FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR

FD102 FIRE PROTECTION DEMOLITION PLAN - SECOND FLOOR

FD103 FIRE PROTECTION DEMOLITION PLAN - THIRD FLOOR

FD104 FIRE PROTECTION DEMOLITION PLAN - PENTHOUSE

FA601 FIRE ALARM RISER DIAGRAM AND IO MATRIX

FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR

FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR

FX103 FIRE SUPPRESSION PLAN - THIRD FLOOR

FX104 FIRE SUPPRESSION PLAN - PENTHOUSE

FX401 FIRE SUPPRESSION ENLARGED PLAN - FIRST FLOOR

FX501 FIRE SUPPRESSION DETAILS

FX601 FIRE SUPPRESSION RISER DIAGRAM

AREA OF WORK

8/26/2020

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA HUDSON VALLEY HEALTHCARE SYSTEM

AutoCAD SHX Text BUILDING 17 SPRINKLERS FRANKLIN DELANO ROOSEVELT CAMPUS 2094 ALBANY POST ROAD MONTROSE, NEW YORK 10548

AutoCAD SHX Text N

PATH OF DEBRIS

REMOVAL

AREA OF DEBRIS REMOVAL AT NORTH WEST

OVERHEAD DOOR UNLESS OTHERWISE DISCUSSED

WITH VA COR. SEE DRAWINGS FD101 THRU FD104

FOR FURTHER DETAIL ON DEMOLITION.

WW

W

EXISTING 8" SITE

WATER SUPPLY

EXISTING 6"

FIRE WATER

EXISTING PIV-17

WITH TAMPER

SWITCH

FW

ENTRANCE GATE

ALBANY POST ROAD

ALBANY

POST

ROAD

GC101

SELECT BACKFILL

COMPACTED TO 95%

SPD

SUITABLE EXCAVATED

BACKFILL COMPACTED

TO 85% SPD

FINISH GRADE

5'- 0"

M

IN

MI

N

6" MI

N12"

MIN

12"

MIN

DETECTABLE WARNING

TAPE

6" CALICHE SURFACING

EXCEPT IN NATURAL TERRAIN

5'-0"

MINIMUM

MINIMUM

EXTENTS OF

EXCAVATION

CONTRACTOR TO

DETERMINE IF ADDITIONAL

EXCAVATION IS NECESSARY

TO ACHIEVE INSTALLATION.

EXISTING 6" FIRE

WATER SUPPLY

EXISTING SPRINKLER SUPPLY

LINE IS ASSUMED TO PASS

UNDER STEAM TRENCH

EXISTING STEAM

TRENCH

PROPOSED CONNECTION LOCATION TO NEW

SPRINKLER SYSTEM MINIMUM 5' FROM FACE OF

BUILDING. CONTRACTOR TO VERIFY CONDITIONS

IN FIELD AND COORDINATE WITH COR.

BUILDING 17

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL SITE AND DEBRIS

REMOVAL PLAN

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19

GC101

B17

620-18-109

SBV CJR

REV 0 CONTRACT DOCUMENTS 2020/08/19

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

N

SCALE: NTS

GENERAL SITE AND DEBRIS REMOVAL PLAN1

GENERAL NOTES

1. COORDINATE FINAL LOCATION OF DUMPSTER WITH FACILITY TO MITIGATE EFFECT OF

DEMOLITION DURING WAREHOUSE OPERATIONS.

SCALE: NTS

TRENCH BACKFILL DETAIL2 SCALE: 1/4" = 1'-0"

LIMITS OF EXCAVATION3

8/26/2020

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

SERVICE

CHIEF

101CPROCESSING

101D

STORAGE

101A

STAGING

102OFFICE

102A

LAUNDRY

102C

CLEAN LINEN

102B SHIPPING

RECEIVING

TOILET

101B

TOILET

PIT ROOM

SOUTH

STAIR

HALL

OFFICE

VAULT

TRANSFORMER

ROOM

STORAGE

DSDSDS

DSDSDSDS

FREIGHT

ELEVATOR

NORTH

STAIR HALL

X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

XX

X

X X

X X

X X

X X

X X

X X

X

X X X

X

X X

X X

X

X X

X

X

X

XX

X X X X X

X X

X

X X

X X

X X

X

X

X

X

X X X

X X

FP

X

X X X X X X X X X X X X X X X

X

FP

X X

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

HAZARDOUS MATERIALS

ABATEMENT PLAN - FIRST FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19 H-101

B17

620-18-109

MB NK

REV 0 CONTRACT DOCUMENTS 2020/08/19

SCALE: 3/16" = 1'-0"

HAZARDOUS MATERIALS ABATEMENT PLAN - FIRST FLOOR1

KEYPLAN

N

N

GENERAL NOTES

A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.

B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING

MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR

REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE

BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.

C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.

E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.

F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING

LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL

NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.

G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY

PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE

DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR

CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR

TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS

APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)

SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE

ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.

J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS

FOR ADDITIONAL INFORMATION AND COORDINATION.

K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS

INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.

AA-1

ASBESTOS AWARENESS NOTES

ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS

ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING

INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.

LEAD AWARENESS NOTES

1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL

RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING

COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS

THAT HAVE BEEN TESTED.

3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:

· SPRINKLER PIPE

· FLOORS/LANDINGS IN STAIRWELL

4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL

AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED

BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.

5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE

DISTURBANCE OF LEAD.

6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO

DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO

WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

ASBESTOS REMOVAL NOTES

AA-1 CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF ASBESTOS-CONTAINING 9” X 9” FLOOR TILE AND

ASBESTOS-CONTAINING MASTIC. REMOVE TO EXTENTS DETERMINED NECESSARY FOR REMOVAL OF EXISTING WATER SUPPLY AND

SLAB CORING FOR NEW WATER SUPPLY. LESS THAN 10 SQUARE FEET OF TILE IS ANTICIPATED TO BE REMOVED BY THE PROJECT.

WORK SHALL BE PERFORMED IN A MINOR TENT PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. COORDINATE WITH GENERAL

CONTRACTOR EXACT LOCATION OF FLOOR TILE TO BE REMOVED. PROTECT ADJACENT FLOORING SCHEDULED TO REMAIN.

AA-2 PROVIDE CORE IN EXISTING DRYWALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. THE DRYWALL JOINT COMPOUND

IS ASBESTOS-CONTAINING. WORK SHALL BE PERFORMED IN MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3.

APPROXIMATELY 20 PENETRATIONS WILL BE REQUIRED. COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR AND REFER

TO DRAWINGS FD-101 AND FX-101 FOR FURTHER INFORMATION.

AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING

MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FAÇADE. PERFORM CORING WITHIN

MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.

COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.

95 Perry Street , Suite 300

Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199

AA-2

(THROUGHOUT)

AA-2

AA-2

PROPOSED LOCATION OF REMOTE

DECONTAMINATION ENCLOSURE

(COORDINATE LOCATION WITH THE FACILITY)

AA-3

AA-3

AA-3

AA-2

AA-2

AA-2

AA-2

AA-2

AA-2

(APPROXIMATE LOCATIONS

OF PENETRATIONS THROUGH

WALLS FOR NEW SPRINKLER

PIPES.)

(APPROXIMATE LOCATIONS

OF PENETRATIONS THROUGH

WALLS FOR NEW SPRINKLER

PIPES.)

(APPROXIMATE LOCATIONS

OF PENETRATIONS THROUGH

WALLS FOR NEW SPRINKLER

PIPES.)

X X EXISTING SPRINKLER PIPE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SOUTH

STAIR

HALL

GENERAL STORAGE

DSDSDS

DSDSDSDS

FREIGHT

ELEVATOR

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXX

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X

FP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

HAZARDOUS MATERIALS

ABATEMENT PLAN - SECOND FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19 H-102

B17

620-18-109

SBV CJR

REV 0 CONTRACT DOCUMENTS 2020/08/19

SCALE: 3/16" = 1'-0"

HAZARDOUS MATERIALS ABATEMENT PLAN - SECOND FLOOR1

KEYPLAN

N

N

AA-3

AA-3

A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.

B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING

MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR

REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE

BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.

C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.

E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.

F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING

LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL

NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.

G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY

PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE

DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR

CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR

TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS

APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)

SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE

ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.

J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS

FOR ADDITIONAL INFORMATION AND COORDINATION.

K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS

INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.

ASBESTOS AWARENESS NOTES

ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS

ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING

INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.

LEAD AWARENESS NOTES

1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL

RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING

COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS

THAT HAVE BEEN TESTED.

3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:

· SPRINKLER PIPE

· FLOORS/LANDINGS IN STAIRWELL

4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL

AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED

BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.

5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE

DISTURBANCE OF LEAD.

6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO

DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO

WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

ASBESTOS REMOVAL NOTES

AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING

MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FACADE. PERFORM CORING WITHIN

MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.

COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.

(APPROXIMATE LOCATIONS

OF PENETRATIONS THROUGH

WALLS FOR NEW SPRINKLER

PIPES.)

(APPROXIMATE LOCATIONS

OF PENETRATIONS THROUGH

WALLS FOR NEW SPRINKLER

PIPES.)

X X EXISTING SPRINKLER PIPE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FREIGHT

ELEVATOR

GENERAL

STORAGE

SOUTH

STAIR

HALL

FILE

SETRUCTION

GENERAL

STORAGE

303A

DOWN

UP

NORTH STAIR

HALL

XX

X X

XXXXX

X X

X X

X X X

XXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X X X

X X X X X X X X X X X X X X X X

FP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

HAZARDOUS MATERIALS

ABATEMENT PLAN - THIRD FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19 H-103

B17

620-18-109

MB NK

REV 0 CONTRACT DOCUMENTS 2020/08/19

SCALE: 3/16" = 1'-0"

HAZARDOUS MATERIALS ABATEMENT PLAN - THIRD FLOOR1

KEYPLAN

N

N

95 Perry Street , Suite 300

Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199

AA-3

A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.

B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING

MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR

REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE

BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.

C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.

E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.

F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING

LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL

NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.

G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY

PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE

DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR

CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR

TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS

APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)

SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE

ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.

J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS

FOR ADDITIONAL INFORMATION AND COORDINATION.

K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS

INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.

ASBESTOS AWARENESS NOTES

ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS

ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING

INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.

LEAD AWARENESS NOTES

1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL

RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING

COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS

THAT HAVE BEEN TESTED.

3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:

· SPRINKLER PIPE

· FLOORS/LANDINGS IN STAIRWELL

4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL

AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED

BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.

5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE

DISTURBANCE OF LEAD.

6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO

DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO

WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

ASBESTOS REMOVAL NOTES

AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING

MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FACADE. PERFORM CORING WITHIN

MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.

COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.

(APPROXIMATE LOCATIONS

OF PENETRATIONS THROUGH

WALLS FOR NEW SPRINKLER

PIPES.)

X X EXISTING SPRINKLER PIPE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MECH ROOM

ROOF

SOUTH

STAIR

HALL

X

X

X X X X X X X X

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

HAZARDOUS MATERIALS

ABATEMENT PLAN - PENTHOUSE

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19 H-104

B17

620-18-109

MB NK

REV 0 CONTRACT DOCUMENTS 2020/08/19

SCALE: 3/16" = 1'-0"

HAZARDOUS MATERIALS ABATEMENT PLAN - PENTHOUSE1

KEYPLAN

N

N

AA-3

95 Perry Street , Suite 300

Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199

ASBESTOS AWARENESS NOTES

ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS

ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING

INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.

LEAD AWARENESS NOTES

1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL

RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.

2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING

COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS

THAT HAVE BEEN TESTED.

3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:

· SPRINKLER PIPE

· FLOORS/LANDINGS IN STAIRWELL

4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL

AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED

BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.

5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE

DISTURBANCE OF LEAD.

6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO

DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO

WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

ASBESTOS REMOVAL NOTES

AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING

MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FACADE. PERFORM CORING WITHIN

MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.

COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.

A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.

B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING

MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR

REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE

BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.

C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.

E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.

F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING

LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL

NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.

G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY

PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE

DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR

CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR

TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS

APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)

SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE

OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE

ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.

J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS

FOR ADDITIONAL INFORMATION AND COORDINATION.

K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS

INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.

(APPROXIMATE LOCATION OF

PIPE TO BE DEMOLISHED)

X X EXISTING SPRINKLER PIPE

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE PROTECTION NOTES AND

LEGENDS

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19 F-001

B17

620-18-109

SBV CJR

REV 0 CONTRACT DOCUMENTS 2020/08/19

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

FIRE PROTECTION SYMBOLS

PENDANT SPRINKLER, ON DROP NIPPLE

ENDCAP

UPRIGHT SPRINKLER

SPRINKLER RISER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

CAPPED OUTLET

PENDANT SPRINKLER

UPRIGHT SPRINKLER, ELEVATION

PLUG WITH BLEEDER

GENERIC VALVE SYMBOL

UPRIGHT SPRINKLER WITH GUARD, ELEVATION

PIPE SECTION

■ ■ ■ EXISTING FIRE BARRIER, 1 HOUR

EXISTING FIRE BARRIER, 2 HOUR■ ■ ■ ■ ■ ■

EXISTING FIRE-BARRIER, SMOKE BARRIER,1 HOUR■S ■S

EXISTING FIRE-BARRIER, SMOKE BARRIER, 2 HOUR■ ■S ■ ■S

S EXISTING SMOKE BARRIER LINE

SMOKE AND FIRE BARRIER SYMBOLS

GENERAL PLUMBING SYMBOLS

GENERAL NOTES:

1. EXISTING UTILITIES SHOWN IN THIS DRAWING PACKAGE ARE INTENDED TO ILLUSTRATE AREAS WHERE OBSTRUCTIONS

MAY PRESENT INTERFERENCES OR CHALLENGES TO SPRINKLER SYSTEM INSTALLATION. IT IS NOT MEANT TO SERVE AS AN ALL INCLUSIVE AS-BUILT UTILITY SURVEY AND DOES NOT ABSOLVE THE CONTRACTOR FROM ATTENDING ANY

PRE-BID WALK DOWNS OR SURVEYING EXISTING CONDITIONS PRIOR TO CONSTRUCTION.

SPRINKLER SYSTEM INSTALLATION

1. ALL WORK TO COMPLY WITH THE VA FIRE PROTECTION DESIGN MANUAL 7TH EDITION, DECEMBER 2015, NFPA 101 LIFE

SAFETY CODE (2018), AND ALL OTHER APPLICABLE CODES ADOPTED BY THE VA. ALL EQUIPMENT AND FIXTURES SHALL BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS. ALL SPRINKLER PIPING SHALL CONFORM TO NFPA 13

STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS (2019).

2. SPRINKLER SYSTEM PIPE SIZING IS BASED ON PRELIMINARY DESIGN CALCULATIONS. INSTALLING CONTRACTOR SHALL

PROVIDE HYDRAULIC CALCULATIONS AND HYDRAULIC DATA PLATE FOR INSTALLED SYSTEM.

a.) WATER SUPPLY PRESSURE AT THE TIME OF THIS DESIGN HAS BEEN SHOWN TO BE DEFICIENT.(APPROXIMATELY 50

PSI STATIC)

b.) THE DEPARTMENT OF VETERANS AFFAIRS HAS DETERMINED IT WOULD LIKE TO REDUCE THE SECOND AND THIRD FLOOR TO ORDINARY HAZARD GROUP 1 AND MAINTAIN AN ADMINISTRATIVE CONTROL OF AN 8'-0" MAXIMUM

STORAGE HEIGHT.

3. THE CONTRACTOR SHALL COORDINATE PIPE ROUTINGS WITH STRUCTURE, DUCTWORK, PIPING, LIGHTS, ETC. PIPING

SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANELS.

4. THE CONTRACTOR SHALL REPLACE ANY DAMAGED OR BROKEN CEILING TILES, AS WELL AS TILES WITH LEFTOVER

PENETRATIONS FROM PREVIOUS SPRINKLER HEADS.

5. PROVIDE FACTORY MUTUAL (FM) APPROVED, QUICK RESPONSE SPRINKLERS IN ALL AREAS.

a.) ALL SPRINKLERS ARE TO BE ORDINARY TEMPERATURE (155°F) RATED UNLESS OTHERWISE NOTED. REFERENCE

DETAIL ON FX501 FOR DETERMINATION OF SPRINKLER TEMPERATURE RATING AROUND UNIT HEATERS. THIS

DETAIL IS A GUIDE. CONTRACTOR SHOULD REFER TO NFPA 13 FOR ALL INSTALLATIONS.

6. THE CONTRACTOR SHALL COORDINATE SPRINKLER HEAD LOCATIONS WITH STRUCTURE, DUCTWORK, DIFFUSERS, LIGHTS, REFLECTED CEILING PLANS, ETC. UPRIGHT SPRINKLER HEAD DEFLECTORS SHALL BE INSTALLED AT AN

ELEVATION PER NFPA13. (BETWEEN 2-12" FROM THE UNDERSIDE OF THE CEILING).

7. WATER SUPPLY FOR ALL CONTROL VALVES SHALL BE ELECTRICALLY SUPERVISED (UNLESS NOTED OTHERWISE) AND MECHANICALLY LOCKED FOR PROPER POSITION. WATER FLOW AND SUPERVISORY CIRCUITS SHALL BE IN ACCORDANCE WITH NFPA 13 STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS AND NFPA 72 NATIONAL FIRE

ALARM CODE.

8. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE FIRESTOPPED. REFER TO SPECIFICATIONS.

9. ALL EXPOSED SPRINKLER PIPING IS TO BE PAINTED RED. SPRINKLER PIPE LOCATED ABOVE LAY-IN CEILING DOES NOT

NEED TO BE PAINTED.

10. PROVIDE PIPE CLAMPS AT ALL FLOOR PENETRATIONS.

GENERAL SYMBOLS

DEMOLISH/REMOVE

GENERAL LINETYPES

DEMOLITION LINE

DEMOLITION WALL

ROOM NAME AND NUMBERC2

CORRIDOR

3-WAY VALVE

OS&Y VALVE

BACKFLOW PREVENTER- DOUBLE CHECK TYPE

ANGLE VALVE

ALARM CHECK VALVE

EXISTING FENCE

FIRE DEPARTMENT CONNECTION

FIRE HOSE VALVE CONNECTION

EXIT SIGN, WALL MOUNTED W/ DIRECTIONAL ARROWS AND FACES

EXIT SIGN, CEILING MOUNTED W/ DIRECTIONAL ARROWS AND FACES

INDICATING BUTTERFLY VALVE

LIGHT FIXTURE, RECESSED, 2'X2'

OCCUPANCY SENSOR, CEILING MOUNTEDOC

SECURITY ACCESS, VIDEO CAMERA WITH LENS

M = MOTION DETECTOR

PZ = MOTION DETECTOR WITH PAN AND ZOOM

PTZ= MOTION DETECTOR WITH PAN, TILT, AND ZOOM

LIGHT FIXTURE, SURFACE MOUNTED, 1'X4'

LIGHT FIXTURE, SURFACE MOUNTED, 1'X8'

STEAM UNIT HEATER

STEAMS

ELECTRICAL CONDUITE

STEAM CONDENSATEC

SPEAKERS

ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

FDC FIRE DEPARTMENT CONNECTION

F/Z

FLOOR/ZONE CONTROL VALVE ASSEMBLY

AREA A

AREA BOUNDRY

AREA B

MATERIAL

A

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

MATERIAL

B

CHECK VALVE

G UPRIGHT SPRINKLER WITH GUARD

BALL VALVE

POST INDICATOR VALVE

SIDEWALL SPRINKLER

BALL DRIP VALVE

LIMIT OF DEMOLITION

INFECTION CONTROL NOTES

1. ALL CONSTRUCTION WORK IS TO COMPLY WITH STATION INFECTION CONTROL POLICY 11IC-05HV.

(ATTACHED TO CONSTRUCTION SPECIFICATIONS)

2. PROVIDES ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM DISPERSING INTO ATMOSPHERE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. WIPE SURFACES WITH DISINFECTANT UPON COMPLETION OF WORK IN THAT AREA.

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

PHASING NOTES

1. WORK ACTIVITIES WILL BE LIMITED TO ONE FLOOR AT A TIME. COORDINATE WITH COR.

2. ALL ACM ABATEMENT AND REMOVAL SHALL BE DONE PRIOR TO ANY SPRINKLER OR FIRE ALARM

SYSTEM WORK ON A GIVEN FLOOR.

3. NEW SPRINKLER, STANDPIPE, FLOOR/ZONE CONTROL VALVES (ONE EACH FLOOR), AND ASSOCIATED

FIRE ALARM INTERFACE TO BE INSTALLED THROUGHOUT PROJECT.

4. PERFORM SPRINKLER SYSTEM PRESSURE TEST AND FIRE ALARM SYSTEM TEST.

5. EXCAVATE AND TIE-INTO NEW SYSTEM.

a. NO FIRE WATCH OR TEMPORARY FIRE PROTECTION IS REQUIRED FROM THE CONTRACTOR.

THE FACILITY WILL IMPLEMENT ILSM.

6. DEMO ALL EXISTING SPRINKLER PIPE AND HANGERS, ETC.

7. PATCH ALL PIPE PENETRATIONS AND OTHER DAMAGE LEFT BY THE PROJECT AND EXISTING

SPRINKLER SYSTEM.

NFPA 13 HAZARD CLASSIFICATION BY AREA

LOCATION HAZARD CLASSIFICATION

1ST FLOOR LAUNDRY ORDINARY HAZARD GR.1

1ST FLOOR SHIPPING & RECEIVING ORDINARY HAZARD GR. 2

2ND FLOOR STORAGE ORDINARY HAZARD GR. 2

3RD FLOOR STORAGE *ORDINARY HAZARD GR. 1

MECHANICAL PENTHOUSE **

* ENCORUS GROUP HAS DETERMINED THAT THE SITE WATER SUPPLY IS LIMITED AND WILL ONLY ALLOW FOR HAZARD CLASSIFICATION OF ORDINARY HAZARD GROUP 1 ON THE THIRD FLOOR PROVIDED THAT THE VA ONLY

ALLOWS STORAGE HEIGHTS OF UP TO 8'-0".

**ENCORUS GROUP HAS DETERMINED THAT THE SITE WATER SUPPLY IS LIMITED AND THE MINIMUM WATER PRESSURE CANNOT BE ACHIEVED FOR THE APPROPRIATE HAZARD CLASSIFICATIONS OF ORDINARY HAZARD GROUP 1 IN THE MECHANICAL PENTHOUSE. THE VA HAS REQUESTED THAT THE DESIGN INCLUDE SPRINKLERS WITHIN THE PENTHOUSE REGARDLESS. THE VA IS RESPONSIBLE FOR PROVIDING ADDITIONAL MEASURES FOR INCREASED WATER SUPPLY, FIRE PROTECTION, OR BUILDING MODIFICATIONS THAT WOULD PROVIDE

APPROPRIATE PROTECTION TO THE STANDARDS OF NFPA 13.

SPRINKLER HEADS BY TEMPERATURE RATING

FLOOR ORDINARY INTERMEDIATE HIGH

1ST FLOOR 64 9 6

2ND FLOOR 53 14 7

3RD FLOOR 47 18 9

PENTHOUSE 4 NA NA

*QUANTITIES ARE FOR ESTIMATING PURPOSES ONLY

FACP FIRE ALARM CONTROL PANEL

ADDRESSABLE INPUT MODULE

E = EXISTING DEVICE

2 = DUAL-INPUT

AIM

AOM

ADDRESSABLE OUTPUT MODULE

E = EXISTING DEVICE

2 = DUAL-OUTPUT

FIRE ALARM EQUIPMENT

PANELS/CABINETS/MISC DEVICES

FIRE PROTECTION MISC SYMBOLS

VALVE SUPERVISORY SWITCHVS

WF FLOW DETECTOR SWITCH

IM

INTERFACE MODULE

E = EXISTING DEVICE

F

REMOTE INDICATOR

E = EXISTING DEVICE

RI

FIRE ALARM PULL STATION

E = EXISTING DEVICE

H

SMOKE DETECTOR

E = EXISTING DEVICE

HEAT DETECTOR/SENSOR (THERMAL DETECTION)

E = EXISTING DEVICE

S

CONTROL RELAY

E = EXISTING DEVICER

X

X

E

E

E

E

E

E

8/26/2020

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

X

101CPROCESSING

101D

STORAGE

101A

STAGING

102OFFICE

102A

LAUNDRY

102C

CLEAN LINEN

102B SHIPPING

RECEIVING

TOILET

101B

TOILET

PIT ROOM

SOUTH

STAIR

HALL

OFFICE

VAULT

TRANSFORMER

ROOM

STORAGE

DSDSDS

DSDSDSDS

FREIGHT

ELEVATOR

PROPOSED STAIRWELL

EXIT, DOOR LOCATION NOT

FINALIZED (BY OTHERS)

S S S

S S

S S

S S S S

S S

S S

S

S S

S

E E E

E

E

EEEEEEEE

E E

EE

E

E E

EEEEEEEEE EEEEEEEEE EEEEEEEEE

C C C S S S

SSSSSSSSSSSSSSSS

S

S

SSSSSSSSSSS CCCCCCCCCCC

SC

S C

SSSSSSSSS CCC

S S

S S

S

S S S S S S S S S S S S S S S

CCCCCC

S S

E E E E E E E E E E E E E

E

E E

S

C

E E

E

EEEEEE

SSSS

E E

OVER HEAD

ROLL UP DOOR

OVER HEAD

ROLL UP DOOR

FIRE ALARM

CONDUIT

INSULATED PIPE

(4-6") ELEVATION

10'-0" AFF

CONDUIT

ELEVATION

10'-7" AFF

LARGE CONDUIT (3-4")

ELEVATION 9'-6" AFF

STEAM

(8-12" WITH

INSULATION)

ELEVATION

10'-0" AFF

STEAM

(8-12" WITH

INSULATION)

ELEVATION

10'-0" AFF

STEAM CONDENSATE

(4-6" WITH INSULATION)

ELEVATION 9'-0" AFF

CONDUIT

ELEVATION

10'-7" AFF

STEAM CONDENSATE (4-6" WITH INSULATION)

ELEVATION 9'-6" AFF

STEAM (8-12" WITH INSULATION)

ELEVATION 10'-0" AFF

SC

OC

CAMERA

ELEVATION

9'-6" AFF

S

LAUNDRY ROOM

EXITS

NORTH

STAIR HALL

X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

XX

X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X

X X

X

X

X

XX

X X X X X

X X

X

X X

X X

X X

X

3" SPRINKLER SUPPLY

UP TO SECOND FLOOR

3" SPRINKLER SUPPLY

UP TO SECOND FLOOR

4" FEED MAIN

ELEVATION 10'-0" AFF

EXISTING

SPRINKLER

RISER

X

X

X

X X X

X X

1" - 2-1/2" SPRINKLER

BRANCH ELEVATION

10'-6" AFF (TYP)

1" - 2-1/2" SPRINKLER

BRANCH ELEVATION

10'-6" AFF (TYP)

SEE FX501,

DETAIL 1

FP

X

X X X X X X X X X X X X X X X

X

FP

X X

X

REMOVE VALVE WITH

SPRINKLER PIPE

REMOVE VALVE WITH

SPRINKLER PIPE

FD101

2 4 5

S S

S

S

E S

S

X

APPROXIMATE AREA OF

CONCRETE FLOOR DEMOLITION.

EXCAVATE AREA BELOW FLOOR

AS NEEDED TO INSTALL RISER

AND THRUST BLOCK

PER FX501,DETAIL 1

4 5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE PROTECTION DEMOLITION

PLAN - FIRST FLOOR

CONTRACT DOCUMENTS

FULLY SPRINKLERED

BUILDING 17 SPRINKLERS

2094 ALBANY POST ROAD

MONTROSE, NY 10548

2020/08/19

FD101

B17

620-18-109

SBV CJR

REV 0 CONTRACT DOCUMENTS 2020/08/19

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

SCALE: 3/16" = 1'-0"

FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR1

KEYPLAN

N

GENERAL NOTES

1. SEE F-001 FOR NOTES AND LEGEND.

2. ALL SPRINKLER SYSTEM COMPONENTS AND APPURTENANCES TO BE REMOVED.

THIS INCLUDES BUT IS NOT LIMITED TO ALL PIPE, HEADS, RISER ASSEMBLY,

VERTICAL SUPPLY PIPE BETWEEN FLOORS, STANDPIPES, VALVES, HANGERS,

SIGNS, SPARE EQUIPMENT, ETC. PIPE SHALL BE REMOVED UNDERGROUND TO A

DISTANCE FROM THE BUILDING AS SHOWN ON FX501, DETAIL 1.

3. ANYWHERE EXISTING PIPE PENETRATES A WALL, THAT PENETRATION SHALL BE

PATCHED AND REPAIRED WITH LIKE MATERIAL.

4. UNDERSIDE OF UNIT HEATERS ARE INSTALLED AT APPROXIMATELY 9'-0" AFF.

5. PRIOR TO BEGINNING OF DEMOLITION, COORDINATE PATH OF DEBRIS REMOVAL

WITH WAREHOUSE SUPERVISOR.

6. ELEVATIONS UNLESS OTHERWISE NOTED: CEILING 12'-0", EAST TO WEST BEAMS:

10'-7", NORTH TO SOUTH BEAMS: 11'-0"

7. DURING DEMOLITION OF EXISTING SPRINKLER SYSTEM, REMOVE ANY SPRINKLER

PIPE OR PIPE SLEEVES FROM FLOOR TO PREP FOR GROUT FILLING OF

PENETRATION.

8. ANY FLOOR OR WALL PENETRATIONS THAT WILL BE LEFT UNATTENDED DURING

DEMOLITION AND NOT PERMANENTLY FINISHED THAT DAY SHALL BE TEMPORARILY

FIRE STOPPED TO MATCH THE INDICATED ASSEMBLY RATING. FLOORS SHALL BE

PROVIDED WITH A 2-HOUR FIRE RESISTANCE RATING. SEE FX501 FOR DETAIL ON

FILLING EXISTING PIPE FLOOR PENETRATIONS.

9. ANY JACKHAMMER IS TO BE PERFORMED DURING W.H.E.N. HOURS. COORDINATE

WITH VA.

KEYED NOTES

1 CONDUIT SUPPORTED BY SAME HANGER AS EXISTING SPRINKLER PIPE. DURING

EXISTING SPRINKLER DEMO, REMOVE THE SPRINKLER PIPE ONLY AND LEAVE

CONDUIT SUPPORTED.

2 CHASE…

This is the start of the file's text. The full file is on GovTribe.