S02 - Drawings.pdf
PDF 4 MB Posted
- Attached to
- Y1DZ--620-14-108 l Building 17 Sprinklers
- Solicitation number
- 36C24221B0002
About this file
This presolicitation notice describes an upcoming federal contract opportunity to replace the sprinkler system in Building 17 at the Hudson Valley Healthcare System Montrose Campus in Montrose, New York. The contractor will furnish all materials, equipment, personnel and supervision to accomplish the work according to contract drawings, specifications and VA requirements. The contract completion time is 365 calendar days from notice to proceed. This is a 100% SDVOSB set-aside requiring registration in both the VetBiz and SAM databases. Bids will be accepted only from responsible and responsive SDVOSBs approved under NAICS 238220 with a size standard of $15 million. A bid bond is required and performance and payment bonds will be required upon award. The solicitation and specifications will be available on SAM.gov around October 20th with bid submission details included. Questions about the solicitation are due by October 16th. The cost range for the project is $250,000 to $500,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - Specs.pdf | ||
| Commissioning Plan.pdf | ||
| 36C24221B0002_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
TITLE SHEET CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19
GI001
B17
620-18-109
SBV CJR
REV 0 CONTRACT DOCUMENTS 2020/08/19
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
NORTH ARROW
DETAIL NUMBER
DETAIL NUMBER
DRAWING REF NUMBER
DRAWING REF NUMBER
DETAIL NUMBER
DRAWING REF NUMBER
DETAIL NUMBER
DRAWING REF NUMBER
DETAIL NUMBER
DRAWING REF NUMBER
VIEWING
DIRECTION
VIEWING
DIRECTION
VIEW TITLE
BUILDING/WALL SECTION CUT
ELEVATION
DETAIL SECTION CUT
DETAIL CALLOUT
DRAWING SYMBOLS
SCALE: X" = 1'-0"
DETAIL TITLEXX
XXXXX
XXXXX
X
XXXXX
X
XXXXX
X
XXXXX
X
DRAWING LIST
DRAWING NUMBER DRAWING TITLE
GENERAL
GI001 TITLE SHEET
GC101 GENERAL SITE AND DEBRIS REMOVAL PLAN
HAZARDOUS MATERIALS
H-101 HAZARDOUS MATERIALS ABATEMENT PLAN - FIRST FLOOR
H-102 HAZARDOUS MATERIALS ABATEMENT PLAN - SECOND FLOOR
H-103 HAZARDOUS MATERIALS ABATEMENT PLAN - THIRD FLOOR
H-104 HAZARDOUS MATERIALS ABATEMENT PLAN - PENTHOUSE
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES AND LEGENDS
FD101 FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR
FD102 FIRE PROTECTION DEMOLITION PLAN - SECOND FLOOR
FD103 FIRE PROTECTION DEMOLITION PLAN - THIRD FLOOR
FD104 FIRE PROTECTION DEMOLITION PLAN - PENTHOUSE
FA601 FIRE ALARM RISER DIAGRAM AND IO MATRIX
FX101 FIRE SUPPRESSION PLAN - FIRST FLOOR
FX102 FIRE SUPPRESSION PLAN - SECOND FLOOR
FX103 FIRE SUPPRESSION PLAN - THIRD FLOOR
FX104 FIRE SUPPRESSION PLAN - PENTHOUSE
FX401 FIRE SUPPRESSION ENLARGED PLAN - FIRST FLOOR
FX501 FIRE SUPPRESSION DETAILS
FX601 FIRE SUPPRESSION RISER DIAGRAM
AREA OF WORK
8/26/2020
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA HUDSON VALLEY HEALTHCARE SYSTEM
AutoCAD SHX Text BUILDING 17 SPRINKLERS FRANKLIN DELANO ROOSEVELT CAMPUS 2094 ALBANY POST ROAD MONTROSE, NEW YORK 10548
AutoCAD SHX Text N
PATH OF DEBRIS
REMOVAL
AREA OF DEBRIS REMOVAL AT NORTH WEST
OVERHEAD DOOR UNLESS OTHERWISE DISCUSSED
WITH VA COR. SEE DRAWINGS FD101 THRU FD104
FOR FURTHER DETAIL ON DEMOLITION.
WW
W
EXISTING 8" SITE
WATER SUPPLY
EXISTING 6"
FIRE WATER
EXISTING PIV-17
WITH TAMPER
SWITCH
FW
ENTRANCE GATE
ALBANY POST ROAD
ALBANY
POST
ROAD
GC101
SELECT BACKFILL
COMPACTED TO 95%
SPD
SUITABLE EXCAVATED
BACKFILL COMPACTED
TO 85% SPD
FINISH GRADE
5'- 0"
M
IN
MI
N
6" MI
N12"
MIN
12"
MIN
DETECTABLE WARNING
TAPE
6" CALICHE SURFACING
EXCEPT IN NATURAL TERRAIN
5'-0"
MINIMUM
MINIMUM
EXTENTS OF
EXCAVATION
CONTRACTOR TO
DETERMINE IF ADDITIONAL
EXCAVATION IS NECESSARY
TO ACHIEVE INSTALLATION.
EXISTING 6" FIRE
WATER SUPPLY
EXISTING SPRINKLER SUPPLY
LINE IS ASSUMED TO PASS
UNDER STEAM TRENCH
EXISTING STEAM
TRENCH
PROPOSED CONNECTION LOCATION TO NEW
SPRINKLER SYSTEM MINIMUM 5' FROM FACE OF
BUILDING. CONTRACTOR TO VERIFY CONDITIONS
IN FIELD AND COORDINATE WITH COR.
BUILDING 17
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL SITE AND DEBRIS
REMOVAL PLAN
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19
GC101
B17
620-18-109
SBV CJR
REV 0 CONTRACT DOCUMENTS 2020/08/19
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
N
SCALE: NTS
GENERAL SITE AND DEBRIS REMOVAL PLAN1
GENERAL NOTES
1. COORDINATE FINAL LOCATION OF DUMPSTER WITH FACILITY TO MITIGATE EFFECT OF
DEMOLITION DURING WAREHOUSE OPERATIONS.
SCALE: NTS
TRENCH BACKFILL DETAIL2 SCALE: 1/4" = 1'-0"
LIMITS OF EXCAVATION3
8/26/2020
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
SERVICE
CHIEF
101CPROCESSING
101D
STORAGE
101A
STAGING
102OFFICE
102A
LAUNDRY
102C
CLEAN LINEN
102B SHIPPING
RECEIVING
TOILET
101B
TOILET
PIT ROOM
SOUTH
STAIR
HALL
OFFICE
VAULT
TRANSFORMER
ROOM
STORAGE
DSDSDS
DSDSDSDS
FREIGHT
ELEVATOR
NORTH
STAIR HALL
X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X
X X X
X
X X
X X
X
X X
X
X
X
XX
X X X X X
X X
X
X X
X X
X X
X
X
X
X
X X X
X X
FP
X
X X X X X X X X X X X X X X X
X
FP
X X
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
HAZARDOUS MATERIALS
ABATEMENT PLAN - FIRST FLOOR
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19 H-101
B17
620-18-109
MB NK
REV 0 CONTRACT DOCUMENTS 2020/08/19
SCALE: 3/16" = 1'-0"
HAZARDOUS MATERIALS ABATEMENT PLAN - FIRST FLOOR1
KEYPLAN
N
N
GENERAL NOTES
A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING
MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR
REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE
BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED
ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING
LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL
NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY
PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE
DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR
CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR
TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS
APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)
SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE
ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS
FOR ADDITIONAL INFORMATION AND COORDINATION.
K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS
INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.
AA-1
ASBESTOS AWARENESS NOTES
ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS
ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING
INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.
LEAD AWARENESS NOTES
1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL
RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING
COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS
THAT HAVE BEEN TESTED.
3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:
· SPRINKLER PIPE
· FLOORS/LANDINGS IN STAIRWELL
4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL
AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED
BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.
5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO
DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO
WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.
ASBESTOS REMOVAL NOTES
AA-1 CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF ASBESTOS-CONTAINING 9” X 9” FLOOR TILE AND
ASBESTOS-CONTAINING MASTIC. REMOVE TO EXTENTS DETERMINED NECESSARY FOR REMOVAL OF EXISTING WATER SUPPLY AND
SLAB CORING FOR NEW WATER SUPPLY. LESS THAN 10 SQUARE FEET OF TILE IS ANTICIPATED TO BE REMOVED BY THE PROJECT.
WORK SHALL BE PERFORMED IN A MINOR TENT PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. COORDINATE WITH GENERAL
CONTRACTOR EXACT LOCATION OF FLOOR TILE TO BE REMOVED. PROTECT ADJACENT FLOORING SCHEDULED TO REMAIN.
AA-2 PROVIDE CORE IN EXISTING DRYWALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. THE DRYWALL JOINT COMPOUND
IS ASBESTOS-CONTAINING. WORK SHALL BE PERFORMED IN MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3.
APPROXIMATELY 20 PENETRATIONS WILL BE REQUIRED. COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR AND REFER
TO DRAWINGS FD-101 AND FX-101 FOR FURTHER INFORMATION.
AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING
MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FAÇADE. PERFORM CORING WITHIN
MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.
COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.
95 Perry Street , Suite 300
Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
AA-2
(THROUGHOUT)
AA-2
AA-2
PROPOSED LOCATION OF REMOTE
DECONTAMINATION ENCLOSURE
(COORDINATE LOCATION WITH THE FACILITY)
AA-3
AA-3
AA-3
AA-2
AA-2
AA-2
AA-2
AA-2
AA-2
(APPROXIMATE LOCATIONS
OF PENETRATIONS THROUGH
WALLS FOR NEW SPRINKLER
PIPES.)
(APPROXIMATE LOCATIONS
OF PENETRATIONS THROUGH
WALLS FOR NEW SPRINKLER
PIPES.)
(APPROXIMATE LOCATIONS
OF PENETRATIONS THROUGH
WALLS FOR NEW SPRINKLER
PIPES.)
X X EXISTING SPRINKLER PIPE
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SOUTH
STAIR
HALL
GENERAL STORAGE
DSDSDS
DSDSDSDS
FREIGHT
ELEVATOR
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXX
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X
FP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
HAZARDOUS MATERIALS
ABATEMENT PLAN - SECOND FLOOR
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19 H-102
B17
620-18-109
SBV CJR
REV 0 CONTRACT DOCUMENTS 2020/08/19
SCALE: 3/16" = 1'-0"
HAZARDOUS MATERIALS ABATEMENT PLAN - SECOND FLOOR1
KEYPLAN
N
N
AA-3
AA-3
A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING
MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR
REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE
BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED
ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING
LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL
NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY
PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE
DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR
CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR
TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS
APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)
SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE
ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS
FOR ADDITIONAL INFORMATION AND COORDINATION.
K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS
INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.
ASBESTOS AWARENESS NOTES
ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS
ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING
INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.
LEAD AWARENESS NOTES
1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL
RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING
COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS
THAT HAVE BEEN TESTED.
3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:
· SPRINKLER PIPE
· FLOORS/LANDINGS IN STAIRWELL
4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL
AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED
BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.
5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO
DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO
WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.
ASBESTOS REMOVAL NOTES
AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING
MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FACADE. PERFORM CORING WITHIN
MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.
COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.
(APPROXIMATE LOCATIONS
OF PENETRATIONS THROUGH
WALLS FOR NEW SPRINKLER
PIPES.)
(APPROXIMATE LOCATIONS
OF PENETRATIONS THROUGH
WALLS FOR NEW SPRINKLER
PIPES.)
X X EXISTING SPRINKLER PIPE
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FREIGHT
ELEVATOR
GENERAL
STORAGE
SOUTH
STAIR
HALL
FILE
SETRUCTION
GENERAL
STORAGE
303A
DOWN
UP
NORTH STAIR
HALL
XX
X X
XXXXX
X X
X X
X X X
XXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X X X
X X X X X X X X X X X X X X X X
FP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
HAZARDOUS MATERIALS
ABATEMENT PLAN - THIRD FLOOR
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19 H-103
B17
620-18-109
MB NK
REV 0 CONTRACT DOCUMENTS 2020/08/19
SCALE: 3/16" = 1'-0"
HAZARDOUS MATERIALS ABATEMENT PLAN - THIRD FLOOR1
KEYPLAN
N
N
95 Perry Street , Suite 300
Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
AA-3
A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING
MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR
REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE
BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED
ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING
LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL
NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY
PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE
DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR
CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR
TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS
APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)
SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE
ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS
FOR ADDITIONAL INFORMATION AND COORDINATION.
K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS
INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.
ASBESTOS AWARENESS NOTES
ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS
ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING
INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.
LEAD AWARENESS NOTES
1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL
RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING
COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS
THAT HAVE BEEN TESTED.
3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:
· SPRINKLER PIPE
· FLOORS/LANDINGS IN STAIRWELL
4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL
AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED
BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.
5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO
DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO
WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.
ASBESTOS REMOVAL NOTES
AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING
MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FACADE. PERFORM CORING WITHIN
MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.
COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.
(APPROXIMATE LOCATIONS
OF PENETRATIONS THROUGH
WALLS FOR NEW SPRINKLER
PIPES.)
X X EXISTING SPRINKLER PIPE
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MECH ROOM
ROOF
SOUTH
STAIR
HALL
X
X
X X X X X X X X
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
HAZARDOUS MATERIALS
ABATEMENT PLAN - PENTHOUSE
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19 H-104
B17
620-18-109
MB NK
REV 0 CONTRACT DOCUMENTS 2020/08/19
SCALE: 3/16" = 1'-0"
HAZARDOUS MATERIALS ABATEMENT PLAN - PENTHOUSE1
KEYPLAN
N
N
AA-3
95 Perry Street , Suite 300
Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
ASBESTOS AWARENESS NOTES
ASBESTOS-CONTAINING MATERIALS (ACM), INCLUDING BUT NOT LIMITED TO PIPE/PIPE FITTING INSULATION AND FLOORING MATERIALS
ARE LOCATED WITHIN THE BUILDING. WORK IS SCHEDULED TO TAKE PLACE IN CLOSE PROXIMITY TO FRIABLE PIPE/PIPE FITTING
INSULATION IN AREAS. ANY DISTURBANCE TO ACM MUST BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR.
LEAD AWARENESS NOTES
1. CONTRACTORS ARE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL
RULE FOR ALL ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS BEEN PERFORMED ON REPRESENTATIVE BUILDING
COMPONENTS WITHIN THE BUILDING. REFER TO SURVEY REPORT FOR ADDITIONAL INFORMATION ON SURFACES/COMPONENTS
THAT HAVE BEEN TESTED.
3. THE FOLLOWING MATERIALS HAVE BEEN IDENTIFIED TO BE COVERED WITH LEAD-BASED PAINT:
· SPRINKLER PIPE
· FLOORS/LANDINGS IN STAIRWELL
4. ALL DISTURBANCE OF LEAD SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION VA02833313 - LEAD-BASED PAINT REMOVAL
AND DISPOSAL. THE USE OF TORCHES SHALL NOT BE ALLOWED TO CUT THE EXISTING SPRINKLER PIPES. ALL LEAD COATED
BUILDING MATERIALS ARE TO BE PROPERLY DISPOSED OF OR RECYCLED.
5. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
6. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE CONTRACTORS OF THEIR RESPONSIBILITIES UNDER OSHA TO
DETERMINE THE LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED TO, AND TO
WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.
ASBESTOS REMOVAL NOTES
AA-3 PROVIDE CORE IN EXTERIOR WALL TO ENABLE REMOVAL/ INSTALLATION OF SPRINKLER PIPE. AN ASBESTOS-CONTAINING
MOISTURE BARRIER IS ASSUMED TO EXIST BETWEEN THE STRUCTURAL BLOCK AND BRICK FACADE. PERFORM CORING WITHIN
MINOR TENTS PER PROCEDURES DESCRIBED IN NYS ICR 56-11.3. APPROXIMATELY 10 PENETRATIONS WILL BE REQUIRED.
COORDINATE ALL WORK WITH GENERAL CONTRACTOR AND REFER TO FULL DRAWING SET FOR MORE INFORMATION.
A. PERFORM ALL WORK IN ACCORDANCE WITH NYS ICR 56 AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL (I.E. SUSPECT ASBESTOS-CONTAINING
MATERIAL, MOLD GROWTH, ETC.) IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR
REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE
BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED
ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING
LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR REPRESENTATIVE WILL
NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY
PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE
DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR
CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR
TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS
APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S)
SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE
OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE
ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
J. REFER TO SPECIFICATION SECTIONS VA02821319, VA02833313, THE PROJECT SURVEY REPORT AND THE CONTRACT DOCUMENTS
FOR ADDITIONAL INFORMATION AND COORDINATION.
K. COORDINATE THE LOCATION OF THE REMOTE PERSONAL DECONTAMINATION UNIT WITH THE FACILITY. THE PROPOSED LOCATION IS
INDICATED ON THE DRAWING. A DESIGNATED PATHWAY SHALL BE UTILIZED.
(APPROXIMATE LOCATION OF
PIPE TO BE DEMOLISHED)
X X EXISTING SPRINKLER PIPE
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
FIRE PROTECTION NOTES AND
LEGENDS
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19 F-001
B17
620-18-109
SBV CJR
REV 0 CONTRACT DOCUMENTS 2020/08/19
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
FIRE PROTECTION SYMBOLS
PENDANT SPRINKLER, ON DROP NIPPLE
ENDCAP
UPRIGHT SPRINKLER
SPRINKLER RISER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
CAPPED OUTLET
PENDANT SPRINKLER
UPRIGHT SPRINKLER, ELEVATION
PLUG WITH BLEEDER
GENERIC VALVE SYMBOL
UPRIGHT SPRINKLER WITH GUARD, ELEVATION
PIPE SECTION
■ ■ ■ EXISTING FIRE BARRIER, 1 HOUR
EXISTING FIRE BARRIER, 2 HOUR■ ■ ■ ■ ■ ■
EXISTING FIRE-BARRIER, SMOKE BARRIER,1 HOUR■S ■S
EXISTING FIRE-BARRIER, SMOKE BARRIER, 2 HOUR■ ■S ■ ■S
S EXISTING SMOKE BARRIER LINE
SMOKE AND FIRE BARRIER SYMBOLS
GENERAL PLUMBING SYMBOLS
GENERAL NOTES:
1. EXISTING UTILITIES SHOWN IN THIS DRAWING PACKAGE ARE INTENDED TO ILLUSTRATE AREAS WHERE OBSTRUCTIONS
MAY PRESENT INTERFERENCES OR CHALLENGES TO SPRINKLER SYSTEM INSTALLATION. IT IS NOT MEANT TO SERVE AS AN ALL INCLUSIVE AS-BUILT UTILITY SURVEY AND DOES NOT ABSOLVE THE CONTRACTOR FROM ATTENDING ANY
PRE-BID WALK DOWNS OR SURVEYING EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
SPRINKLER SYSTEM INSTALLATION
1. ALL WORK TO COMPLY WITH THE VA FIRE PROTECTION DESIGN MANUAL 7TH EDITION, DECEMBER 2015, NFPA 101 LIFE
SAFETY CODE (2018), AND ALL OTHER APPLICABLE CODES ADOPTED BY THE VA. ALL EQUIPMENT AND FIXTURES SHALL BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS. ALL SPRINKLER PIPING SHALL CONFORM TO NFPA 13
STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS (2019).
2. SPRINKLER SYSTEM PIPE SIZING IS BASED ON PRELIMINARY DESIGN CALCULATIONS. INSTALLING CONTRACTOR SHALL
PROVIDE HYDRAULIC CALCULATIONS AND HYDRAULIC DATA PLATE FOR INSTALLED SYSTEM.
a.) WATER SUPPLY PRESSURE AT THE TIME OF THIS DESIGN HAS BEEN SHOWN TO BE DEFICIENT.(APPROXIMATELY 50
PSI STATIC)
b.) THE DEPARTMENT OF VETERANS AFFAIRS HAS DETERMINED IT WOULD LIKE TO REDUCE THE SECOND AND THIRD FLOOR TO ORDINARY HAZARD GROUP 1 AND MAINTAIN AN ADMINISTRATIVE CONTROL OF AN 8'-0" MAXIMUM
STORAGE HEIGHT.
3. THE CONTRACTOR SHALL COORDINATE PIPE ROUTINGS WITH STRUCTURE, DUCTWORK, PIPING, LIGHTS, ETC. PIPING
SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANELS.
4. THE CONTRACTOR SHALL REPLACE ANY DAMAGED OR BROKEN CEILING TILES, AS WELL AS TILES WITH LEFTOVER
PENETRATIONS FROM PREVIOUS SPRINKLER HEADS.
5. PROVIDE FACTORY MUTUAL (FM) APPROVED, QUICK RESPONSE SPRINKLERS IN ALL AREAS.
a.) ALL SPRINKLERS ARE TO BE ORDINARY TEMPERATURE (155°F) RATED UNLESS OTHERWISE NOTED. REFERENCE
DETAIL ON FX501 FOR DETERMINATION OF SPRINKLER TEMPERATURE RATING AROUND UNIT HEATERS. THIS
DETAIL IS A GUIDE. CONTRACTOR SHOULD REFER TO NFPA 13 FOR ALL INSTALLATIONS.
6. THE CONTRACTOR SHALL COORDINATE SPRINKLER HEAD LOCATIONS WITH STRUCTURE, DUCTWORK, DIFFUSERS, LIGHTS, REFLECTED CEILING PLANS, ETC. UPRIGHT SPRINKLER HEAD DEFLECTORS SHALL BE INSTALLED AT AN
ELEVATION PER NFPA13. (BETWEEN 2-12" FROM THE UNDERSIDE OF THE CEILING).
7. WATER SUPPLY FOR ALL CONTROL VALVES SHALL BE ELECTRICALLY SUPERVISED (UNLESS NOTED OTHERWISE) AND MECHANICALLY LOCKED FOR PROPER POSITION. WATER FLOW AND SUPERVISORY CIRCUITS SHALL BE IN ACCORDANCE WITH NFPA 13 STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS AND NFPA 72 NATIONAL FIRE
ALARM CODE.
8. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE FIRESTOPPED. REFER TO SPECIFICATIONS.
9. ALL EXPOSED SPRINKLER PIPING IS TO BE PAINTED RED. SPRINKLER PIPE LOCATED ABOVE LAY-IN CEILING DOES NOT
NEED TO BE PAINTED.
10. PROVIDE PIPE CLAMPS AT ALL FLOOR PENETRATIONS.
GENERAL SYMBOLS
DEMOLISH/REMOVE
GENERAL LINETYPES
DEMOLITION LINE
DEMOLITION WALL
ROOM NAME AND NUMBERC2
CORRIDOR
3-WAY VALVE
OS&Y VALVE
BACKFLOW PREVENTER- DOUBLE CHECK TYPE
ANGLE VALVE
ALARM CHECK VALVE
EXISTING FENCE
FIRE DEPARTMENT CONNECTION
FIRE HOSE VALVE CONNECTION
EXIT SIGN, WALL MOUNTED W/ DIRECTIONAL ARROWS AND FACES
EXIT SIGN, CEILING MOUNTED W/ DIRECTIONAL ARROWS AND FACES
INDICATING BUTTERFLY VALVE
LIGHT FIXTURE, RECESSED, 2'X2'
OCCUPANCY SENSOR, CEILING MOUNTEDOC
SECURITY ACCESS, VIDEO CAMERA WITH LENS
M = MOTION DETECTOR
PZ = MOTION DETECTOR WITH PAN AND ZOOM
PTZ= MOTION DETECTOR WITH PAN, TILT, AND ZOOM
LIGHT FIXTURE, SURFACE MOUNTED, 1'X4'
LIGHT FIXTURE, SURFACE MOUNTED, 1'X8'
STEAM UNIT HEATER
STEAMS
ELECTRICAL CONDUITE
STEAM CONDENSATEC
SPEAKERS
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
FDC FIRE DEPARTMENT CONNECTION
F/Z
FLOOR/ZONE CONTROL VALVE ASSEMBLY
AREA A
AREA BOUNDRY
AREA B
MATERIAL
A
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
MATERIAL
B
CHECK VALVE
G UPRIGHT SPRINKLER WITH GUARD
BALL VALVE
POST INDICATOR VALVE
SIDEWALL SPRINKLER
BALL DRIP VALVE
LIMIT OF DEMOLITION
INFECTION CONTROL NOTES
1. ALL CONSTRUCTION WORK IS TO COMPLY WITH STATION INFECTION CONTROL POLICY 11IC-05HV.
(ATTACHED TO CONSTRUCTION SPECIFICATIONS)
2. PROVIDES ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM DISPERSING INTO ATMOSPHERE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. WIPE SURFACES WITH DISINFECTANT UPON COMPLETION OF WORK IN THAT AREA.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
PHASING NOTES
1. WORK ACTIVITIES WILL BE LIMITED TO ONE FLOOR AT A TIME. COORDINATE WITH COR.
2. ALL ACM ABATEMENT AND REMOVAL SHALL BE DONE PRIOR TO ANY SPRINKLER OR FIRE ALARM
SYSTEM WORK ON A GIVEN FLOOR.
3. NEW SPRINKLER, STANDPIPE, FLOOR/ZONE CONTROL VALVES (ONE EACH FLOOR), AND ASSOCIATED
FIRE ALARM INTERFACE TO BE INSTALLED THROUGHOUT PROJECT.
4. PERFORM SPRINKLER SYSTEM PRESSURE TEST AND FIRE ALARM SYSTEM TEST.
5. EXCAVATE AND TIE-INTO NEW SYSTEM.
a. NO FIRE WATCH OR TEMPORARY FIRE PROTECTION IS REQUIRED FROM THE CONTRACTOR.
THE FACILITY WILL IMPLEMENT ILSM.
6. DEMO ALL EXISTING SPRINKLER PIPE AND HANGERS, ETC.
7. PATCH ALL PIPE PENETRATIONS AND OTHER DAMAGE LEFT BY THE PROJECT AND EXISTING
SPRINKLER SYSTEM.
NFPA 13 HAZARD CLASSIFICATION BY AREA
LOCATION HAZARD CLASSIFICATION
1ST FLOOR LAUNDRY ORDINARY HAZARD GR.1
1ST FLOOR SHIPPING & RECEIVING ORDINARY HAZARD GR. 2
2ND FLOOR STORAGE ORDINARY HAZARD GR. 2
3RD FLOOR STORAGE *ORDINARY HAZARD GR. 1
MECHANICAL PENTHOUSE **
* ENCORUS GROUP HAS DETERMINED THAT THE SITE WATER SUPPLY IS LIMITED AND WILL ONLY ALLOW FOR HAZARD CLASSIFICATION OF ORDINARY HAZARD GROUP 1 ON THE THIRD FLOOR PROVIDED THAT THE VA ONLY
ALLOWS STORAGE HEIGHTS OF UP TO 8'-0".
**ENCORUS GROUP HAS DETERMINED THAT THE SITE WATER SUPPLY IS LIMITED AND THE MINIMUM WATER PRESSURE CANNOT BE ACHIEVED FOR THE APPROPRIATE HAZARD CLASSIFICATIONS OF ORDINARY HAZARD GROUP 1 IN THE MECHANICAL PENTHOUSE. THE VA HAS REQUESTED THAT THE DESIGN INCLUDE SPRINKLERS WITHIN THE PENTHOUSE REGARDLESS. THE VA IS RESPONSIBLE FOR PROVIDING ADDITIONAL MEASURES FOR INCREASED WATER SUPPLY, FIRE PROTECTION, OR BUILDING MODIFICATIONS THAT WOULD PROVIDE
APPROPRIATE PROTECTION TO THE STANDARDS OF NFPA 13.
SPRINKLER HEADS BY TEMPERATURE RATING
FLOOR ORDINARY INTERMEDIATE HIGH
1ST FLOOR 64 9 6
2ND FLOOR 53 14 7
3RD FLOOR 47 18 9
PENTHOUSE 4 NA NA
*QUANTITIES ARE FOR ESTIMATING PURPOSES ONLY
FACP FIRE ALARM CONTROL PANEL
ADDRESSABLE INPUT MODULE
E = EXISTING DEVICE
2 = DUAL-INPUT
AIM
AOM
ADDRESSABLE OUTPUT MODULE
E = EXISTING DEVICE
2 = DUAL-OUTPUT
FIRE ALARM EQUIPMENT
PANELS/CABINETS/MISC DEVICES
FIRE PROTECTION MISC SYMBOLS
VALVE SUPERVISORY SWITCHVS
WF FLOW DETECTOR SWITCH
IM
INTERFACE MODULE
E = EXISTING DEVICE
F
REMOTE INDICATOR
E = EXISTING DEVICE
RI
FIRE ALARM PULL STATION
E = EXISTING DEVICE
H
SMOKE DETECTOR
E = EXISTING DEVICE
HEAT DETECTOR/SENSOR (THERMAL DETECTION)
E = EXISTING DEVICE
S
CONTROL RELAY
E = EXISTING DEVICER
X
X
E
E
E
E
E
E
8/26/2020
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
X
101CPROCESSING
101D
STORAGE
101A
STAGING
102OFFICE
102A
LAUNDRY
102C
CLEAN LINEN
102B SHIPPING
RECEIVING
TOILET
101B
TOILET
PIT ROOM
SOUTH
STAIR
HALL
OFFICE
VAULT
TRANSFORMER
ROOM
STORAGE
DSDSDS
DSDSDSDS
FREIGHT
ELEVATOR
PROPOSED STAIRWELL
EXIT, DOOR LOCATION NOT
FINALIZED (BY OTHERS)
S S S
S S
S S
S S S S
S S
S S
S
S S
S
E E E
E
E
EEEEEEEE
E E
EE
E
E E
EEEEEEEEE EEEEEEEEE EEEEEEEEE
C C C S S S
SSSSSSSSSSSSSSSS
S
S
SSSSSSSSSSS CCCCCCCCCCC
SC
S C
SSSSSSSSS CCC
S S
S S
S
S S S S S S S S S S S S S S S
CCCCCC
S S
E E E E E E E E E E E E E
E
E E
S
C
E E
E
EEEEEE
SSSS
E E
OVER HEAD
ROLL UP DOOR
OVER HEAD
ROLL UP DOOR
FIRE ALARM
CONDUIT
INSULATED PIPE
(4-6") ELEVATION
10'-0" AFF
CONDUIT
ELEVATION
10'-7" AFF
LARGE CONDUIT (3-4")
ELEVATION 9'-6" AFF
STEAM
(8-12" WITH
INSULATION)
ELEVATION
10'-0" AFF
STEAM
(8-12" WITH
INSULATION)
ELEVATION
10'-0" AFF
STEAM CONDENSATE
(4-6" WITH INSULATION)
ELEVATION 9'-0" AFF
CONDUIT
ELEVATION
10'-7" AFF
STEAM CONDENSATE (4-6" WITH INSULATION)
ELEVATION 9'-6" AFF
STEAM (8-12" WITH INSULATION)
ELEVATION 10'-0" AFF
SC
OC
CAMERA
ELEVATION
9'-6" AFF
S
LAUNDRY ROOM
EXITS
NORTH
STAIR HALL
X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X
X X
X
X
X
XX
X X X X X
X X
X
X X
X X
X X
X
3" SPRINKLER SUPPLY
UP TO SECOND FLOOR
3" SPRINKLER SUPPLY
UP TO SECOND FLOOR
4" FEED MAIN
ELEVATION 10'-0" AFF
EXISTING
SPRINKLER
RISER
X
X
X
X X X
X X
1" - 2-1/2" SPRINKLER
BRANCH ELEVATION
10'-6" AFF (TYP)
1" - 2-1/2" SPRINKLER
BRANCH ELEVATION
10'-6" AFF (TYP)
SEE FX501,
DETAIL 1
FP
X
X X X X X X X X X X X X X X X
X
FP
X X
X
REMOVE VALVE WITH
SPRINKLER PIPE
REMOVE VALVE WITH
SPRINKLER PIPE
FD101
2 4 5
S S
S
S
E S
S
X
APPROXIMATE AREA OF
CONCRETE FLOOR DEMOLITION.
EXCAVATE AREA BELOW FLOOR
AS NEEDED TO INSTALL RISER
AND THRUST BLOCK
PER FX501,DETAIL 1
4 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
FIRE PROTECTION DEMOLITION
PLAN - FIRST FLOOR
CONTRACT DOCUMENTS
FULLY SPRINKLERED
BUILDING 17 SPRINKLERS
2094 ALBANY POST ROAD
MONTROSE, NY 10548
2020/08/19
FD101
B17
620-18-109
SBV CJR
REV 0 CONTRACT DOCUMENTS 2020/08/19
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: 3/16" = 1'-0"
FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR1
KEYPLAN
N
GENERAL NOTES
1. SEE F-001 FOR NOTES AND LEGEND.
2. ALL SPRINKLER SYSTEM COMPONENTS AND APPURTENANCES TO BE REMOVED.
THIS INCLUDES BUT IS NOT LIMITED TO ALL PIPE, HEADS, RISER ASSEMBLY,
VERTICAL SUPPLY PIPE BETWEEN FLOORS, STANDPIPES, VALVES, HANGERS,
SIGNS, SPARE EQUIPMENT, ETC. PIPE SHALL BE REMOVED UNDERGROUND TO A
DISTANCE FROM THE BUILDING AS SHOWN ON FX501, DETAIL 1.
3. ANYWHERE EXISTING PIPE PENETRATES A WALL, THAT PENETRATION SHALL BE
PATCHED AND REPAIRED WITH LIKE MATERIAL.
4. UNDERSIDE OF UNIT HEATERS ARE INSTALLED AT APPROXIMATELY 9'-0" AFF.
5. PRIOR TO BEGINNING OF DEMOLITION, COORDINATE PATH OF DEBRIS REMOVAL
WITH WAREHOUSE SUPERVISOR.
6. ELEVATIONS UNLESS OTHERWISE NOTED: CEILING 12'-0", EAST TO WEST BEAMS:
10'-7", NORTH TO SOUTH BEAMS: 11'-0"
7. DURING DEMOLITION OF EXISTING SPRINKLER SYSTEM, REMOVE ANY SPRINKLER
PIPE OR PIPE SLEEVES FROM FLOOR TO PREP FOR GROUT FILLING OF
PENETRATION.
8. ANY FLOOR OR WALL PENETRATIONS THAT WILL BE LEFT UNATTENDED DURING
DEMOLITION AND NOT PERMANENTLY FINISHED THAT DAY SHALL BE TEMPORARILY
FIRE STOPPED TO MATCH THE INDICATED ASSEMBLY RATING. FLOORS SHALL BE
PROVIDED WITH A 2-HOUR FIRE RESISTANCE RATING. SEE FX501 FOR DETAIL ON
FILLING EXISTING PIPE FLOOR PENETRATIONS.
9. ANY JACKHAMMER IS TO BE PERFORMED DURING W.H.E.N. HOURS. COORDINATE
WITH VA.
KEYED NOTES
1 CONDUIT SUPPORTED BY SAME HANGER AS EXISTING SPRINKLER PIPE. DURING
EXISTING SPRINKLER DEMO, REMOVE THE SPRINKLER PIPE ONLY AND LEAVE
CONDUIT SUPPORTED.
2 CHASE…