S02 Drawings_531-23-105 Upgrade HVAC B85.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26024R0064
About this file
This document is a set of architectural, structural, and mechanical drawings and specifications for a construction project to upgrade the HVAC system in Building 85 at the Boise, Idaho VA Medical Center.
The key details include:
- The project scope is to add a new air-cooled chiller and DX air conditioning system to Building 85, including architectural, structural, mechanical, and electrical work.
- The construction will be performed at the existing Boise VA Medical Center facility, with requirements to maintain access and avoid disrupting ongoing operations.
- The drawings and specifications provide details on the demolition, new mechanical equipment, structural support, and electrical work required.
- Related federal contract opportunity solicitation number 36C26024R0064 has been issued by the Department of Veterans Affairs Veterans Health Administration for this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In List.pdf | ||
| 36C26024R0064 0001.docx | DOCX document | |
| S02 Wage Determination ID20240104_01-12-2024.pdf | ||
| S02 531-23-105 SOW rev1.docx | DOCX document | |
| S02 EXHIBIT A Project Information Sheet for Contractors.pdf | ||
| S02 Spec_531-23-105 Upgrade HVAC B85.pdf | ||
| S02 EXHIBIT B Past Performance Questionnaire.pdf | ||
| 36C26024R0064 Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH CIVIL PLANS.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
HAZARDOUS MATERIALS
1. THE CONSTRACTOR AND/OR THE CONTRATOR'S SUBS SHALL IMMEDIATELY
NOTIFY THE VA IF AN SUSPECT MATERIAL IS FOUND.
BOISE VAMC SPECIFIC NOTES
CONTRACTOR IS REQUIRED TO FOLLOW ALL OSHA REGULATIONS
CONCERNING CONSTRUCTION. THE SUPERINTENDENT IS REQUIRED
TO HAVE COMPLETED, AS A MINIMUM, OSHA’S 30-HOUR TRAINING AND
BE KNOWLEDGEABLE OF GENERAL SAFETY REQUIREMENTS FOR
CONFINED SPACES, FALL PROTECTION, PERSONAL PROTECTIVE
EQUIPMENT, TRENCHING, SCAFFOLDING, CRANES, ELECTRICAL, ETC.
APPLICABLE SUBCONTRACTORS ARE TO HAVE A COMPETENT PERSON
ON SITE WHEN REQUIRED BY OSHA. IF ACCESSING A CONFINED
SPACE, THE CONTRACTOR IS REQUIRED HAVE THEIR OWN CONFINED
SPACE AIR MONITOR AND TO TEST THE AIR PRIOR TO ENTERING ANY
CONFINED SPACE. IF THE CONTRACTOR MUST ENTER A SANITARY
SEWER MANHOLE, IN ADDITION TO A CONFINED SPACE AIR MONITOR,
THEY MUST HAVE PROPER OSHA RESCUE EQUIPMENT FOR A PERMIT
REQUIRED CONFINED SPACE. WHERE IT IS NOT POSSIBLE FOR THE VA
TO SHUTDOWN AN ELECTRICAL PANEL OR CIRCUIT, THE CONTRACTOR
MUST PROVIDE AND USE THE APPROPRIATE SAFETY CLOTHING AND
EQUIPMENT AS REQUIRED BY NFPA 70E. THE VA WILL BE MONITORING
THE CONTRACTOR’S COMPLIANCE WITH OSHA REGULATIONS. FAILURE
TO COMPLY IS GROUNDS FOR STOPPING WORK.
SITE PLAN GENERAL NOTES
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES
THAT ARE NOT MARKED FOR REMOVAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
Approved: Chief Facilities Management
Approved: Director
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/V A
U p g ra d e
H V
A C
B u ild in g
A rc h .r v t
/1
/2
:4
:2
P
M
GI-001
COVER SHEET
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
CDX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
EQ-X
CPT1
W-X
Department of Veterans Affairs Network Contracting Office 20
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
Project No: 531-23-105
Boise, ID, 83706
DESIGN TEAM
OWNER
CODE REFERENCES
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
GENERAL NOTES
VICINITY MAP
THIS PROJECT IS LOCATED AT THE BOISE, IDAHO VA MEDICAL CENTER. THE PROJECT'S
SCOPE OF WORK ENTAILS ADDING A NEW AIR COOLED CHILLER AND A DX AIR
CONDITIONING SYSTEM TO BUILDING 85.
THIS WORK SHALL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND
ELECTRICAL.
DESCRIPTIONSYMBOL
UPGRADE HVAC BUILDING 85, 531-23-105
Boise, Idaho VA Medical Center Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
David Combs (dcombs@aesusdesign.com)
480-454-2861
NORTH
PROJECT AREA
960 Broadway Ave., Suite 460
A. ANY CHANGES MUST BE APPROVED BY VA BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
H. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES
THAT ARE NOT MARKED FOR REMOVAL.
BUILDING CODE:
2018 IBC - INTERNATIONAL BUILDING CODE
2018 IEBC - EXISTING BUILDING CODE
2018 IECC - INTERNATIONAL ENERGY CONSERVATION CODE
2018 IFC - INTERNTIONAL FIRE CODE
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2018 IMC - INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2017 IPC - INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2017 NEC - NATIONAL ELECTRICAL CODE
NO LIFE SAFETY WILL BE AFFECTED BY THIS PROJECT.
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
ISSUED SHEETS
Sheet Number Sheet Name
GENERAL
GI-001 COVER SHEET
ARCHITECTURE
AD-101 BLDG 85 DEMO ROOF PLAN
AE-101 BLDG 85 2ND FLOOR REFLECTED CEILING PLAN
AE-102 BLDG 85 & 85A ROOF PLAN
STRUCTURAL
SE-101 GENERAL STRUCTURAL NOTES
SE-102 ROOF FRAMING PLAN
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Chad Spencer (cspencer@aesusdesign.com)
480-454-2861
PROJECT AREA
Structural Engineers
2058 S Dobson Rd, Suite 10
Mesa, Arizona, 85202
United Structural Design, LLC
Dgraspas@unitedstr.com
480-382-9768
Veteran Affairs
Department of Veterans Affairs
Assistant Chief - FMS Boise VAMC
Bryan Lightfield
Revisions: Date:
02.01.24
MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATION
MD-202 MECHANICAL ROOF DEMOLITION PLAN
M-201 MECHANICAL LEVEL 2 PLAN
M-202 MECHANICAL ROOF PLAN
M-501 MECHANICAL DETAILS
M-801 MECHANICAL CONTROLS
ELECTRICAL
EP-000 LEGENDS AND ABBREVIATIONS
EP-101 ELECTRICAL POWER PLAN
EP-102 ELECTRICAL ROOF PLAN
EP-601 ELECTRICAL ONE-LINE DIAGRAM
EP-701 PANEL SCHEDULES
ONJ
HGFE
ROOF PLAN GENERAL NOTES
1. ROOF TYPE: EXISTING TO REMIAN
2. THE GC IS RESPONSIBLE FOR ANY DAMAGE DONE TO THE
EXISTING ROOF. AND WILL BE RESPONSIBLE FOR ANY AND ALL
REPAIRS.
3. ALL ROOF TOP MECHANICAL, ELECTRICAL AND/OR PLUMBING
EQUIPMENT SHOWN FOR INFORMATION ONLY. REFERENCE
MECHANICAL, ELECTRICAL AND PLUMBING DOCUMENTS AND
SPECIFICATIONS FOR SPECIFIC DESIGN INFORMATION.
4. PROVIDE WALKWAY PROTECTION TO MAJOR MECHANICAL,
ELECTRICAL AND PLUMBING EQUIPMENT AS REQUIRED TO
PROVIDE SERVICE ACCESS. WALKWAY PROTECTION IS
INDICATED AS A GENERAL LAYOUT AND MAY NOT SHOW ALL FINAL
LOCATIONS OF ALL EQUIPMENT.
6. PATCH AND REPAIR EXISTING ROOFS DAMAGED DURING
CONSTRUCTION.
7. ANY ROOF MODIFICATIONS REQUIRED TO BE COORDINATED WITH
VA AND EXISTING WARRANTIES.
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
KEYED DEMOLITION NOTES
ITEMS SHOWN DASHED TO BE
DEMOLISHED
HATCH INDICATES AREA TO BE COVERED
BY KEYED NOTES LOCATED WITHIN
A. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON
THE DRAWINGS: COORDINATE DEMOLITION WITH
ARCHITECTURAL DRAWINGS AND REQUIREMENTS SHOWN ON
ALL MECHANICAL PLUMBING AND ELECTRICAL, AND
STRUCTURAL DRAWINGS
B. EXISTING CONDITIONS SHOWN ARE FROM AVAILBLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
OWNER OF ANY DISCREPENCIES.
C. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH
ADJACENT BUILDING AREAS
D. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
E. PROTECT EXISTING MATIERALS AND EQUIPMENT WHICH ARE
NOT TO BE DEMOLISHED. CONTRACTOR TO PROTECT FROM
DAMAGE ALL EXISTING FLOORS, WALLS, CEILINGS, ETC.
CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS,
ETC. IF AREAS NEED TO BE REPAIRED, FINISHES ARE TO
MATCH EXISTING.
F. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK.
ALSO MAINTAIN REQUIRED EGRESS AROUND TEMPORARY
PARTITIONS.
G. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS
AND ABOVE CEILINGS.
H. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF
ANY SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE
OWNER TO REMOVE PERSONAL BELONGINGS AND DESIGNATE
ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER ITEMS TO
BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS
NOT DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS
TIME SHALL BE DISPOSED OF BY THE CONTRACTOR. REFER TO
SPECIFICATION FOR NOTIFICATION REQUIREMENTS.
I. SCOPE OF WORK TO BE REMOVED IS SHOWN WITH DASHED
LINES. COORDINATE EXTENT OF DEMOLITION OF EXISTING
ITEMS TO BE PARTIALLY DEMOLISHED WITH THE FLOOR PLAN
AND REFLECTED CEILING PLAN.
J. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED,
OR BECOME THE PROPERTY OF THE OWNER.
K. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
01 02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
Approved: Chief Facilities Management
Approved: Director
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/V A
U p g ra d e
H V
A C
B u ild in g
A rc h .r v t
/1
/2
:4
:2
P
M
AD-101
BLDG 85 DEMO ROOF PLAN
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
1/8" = 1'-0"1
BLDG 85 DEMO ROOF PLAN
KEYNOTES
1 REMOVE STAIR, LANDING, GUARDRAILS, AND ROOF SUPPORTS. RETURN
THE STAIR TO VA. PATCH AND REPAIR ROOF AT STAIR SUPPORT
LOCATIONS AS REQUIRED.
2 DEMOLISH DUCT RACKS, SUPPORTS, AND ALL ASSOCIATED
COMPONENTS AS REQUIRED. PATCH AND REPAIR ROOF AS REQUIRED.
3 REMOVE AND RECONFIGURE EXISTING DUCT PER MECHANICAL.
4 EXISTING ROOF TO REMAIN.
5 EXISTING WALKPADS TO REMAIN.
6 EXISTING STEEL STRUCTURE TO REMAIN.
7 EXISTING EXPANSION JOINT CAPS TO REMAIN.
8 EXISTING MECHANICAL EQUIPMENT TO REMAIN.
Revisions: Date:
X
02.01.24
DN
UP
DN
DN
UP
OMNI
CELL
MEDICAL
VENDING
ONJ
HG
REFLECTED CEILING PLAN
GENERAL NOTES
A. THE GC SHALL VISIT THE SITE PRIOR TO BIDDING TO BETTER UNDERSTAND
THE EXISTING CONDITIONS, TYPICAL.
B. IN THE CASE OF MINOR DISCREPANCIES BETWEEN MEP AND
ARCHITECTURAL DOCUMENTS IN THE LOCATION OF CEILING MOUNTED
COMPONENTS, THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL
GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT SHALL
BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR TO
PROCEEDING WITH THE WORK.
C. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR MOUNTING
LOCATIONS OF ITEMS WHERE NO CEILING IS REQUIRED OR INDICATED.
D. LIGHTS, DIFFUSERS, EXIT SIGNS, SMOKE DETECTORS, SPEAKERS, STROBES,
AND MISCELLANEOUS DEVICES SHALL BE REMOVED AND RE-INSTALLED AS
REQUIRED TO INSTALL THE NEW PIPING, SEE MPE FOR ADDITIONAL INFO.
E. ALL SPRINKLER HEADS SHALL REMAIN UNDISTURBED UNLESS NOTED
OTHERWISE.
F. ACCESS DOOR LOCATIONS IN GYPSUM BOARD CEILINGS ARE INDICATED ON
RCP'S ONLY WHERE ARCHITECTURALLY SIGNIFICANT. REFERENCE
SPECIFICATIONS AND MEP DRAWINGS FOR OTHER ACCESS DOOR
LOCATIONS.
CEILING SYMBOLS
EXISTING SUPPLY AIR
EXISTING 4X2 CEILING
MOUNTED LIGHT
EXISTING EXHAUST AIR
EXISTING ACOUSTIC
CEILING TILE
EXISTING DOWNLIGHT
EXISTING SUSPENDED
LIGHT
NO CEILING, EXPOSED TO
STRUCTURE / DECK ABOVE
EXP
NEW CASSETTE MINI SPLIT
EXISTING 2X2 CEILING
MOUNTED LIGHT
SEE KEYNOTE 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
Approved: Chief Facilities Management
Approved: Director
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/V A
U p g ra d e
H V
A C
B u ild in g
A rc h .r v t
/1
/2
:4
:2
P
M
AE-101
BLDG 85 2ND FLOOR REFLECTED
CEILING PLAN
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
1/8" = 1'-0"1
BLDG 85 LEVEL 2 RCP
KEYNOTES
1 CEILING MOUNTED HVAC CASSETTE, SEE MECHANICAL FOR
ADDITIONAL INFORMATION. REMOVE AND REINSTALL EXISTING LAY-IN
CEILING AS REQUIRED TO RUN NEW LINE SETS TO CONDENSERS. SEE
ROOF PLAN FOR CONDENSER LOCATION.
2 REMOVE AND REINSTALL CEILINGS, LIGHTS, DIFFUSERS, AND LOW
VOLTAGE EQUIPMENT AS REQUIRED TO INSTALL NEW REFRIGERANT
PIPING. THE GC SHALL ROUTE REFRIGERANT PIPING AROUND
EXISTING SPRINKLER MAINS AND OR DROPS.
3 NEW REFRIGERANT PIPING AND CONDUIT/SLEEVE TO PENETRATE
EXISTING BRICK WALL ABOVE ADJACENT LAB CEILING. GC TO CORE
DRILL TO MATCH SLEEVE SIZE +/-1/4", PROVIDE ALL SEALANTS AT
EACH SIDE.
Revisions: Date:
X
VERIFY W/
ELEC
V E
R
IF
Y W
E
L E
C
ON
J
J
HGFE
D
6 6
AE-102
15 16
AE-102
AE-102
AE-102
ROOF PLAN GENERAL NOTES
1. ROOF TYPE: EXISTING TO REMIAN
2. THE GC IS RESPONSIBLE FOR ANY DAMAGE DONE TO THE
EXISTING ROOF. AND WILL BE RESPONSIBLE FOR ANY AND ALL
REPAIRS.
3. ALL ROOF TOP MECHANICAL, ELECTRICAL AND/OR PLUMBING
EQUIPMENT SHOWN FOR INFORMATION ONLY. REFERENCE
MECHANICAL, ELECTRICAL AND PLUMBING DOCUMENTS AND
SPECIFICATIONS FOR SPECIFIC DESIGN INFORMATION.
4. PROVIDE WALKWAY PROTECTION TO MAJOR MECHANICAL,
ELECTRICAL AND PLUMBING EQUIPMENT AS REQUIRED TO
PROVIDE SERVICE ACCESS. WALKWAY PROTECTION IS
INDICATED AS A GENERAL LAYOUT AND MAY NOT SHOW ALL FINAL
LOCATIONS OF ALL EQUIPMENT.
6. PATCH AND REPAIR EXISTING ROOFS DAMAGED DURING
CONSTRUCTION.
7. ANY ROOF MODIFICATIONS REQUIRED TO BE COORDINATED WITH
VA AND EXISTING WARRANTIES.
FRT WOOD
NAILER
PREFABRICATED,
MECHANICAL ROOF
CURB ANCHORED TO
NAILER
REGLET AND
COUNTERFLASHING
/4
M
IN
/4
M
IN
C U
R B
T O
B E
C U
S T
O M
H
E
IG
H T
T O
C O
O R
D
IN
A T
W
IT
H R
O O
F S
L O
P
C
N
D
IT
IO
N
CONT. RIGID INSULATION
FOR SOUND ATTENUATION
REMOVE EXISTING
ROOFING AS REQ'D
FOR NEW CURB
EXISTING ROOF
TO REMAIN
PATCH AND REPAIR ROOF AT
NEW CURB LOCATION. ROOF
MEMBRANE TO RUN UP THE
CURB AND UNDER THE REGLET
AND COUNTERFLASHING.
PROVIDE ALL FLASHING AND
SEALANTS, TYPICAL.
CONT. ROOFING MEMBRANE OVER
PEEL AND STICK MEMBRANE,
EXTERIOR SHEATING, AND CURB
FRAMING.
SEE ELECTRICAL FOR
CONDUIT SIZE AND
ROUTE, TYPICAL. PROVIDE SHOP DRAWINGS
FOR UNI-STRUT SUPPORT,
TYPICAL.
PADS ON FINISHED ROOF
SURFACE
PIPE SLEEVE
CONT. BACKER ROD
AND SEALANT AT
EACH FACE
REFRIGERANT PIPING
/ CONDUIT LINES
PIPE SLEEVE
EXISTING BUILDING
EXTERIOR WALL
WATERPROOFING
CLAMP FLANGE
CONT. SEALANT
JOINT SEE MECHANICAL FOR
DUCT SIZE AND ROUTE,
TYPICAL. PROVIDE SHOP DRAWINGS
FOR UNI-STRUT SUPPORT,
TYPICAL.
PADS ON FINISHED ROOF
SURFACE
VERIFY W/
MECH
V E
R
IF
Y W
M
E C
H
NOTES:
BASIS OF DESIGN DUCT SUPPORT
IS PRE-MANUFACTURED (PHP).
STICK BUILT IS ACCEPTABLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
Approved: Chief Facilities Management
Approved: Director
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/V A
U p g ra d e
H V
A C
B u ild in g
A rc h .r v t
/1
/2
:4
:3
P
M
AE-102
BLDG 85 & 85A ROOF PLAN
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
1/8" = 1'-0"
BLDG 85 ROOF PLAN
KEYNOTES
1 RECONFIGURED MECHANICAL DUCT AND SUPPORTS. SUPPORTS TO BE
PRE-MANUFACTURED PER PHP OR EQUAL.
2 NEW MECHANICAL EQUIPMENT WITH NEW STEEL SUPPORTS TIED INTO EXISTING
FRAME. SEE STRUCTURAL AND MECHANICAL FOR ADDITIONAL INFORMATION.
3 NEW MECHANICAL EQUIPMENT AND PRE-MANUFACTURED EQUIPMENT CURB.
PATCH AND REPAIR ROOF AS REQUIRED.
4 EXISTING DUCT AND SUPPORTS TO REMAIN.
5 EXISTING ROOF TO REMAIN.
6 EXISTING MECHANICAL EQUIPMENT TO REMAIN.
7 EXISTING WALKPADS TO REMAIN.
8 EXISTING EXPANSION JOINT CAPS TO REMAIN.
9 EXISTING STEEL STRUCTURE TO REMAIN.
10 EXISTING ROOF DRAINS TO REMAIN, TYPICAL.
11 EXISTING EXHAUST VENT TO REMAIN.
12 NEW REFRIGERANT PIPING AND CONDUIT/SLEEVE TO PENETRATE EXISTING BRICK
WALL ABOVE ADJACENT LAB CEILING. GC TO CORE DRILL TO MATCH SLEEVE SIZE
+/-1/4", PROVIDE ALL SEALANTS AT EACH SIDE.
13 PROPOSED REFRIGERANT PIPING ROUTE ON/ABOVE ROOF, GC TO PROVIDE ALL
SUPPORTS.
14 PROVIDE AND INSTALL PRE-MANUFACTURED STAIR, LANDING, AND GUARDRAILS
(PHP OR EQUIVALENT) WITH ISOLATION PADS. LAYOUT ISOLATION PADS
ACCORDING TO THE FOOTPRINT OF STAIRS AND LANDING. GC TO CONFIRM FIELD
CONDITIONS AND PROVIDE SITE SPECIFIC SHOP DRAWINGS FOR REVIEW.
15 CONDUIT TO PENETRATE EXISTING WALL AT EXISTING RACK HEIGHT. GC TO CORE
DRILL TO MATCH CONDUIT SIZE +/-1/4", PROVIDE ALL SEALANTS AT EACH SIDE.
16 NEW ELECTRICAL CONDUIT RUN TO BE MOUNTED AND ROUTED TO EXISTING RACK,
ADD ADDITIONAL SUPPORTS AS REQUIRED, SEE ELECTRICAL. SEE DETAIL 3/AE-102.
LOW ROOF 85A
HIGH ROOF 85
LOW
ROOF
85A
HIGH
ROOF
1 1/2" = 1'-0"
EQUIPMENT CURB
Revisions: Date:
X
1/2" = 1'-0"
PRE-MANUFACTURED SUPPORT
3" = 1'-0"
PENETRATION
1/2" = 1'-0"
PRE-MANUFACTURED SUPPORT
NUMERICAL QUANTITIES WHEN
ENCLOSED IN PARENTHESES
ARCHITECT/ENGINEER
ANCHOR BOLT
AGGREGATE BASE COURSE
ARCHITECT
AMERICAN SOCIETY FOR
TESTING AND MATERIALS
BOTTOM OF DECK
BOTTOM OF STEEL
CAST-IN-PLACE
CONSTRUCTION JOINT
CONTROL JOINT
CENTERLINE
CLEAR
CONCRETE MASONRY UNIT
DIAMETER
DIMENSION
DEAD LOAD
EACH
EACH FACE
EXPANSION JOINT
ELEVATION
EDGE OF SLAB
EQUAL
EXISTING
EACH WAY
FUTURE
FINISH FLOOR ELEVATION
FLOOR
FEET
FOOTING
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLUED LAMINATED WOOD BEAM
GENERAL STRUCTURAL NOTES
HORIZONTAL
HOLLOW STRUCTURAL
SECTION MOMENT OF INERTIA
INTERNATIONAL BUILDING CODE
INSIDE DIAMETER
INTERIOR
ONE THOUSAND POUNDS
KIP PER LINEAR FOOT
STEEL ANGLE
POUND
LIVE LOAD
LONG LEG BACK TO BACK
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LAMINATED STRAND LUMBER
LONG SIDE HORIZONTAL
LONG SIDE VERTICAL
MASONRY CONTROL JOINTS
MECHANICAL
MANUFACTURER
MINIMUM
NOT APPLICABLE
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OPPOSITE
ORIENTED STRAND BOARD
PERPENDICULAR
POUNDS PER LINEAR FOOT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PARALLEL STRAND LUMBER
POST TENSIONED
QUALITY ASSURANCE
QUALITY CONTROL
REQUIRED
REQUEST FOR INFORMATION
ROOF TOP UNIT
SQUARE FOOT
SIMILAR
STANDARD
TOP AND BOTTOM
TONGUE AND GROOVE
TOP OF BEAM
TOP OF CONCRETE
TOP OF DECK
TOP OF FOOTING
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TYPICAL
UNLESS NOTED OTHERWISE
VERTICAL
VERIFY IN FIELD
WATER TO CEMENT RATIO
WINDLOAD
WORK POINT
WELDED WIRE FABRIC
WELDED WIRE REINFORCEMENT
ABBRV TERM
TERMS AND
ABBREVIATIONS
A\E
AB
ABC
ARCH
ASTM
BOD
BOS
CIP
CJ
CL
CLR
CMU
DIA
DIM
DL
EA
EF
EJ
EL
EOS
EQ
(E)
EW
(F)
FF
FLR
FT
FTG
GA
GALV
GC
GLB
GSN
HORIZ
HSS
I
IBC
ID
INT
KIP, K
KLF
L
LB
LL
LLBB
LLH
LLV
LSL
LSH
LSV
MCJ
MECH
MFR
MIN
NA
NTS
OC
OD
OPP
OSB
PERP
PLF
PSF
PSI
PSL
PT
QA
QC
REQ'D
RFI
RTU
SF
SIM
STD
T&B T&G
TOB
TOC
TOD
TOF
TOM
TOP
TOS
TOW
TYP
UNO
VERT
VIF
W/C
WL
WP
WWF
WWR
EXISTING BUILDING DESIGN LOADS:
1. ROOF:
• LIVE LOAD 25 PSF (REDUCIBLE)
• SNOW LOAD 25 PSF
2. WIND LOAD:
• RISK CATEGORY II
• BASIC WIND SPEED, V : 105 MPH
• EXPOSURE CATEGORY: B
3. SEISMIC LOADS:
• RISK CATEGORY II
• IMPORTANCE FACTOR, Ie : 1.0
• SEISMIC SITE CLASS: D
• Ss: 0.326
• S1: 0.114
• SDS: 0.335
• SD1: 0.181
• SEISMIC DESIGN CATEGORY: B
UNIT SUPPORT DESIGN BASED ON MECHANICAL UNIT LOADS PER
MECHANICAL PLANS
EXISTING STRUCTURE:
1. EXISTING STRUCTURAL DIMENSIONS AND MEMBER SIZES ARE FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN
THE FIELD PRIOR TO FABRICATION. THE CONTRACTOR SHALL VERIFY
THE ACTUAL CONFIGURATION OF EXISTING CONSTRUCTION AND THE
CONDITION OF THE STRUCTURE BEFORE BEGINNING WORK. ANY
DISCREPANCIES OR UNSOUND CONDITIONS SHALL BE REPORTED TO
THE ARCHITECT FOR RESOLUTION BEFORE BEGINNING WORK. REFER
TO ARCHITECTURAL PLANS FOR DIMENSIONS, EMBEDMENTS, AND
OPENINGS NOT SHOWN. REFER TO MECHANICAL AND ELECTRICAL
PLANS FOR DUCTS, PIPING, EMBEDMENTS, AND OPENINGS NOT
SHOWN.
2. TEMPORARY SHORING AND BRACING MAY BE NECESSARY IN ORDER
TO PERFORM THE NECESSARY STRUCTURAL MODIFICATIONS TO THE
EXISTING STRUCTURE SHOWN ON THE STRUCTURAL AND
ARCHITECTURAL PLANS AND DETAILS. THE CONTRACTOR MUST
RETAIN A LICENSED STRUCTURAL ENGINEER WHO SHALL INVESTIGATE
WHERE THIS TEMPORARY SHORING/BRACING IS REQUIRED, AND SHALL
DESIGN THIS TEMPORARY SHORING/BRACING.
3. THE CONTRACTOR SHALL BE AWARE THAT INCREASED COSTS AND
CHANGES MAY BE REQUIRED BECAUSE OF POSSIBLE OMISSIONS,
AMBIGUITIES OR INCONSISTENCIES IN THE DRAWINGS RELATED TO
THE CONNECTION DETAILS AT THE POINT BETWEEN NEW FRAMING
AND THE EXISTING STRUCTURE. THEREFORE, THE FINAL
CONSTRUCTION COST OF THE PROJECT MAY EXCEED THE ESTIMATED
CONSTRUCTION COST. THE CONTRACTOR/OWNER SHALL SET ASIDE A
RESERVE AMOUNT WITHIN INDUSTRY STANDARDS AS A CONTINGENCY
TO BE USED, AS REQUIRED, TO PAY FOR ANY SUCH INCREASED COSTS
AND CHANGES.
4. EXISTING STRUCTURAL DIMENSIONS AND MEMBER SIZES ARE FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
ELEVATIONS IN THE FIELD PRIOR TO FABRICATION. THE CONTRACTOR
SHALL VERIFY THE ACTUAL CONFIGURATION OF EXISTING
CONSTRUCTION AND THE CONDITION OF THE STRUCTURE BEFORE
BEGINNING WORK. ANY DISCREPANCIES IN GEOMETRY, DETAILS OR
UNSOUND CONDITIONS OF THE EXISTING STRUCTURE SHALL BE
REPORTED TO THE EOR FOR RESOLUTION BEFORE BEGINNING WORK.
EXISTING CONCRETE STRUCTURE:
1. THIS PROJECT MAY BE UTILIZING EXISTING CONCRETE STRUCTURE.
CRACKING IS INHERENT TO THE MATERIAL PROPERTIES OF
CONCRETE CONSTRUCTION. THE OWNER SHALL RELEASE USD, ITS
OFFICERS, DIRECTORS, EMPLOYEES AND SUBCONSULTANTS
AGAINST ANYTHING ASSOCIATED WITH CRACKS IN THE EXISTING
CONCRETE. USD WILL MAKE EVERY EFFORT TO MINIMIZE THE
EFFECTS OF UNSIGHTLY CRACKING BUT THE PRESENCE OF CRACKS
ARE NORMAL AND UNAVOIDABLE IN CONCRETE. ALLOWANCE SHALL
BE MADE IN THE CONSTRUCTION BUDGET FOR SEALING OF SUCH
CRACKS. IN SOME CASES, CRACKS DO NOT APPEAR UNTIL WELL
AFTER CONSTRUCTION HAS BEEN COMPLETED. IT IS THE
RESPONSIBILITY OF THE OWNER TO MAINTAIN THE STRUCTURE
PROPERLY OVER THE LIFE OF THE STRUCTURE.
GENERAL:
1. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS
REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE
METHOD OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES.
2. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY PRECAUTIONS AND
PROGRAMS IN CONNECTION WITH THE WORK THAT CONFORMS TO
THE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) SAFETY AND HEALTH STANDARDS FOR THE
CONSTRUCTION INDUSTRY.
3. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON
FRAMED FLOORS OR ROOF. LOAD SHALL NOT EXCEED THE DESIGN
LIVE LOAD PER SQUARE FOOT.
4. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR
MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR
ADDENDUM.
5. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING WITH
APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR
TO CONSTRUCTION. DO NOT PENETRATE ANY STRUCTURAL ELEMENTS
(BEAMS, COLUMNS, WALLS, SLABS, STEEL DECKS, ETC.) WITHOUT
PRIOR WRITTEN APPROVAL OF STRUCTURAL ENGINEER THROUGH
ARCHITECT OR OWNER.
6. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. HE SHALL BE
RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN
OPTION AND HE SHALL COORDINATE ALL DETAILS.
7. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER
GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS. WHERE NO
SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO
SIMILAR WORK ON THE PROJECT.
8. TYPICAL DETAILS ARE NOT CUT ON DRAWINGS, BUT APPLY UNLESS
NOTED OTHERWISE. TYPICAL DETAILS SHALL APPLY TO ALL SUCH
SITUATIONS AND CONDITIONS WHICH ARE SIMILAR TO THE CONDITION
SHOWN ON THE DETAIL OR VERBALLY DESCRIBED IN THE TITLE OF THE
DETAIL OR NOTES ON THE DETAIL. TYPICAL DETAILS SHALL APPLY
REGARDLESS OF WHETHER OR NOT THE DETAIL IS CUT ON THE PLANS.
9. WHERE ANY DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS,
GENERAL STRUCTURAL NOTES AND SPECIFICATIONS, THE GREATER
REQUIREMENTS SHALL GOVERN.
10. ANY ENGINEERING DESIGN PROVIDED BY OTHERS AND SUBMITTED
FOR REVIEW SHALL BEAR THE SEAL OF A CIVIL OR STRUCTURAL
ENGINEER REGISTERED IN THE STATE IN WHICH THE PROJECT IS
LOCATED. SUPPLIER OF ENGINEERED STRUCTURAL COMPONENTS
SHALL BE RESPONSIBLE FOR COMPLETE DESIGN AND SHALL USE ALL
CONTRACT DOCUMENTS FROM ALL DISCIPLINES.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL
DIMENSIONS WITH ARCHITECTURAL DRAWINGS AND FINISHED GRADE
WITH CIVIL DRAWINGS PRIOR TO START OF CONSTRUCTION. ALL
DIMENSIONS SHOWN ON STRUCTURAL DRAWINGS ARE TO ASSIST
CONTRACTOR IN VERIFICATION. DO NOT SCALE DIMENSIONS FROM
DRAWINGS.
12. ITEMS SHOWN BY OTHER DISCIPLINES WITH REFERENCE TO
STRUCTURAL DRAWINGS BUT NOT SHOWN ON THESE STRUCTURAL
DRAWINGS SHALL BE CONSIDERED DESIGN BUILD ITEMS.
CONTRACTOR SHALL SUBMIT DESIGN BY OTHERS FOR REVIEW
SHORING:
1. THE CONTRACTOR IS RESPONSIBLE FOR THE STRENGTH AND
STABILITY OF THE STRUCTURE DURING CONSTRUCTION AND SHALL
PROVIDE TEMPORARY SHORING, BRACING, AND OTHER ELEMENTS
REQUIRED TO MAINTAIN STABILITY UNTIL THE STRUCTURE IS
COMPLETE. SHORING DESIGN SHALL BE PROVIDED BY A CIVIL OR
STRUCTURAL ENGINEER REGISTERED IN THE STATE IN WHICH THE
PROJECT IS LOCATED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
BE FAMILIAR WITH THE WORK REQUIRED IN THE CONSTRUCTION
DOCUMENTS AND THE REQUIREMENTS FOR EXECUTING IT PROPERLY.
DEMOLITION:
1. DEMOLITION OF EXISTING STRUCTURE TO BE REMOVED SHALL BE
PERFORMED BY THE CONTRACTOR USING MEANS NECESSARY TO
PREVENT DAMAGE TO THE EXISTING STRUCTURE TO REMAIN. DAMAGE
TO THE EXISTING STRUCTURE TO REMAIN SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE USING METHODS REVIEWED BY THE
STRUCTURAL ENGINEER. IF EXISTING CONDITIONS DIFFER FROM
THOSE SHOWN IN THE CONTRACT DOCUMENTS, CONTACT
STRUCTURAL ENGINEER THROUGH ARCHITECT PRIOR TO
PROCEEDING WITH WORK.
STRUCTURAL STEEL:
1. LATEST AISC AND AWS CODES APPLY. THE WORD APPROVED
INSPECTION 4.4 OF THE AISC CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES IS REDEFINED AS REVIEWED.
2. STEEL SHALL BE FINISHED AT LOCATIONS EXPOSED TO WEATHER
WITH A CORROSION RESISTANT COATING APPLICABLE TO WEATHER
AND EXPOSURE CONDITIONS OF PROJECT LOCATION.
3. WHEN STRUCTURAL STEEL IS FURNISHED TO A SPECIFIED MINIMUM
YIELD POINT GREATER THAN 36 KSI, THE ASTM OR OTHER
SPECIFICATION DESIGNATION SHALL BE INCLUDED NEAR THE
ERECTION MARK ON EACH SHIPPING ASSEMBLY OR IMPORTANT
CONSTRUCTION COMPONENT OVER ANY SHOP COAT OF PAINT PRIOR
TO SHIPMENT FROM THE FABRICATORS PLANT.
4. IF IT IS NECESSARY TO SPLICE ANY MEMBER, SPLICE LOCATIONS ARE
SUBJECT TO REVIEW BY STRUCTURAL ENGINEER. SPLICES SHALL BE
FULL PENETRATION WELDED AND TESTED PER THIS SECTION.
INDICATE ALL SPLICE LOCATIONS, AND WELDING PROCEDURES ON
SHOP DRAWINGS FOR REVIEW PRIOR TO FABRICATION.
5. ALL BEAMS SHALL BE ERECTED WITH THE NATURAL CAMBER
UPWARDS.
6. ALL BOLTS SHALL BE INSTALLED WITH STEEL WASHERS.
7. ALL REFERENCE TO HEADED STUDS SHALL INDICATE AUTOMATIC
WELDED HIGH STRENGTH HEADED STUDS (NELSON OR EQUIVALENT).
SHEAR CONNECTORS SHALL BE NELSON TYPE S3L OR EQUIVALENT
AND SHALL BE MANUFACTURED FROM COLD DRAWN STEEL
CONFORMING TO ASTM A 108. STUDS SHALL CONFORM TO ALL
REQUIREMENTS OF THE LATEST EDITION OF THE AWS C5.4
"RECOMMENDED PRACTICES FOR STUD WELDING" AND THE AWS D1.1
"STRUCTURAL WELDING CODE" PUBLISHED BY THE AMERICAN
WELDING SOCIETY. CONFORMANCE SHALL INCLUDE, BUT NOT BE
LIMITED TO, ALL QUALITY CONTROL TESTING PROVISIONS OF THE
AFOREMENTIONED PUBLICATIONS.
8. HEADED SHEAR CONNECTOR STUDS ON COMPOSITE STEEL BEAMS
SHALL BE 3/4" DIAMETER TYPICAL UNLESS NOTED OTHERWISE AND
UNIFORMLY SPACED. FOR LENGTH AND SPACING REQUIREMENTS, SEE
TYPICAL DETAIL. USE NOT MORE THAN ONE STUD PER RIB WHERE THE
NUMBER OF STUDS REQUIRED IS LESS THAN OR EQUAL TO THE
NUMBER OF RIBS AVAILABLE. WHERE THE NUMBER OF STUDS
REQUIRED EXCEEDS THE NUMBER OF RIBS AVAILABLE, PLACE A
MINIMUM OF ONE STUD PER RIB FULL LENGTH OF THE BEAM. PLACE
ADDED STUDS (NO MORE THAN TWO PER RIB TOTAL) IN EACH RIB
BEGINNING AT THE SUPPORTS AT EACH END AND MOVING TOWARDS
MIDSPAN UNTIL REQUIRED NUMBER OF STUDS ARE SUPPLIED.
MAXIMUM LONGITUDINAL STUD SPACING IS 32" CENTER TO CENTER.
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO
INSTALLATION. HEADED STUD LENGTHS AS SPECIFIED SHALL BE
INTERPRETED AS THE FINISHED LENGTH AFTER INSTALLATION.
9. ALL WELDING BY WELDERS HOLDING VALID CERTIFICATES AND
HAVING CURRENT EXPERIENCE IN TYPE OF WELD SHOWN ON THE
DRAWINGS OR NOTES, CERTIFICATES SHALL BE THOSE ISSUED BY AN
INDEPENDENT TESTING AGENCY.
10. ALL WELDING DONE BY E70 SERIES LOW HYDROGEN RODS. USE E90
SERIES FOR ASTM A706 REINFORCING BARS. USE E308 SERIES FOR
STAINLESS TO STAINLESS WELDS AND E309 SERIES FOR STAINLESS
TO CARBON STEELS.
11. ALL WELDING PER AMERICAN WELDING SOCIETY STANDARDS. ALL
WELDS ON DRAWINGS ARE SHOWN AS SHOP WELDS. CONTRACTOR
MAY SHOP WELD OR FIELD WELD AT THEIR DISCRETION. SHOP WELDS
OR FIELD WELDS SHALL BE SHOWN ON SHOP DRAWINGS.
12. SLAG SHALL BE REMOVED FROM ALL COMPLETED WELDS, AND THE
WELD AND ADJACENT BASE METAL SHALL BE CLEANED BY BRUSHING
OR OTHER SUITABLE MEANS. WELDED JOINTS SHALL NOT BE PAINTED
UNTIL AFTER WELDING HAS BEEN COMPLETED AND THE WELD
ACCEPTED.
13. ALL COMPLETE PENETRATION WELDS SHALL BE TESTED.
14. STEEL FABRICATOR TO COORDINATE ALL BRACING, PLATES,
ERECTION BOLTS, ETC. WITH STEEL JOIST MANUFACTURER AND
STEEL ERECTOR.
15. ALL STRUCTURAL STEEL SHALL BE FABRICATED BY A FABRICATOR
WITH ANY ONE OF THE FOLLOWING MINIMUM QUALIFICATIONS.
QUALIFICATIONS SHALL BE IN EFFECT AT TIME OF BID.
• INTERNATIONAL ACCREDITATION SERVICE, INC. (IAS) APPROVED
FABRICATOR.
• AISC CERTIFIED FABRICATOR (STD).
16. STEEL PROPERTIES
• WIDE FLANGE COLUMNS, BEAMS AND TEES: ASTM A992 (Fy = 50
KSI)
• CHANNELS, PLATES AND ANGLES: ASTM A36 (Fy = 36 KSI)
• PIPE STEEL: ASTM A53 Gr. B (Fy = 35 KSI)
• HSS RECTANGULAR STEEL: ASTM A500 Gr. C (Fy = 50 KSI)
• HSS ROUND STEEL: ASTM A500 Gr. C (Fy = 46 KSI)
• BOLTS: ASTM F3125 (A325) OR ASTM A F1852 TWIST-OFF TYPE
• ANCHOR RODS: ASTM F1554 Gr. 36 (Fy = 36 KSI)
17. STEEL BOLTS SHALL BE PRETENSIONED UNLESS OTHERWISE NOTED
AS A SNUG-TIGHT CONNECTION ON THE DRAWINGS OR DETAILS. ONE
OF THE FOLLOWING METHODS SHALL BE USED TO ASSURE ADEQUATE
PRETENSIONING IS ACHIEVED:
• TURN-OF-NUT METHOD
• DIRECT TENSION INDICATOR WASHERS
• CALIBRATED WRENCH
• TWIST-OFF TYPE BOLT
EXISTING DRAWINGS:
1. INFORMATION SHOWN AS EXISTING WAS SUPPLIED BY THE OWNER.
THE DRAWINGS WERE PREPARED BY ABC STRUCTURAL ENGINEERS,
AND AESUS DESIGN GROUP ARCHITECTS, JOB NUMBER 531-24-105,
DATED OCTOBER 13, 2023.
CODE:
2018 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC)
1. STEEL BEAM PER PLAN.
2. (4) 3/4" DIA. BOLTS ON BEAM
GAGE. (STUDS WELDED TO
TOP FLANGE ON BEAM MAY
BE USED IN LIEU OF BOLTS).
3. 3/8" STEEL STIFFENER PLATE
EACH SIDE OF BEAM WEB.
4. CENTERLINE OF BEAM AT
STIFFENER PLATE.
5. WELD (3) SIDES - TYPICAL.
3/16
1. MECHANICAL UNIT AND
CONNECTION BY OTHERS.
2. STEEL BEAM PER PLANS.
1. STEEL BEAM PER PLAN.
2. 3/8" STEEL SHEAR PLATE - USE
9/16" STEEL SHEAR PLATE
WHERE "D" = 27" OR GREATER.
EDGE DISTANCES PER
TYPICAL BOLT SCHEDULE AND
LATEST EDITION OF AISC.
3. FOR SIZE, TYPE AND NUMBER
OF BOLTS. SEE TYPICAL BOLT
SCHEDULE.
4. "D" = LESSER OF BEAM
DEPTHS AS OCCURS.
5. WELD 3 SIDES TYPICAL - USE
SAME CONNECTION AT
STIFFENER PLATES WHEN
REQ'D.
6. AT ONE SIDED CONNECTIONS
INSTALL 3/8" STIFFENER PLATE
OPPOSITE SHEAR PLATE.
TYPICAL.
7. 1/2" MAXIMUM FROM EDGE OF
SHEAR PLATE IF SHEAR PLATE
EXTENDS BEYOND EDGE OF
BEAM FLANGE.
8. 1/2" MAXIMUM FROM EDGE OF
BEAM FLANGE IF FLANGE
EXTENDS BEYOND EDGE OF
SHEAR PLATE.
9. 5/16" WELD AT 3/8" PLATE
1/2" WELD AT 9/16" PLATE.
"D
"D
"D
3/16
NOTE 8
NOTE 7
1. THE TYPICAL STEEL BEAM TO
STEEL COLUMN OR STEEL
BEAM TO STEEL BEAM
CONNECTION CONSISTS OF
3/8" SINGLE SHEAR PLATES
WITH BOLTS PER SCHEDULE.
USE 9/16" SHEAR PLATES
WHERE "D" = 27" OR
GREATER.
2. FABRICATOR SHALL TAKE
NECESSARY PRECAUTIONS
AGAINST BOLT SHANK OUT.
FABRICATOR'S OPTION:
• PROVIDE THICKER
SHEAR PLATE.
• PROVIDE MULTIPLE
WASHERS AT EITHER
END OF BOLT (2
MAXIMUM PER END).
NOMINAL BEAM
DEPTH "D"
NUMBER OF 1" DIAMETER
BOLTS (ASTM F1852)
UP TO 7" 2
8" - 11" 2
12" - 14" 3
15" - 17" 4
18" - 20" 5
21" - 26" 6
27" - 29" 7
30" - 32" 8
33" - 35" 9
36" 10
1. PREMANUFACTURED CURB
AND ATTACHMENT BY
OTHERS.
2. WELD (3) SIDES - TYPICAL.
3. 3/8" STEEL STIFFENER PLATE
EACH SIDE OF BEAM WEB.
4. CENTERLINE OF BEAM AT
STIFFENER PLATE.
5. EXISTING STEEL BEAM.
3/16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 -
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
P
\2
V A
M e d ic a l C e n te r
B o is e B ld g
H
V A
C U p g ra d e
A
E S
U S
R e v it
\2
V A
U p g ra d e H
V A
C B u ild in g
S tr u c t.
rv t
/2
/2
:5
:3
P
M
SE-101
GENERAL STRUCTURAL NOTES
500 W FORT ST, BOISE, ID 83702
531-24-105
FEB. 2, 2024 DG DB
UPGRADE HVAC BUILDING 85FINAL BID DOCUMENTS
USD #:23639
SHEET LIST
SHEET
NUMBER SHEET NAME
SE-101 GENERAL STRUCTURAL NOTES
SE-102 ROOF FRAMING PLAN
Revisions: Date:
NO SCALE SE-102A4
STEEL BEAM BEARING ON STEEL BEAM
5151-2S-08 415-15
NO SCALE SE-102B4
MECHANICAL UNIT AT STEEL BEAM
NO SCALE SE-102C4
TYPICAL WIDE FLANGE BEAM TO BEAM CONNECTION
5151-2T-08 412-07
NO SCALEC3
TYPICAL BOLT SCHEDULE FOR TYPICAL STEEL CONNECTIONS
5100-2T-02 401-04
NO SCALE SE-102B3
STEEL BEAM BEARING ON STEEL BEAM
5151-2S-06 415-15M
01/24/2024
Approved: Chief Facilities Management
Approved: Director
531-23-105
N
N
J
J
HGFE
(E) 13,000# (E) 13,000#
(E) 9,000#
6,500#
315315
(E) W14X22 (E) W14X22
(E
W X
W X
W X
W14X22
W14X22
(E
W X
(E
W X
(E
W X
(E
W X
(E
W X
(E
W X
(E
W X
(E
W X
(E
W X
(E) W14X22
(E) W14X22 (E) W14X22
(E
W X
(E
W X
(E) 12K
(E) 12K
(E) 2L3X3X3/16
(E) 2L3X3X3/16
(E) 12K
(E) W12X14
(E
K
(E
W X
(E
W X
(E
W X
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E) W16X26 (E) W12X14(E) W16X26(E) W21X50
(E) W24X62 (E) W16X26 (E) W16X26 (E) W16X26 (E) W14X22
(E
W X
(E
.5
V S
(E
W X
(E
W X
(E
W X
(E
.5
V S
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
K
(E) W14X22 (E) W14X22 (E) W12X14 (E) W12X14 (E) W16X26
(E
W X
(E
K
(E
K
(E
K
(E) W14X22 (E) W14X22 (E) W16X31
(E
.5
V S
(E
W X
(E
.5
V S
(E
K
(E
K
(E
K
(E
K
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E) W12X14 (E) W12X14
(E) 12K
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
700# 700#
319319
B4
SE-101
A4
SE-101
C4
SE-101
A4
SE-101
B3
SE-101
ROOF FRAMING NOTES
A. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DIMENSIONS,
ELEVATIONS WHERE SHOWN ARE TO BE USED AS AN AID AND SHALL BE
COORDINATED WITH THE ARCHITECT OR GENERAL CONTRACTOR PRIOR
TO CONSTRUCTION.
B. FOR ADDITIONAL INFORMATION, REFERENCE GENERAL STRUCTURAL
NOTES.
C. ANY REFERENCE TO ELEVATIONS ARE BASED ON A PROJECT DATUM OF
0'-0" AT FINISH FLOOR OF 1ST FLOOR. FOR MORE INFORMATION SEE
ARCHITECTURAL DRAWINGS.
D. FOR CLARITY, ALL ROOF OPENINGS MAY NOT BE SHOWN ON FRAMING
PLAN. FOR EXACT SIZE, NUMBER AND LOCATION SEE ARCHITECTURAL,
MECHANICAL, AND PLUMBING DRAWINGS. FOR FRAMING AT OPENINGS,
SEE TYPICAL DETAILS.
E. VERIFY EXACT SIZE, WEIGHT AND LOCATION OF MECHANICAL UNITS,
EQUIPMENT AND SUPPORTS INDICATED ON PLAN WITH ARCHITECTURAL,
MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND PLUMBING DRAWINGS.
F. FOR CLARITY, DETAILS MAY ONLY SHOW ONE SIDE OF CONNECTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 -
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
2058 S Dobson Rd., Suite 10, Mesa, AZ 85202
(480) 454-6408 www.unitedstr.com
P
\2
V A
M e d ic a l C e n te r
B o is e B ld g
H
V A
C U p g ra d e
A
E S
U S
R e v it
\2
V A
U p g ra d e H
V A
C B u ild in g
S tr u c t.
rv t
/2
/2
:5
:3
P
M
SE-102
ROOF FRAMING PLAN
500 W FORT ST, BOISE, ID 83702
531-24-105
FEB. 2, 2024 USD USD
UPGRADE HVAC BUILDING 85FINAL BID DOCUMENTS
USD #:23639
Revisions: Date:
1/8" = 1'-0"1
ROOF FRAMING PLAN
KEYNOTES
302 APPROXIMATE LOCATION OF MECHANICAL UNIT. FOR FRAMING AT
MECHANICAL UNITS AND AROUND OPENINGS, REFER TO TYPICAL DETAILS.
REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR EXACT SIZE
AND LOCATION.
315 EXISTING REINFORCED CONCRETE ROOF BELOW.
316 EXISTING STEEL COLUMN.
317 PRE-ENGINEERED STRUCTURAL CURB ON TOP OF ROOF. THIS ITEM IS
DESIGNED BY OTHERS. CURB SHALL BE DESIGNED TO CLEAR SPAN FROM
EXISTING STEEL JOIST TO EXISTING STEEL JOIST.
318 EXISTING STEEL STRUCTURAL TO REMAIN. TYP.
319 EXISTING MECHANICAL UNIT TO REMAIN.
320 NEW MECHANICAL EQUIPMENT WITH NEW STEEL SUPPORTS TIED INTO
EXISTING FRAME
01/24/2024
Approved: Chief Facilities Management
Approved: Director
531-23-105
SYMBOL
ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE.
MECHANICAL SYMBOLS LEGEND
DESCRIPTION
X-X, Xø
DIFFUSER TAG
(X-X = DIFFUSER TYPE, Xø = NECK SIZE, ### = CFM VALUE)
VAV BOX - HW
VAV BOX - EH
VAV UNIT - PARALLEL POWERED
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
SUPPLY SLOT DIFFUSER
RETURN SLOT GRILLE
SUPPLY, RETURN, OR EXHAUST SIDEWALL DIFFUSER/GRILLE
FLEXIBLE ROUND DUCT
FLEXIBLE RECTANGULAR DUCT
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING UP
RETURN RECTANGULAR DUCT GOING UP
EXHAUST RECTANGULAR DUCT GOING UP
SUPPLY ROUND DUCT GOING DOWN
RETURN ROUND DUCT GOING DOWN
SUPPLY ROUND DUCT GOING DOWN
SUPPLY ROUND DUCT GOING UP
RETURN ROUND DUCT GOING UP
SUPPLY ROUND DUCT GOING UP
PIPE GOING DOWN
PIPE TEE GOING DOWN
PIPE GOING UP
PIPE TEE GOING UP
AIR VALVE FOR SUPPLY, RETURN, AND EXHAUST
M
SD
FSD
MANUAL DAMPER
SMOKE DAMPER
FD FIRE DAMPER
FIRE AND SMOKE DAMPER
MOTORIZED DAMPER
AM AIR FLOW MEASURING DAMPER
HUMIDIFIER GRIDH
REHEAT COIL
THERMOSTAT
HUMIDISTAT
CO2 SENSOR
PRESSURE MONITOR
PRESSURE SENSOR
T
H
CO2
BALANCING VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
GLOBE VALVE
Y-STRAINER WITH BLOWDOWN VALVE
STEAM TRAP - INVERTED VALVE
DUCT SMOKE DETECTOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
MES GROUP, INC
550 North Reo Street Tampa, FL, 33609 813-289-4700 David Keith
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /V
A_ U pg ra de H
VA
C
B ui ld in g
_M ec h.
rv t 2/
1/
:5 7:
P
M
M-001
MECHANICAL LEGENDS AND
ABBREVIATIONS
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
ALL MECHANICAL, ELECTRICAL, AND PLUMBING WORK SHALL COMPLY WITH ALL
APPLICABLE STATE AND LOCAL BUILDING CODES. REFER TO SPECIFICATIONS FOR
MATERIALS AND METHODS FOR MECHANICAL CONSTRUCTION.
CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED
FOR A COMPLETE WORKING AND COORDINATED SYSTEM.
REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF WALLS WHICH EXTEND TO
STRUCTURE. EACH PIPE PENETRATION THROUGH THESE WALLS SHALL BE INSTALLED
AS DETAILED.
COORDINATE THE EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE
LOCATIONS OF LIGHT FIXTURES, PIPING, CONDUIT AND OTHER CONSTRUCTION, TO
ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT.
COORDINATE THE LOCATION OF PIPING WITH OTHER TRADES AND PROVIDE OFFSETS
IN PIPING AS REQUIRED.
IT IS THE INTENT OF THESE DOCUMENTS TO ALLOW ALL CEILING CONSTRUCTION AND
HEIGHTS TO BE AS SHOWN ON THE ARCHITECTURAL DRAWINGS. COORDINATE THE
LOCATION OF PIPING AND PROVIDE OFFSETS IN PIPING AS REQUIRED TO MEET THIS
INTENT.
CONDUIT AND PIPING SHALL BE INDEPENDENTLY SUPPORTED, AND EACH SUPPORT
SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEMS SUPPORTS.
INSTALL ALL FLOOR MOUNTED EQUIPMENT ON PADS AS SPECIFIED. PAD BY GENERAL
CONTRACTOR. COORDINATE REQUIREMENTS WITH GENERAL CONTRACTOR.
PROTECT EQUIPMENT FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL
COMPLETION OF CONSTRUCTION.
REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON
COMPLETION OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED.
CONTRACTOR SHALL VISIT JOBSITE AND VERIFY SIZE AND LOCATION OF ALL EXISTING
ITEMS AND CONDITIONS.
ALL CONNECTIONS BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH
DIELECTRIC UNIONS.
ALL EXISTING FACILITIES SHALL BE PROTECTED DURING THE CONSTRUCTION
ACTIVITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE
AND STORE ITEMS WHICH ARE SUBJECT TO DAMAGE.
COR SHALL HAVE FINAL APPROVAL OF ALL GRILLE, DIFFUSER, AND THERMOSTAT
LOCATIONS.
COORDINATE ALL WALL MOUNTED DEVICE LOCATIONS (T-STATS) WITH ARCHITECTURAL
INTERIOR ELEVATIONS.
ANY DEVIATIONS FROM SCHEDULED EQUIPMENT RESULTING IN ADDITIONAL COST DUE
TO THE LACK OF COORDINATION WITH DIMENSIONS AND WEIGHTS WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
WIRING: COMBUSTIBLE ELECTRICAL OR ELECTRONIC WIRING METHODS AND
MATERIALS, OPTICAL FIBER CABLE, AND OPTICAL FIBER RACEWAYS EXPOSED WITHIN A
PLENUM SHALL HAVE A PEAK OPTICAL DENSITY NOT GREATER THAN .50, AN AVERAGE
OPTICAL DENSITY NOT GREATER THAN 0.15 AND A FLAME SPREAD NOT GREATER THAN
5 FEET WHEN TESTED IN ACCORDANCE WITH NFPA 262. ONLY TYPE OFNP (PLENUM
RATED NON-CONDUCTIVE FIBER CABLE) SHALL BE INSTALLED IN PLENUM-RATED
RACEWAYS. WIRING, CABLE, AND RACEWAYS ADDRESSED IN THIS SECTION SHALL BE
LISTED AND LABELED AS PLENUM RATED AND SHALL BE INSTALLED IN ACCORDANCE
WITH ICC ELECTRICAL CODE.
ALL CHILLER OR CONDENSING UNIT COILS ARE TO BE COMPLETELY PROTECTED USING
AIR INTAKE FILTRATION SCREENS SPECIFICALLY DESIGNED FOR COTTONWOOD
FILTRATION. THE SCREENS SHALL BE EASILY REMOVABLE WITH QUARTER TURN
CONNECTIONS. THE SCREEN SHALL NOT VOID THE WARRANTY OF THE ORIGINAL
EQUIPMENT MANUFACTURER. THE SCREENS SHALL HAVE A STATIC PRESSURE DROP
LESS THAN 0.1 INCHES OF WATER GAGE, BE UV RESISTANT, FLAME RESISTANT, NON-
ELECTRO STATIC, AND MOLD AND MILDEW RESISTANT. THE FILTERS SHALL BE IN
ACCORDANCE WITH THE NATIONAL AIR FILTRATION ASSOCIATION FOR COTTONWOOD
FILTERS.
Revisions: Date:
NOTES:
1. PROVIDE CONDENSING COIL AIR INTAKES WITH REMOVABLE INTAKE FILTERS (APPROXIMATELY 1/4" WIRE MESH, COTTONWOOD SCREEN, QUARTER-TURN FASTENERS, PRESSURE DROP <0.1"WC, UV-RESISTANT, FLAME-RESISTANT, NON-ELECTROSTATIC, MOLD&MILDEW RESISTANT, AN IN ACCORDANCE WITH THE "NATIONAL AIR FILTRATION ASSOCIATION FOR COTTONWOOD FILTERS"). INSTALL REMOVABLE INTAKE FILTERS AT CONDENSER COILS OF ALL CHILLERS. BASIS OF DESIGN: AIR INTAKE FILTRATION OR APPROVED
EQUAL. THE SCREEN SHALL NOT VOID THE WARRANTY OF THE OEM CHILLER.
2. PROVIDE LOW AMBIENT KIT OPTION THAT ALLOW COOLING OPERATION AT AMBIENT TEMPERATURE OF 30 DEG F. PROVIDE EVAPORATOR HEATER TO PROTECT UNIT AT LOW AMBIENT.
3. PROVIDE BACNET COMPATIBLE CONTROLLER (IP & MSTP). PROVIDE HANDHELD CHILLER CONTROLS DIAGNOSTICS TOOL (EQUAL TO CARRIER NAVIGATOR, PROVIDE TOTAL OF ONE DEVICE).
4. SINGLE-POINT ELECTRICAL CONNECTION, HIGH SCCR (>= 65 kAIC). PROVIDE GFCI OUTLET.
5. COPPER COIL CONDENSER COIL. PROVIDE UNIT WITH HOT GAS BYPASS, VARIABLE CONDENSER FANS, BRAZED-PLATE HX.
6. PROVIDE CHILLER WITH HOT-GAS BYPASS OPTION (TURNDOWN TO 12% CAPACITY).
7. REFRIGERANT TO BE R32 (OR OTHERWISE NOT SUBJECT TO PHASE-OUT BY EPA).
8. CIRCULATION WATER IS 30% ETH GLYCOL, MINIMUM EVAPORATOR FLOW IS 136 GPM.
AIR COOLED CHILLER SCHEDULE
MARK LOCATION SERVES
NOMINAL ARI
CAPACITY (TONS)
MINIMUM PERFORMANCE
EFFICIENCY @
AHRI (KW-TON /
IPLV)
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN (OR EQUAL)
REMARKS
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
MAX
WPD
(FT)
CONDENSER
AMBIENT OA
TEMP (°F) VOLT PHASE
CIRCUIT
MANUFACTURER MODELMCA MOCP
85-CH-5 B.85 ROOF B.85 102 208.8 54.0 °F 44.0 °F 20 120.0 °F 1.11 / 17.02 5400 460 3 189.3 225 Carrier 30RC 102T Small ALL NOTES, PROVIDE
VIBRATION ISOLATORS
OPTIONS: DFK = DOWNFLOW KIT, DSC = DISCONNECT, RMT = REMOTE THERMISTOR, FR2 = 2" EXTERNAL FILTER RACK, STS = UL508 CONDENSATE OVERFLOW SWITCH, CSP = INTEGRAL CONDENSATE PUMP, COO = COOLING ONLY--ADJUST
UNIT CONFIGURATION FOR COOLING-ONLY OPERATION.
SPECIFICATIONS: UNITS SHALL BE ARI LISTED, COMPY WITH FED SPEC A-A-50502, AND HAVE EPA ENERGY STAR LABEL. FURNISH UNIT WITH SINGLE-POINT POWER CONNECTION. COORDINATE THERMOSTAT/CONTROL OPTIONS WITH FLOOR...
VARIABLE REFRIGERANT INDOOR UNIT SCHEDULE
MARK LOCATION SERVES SIZE
AIR FLOW COOLING @ AHRI CONDITIONS
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN (OR EQUAL)
REMARKS
FAN AIR FLOW
(CFM)
MIN TOTAL
CAPACITY (BTUH)
MIN SENS
CAPACITY (BTUH)
EAT
VOLT PHASE
CIRCUIT
MANUFACTURER MODELDb (°F) Wb (°F) MCA MOCP 85-CAS-9 (215) B.85 LEVEL 2 RM 215 18 450 16402 11970 80.0 °F 67.0 °F 40 208 1 0.7 15 CARRIER MMU-UP0181MH-UL CSP, COO
85-CAS-10 (215A) B.85 LEVEL 2 RM 215A 30 730 27336 18770 80.0 °F 67.0 °F 55 208 1 1.09 15 CARRIER MMU-UP0301MH-UL CSP, COO 85-CAS-11 (215A) B.85 LEVEL 2 RM 215A 30 730 27336 18770 80.0 °F 67.0 °F 55 208 1 1.09 15 CARRIER MMU-UP0301MH-UL CSP, COO 85-CAS-12 (215A) B.85 LEVEL 2 RM 215A 30 730 27336 18770 80.0 °F 67.0 °F 55 208 1 1.09 15 CARRIER MMU-UP0301MH-UL CSP, COO 85-CAS-13 (215A) B.85 LEVEL 2 RM 215A 30 730 27336 18770 80.0 °F 67.0 °F 55 208 1 1.09 15 CARRIER MMU-UP0301MH-UL CSP, COO 85-CAS-14 (215J) B.85 LEVEL 2 RM 215J 15 390 14032 10421 80.0 °F 67.0 °F 40 208 1 0.6 15 CARRIER MMU-UP0151MH-UL CSP, COO 85-CAS-15 (215J) B.85 LEVEL 2 RM 215J 15 390 14032 10421 80.0 °F 67.0 °F 40 208 1 0.6 15 CARRIER MMU-UP0151MH-UL CSP, COO 85-CAS-16 (215T) B.85 LEVEL 2 RM 215T 15 390 14032 10241 80.0 °F 67.0 °F 40 208 1 0.6 15 CARRIER MMU-UP0151MH-UL CSP, COO 85-CAS-17 (215T) B.85 LEVEL 2 RM 215T 15 390 14032 10241 80.0 °F 67.0 °F 40 208 1 0.6 15 CARRIER MMU-UP0151MH-UL CSP, COO
NOTES:
1.PROVIDE BACNET INTERFACE MODULE, REFER TO CONTROL DIAGRAMS. INTERCONNECT CONENSING UNITS FOR JOINT OPERATION. PROVIDE OWNER WITH CARRIER SERVICE SOFTWARE TOOL (OR EQUAL FOR PURPOSE
OF ADJUSTING SET POINTS OF VRF UNITS).
SPECIFICATIONS: UNITS SHALL BE ARI LISTED, COMPY WITH FED SPEC A-A-50502, AND HAVE EPA ENERGY STAR LABEL. UNIT SHALL BE EQUIPED WITH MEANS OF DEFROST MANAGEMENT, CORROSION-RESISTANT CONDENSER COIL (6000HR SALT SPRAY), CASING RATED FOR 1000HR SALT SPRAY AND 500HR UV RESISTANCE PER ASTM D4587-11. FURNISH UNIT WITH SINGLE-POINT POWER CONNECTION. REFER TO CONTROL DIAGRAM...
VARIABLE REFRIGERANT CONDENSING UNIT SCHEDULE
MARK LOCATION SERVES SIZE
COOLING
REFRIGERANT
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN (OR EQUAL)
REMARKS
CAPACITY
(BTUH)
AMBIENT
(°F) PHASE VOLT
CIRCUIT
MANUFACTURER MODELMCA MOCP
85-VRF-4 B.85A ROOF LAB 120 120000 95.0 °F R410A 700 3 460 22 25 CARRIER MMY-AP192S6FT6P-UL NOTE 1 85-VRF-5 B.85A ROOF LAB 72 72000 95.0 °F R410A 600 3 460 11.8 15 CARRIER MMY-AP192S6FT6P-UL NOTE 1
Approved: Chief Facilities Management
Approved: Director
GENERAL NOTES
A. REFER TO ADDITIONAL GENERAL NOTES ON SHEET M-001.
ONJ
H
(E)36"x24"SA
(E)36"x24"RA
(E)36"x24"RA
(E)AHU-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
MES GROUP, INC
550 North Reo Street Tampa, FL, 33609 813-289-4700 David Keith
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /V
A_ U pg ra de H
VA
C
B ui ld in g
_M ec h.
rv t 2/
1/
:5 7:
P
M
MD-202
MECHANICAL ROOF DEMOLITION
PLAN
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
1/8" = 1'-0"1 MECHANICAL LEVEL 2 DEMOLITION PLAN
Revisions: Date:
LEGEND NOTES
1 DISCONNECT AND REMOVE DUCTWORK AS INDICATED AND PREPARE TO INSTALL NEW,
RELOCATED DUCT. COORDINATE PERIOD OF INTERRUPTION WITH OWNER.
2 PHASING NOTE: DO NOT DEMOLISH DUCT UNIT NEW VRF SYSTEM IS INSTALLED AND
OPERATIONAL. THE NEW VRF SYSTEM WILL PROVIDE TEMPORARY COOLING TO LAB WHILE
WORK IS PERFORMED ON (E)AHU-8.
Approved: Chief Facilities Management
AP
AP
AP
AP
APAP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
UP
DN
DN
UP
DN
DN
UP
OMNI
CELL
MEDICAL
VENDING
GENERAL NOTES
A.
B.
C.
REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
PROVIDE NEW WATER FILL AFTER NEW WORK IS COMPLETE. REPLENISH ETH GLYCOL
LEVELS TO 30% AND MINIMUM OF 20 PSI PRESSURE.
CONTRACTOR SHALL PROVIDE TO THE VA COR IN WRITING THE EXACT AMOUNT OF
REFRIGERANT QUANTITY THAT WAS REQUIRED TO FILL THE VRF SYSTEM.ONJ
H
85-CAS-15 (215J)
85-CAS-14 (215J)
85-CAS-16 (215T)
85-CAS-17 (215T)
85-CAS-10 (215A)
85-CAS-11 (215A)
85-CAS-12 (215A)
85-CAS-13 (215A)
85-CAS-9 (215) 1 (TYP 4)
3/4"CD
3/4"CD
3/4"CD
3/4"CD
MFS
MFS
(TYP 2)
1 (TYP 2)
85-VRF-4 85-VRF-5
3/4"CD
3/4"CD
3/4"CD
3/4"CD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
MES GROUP, INC
550 North Reo Street Tampa, FL, 33609 813-289-4700 David Keith
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /V
A_ U pg ra de H
VA
C
B ui ld in g
_M ec h.
rv t 2/
1/
:5 7:
P
M
M-201
MECHANICAL LEVEL 2 PLAN
500 W FORT ST, BOISE, ID 83702
531-23-105
85 & 85A
Feb. 2, 2024 AESUS AESUS
UPGRADE HVAC BUILDING 85FINAL - BID DOCUMENTS
1/8" = 1'-0"1 MECHANICAL LEVEL 2 PLAN
Revisions: Date:
LEGEND NOTES
1 PROVIDE VRF INDOOR UNIT IN CEILING. ROUTE REFRIGERANT PIPING PER
MANUFACTURERS INSTRUCTIONS.
2 PROVIDE VRF MULTIPORT FLOW SELECTOR ABOVE CEILING.
This is the start of the file's text. The full file is on GovTribe.