S02 Drawings 515-23-204.pdf

PDF 14 MB Posted

Attached to
Z1DA--Replace Dry Pipe Sprinklers 515-23-204 Federal contract opportunity
Solicitation number
36C25023B0060
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25023B0060 for the replacement of dry pipe sprinklers at location 515-23-204. The opportunity type is a solicitation to replace existing dry pipe sprinkler systems. No other details are provided regarding requirements, response dates, pricing terms, or incumbent contractors.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Dry Pipe Sprinklers 515-23-204, newest first.
File Type Posted
S06 515-23-204 Site Visit Attendance Log.pdf PDF
36C25023B0060 0003.docx DOCX document
36C25023B0060 0002.docx DOCX document
36C25023B0060 0001.docx DOCX document
S02 RFI Form - 515-23-204.doc DOC document
S02 Specifications 515-23-204.pdf PDF
S03 Wage Determination MI20230079 04.14.2023 -Calhoun - 515-23-204.pdf PDF
36C25023B0060_1.docx DOCX document
S02 Contractor EMR Certification Form - 515-23-204.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 3

BUILDING 7

BUILDING 12

BUILDING 39

BUILDING 82, MRI SUITE

BUILDING 4

BUILDING 22

BUILDING 27

BUILDING 73

BUILDING 84

BUILDING 9

BUILDING 8

BUILDING 13

L E G E N D & A B B R E V I A T I O N S :

DN DOWN

DPV DRY PIPE VALVE

(E) EXISTING TO REMAIN

GPM GALLONS PER MINUTE

PSI POUNDS PER SQUARE INCH

QR QUICK RESPONSE

SF SQUARE FEET

LIMIT OF DEMOLITION

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

PIPE UP

PIPE DOWN

PIPING CONTINUATION

FIRE PROTECTION (DRY PIPE)

FPD

FIRE PROTECTION (WET PIPE)

FP

NEW PIPING

PIPING TO BE REMOVED

EXISTING PIPING

DRY PIPE SPRINKLER HEAD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:4

P

M

G000

COVER SHEET

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTSBATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

BATTLE CREEK VA MEDICAL CENTER

PROJECT NUMBER: 515-23-204

5500 ARMSTRONG ROAD BATTLE CREEK, MICHIGAN 49037

DEPARTMENT OF VETERANS AFFAIRS

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

A. THE CONTRACT DRAWINGS AND PROJECT SPECIFICATIONS (INDICATED BY THE SAME PROJECT NUMBER) ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) OF ANY

DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.

B. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN.

C. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE

CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE COR.

D. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION

AND CONSTRUCTION.

E. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND

REGULATIONS.

F. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR

CONSTRUCTION AND EXPECTED QUALITY.

G. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.

H. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

G E N E R A L N O T E S V I C I N I T Y M A P N

NTS

C A M P U S M A P

NTS

N

GENERAL

G000 COVER SHEET

FIRE PROTECTION

FX101 FIRE PROTECTION PLAN, BUILDING 3

FX102 FIRE PROTECTION PLAN, BUILDING 4

FX103 FIRE PROTECTION PLAN, BUILDING 7

FX104 FIRE PROTECTION PLAN, BUILDING 8

FX105 FIRE PROTECTION PLAN, BUILDING 9

FX106 FIRE PROTECTION PLAN, BUILDING 12

FX107 FIRE PROTECTION PLAN, BUILDING 13 - AREA A

FX108 FIRE PROTECTION PLAN, BUILDING 13 - AREA B

FX109 FIRE PROTECTION PLAN, BUILDING 22

FX110 FIRE PROTECTION PLAN, BUILDING 27

FX111 FIRE PROTECTION PLAN, BUILDING 39

FX112 FIRE PROTECTION PLAN, BUILDING 73

FX113 FIRE PROTECTION PLAN, BUILDING 82, MRI SUITE

FX114 FIRE PROTECTION PLAN, BUILDING 84

S H E E T L I S T

LOCATION OF

BATTLE CREEK VA

MEDICAL CENTER

SIGNATURE BLOCK

SERVICE

S I G N A T U R E S

SIGNATURE DATE

EXECUTIVE MEDICAL CENTER DIRECTOR

ASSOCIATE DIRECTOR

ASSISTANT DIRECTOR

CHIEF OF STAFF

ASSOCIATE DIRECTOR FOR PATIENT CARE

SERVICES/NURSE EXECUTIVE

CHIEF, FMS

CHIEF, ENGINEERING SECTION

CHIEF, ENVIRONMENTAL SERVICE

INFECTION CONTROL OFFICER

PATIENT SAFETY MANAGER

GEMS COORDINATOR

SAFETY SPECIALIST

CHIEF, POLICE SERVICE

CHIEF, FIRE SECTION

UNION SAFETY REPRESENTATIVE

CONTRACTING OFFICER

CONTRACTING OFFICERS REPRESENTATIVE

No. Revisions: Date:

BID DOCUMENTS 04/26/2023

04/26/2023

A B C D E F G H I J K L M N O P Q R S

(E) 4" FPD DN

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 3" FPD

(E) 2" FPD

(E) 2" FPD (E) 2" FPD

(E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD(E) 2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1" FPD (E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD (E) 1" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD(E) 2" FPD(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 2" FPD(E) 2" FPD(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1" FPD (E) 1" FPD

(E) 1" FPD(E) 1 1/2" FPD

(E) 1" FPD (E) 1" FPD

(E) 1 1/4" FPD

(E) 3" FPD

1 1

1 1

2 2

1 1 1 1 1 1

1 1 1 1 1 1 1 1

1 1 1

1 1

1 1

1 1

1 1

1 1

1 1 1 1 1

FPD FPD FPD FPD

33 3 333

(E) 3" FPD

4 4 4

5 5 5 5

K L M

MECH

(E) 4" FP DN

(E) 4" FPD UP

(E) 4" DPV

CORRIDOR

C16

STAIR

CORRIDOR

C15

CORRIDOR

C12

EXAM

H.A.C.

BUILDING 3

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING AND SPRINKLERS SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE.

CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. EXISTING SPRINKLERS IN HATCHED AREAS ON PLAN ARE OBSTRUCTED BY EXISTING DUCTWORK AND/OR OTHER EQUIPMENT. REMOVE SPRINKLERS IN HATCHED AREAS AND REWORK PIPING AND LOCATE NEW

SPRINKLERS IN ACCORDANCE WITH NFPA 13 COVERAGE REQUIREMENTS.

E. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH EQUIPMENT CAN

NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

F. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A COMPLETE

INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.

G. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.

H. PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS

OF IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

I. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

J. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

F I R E H A Z A R D L E G E N D

LIGHT HAZARDFIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:5

P

M

FX101

FIRE PROTECTION PLAN,

BUILDING 3

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

FIRST FLOOR FIRE PROTECTION PLAN

CAMPUS KEYPLAN

N

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO

MATCH EXISTING.

2 CONNECT NEW FIRE PROTECTION PIPING TO EXISTING AT POINT SHOWN.

3 SPRINKLER CONTRACTOR TO ROUTE NEW PIPING AND LOCATE NEW SPRINKLERS IN HATCHED AREA IN ACCORDANCE WITH NFPA 13 SPRINKLER COVERAGE REQUIREMENTS AND FIRE SPRINKLER HAZARD SCHEDULE ON THIS SHEET.

4 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.

5 REMOVE DUCT AND ASSOCIATED DUCT INSULATION IN THIS AREA AS NECESSARY TO COMPLETE FIRE PROTECTION WORK INDICATED. INSTALL NEW DUCT AND DUCT INSULATION TO MATCH EXISTING AFTER COMPLETION OF FIRE PROTECTION WORK. RE-USE EXISTING DUCT SUPPORTS. REFER TO DIVISION 23 SPECIFICATIONS. COORDINATE SHUTDOWN OF

ASSOCIATED HVAC SYSTEM WITH VA COR.

No. Revisions: Date:

H

EA B C D

(E) 4" FPD DN

(E) 4" FPD

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/2" FPD (E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 2" FPD

1 1 1 1

1 1 1 1

1 1 1 1 1

1 1

(E) 1" FPD

H

E

(E) 4" FPD UP

(E) 4" FP DN

(E) 4" DPV

STAIRS

CORRIDOR

C23

H.A.C.

CORRIDOR

C21

OFFICE

222 MENS TOILET

220 BUILDING 4

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:0

P

M

FX102

FIRE PROTECTION PLAN,

BUILDING 4

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

CAMPUS KEYPLAN

N

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

No. Revisions: Date:

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 3" FPD

(E) 3" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 3" FPD (E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD

(E) 4" FPD DN

(E) 4" FPD

(E) 4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD (E) 1 1/2" FPD

(E) 4" FPD

(E) 2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 4" FPD

(E) 4" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1" FPD

(E) 3" FPD

(E) 2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 1" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD

(E) 1" FPD

(E) 3" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 3" FPD

(E) 3" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 3" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD (E) 1" FPD(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

1 1

1 1 1

1 1

1 1

1 1

1 1

1 1 1 1 1

1 1

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 4" FPD

1 1

4 4 4

ELEVATOR MACHINE ROOM

XXX

(E) 4" FPD UP

(E) 4" DPV

STAIR

S2-02

ELEC

209E

CORRIDOR

C2-1

COMMUNITY HEALTH

NURSING

BUILDING 7

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:1

P

M

FX103

FIRE PROTECTION PLAN,

BUILDING 7

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 SPRINKLER LOCATED IN CRAWL SPACE.

3 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.

4 REMOVE DUCT AND ASSOCIATED DUCT INSULATION IN THIS AREA AS NECESSARY TO COMPLETE FIRE PROTECTION WORK INDICATED. INSTALL NEW DUCT AND DUCT INSULATION TO MATCH EXISTING AFTER COMPLETION OF FIRE PROTECTION WORK. RE-USE EXISTING DUCT SUPPORTS. REFER TO DIVISION 23

SPECIFICATIONS. COORDINATE SHUTDOWN OF ASSOCIATED HVAC SYSTEM WITH VA COR.

No. Revisions: Date:

(E) 3" FPD DN

(E) 2 1/2" FPD (E) 3" FPD

(E) 2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD (E) 2 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

1 1

1 1

1 1

1 1

1 1

1 1 1

1 1 1

1 1

1 1

1 1

(E) 4" FP DN

(E) 3" FPD UP

(E) 4" DPV

STAIRS WEST

B

OFFICE

H.A.C.

OFFICE

224A

CORRIDOR

E

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

BUILDING 8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:2

P

M

FX104

FIRE PROTECTION PLAN,

BUILDING 8

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

N

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

CAMPUS KEYPLAN

No. Revisions: Date:

(E) 4" FPD DN

(E) 3" FPD

(E) 2 1/2" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD(E) 3" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 1" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 3" FPD

(E) 2" FPD

(E) 2 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 2" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

1 1

1 1

1 1

1 1

1 1

1 1 1

1 1 1

1 1 1

1 1

1 1

(E) 2 1/2" FPD

(E) 4" FPD UP

(E) 4" FP DN

STORAGE

STAIR

OFFICE

DATA

204A

CORRIDOR

C21

BUILDING 9

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:3

P

M

FX105

FIRE PROTECTION PLAN,

BUILDING 9

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.

No. Revisions: Date:

(E) 4" FPD DN

(E) 3" FPD(E) 3" FPD

(E) 2 1/2" FPD

(E) 1" FPD

(E) 1 1/2" FPD(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 2 1/2" FPD(E) 2 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD(E) 2 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD (E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 1

1 1 1

1 1 1

1 1

1 1

1 1

2 2

(E) 4" FP DN

(E) 4" DPV

STAIR 1

S1

TOILET

204A

WORK ROOM

H.A.C.

CORRIDOR

C21

BUILDING 12

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:3

P

M

FX106

FIRE PROTECTION PLAN,

BUILDING 12

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 REMOVE DUCT AND ASSOCIATED DUCT INSULATION IN THIS AREA AS NECESSARY TO COMPLETE FIRE PROTECTION WORK INDICATED. INSTALL NEW DUCT AND DUCT INSULATION TO MATCH EXISTING AFTER COMPLETION OF FIRE PROTECTION WORK. RE-USE EXISTING DUCT SUPPORTS. REFER TO DIVISION 23

SPECIFICATIONS. COORDINATE SHUTDOWN OF ASSOCIATED HVAC SYSTEM WITH VA COR.

No. Revisions: Date:

10111213141516171819202122

A

B

C

D

E

F

G

(E) 4" FPD DN

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 4" FPD

(E) 4" FPD

(E) 4" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

(E) 1 1/2" FPD UP

(E) 1 1/4" FPD

(E) 2" FPD

(E) 4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD(E) 1" FPD

(E) 4" FPD

(E) 4" FPD

(E) 4" FPD

(E) 2" FPD

(E) 2" FPD

(E) 4" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD

(E) 4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 4" FPD

(E) 4" FPD

(E) 4" FPD

(E) 1 1/4" FPD

(E) 4" FPD

(E) 1 1/4" FPD

(E) 2 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2 1/2" FPD

(E) 1" FPD

(E) 4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

1 1 1

1 1 1

1 1 1

1 1 1

1 1

1 1

1 1

1 1 1

1 1

1 1

1 1

1 1 1

1 1

A R

E A

B

A R

E A

A

A R

E A

B

A R

E A

A

DATA

S9

101112

C

D

E

G

(E) 4" FPD UP

(E) 4" DPV

STORAGE

STAIRS

ENG

H.A.C.

CORRIDOR

C31

CORRIDOR

C36

BUILDING 13

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:4

P

M

FX107

FIRE PROTECTION PLAN,

BUILDING 13 - AREA A

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN - AREA A

1/8" = 1'-0"

THIRD FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 SPRINKLER LOCATED IN CRAWL SPACE.

3 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.

No. Revisions: Date:

12345678910

A

B

C

D

E

F

G

(E) 4" FPD

(E) 4" FPD

(E) 4" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 4" FPD (E) 4" FPD

(E) 4" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 4" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD

(E) 2" FPD

(E) 2" FPD (E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 2 1/2" FPD

(E) 2" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD (E) 1" FPD

(E) 4" FPD

(E) 1" FPD

(E) 4" FPD

(E) 4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 4" FPD

(E) 1" FPD

(E) 4" FPD

(E) 1" FPD (E) 1 1/4" FPD

(E) 3" FPD

(E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD (E) 1" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 4" FPD

(E) 3" FPD

(E) 1 1/4" FPD

(E) 1" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

1 1 1

1 1 1 1

1 1 1

1 1

1 1 1

1 1 1

1 1 1

1 1

1 1 1

A R

E A

B

A R

E A

A

A R

E A

B

A R

E A

A

(E) 1 1/4" FPD

BUILDING 13

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:5

P

M

FX108

FIRE PROTECTION PLAN,

BUILDING 13 - AREA B

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN - AREA B

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.

No. Revisions: Date:

A B C E F H J K M N O P Q R S

L

IGD

(E) 4" FPD DN

(E) 3" FPD(E) 3" FPD

(E) 2" FPD

(E) 1" FPD (E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD(E) 2" FPD(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD

(E) 3" FPD

(E) 3" FPD

(E) 2" FPD(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD

(E) 1" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1" FPD (E) 1 1/4" FPD

(E) 1 1/2" FPD (E) 2" FPD

(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 3" FPD

(E) 3" FPD

(E) 2" FPD

(E) 2" FPD(E) 2" FPD(E) 1 1/2" FPD

(E) 1" FPD

(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD(E) 2" FPD(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 1" FPD

(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD

1 1 1 1

1 1 1

1 1

1 1

1 1 1

1 1

1 1

1 1

1 1

P Q

(E) 4" FPD UP

(E) 4" DPV

SEMI-PRIVATE ROOM

BATH

222A

ELEC

221E

CORRIDOR

C23

BUILDING 22

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:0

P

M

FX109

FIRE PROTECTION PLAN,

BUILDING 22

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN GYPSUM WALL AND REPLACE WITH NEW. EXISTING PIPING

TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH WALL TO MATCH EXISTING.

No. Revisions: Date:

(E) 3" DPV

(E) 3" FPD

FPD UP

IT

001A

MECH

MECH

MECH

002A

PORCH

LOBBY

OFFICE

CLOSET

117A

OFFICE

CORRIDOR

C12

OFFICE

FPD DN

2 PORCH

BUILDING 27

F I R E H A Z A R D L E G E N D

LIGHT HAZARD

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH EQUIPMENT CAN

NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A COMPLETE

INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.

F. PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS

OF IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.

G. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

H. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD 0.10 GPM/SF OVER 1500

SF

100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:0

P

M

FX110

FIRE PROTECTION PLAN,

BUILDING 27

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

BASEMENT FIRE PROTECTION PLAN

1/8" = 1'-0"

FIRST FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER PIPING AND ASSOCIATED SPRINKLERS BACK TO POINT SHOWN AND USE AS

POINT OF CONNECTION FOR NEW WORK.

2 SPRINKLER CONTRACTOR TO ROUTE NEW PIPING AND LOCATE NEW SPRINKLERS IN HATCHED AREA IN ACCORDANCE WITH NFPA 13 SPRINKLER COVERAGE REQUIREMENTS AND FIRE SPRINKLER HAZARD SCHEDULE

ON THIS SHEET.

No. Revisions: Date:

(E) 4" FPD(E) 3" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 4" FPD

(E) 1" FPD(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 3" FPD

(E) 2 1/2" FPD (E) 2 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 4" FPD

(E) 4" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD(E) 1 1/2" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD(E) 1" FPD

(E) 3" FPD

(E) 3" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2 1/2" FPD (E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 2 1/2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

1 1 1

1 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 1

1 1

1 1

1 1

1 1 1

1 1

1 1

1 1

1 1

1 1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1

1 1

1 1 1

(E) 4" FPD DN

(E) 4" FPD

(E) 4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

STAIR

S5-4

ELEV PENTHOUSE

S8

(E) 4" DPV

(E) 4" FPD UP

STAIR

S5-2

BUILDING 39

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:1

P

M

FX111

FIRE PROTECTION PLAN,

BUILDING 39

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

ATTIC FIRE PROTECTION PLAN

1/8" = 1'-0"

SECOND FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 SPRINKLER LOCATED IN CRAWL SPACE.

3 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN GYPSUM WALL AND REPLACE WITH NEW. EXISTING PIPING

TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH WALL TO MATCH EXISTING.

No. Revisions: Date:

(E) 6" DPV

(E) 6" FPD

(E) 6" FPD

(E) 4" FPD(E) 4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 4" FPD

(E) 4" FPD

(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1 1/2" FPD(E) 1 1/2" FPD

(E) 1" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1 1/2" FPD(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1" FPD

(E) 1" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD (E) 1" FPD

(E) INSPECTORS

TEST CONNECTION

(E) INSPECTORS

TEST CONNECTION

1 1 1 1 1 1 1 1 1 1 1 1

111111111111

1 1 1 1 1 1 1 1 1 1 1 1

111111111111

1 1 1 1 1 1 1 1 1 1 1 1

222222

2 2 2 2 2 2 2 2 2 2 2 2 2 2

3 2 2 2 2 2 2 2 2 2 2 2 2 2

22222

222223

STORAGE

STORAGE

101B

TOILET

102A

OFFICE

102B

CAGE

102C

STORAGE

FIRE RISER

100E

BUILDING 73

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:2

P

M

FX112

FIRE PROTECTION PLAN,

BUILDING 73

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

GROUND FLOOR FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

2 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN GYPSUM CEILING AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH CEILING TO MATCH EXISTING.

3 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN LAY-IN CEILING AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH CEILING TO MATCH EXISTING.

No. Revisions: Date:

E

D

C

B

A

1 11 131210

E

D

C

B

A

1 11 131210

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

1 1

1 1

1 1

MECHANICAL AREA

00P

ACCESSIBLE REST ROOM

00O

ACCESSIBLE DRESSING

ROOM

00N

INTERVIEW ROOM

00M

RECEPTION

00Q

WAITING ROOM

00L

HALLWAY

C-1

CONTROL ROOM

00J

SCAN ROOM

00K

EQUIPMENT ROOM

PROSTHETICS REP

008A

RECEPTION

007H

CORRIDOR

C01

OXYGEN SHUT-OFF

OCCUPATIONAL THERAPY

WAITING

007E

ORTHOTICS AND

PROSTHETICS

OFFICE

STAIR

S1

PRICING AGENT

008B

EXAM

008C

LAB

008D

OFFICE

008K

OFFICE

008J

OFFICE

008I

SHOE STORAGE

008H

LAB

008F

(E) 2" DPV

(E) 2" FPD

(E) 2" FPD

3 3

3 3

BUILDING 82, MRI SUITE

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.

C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.

D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A

REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.

E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER

INFORMATION.

F. WORK IN MRI SUITE TO BE COMPLETED AFTER HOURS, EXCEPT FOR THE SCAN ROOM. COORDINATE WORK

SCHEDULE IN MRI SUITE WITH VA STAFF.

G. INSTALL NON-FERROUS SPRINKLERS FOR USE INSIDE MRI SHIELDED ENCLOSURES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /B a tt le

C re e k V

A

R e p la c e

S p ri n k le rs /F

F E

B a tt le

C re e k

R e p la c e

S p ri n k le rs

M E

P rv t

/2

/2

:4

:3

P

M

FX113

FIRE PROTECTION PLAN,

BUILDING 82, MRI SUITE

04/26/2023 GP JV

REPLACE DRY PIPE SPRINKLERS,

VARIOUS BUILDINGS

515-23-204

BATTLE CREEK, MI

BID DOCUMENTS

BATTLE CREEK

VA MEDICAL

CENTER Approved: Owner

1/4" = 1'-0"

MRI SUITE FIRE PROTECTION PLAN

N

CAMPUS KEYPLAN

D R A W I N G N O T E S :

1 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN LAY-IN CEILING AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH CEILING TO MATCH EXISTING.

2 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER

K-FACTOR TO MATCH EXISTING.

3 ACCESS FOR WORK TO BE COMPLETED IN SCAN ROOM REQUIRES ESCORT FROM VA MRI STAFF. COORDINATE

WITH VA COR.

No. Revisions: Date:

BCDEFGHJK

R Q P O N M L AS

T

U

V

W

X

Y

Z

AA

(E) 4" FPD DN

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 3" FPD

(E) 2" FPD

(E) 2" FPD

(E) 3" FPD

(E) 2 1/2" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD (E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD (E) 1" FPD(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 3" FPD

(E) 3" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 2 1/2" FPD

(E) 2 1/2" FPD (E) 2 1/2" FPD

(E) 1 1/4" FPD (E) 1 1/4" FPD

(E) 3" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD

(E) 2 1/2" FPD

(E) 1 1/4" FPD(E) 1" FPD (E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 3" FPD

(E) 2 1/2" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1" FPD

(E) 2" FPD

(E) 1 1/2" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 3" FPD

(E) 3" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 3" FPD (E) 3" FPD

(E) 2" FPD

(E) 2" FPD

(E) 2" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

(E) 1" FPD(E) 1 1/4" FPD

(E) 1" FPD

(E) 1 1/4" FPD

(E) 2" FPD

(E) 1 1/2" FPD(E) 1" FPD

(E) 1 1/4" FPD

(E) 1" FPD

(E) 1" FPD

1 1

1 1 1 1 1

1 1

1 1

1 1

1 1 1

1 1

1 1 1

1 1

1 1

1 1

1 1

1 1 1

1 1 1

1 1 1

1 1

1 1

1 1 1

1 1 1

1 1 1

1 1

1 1

FPD

FPD FPD

FPDFPD

3 3

3 3

1 1

(E) 1 1/4" FPD

(E) 1 1/2" FPD

(E) 1 1/4" FPD

5 5

MECH.

DATA

XXX

CDE

V

W

X

(E) 4" FPD UP

(E) 4" DPV

STAIR

iiii

MECH

215E

CORRIDOR

nnnn

CORRIDOR

C25

BUILDING 84

G E N E R A L N O T E S :

A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.

B. LOCATIONS AND SIZES OF EXISTING PIPING AND…

This is the start of the file's text. The full file is on GovTribe.