S02 Drawings 515-23-204.pdf
PDF 14 MB Posted
- Attached to
- Z1DA--Replace Dry Pipe Sprinklers 515-23-204 Federal contract opportunity
- Solicitation number
- 36C25023B0060
About this file
This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25023B0060 for the replacement of dry pipe sprinklers at location 515-23-204. The opportunity type is a solicitation to replace existing dry pipe sprinkler systems. No other details are provided regarding requirements, response dates, pricing terms, or incumbent contractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 515-23-204 Site Visit Attendance Log.pdf | ||
| 36C25023B0060 0003.docx | DOCX document | |
| 36C25023B0060 0002.docx | DOCX document | |
| 36C25023B0060 0001.docx | DOCX document | |
| S02 RFI Form - 515-23-204.doc | DOC document | |
| S02 Specifications 515-23-204.pdf | ||
| S03 Wage Determination MI20230079 04.14.2023 -Calhoun - 515-23-204.pdf | ||
| 36C25023B0060_1.docx | DOCX document | |
| S02 Contractor EMR Certification Form - 515-23-204.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 3
BUILDING 7
BUILDING 12
BUILDING 39
BUILDING 82, MRI SUITE
BUILDING 4
BUILDING 22
BUILDING 27
BUILDING 73
BUILDING 84
BUILDING 9
BUILDING 8
BUILDING 13
L E G E N D & A B B R E V I A T I O N S :
DN DOWN
DPV DRY PIPE VALVE
(E) EXISTING TO REMAIN
GPM GALLONS PER MINUTE
PSI POUNDS PER SQUARE INCH
QR QUICK RESPONSE
SF SQUARE FEET
LIMIT OF DEMOLITION
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PIPE UP
PIPE DOWN
PIPING CONTINUATION
FIRE PROTECTION (DRY PIPE)
FPD
FIRE PROTECTION (WET PIPE)
FP
NEW PIPING
PIPING TO BE REMOVED
EXISTING PIPING
DRY PIPE SPRINKLER HEAD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:4
P
M
G000
COVER SHEET
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTSBATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
BATTLE CREEK VA MEDICAL CENTER
PROJECT NUMBER: 515-23-204
5500 ARMSTRONG ROAD BATTLE CREEK, MICHIGAN 49037
DEPARTMENT OF VETERANS AFFAIRS
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
A. THE CONTRACT DRAWINGS AND PROJECT SPECIFICATIONS (INDICATED BY THE SAME PROJECT NUMBER) ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) OF ANY
DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.
B. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN.
C. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE
CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE COR.
D. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION
AND CONSTRUCTION.
E. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND
REGULATIONS.
F. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR
CONSTRUCTION AND EXPECTED QUALITY.
G. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.
H. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
G E N E R A L N O T E S V I C I N I T Y M A P N
NTS
C A M P U S M A P
NTS
N
GENERAL
G000 COVER SHEET
FIRE PROTECTION
FX101 FIRE PROTECTION PLAN, BUILDING 3
FX102 FIRE PROTECTION PLAN, BUILDING 4
FX103 FIRE PROTECTION PLAN, BUILDING 7
FX104 FIRE PROTECTION PLAN, BUILDING 8
FX105 FIRE PROTECTION PLAN, BUILDING 9
FX106 FIRE PROTECTION PLAN, BUILDING 12
FX107 FIRE PROTECTION PLAN, BUILDING 13 - AREA A
FX108 FIRE PROTECTION PLAN, BUILDING 13 - AREA B
FX109 FIRE PROTECTION PLAN, BUILDING 22
FX110 FIRE PROTECTION PLAN, BUILDING 27
FX111 FIRE PROTECTION PLAN, BUILDING 39
FX112 FIRE PROTECTION PLAN, BUILDING 73
FX113 FIRE PROTECTION PLAN, BUILDING 82, MRI SUITE
FX114 FIRE PROTECTION PLAN, BUILDING 84
S H E E T L I S T
LOCATION OF
BATTLE CREEK VA
MEDICAL CENTER
SIGNATURE BLOCK
SERVICE
S I G N A T U R E S
SIGNATURE DATE
EXECUTIVE MEDICAL CENTER DIRECTOR
ASSOCIATE DIRECTOR
ASSISTANT DIRECTOR
CHIEF OF STAFF
ASSOCIATE DIRECTOR FOR PATIENT CARE
SERVICES/NURSE EXECUTIVE
CHIEF, FMS
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL SERVICE
INFECTION CONTROL OFFICER
PATIENT SAFETY MANAGER
GEMS COORDINATOR
SAFETY SPECIALIST
CHIEF, POLICE SERVICE
CHIEF, FIRE SECTION
UNION SAFETY REPRESENTATIVE
CONTRACTING OFFICER
CONTRACTING OFFICERS REPRESENTATIVE
No. Revisions: Date:
BID DOCUMENTS 04/26/2023
04/26/2023
A B C D E F G H I J K L M N O P Q R S
(E) 4" FPD DN
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 3" FPD
(E) 2" FPD
(E) 2" FPD (E) 2" FPD
(E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD(E) 2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1" FPD (E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD (E) 1" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD(E) 2" FPD(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 2" FPD(E) 2" FPD(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1" FPD (E) 1" FPD
(E) 1" FPD(E) 1 1/2" FPD
(E) 1" FPD (E) 1" FPD
(E) 1 1/4" FPD
(E) 3" FPD
1 1
1 1
2 2
1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1
1 1
1 1
1 1
1 1
1 1
1 1 1 1 1
FPD FPD FPD FPD
33 3 333
(E) 3" FPD
4 4 4
5 5 5 5
K L M
MECH
(E) 4" FP DN
(E) 4" FPD UP
(E) 4" DPV
CORRIDOR
C16
STAIR
CORRIDOR
C15
CORRIDOR
C12
EXAM
H.A.C.
BUILDING 3
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING AND SPRINKLERS SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE.
CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. EXISTING SPRINKLERS IN HATCHED AREAS ON PLAN ARE OBSTRUCTED BY EXISTING DUCTWORK AND/OR OTHER EQUIPMENT. REMOVE SPRINKLERS IN HATCHED AREAS AND REWORK PIPING AND LOCATE NEW
SPRINKLERS IN ACCORDANCE WITH NFPA 13 COVERAGE REQUIREMENTS.
E. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH EQUIPMENT CAN
NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
F. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A COMPLETE
INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
G. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.
H. PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS
OF IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
I. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
J. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
F I R E H A Z A R D L E G E N D
LIGHT HAZARDFIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:5
P
M
FX101
FIRE PROTECTION PLAN,
BUILDING 3
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
FIRST FLOOR FIRE PROTECTION PLAN
CAMPUS KEYPLAN
N
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO
MATCH EXISTING.
2 CONNECT NEW FIRE PROTECTION PIPING TO EXISTING AT POINT SHOWN.
3 SPRINKLER CONTRACTOR TO ROUTE NEW PIPING AND LOCATE NEW SPRINKLERS IN HATCHED AREA IN ACCORDANCE WITH NFPA 13 SPRINKLER COVERAGE REQUIREMENTS AND FIRE SPRINKLER HAZARD SCHEDULE ON THIS SHEET.
4 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.
5 REMOVE DUCT AND ASSOCIATED DUCT INSULATION IN THIS AREA AS NECESSARY TO COMPLETE FIRE PROTECTION WORK INDICATED. INSTALL NEW DUCT AND DUCT INSULATION TO MATCH EXISTING AFTER COMPLETION OF FIRE PROTECTION WORK. RE-USE EXISTING DUCT SUPPORTS. REFER TO DIVISION 23 SPECIFICATIONS. COORDINATE SHUTDOWN OF
ASSOCIATED HVAC SYSTEM WITH VA COR.
No. Revisions: Date:
H
EA B C D
(E) 4" FPD DN
(E) 4" FPD
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/2" FPD (E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 2" FPD
1 1 1 1
1 1 1 1
1 1 1 1 1
1 1
(E) 1" FPD
H
E
(E) 4" FPD UP
(E) 4" FP DN
(E) 4" DPV
STAIRS
CORRIDOR
C23
H.A.C.
CORRIDOR
C21
OFFICE
222 MENS TOILET
220 BUILDING 4
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:0
P
M
FX102
FIRE PROTECTION PLAN,
BUILDING 4
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
CAMPUS KEYPLAN
N
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
No. Revisions: Date:
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 3" FPD
(E) 3" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 3" FPD (E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD
(E) 4" FPD DN
(E) 4" FPD
(E) 4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD (E) 1 1/2" FPD
(E) 4" FPD
(E) 2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 4" FPD
(E) 4" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1" FPD
(E) 3" FPD
(E) 2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 1" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD
(E) 1" FPD
(E) 3" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 3" FPD
(E) 3" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 3" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD (E) 1" FPD(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
1 1
1 1 1
1 1
1 1
1 1
1 1
1 1 1 1 1
1 1
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 4" FPD
1 1
4 4 4
ELEVATOR MACHINE ROOM
XXX
(E) 4" FPD UP
(E) 4" DPV
STAIR
S2-02
ELEC
209E
CORRIDOR
C2-1
COMMUNITY HEALTH
NURSING
BUILDING 7
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:1
P
M
FX103
FIRE PROTECTION PLAN,
BUILDING 7
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 SPRINKLER LOCATED IN CRAWL SPACE.
3 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.
4 REMOVE DUCT AND ASSOCIATED DUCT INSULATION IN THIS AREA AS NECESSARY TO COMPLETE FIRE PROTECTION WORK INDICATED. INSTALL NEW DUCT AND DUCT INSULATION TO MATCH EXISTING AFTER COMPLETION OF FIRE PROTECTION WORK. RE-USE EXISTING DUCT SUPPORTS. REFER TO DIVISION 23
SPECIFICATIONS. COORDINATE SHUTDOWN OF ASSOCIATED HVAC SYSTEM WITH VA COR.
No. Revisions: Date:
(E) 3" FPD DN
(E) 2 1/2" FPD (E) 3" FPD
(E) 2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD (E) 2 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1 1
1 1
1 1
1 1
(E) 4" FP DN
(E) 3" FPD UP
(E) 4" DPV
STAIRS WEST
B
OFFICE
H.A.C.
OFFICE
224A
CORRIDOR
E
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
BUILDING 8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:2
P
M
FX104
FIRE PROTECTION PLAN,
BUILDING 8
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
N
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
CAMPUS KEYPLAN
No. Revisions: Date:
(E) 4" FPD DN
(E) 3" FPD
(E) 2 1/2" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD(E) 3" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 1" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 3" FPD
(E) 2" FPD
(E) 2 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 2" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1 1
1 1 1
1 1
1 1
(E) 2 1/2" FPD
(E) 4" FPD UP
(E) 4" FP DN
STORAGE
STAIR
OFFICE
DATA
204A
CORRIDOR
C21
BUILDING 9
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:3
P
M
FX105
FIRE PROTECTION PLAN,
BUILDING 9
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.
No. Revisions: Date:
(E) 4" FPD DN
(E) 3" FPD(E) 3" FPD
(E) 2 1/2" FPD
(E) 1" FPD
(E) 1 1/2" FPD(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 2 1/2" FPD(E) 2 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD(E) 2 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD (E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1 1
1 1 1
1 1
1 1
1 1
2 2
(E) 4" FP DN
(E) 4" DPV
STAIR 1
S1
TOILET
204A
WORK ROOM
H.A.C.
CORRIDOR
C21
BUILDING 12
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:3
P
M
FX106
FIRE PROTECTION PLAN,
BUILDING 12
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 REMOVE DUCT AND ASSOCIATED DUCT INSULATION IN THIS AREA AS NECESSARY TO COMPLETE FIRE PROTECTION WORK INDICATED. INSTALL NEW DUCT AND DUCT INSULATION TO MATCH EXISTING AFTER COMPLETION OF FIRE PROTECTION WORK. RE-USE EXISTING DUCT SUPPORTS. REFER TO DIVISION 23
SPECIFICATIONS. COORDINATE SHUTDOWN OF ASSOCIATED HVAC SYSTEM WITH VA COR.
No. Revisions: Date:
10111213141516171819202122
A
B
C
D
E
F
G
(E) 4" FPD DN
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 4" FPD
(E) 4" FPD
(E) 4" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
(E) 1 1/2" FPD UP
(E) 1 1/4" FPD
(E) 2" FPD
(E) 4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD(E) 1" FPD
(E) 4" FPD
(E) 4" FPD
(E) 4" FPD
(E) 2" FPD
(E) 2" FPD
(E) 4" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD
(E) 4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 4" FPD
(E) 4" FPD
(E) 4" FPD
(E) 1 1/4" FPD
(E) 4" FPD
(E) 1 1/4" FPD
(E) 2 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2 1/2" FPD
(E) 1" FPD
(E) 4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
1 1 1
1 1 1
1 1 1
1 1 1
1 1
1 1
1 1
1 1 1
1 1
1 1
1 1
1 1 1
1 1
A R
E A
B
A R
E A
A
A R
E A
B
A R
E A
A
DATA
S9
101112
C
D
E
G
(E) 4" FPD UP
(E) 4" DPV
STORAGE
STAIRS
ENG
H.A.C.
CORRIDOR
C31
CORRIDOR
C36
BUILDING 13
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:4
P
M
FX107
FIRE PROTECTION PLAN,
BUILDING 13 - AREA A
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN - AREA A
1/8" = 1'-0"
THIRD FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 SPRINKLER LOCATED IN CRAWL SPACE.
3 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.
No. Revisions: Date:
12345678910
A
B
C
D
E
F
G
(E) 4" FPD
(E) 4" FPD
(E) 4" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 4" FPD (E) 4" FPD
(E) 4" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 4" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD
(E) 2" FPD
(E) 2" FPD (E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 2 1/2" FPD
(E) 2" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD (E) 1" FPD
(E) 4" FPD
(E) 1" FPD
(E) 4" FPD
(E) 4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 4" FPD
(E) 1" FPD
(E) 4" FPD
(E) 1" FPD (E) 1 1/4" FPD
(E) 3" FPD
(E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD (E) 1" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 4" FPD
(E) 3" FPD
(E) 1 1/4" FPD
(E) 1" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
1 1 1
1 1 1 1
1 1 1
1 1
1 1 1
1 1 1
1 1 1
1 1
1 1 1
A R
E A
B
A R
E A
A
A R
E A
B
A R
E A
A
(E) 1 1/4" FPD
BUILDING 13
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:5
P
M
FX108
FIRE PROTECTION PLAN,
BUILDING 13 - AREA B
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN - AREA B
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 REMOVE PATCHED PIPING AND REPLACE WITH NEW FROM JOINT TO JOINT. PIPE SIZE TO MATCH EXISTING.
No. Revisions: Date:
A B C E F H J K M N O P Q R S
L
IGD
(E) 4" FPD DN
(E) 3" FPD(E) 3" FPD
(E) 2" FPD
(E) 1" FPD (E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD(E) 2" FPD(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD
(E) 3" FPD
(E) 3" FPD
(E) 2" FPD(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD
(E) 1" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1" FPD (E) 1 1/4" FPD
(E) 1 1/2" FPD (E) 2" FPD
(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 3" FPD
(E) 3" FPD
(E) 2" FPD
(E) 2" FPD(E) 2" FPD(E) 1 1/2" FPD
(E) 1" FPD
(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD(E) 2" FPD(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD (E) 1" FPD
(E) 2" FPD (E) 2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD
1 1 1 1
1 1 1
1 1
1 1
1 1 1
1 1
1 1
1 1
1 1
P Q
(E) 4" FPD UP
(E) 4" DPV
SEMI-PRIVATE ROOM
BATH
222A
ELEC
221E
CORRIDOR
C23
BUILDING 22
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:0
P
M
FX109
FIRE PROTECTION PLAN,
BUILDING 22
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN GYPSUM WALL AND REPLACE WITH NEW. EXISTING PIPING
TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH WALL TO MATCH EXISTING.
No. Revisions: Date:
(E) 3" DPV
(E) 3" FPD
FPD UP
IT
001A
MECH
MECH
MECH
002A
PORCH
LOBBY
OFFICE
CLOSET
117A
OFFICE
CORRIDOR
C12
OFFICE
FPD DN
2 PORCH
BUILDING 27
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH EQUIPMENT CAN
NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A COMPLETE
INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.
F. PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND METHODS
OF IMPLEMENTATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
G. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
H. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD 0.10 GPM/SF OVER 1500
SF
100 GPM 30 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:0
P
M
FX110
FIRE PROTECTION PLAN,
BUILDING 27
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
BASEMENT FIRE PROTECTION PLAN
1/8" = 1'-0"
FIRST FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER PIPING AND ASSOCIATED SPRINKLERS BACK TO POINT SHOWN AND USE AS
POINT OF CONNECTION FOR NEW WORK.
2 SPRINKLER CONTRACTOR TO ROUTE NEW PIPING AND LOCATE NEW SPRINKLERS IN HATCHED AREA IN ACCORDANCE WITH NFPA 13 SPRINKLER COVERAGE REQUIREMENTS AND FIRE SPRINKLER HAZARD SCHEDULE
ON THIS SHEET.
No. Revisions: Date:
(E) 4" FPD(E) 3" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 4" FPD
(E) 1" FPD(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 3" FPD
(E) 2 1/2" FPD (E) 2 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 4" FPD
(E) 4" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD(E) 1 1/2" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD(E) 1" FPD
(E) 3" FPD
(E) 3" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2 1/2" FPD (E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 2 1/2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
1 1 1
1 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1
1 1
1 1
1 1
1 1 1
1 1
1 1
1 1
1 1
1 1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1
1 1
1 1 1
(E) 4" FPD DN
(E) 4" FPD
(E) 4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
STAIR
S5-4
ELEV PENTHOUSE
S8
(E) 4" DPV
(E) 4" FPD UP
STAIR
S5-2
BUILDING 39
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:1
P
M
FX111
FIRE PROTECTION PLAN,
BUILDING 39
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
ATTIC FIRE PROTECTION PLAN
1/8" = 1'-0"
SECOND FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 SPRINKLER LOCATED IN CRAWL SPACE.
3 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN GYPSUM WALL AND REPLACE WITH NEW. EXISTING PIPING
TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH WALL TO MATCH EXISTING.
No. Revisions: Date:
(E) 6" DPV
(E) 6" FPD
(E) 6" FPD
(E) 4" FPD(E) 4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 4" FPD
(E) 4" FPD
(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1 1/2" FPD(E) 1 1/2" FPD
(E) 1" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1 1/2" FPD(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/2" FPD (E) 1 1/4" FPD (E) 1 1/4" FPD (E) 1" FPD
(E) 1" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD(E) 1 1/4" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD (E) 1" FPD
(E) INSPECTORS
TEST CONNECTION
(E) INSPECTORS
TEST CONNECTION
1 1 1 1 1 1 1 1 1 1 1 1
111111111111
1 1 1 1 1 1 1 1 1 1 1 1
111111111111
1 1 1 1 1 1 1 1 1 1 1 1
222222
2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 2 2 2 2 2 2 2 2 2 2 2 2 2
22222
222223
STORAGE
STORAGE
101B
TOILET
102A
OFFICE
102B
CAGE
102C
STORAGE
FIRE RISER
100E
BUILDING 73
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:2
P
M
FX112
FIRE PROTECTION PLAN,
BUILDING 73
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
GROUND FLOOR FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
2 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN GYPSUM CEILING AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH CEILING TO MATCH EXISTING.
3 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN LAY-IN CEILING AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH CEILING TO MATCH EXISTING.
No. Revisions: Date:
E
D
C
B
A
1 11 131210
E
D
C
B
A
1 11 131210
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
1 1
1 1
1 1
MECHANICAL AREA
00P
ACCESSIBLE REST ROOM
00O
ACCESSIBLE DRESSING
ROOM
00N
INTERVIEW ROOM
00M
RECEPTION
00Q
WAITING ROOM
00L
HALLWAY
C-1
CONTROL ROOM
00J
SCAN ROOM
00K
EQUIPMENT ROOM
PROSTHETICS REP
008A
RECEPTION
007H
CORRIDOR
C01
OXYGEN SHUT-OFF
OCCUPATIONAL THERAPY
WAITING
007E
ORTHOTICS AND
PROSTHETICS
OFFICE
STAIR
S1
PRICING AGENT
008B
EXAM
008C
LAB
008D
OFFICE
008K
OFFICE
008J
OFFICE
008I
SHOE STORAGE
008H
LAB
008F
(E) 2" DPV
(E) 2" FPD
(E) 2" FPD
3 3
3 3
BUILDING 82, MRI SUITE
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.
B. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING WITH THE WORK.
C. ALL EXISTING DRY-PIPE SPRINKLERS IN PROJECT AREAS ARE TO BE REMOVED AND REPLACED.
D. CONDITION OF PIPING AND FITTINGS WERE DETERMINED BY VISUAL INSPECTION OF THE EXTERIORS AND A
REPRESENTATIVE SAMPLE OF PIPE THICKNESS MEASUREMENTS.
E. PROVIDE SPRINKLER CABINET WITH MINIMUM OF (10) SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13 FOR EACH BUILDING WHERE WORK IS BEING PERFORMED. REFER TO SPECIFICATION 21 13 16 FOR FURTHER
INFORMATION.
F. WORK IN MRI SUITE TO BE COMPLETED AFTER HOURS, EXCEPT FOR THE SCAN ROOM. COORDINATE WORK
SCHEDULE IN MRI SUITE WITH VA STAFF.
G. INSTALL NON-FERROUS SPRINKLERS FOR USE INSIDE MRI SHIELDED ENCLOSURES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /B a tt le
C re e k V
A
R e p la c e
S p ri n k le rs /F
F E
B a tt le
C re e k
R e p la c e
S p ri n k le rs
M E
P rv t
/2
/2
:4
:3
P
M
FX113
FIRE PROTECTION PLAN,
BUILDING 82, MRI SUITE
04/26/2023 GP JV
REPLACE DRY PIPE SPRINKLERS,
VARIOUS BUILDINGS
515-23-204
BATTLE CREEK, MI
BID DOCUMENTS
BATTLE CREEK
VA MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
MRI SUITE FIRE PROTECTION PLAN
N
CAMPUS KEYPLAN
D R A W I N G N O T E S :
1 REMOVE EXISTING SPRINKLER HEAD MOUNTED IN LAY-IN CEILING AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER K-FACTOR TO MATCH EXISTING. PATCH CEILING TO MATCH EXISTING.
2 REMOVE EXISTING SPRINKLER HEAD AND REPLACE WITH NEW. EXISTING PIPING TO REMAIN. SPRINKLER
K-FACTOR TO MATCH EXISTING.
3 ACCESS FOR WORK TO BE COMPLETED IN SCAN ROOM REQUIRES ESCORT FROM VA MRI STAFF. COORDINATE
WITH VA COR.
No. Revisions: Date:
BCDEFGHJK
R Q P O N M L AS
T
U
V
W
X
Y
Z
AA
(E) 4" FPD DN
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 3" FPD
(E) 2" FPD
(E) 2" FPD
(E) 3" FPD
(E) 2 1/2" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD (E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD (E) 1" FPD(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 3" FPD
(E) 3" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 2 1/2" FPD
(E) 2 1/2" FPD (E) 2 1/2" FPD
(E) 1 1/4" FPD (E) 1 1/4" FPD
(E) 3" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD(E) 1 1/4" FPD(E) 1" FPD
(E) 2 1/2" FPD
(E) 1 1/4" FPD(E) 1" FPD (E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 3" FPD
(E) 2 1/2" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1" FPD
(E) 2" FPD
(E) 1 1/2" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 3" FPD
(E) 3" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 3" FPD (E) 3" FPD
(E) 2" FPD
(E) 2" FPD
(E) 2" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
(E) 1" FPD(E) 1 1/4" FPD
(E) 1" FPD
(E) 1 1/4" FPD
(E) 2" FPD
(E) 1 1/2" FPD(E) 1" FPD
(E) 1 1/4" FPD
(E) 1" FPD
(E) 1" FPD
1 1
1 1 1 1 1
1 1
1 1
1 1
1 1 1
1 1
1 1 1
1 1
1 1
1 1
1 1
1 1 1
1 1 1
1 1 1
1 1
1 1
1 1 1
1 1 1
1 1 1
1 1
1 1
FPD
FPD FPD
FPDFPD
3 3
3 3
1 1
(E) 1 1/4" FPD
(E) 1 1/2" FPD
(E) 1 1/4" FPD
5 5
MECH.
DATA
XXX
CDE
V
W
X
(E) 4" FPD UP
(E) 4" DPV
STAIR
iiii
MECH
215E
CORRIDOR
nnnn
CORRIDOR
C25
BUILDING 84
G E N E R A L N O T E S :
A. REFER TO SHEET G000 FOR LEGEND AND GENERAL PROJECT NOTES.