S02 - Drawings - 2 of 2.pdf

PDF 2 MB Posted

Attached to
Z1DA--603-18-301 - Replace Roofs Phase I Buildings 1 and 12
Solicitation number
36C24921R0066
Issued by

About this file

This document package includes construction drawings and specifications for a roof replacement project at a Department of Veterans Affairs medical center. The project involves replacing roofs on Buildings 1 and 12, including new insulation, cover boards, roof membranes, flashings, and appurtenances. Key details include specifications for modified bitumen roof systems; drawings showing existing conditions and demolition plans; enlarged roof plans delineating wind zones and technical details for flashing penetrations, drains, scuppers, and other elements. Completion is required by an unspecified date. The solicitation number and agency - Z1DA-603-18-301 from the Veterans Health Administration - are provided.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF 8A

ROOF 7A

(N.I.C)

ROOF BG

(N.I.C)

ROOF 2F(KITCHEN)

ROOF 8C

(N.I.C.)

ROOF 7B

ROOF 8B

(N.I.C.)

ROOF 1F

ROOF 1E

ROOF 10A (N.I.C)

ROOF 11A (N.I.C)

ROOF 2C

ROOF 2B

ROOF 3C

ROOF 1B

ROOF 2D.1

ROOF 1C

ROOF 9A

ROOF 7C

ROOF 1G

ROOF 2D.2

ROOF 9C

ROOF 8D

ROOF 4B

ROOF 4A.1

ROOF 4A.2

ROOF 4A

ROOF 5A

ROOF BD.1

ROOF BD.2

ROOF 4C

ROOF BA

(EMS DOCK)

ROOF 3B

ROOF 2A

ROOF 1A

ROOF BF

ROOF 5B

(N.I.C)

ROOF 5C

ROOF 6B

ROOF 3A

ROOF 3E

ROOF 2D

ROOF 3D

ROOF 2E

ROOF 4E

ROOF 5C.1

ROOF 4D

ROOF BC

(N.I.C)

ROOF BB

(N.I.C)

R O

O F

X

ROOF O

(N.I.C)

(N.I.C)

ROOF S

(SMOKE HOUSE)

ROOF 1G.1

R O

G

ROOF 1G.3

PRD

PRD

PRD

PRD

GU

GU

DS

PRD

PP

PP

PP

PP

PRD PRD

EF

EF

EF

EF

PP

PP

PP PP PP PP PP PP

PP

H H H

H H H

H

H

PRD

PRD

SVP

EF

EF

EF

EF EF EF

PRD

PRD

PRD

PRD

SVP

SVP

FPD

PRD

PRD

PRD

DS

DS

6'-0"

PRD

PRD

PRD

SVP

PRD

EF

EF

PP

PP

EF

EF

EF

EF

EF

EF

EF EF

EF

EF

EF

EF

EF

EF

SVP

SVP

SVP

SVP SVP SVP

PRD

ORD

PRD

ORD

GUDS DS

SVP

SVP

ORD

PRD

ORD

PRD

SVP

SVP

SVP

ORD

PRD

PP

PP

PP

PP

EF

PP

PRD

PRD

PRD

PRD

SVP

SVP

SVP

SVP

SVP

SVP

SVP

SVP

SVP

HVS

EF

PRD PRD

SVP

GU

DS

DS

GU

GU

EF

EF

EF

OSOS

SVP

SVP

SVP

HVS

EF

PRD

PRD

EF

SVP

HVS

PP

PP

PP

PP

PP

PP

SVP

SVP

SVP

HVS

EF EF

EF

RTU

RTU

PRD

PRD

SVP

SVP

SVP

PRD

PRD

SVP

EF

FPD

FPD

RTU

EF

EF

EF

EF

EF

FPD

FPD

SVP

SVP

SVP

SVP

PRD

FPD

FPD

SVP

SVP

PRD

EF

PP

SVP

SVP

SVP

SVP

HVS

PP

FPD

FPD

EF

EF

EF

EF

EF

RTU

PP

PP

PP

PP

PRD

PRD

PRD

EF

SVP

SVP

SVP

FPD

FPD

HVS

HVS

PP PP

PP

PP

PP

PP

PP

PP

PP

EF EF EF EF

H

PRD

PRD

SVP

PRD

SVP

EF

SVP

SVP

SVP

EF

EF

EF

FPD

FPD

PRD

ORD

PRD

ORD

EF

ORD

PRD

ORD

PRD

PRDORD

SVP

EF

SVP

SVP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

SA SA SA

PRD

PRD PRD

FPD FPD

SA

SA

PRD

PRD

EF EF EF

EF

EF

EF EF

RTU

EF

HVS

GU

GU

PRD

PP

PP PP

PP

PRD

SVP

PP

PP

PP

PP

EF

EF

PRD PRD

PRD

SVP

SVP

RTU

PRD

PRD

EF EF

FPD

SVP

SVP

SVP

PRD

PRD

PRD

PRDPRD

PRD

PP

PP

PP

PP

PP

PP PP

FPD

FPD

PP

SVP

SVP

SVP

SVP

RTU

SVP

SVP

FPD

SVP

PP

PP

EF

PRD

RTU

EF EF

SVP SVP

PRD

PRD

PRD

PRD

FPD

PP

PP

FPD

SVP

SVP

RTU

RTU

FPD

SVP

SVP

SVP

PRD

PRD

PRD

PRD

PRD

SVP

PP

PP

PP PP

EF

EF

EF

EF EF

EF

RTU

EF

EF

EF

EF

EF

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EJ

EF

EF

EF

EF

EF

PP

OS

PRD

FPD

SVP

RTU

EF

EF

PP

RTU

PRD

PRD

EF

PP

EF

EF

PP

PP

EF

EF

EF

EF

EF

EF

PP

PP

PP

PP

RTU

PRD

PRD

PRD

PRD

FPD

FPD

FPD

EF

EF

SVP

SVP

PP

PP

PP PP PP PP

PP

SVP

OS

OS

PRD

PRD

PRD PRD

PRD

PRD

EF

FPD

EF

OS

OS

OS

OS

SVP

FPD FPD

EF

EF

FPD

FPD

FPDFPD

PP

PP

SA

EF

EF

SVP

SVP

SVP

SVP

SVP

SVP

FPD

SA

EF

PP

FPD

PRD

FPD

FPD

SVP

FPD

HVS

FPD

PRD

SVP

RTU

EF

EF

EF

PRD

EF

EJ

EJ

SVP

SVP

SVP

SVP

EF

PP

PP

PP

PP

PP

PP

PP

PP

PP PP

RTU RTU

PRD

PRD

OS

MATCH LINE A

MATCH LINE C

MATCH LINE B

MATCH LINE D

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

37'±1'-9"±

57'-8"±

19'-8"± 6'-5"± 14'-2"±

3'-8"±

59'-2"±

15'± 42'-9"± 26'±

41'-3"±

20'±

38'-8"±

19'-4"±

38'±

11'-6"±

33'-4"±

11'-7"±

37'-4"±

23'-8"±

16'-3"±

35'-6"±

37'-8"±

16'±

14'-1"±

21'-8"±

46'-7"±

31'-3"±

39'-4"±

40'-5"±

34'-11"±

12'-7"±

9'-1"±

99'-2"±

9'-9"±

4'±

16'-1"±

37'-4"±

18'±

45'±

25'-1"± 30'-3"± 56'-3"±

23'-5"±40'-4"±4'-4"±

16'-1"± 50'-5"±

5'-8"±

20'-3"±

15'-4"±34'-10"±

20'-3"±

29'-7"±

13'±

7'-3"±

2'-7"± 10'-5"±

8'-3"±

5'-2"±

5'-7"±

11'-6"±

40'-1"±

11'-2"±

40'-4"±

46'-2"±

37'-9"±

36'-2"±

5'-5"±

4'-7"±

10'-9"±

BUILDING 1 KEY PLAN

A B

C D

ROOF 9B

25'-2"±

(N.I.C)

(N.I.C)

(N.I.C)

(N.I.C)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-101

BUILDING 1

OVERALL ROOF PLAN

N

SCALE: 1/16" = 1'-0"

BUILDING 1 OVERALL ROOF PLAN

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

A-109

1). ROOF AREAS 1C, 2A, 2F, 3C, 4A, 4E, 5A, 6B, 7A, 7B, 8A,

8C, 8D, 9B, 9C, BD.1, BD.2, BF & O: MODIFY EXISTING

SCUPPER TO RECEIVE A MINIMUM 4" x 10" SCUPPER

LINER.

2). ROOF AREAS 3A & 9A : MODIFY EXISTING SCUPPER

TO RECEIVE A MINIMUM 4" x 18" SCUPPER LINER.

3). ALL ROOF DRAIN LEADERS EXCEPT ROOF AREA 2E

TO BE MINIMUM 3" Ø (DIAMETER).

4). ROOF AREA 2E ROOF DRAIN LEADER TO BE MINIMUM

4" Ø (DIAMETER).

5). ROOF AREAS 1C, 4A.2, 5B & BA MINIMUM GUTTER

SIZE TO BE 4" x 4" AND DOWNSPOUTS TO BE 2" x 3".

6). ROOF AREAS 2A & 4B MINIMUM GUTTER SIZE TO BE

6" x 6" AND DOWNSPOUTS TO BE 4" x 5".

ADDENDUM 200914 9/14/20201

ROOF 8C

ROOF 7B

ROOF 8B

ROOF 1F

ROOF 1E

ROOF 10A (N.I.C)

ROOF 11A (N.I.C)

ROOF 2C

ROOF 2B

ROOF 3C

ROOF 1B

ROOF 2D.1

ROOF 1C

ROOF 9A

ROOF 7C

ROOF 1G

ROOF 2D.2

ROOF 9C

(N.I.C)

ROOF 1G.1

ROOF 1G.3

GU

PRD

PRD

SVP

GU

GU

PRD

PP

PP PP

PP

PRD

SVP

PP

PP

PP

PP

EF

EF

PRD PRD

PRD

SVP

SVP

RTU

PRD

PRD

EF EF

PRD

PRD

SVP

SVP

FPD

SVP

PP

PP

EF

PRD

RTU

EF EF

SVP SVP

PRD

PRD

PRD

PRD

FPD

PP

PP

FPD

SVP

SVP

RTU

RTU

FPD

SVP

SVP

SVP

PRD

PRD

PRD

PRD

PRD

SVP

PP

PP

PP PP

EF

EF

EF

EF EF

EF

RTU

EF

EF

EF

EF

EF

OS

OS

OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

EJ

EF

EF

EF

EF

EF

PP

OS

PRD

FPD

SVP

RTU

EF

EF

PP

RTU

PRD

PRD

EF

PP

EF

EF

PP

PP

EF

EF

EF

EF

EF

EF

PP

PP

PP

PP

RTU

PRD

PRD

PRD

PRD

FPD

FPD

FPD

EF

EF

SVP

SVP

PP

PP

PP PP PP PP

PP

SVP

OS

OS

PRD

PRD

PRD PRD

PRD

PRD

EF

FPD

EF

OS

OS

OS

OS

SVP

FPD FPD

EF

EF

FPD

FPD

FPDFPD

PP

PP

SA

EF

EF

SVP

SVP

SVP

SVP

SVP

SVP

FPD

SA

EF

PP

FPD

PRD

FPD

FPD

SVP

FPD

HVS

FPD

PRD

SVP

RTU

EF

EF

EF

RTU RTU

DS

BUILDING 1 KEY PLAN

A B

C D

MATCH LINE A

MATCH LINE C

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

37'±1'-9"±

57'-8"±

19'-8"± 6'-5"± 14'-2"±

3'-8"±

15'± 42'-9"±

20'±

38'-8"±

19'-4"±

38'±

11'-6"±

33'-4"±

11'-7"±

23'-8"±

16'-3"±

14'-1"±

21'-8"±

46'-7"±

31'-3"±

39'-4"±

40'-5"±

34'-11"±

25'-1"± 30'-3"±

56'-3"±

ROOF 9B

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

6 6

TYP.

(TO EDGE OF ROOF BEYOND)

17'-5"±

25'-1"± 42'-4"±

41'-7"± 30'-1"±6'±

36'-7"± 36'-5"±

45'-2"±

56'-9"±

26'-1"±

44'-11"± 41'-4"±

27'-9"±

(TO EDGE

OF ROOF

BEYOND)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-102

BUILDING 1 ENLARGED ROOF

PLAN DEMO - A

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN DEMO - A

REMOVE AND DISCARD EXISTING METAL FLASHINGS,

INSULATION, AND ROOFING MEMBRANE ACCORDING

TO SPECIFICATIONS. REPAIR EXISTING DECK AS

REQUIRED. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND STORE EXISTING LIGHTNING

PROTECTION SYSTEM. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION. REINSTALL PER

COMPLETION OF NEW WORK FOR EACH ROOF AREA

REMOVE AND DISCARD EXISTING LADDER. REFER TO

SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

REMOVE AND DISCARD EXISTING STONE COPING

JOINT SEALANT. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND DISCARD EXISTING EXPANSION JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

REMOVE AND DISCARD ABANDONED CURBS. REFER

TO SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

REMOVE AND DISCARD EXISTING SCUPPER LINER.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

ROOF 8D

ROOF 6B

ROOF 3A

ROOF 3E

ROOF 2D

ROOF 3D

ROOF 2E

ROOF 4E

ROOF X1

ROOF O

ROOF S

(SMOKE HOUSE)

R O

PRD

SVP

EF

SVP

SVP

SVP

EF

EF

EF

FPD

FPD

PRD

ORD

PRD

ORD

EF

ORD

PRD

ORD

PRD

PRDORD

SVP

EF

SVP

SVP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

SA SA SA

PRD

PRD PRD

FPD FPD

SA

SA

PRD

PRD

EF EF EF

EF

EF

EF EF

RTU

EF

HVS

FPD

SVP

SVP

SVP

PRD

PRD

PRD

PRD

PP

PP

PP

PP

PP

PP PP

FPD

FPD

PP

SVP

SVP

SVP

SVP

RTU

OS

OS

PS

OS

OS

OS

OS

OS

OS

OS

EJ

EJ

PRD

PRD

PS

BUILDING 1 KEY PLAN

A B

C D

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

MATCH LINE B

MATCH LINE D

26'±

41'-3"±

16'±

12'-7"±

9'-1"±

99'-2"±

9'-9"±

4'±

16'-1"±

37'-4"±

30'-3"±

56'-3"±

8'-3"±

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

31'-10"±

35'-11"± 40'-1"±

45'-2"±

8'±

13'-6"±

TYP.

P

S

102'-3"±

17'±

(TO EDGE

OF ROOF

BEYOND)

(TO EDGE OF ROOF BEYOND)

(N.I.C)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-103

BUILDING 1 ENLARGED

ROOF PLAN DEMO - B

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN DEMO - B

REMOVE AND DISCARD EXISTING METAL FLASHINGS,

INSULATION, AND ROOFING MEMBRANE ACCORDING

TO SPECIFICATIONS. REPAIR EXISTING DECK AS

REQUIRED. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND STORE EXISTING LIGHTNING

PROTECTION SYSTEM. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION. REINSTALL PER

COMPLETION OF NEW WORK FOR EACH ROOF AREA

REMOVE AND DISCARD EXISTING LADDER. REFER TO

SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

REMOVE AND DISCARD EXISTING STONE COPING

JOINT SEALANT. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND DISCARD EXISTING EXPANSION JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

REMOVE AND DISCARD ABANDONED CURBS. REFER

TO SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

REMOVE AND DISCARD EXISTING SCUPPER LINER.

ROOF BG

(N.I.C)

ROOF 2F(KITCHEN)

ROOF 4B

ROOF 4A.1

ROOF 4A.2

ROOF 4A

ROOF 5A

ROOF BD.1

ROOF BD.2

ROOF 4C

ROOF BA

(EMS DOCK)

ROOF BF

ROOF BC

ROOF BB

(N.I.C)

(N.I.C)

PRD

PRD

PRD

PRD

GU

GU

DS

PRD

PP

PP

PP

PP

PRD PRD

EF

EF

EF

EF

PP

PP

PP PP PP PP PP PP

PP

H H H

H H H

H

H

PRD

PRD

SVP

EF

EF

EF

EF EF EF

PRD

PRD

PRD

PRD

PRD

PRD

SVP

SVP

SVP

SVP

SVP

SVP

SVP

SVP

SVP

HVS

EF

PRD PRD

SVP

GU

DS

DS

GU

GU

EF

EF

EF

OSOS

SVP

SVP

SVP

HVS

EF

PRD

PRD

EF

SVP

HVS

PP

PP

PP

PP

PP

PP

SVP

SVP

SVP

HVS

EF EF

EF

RTU

PRD

PRD

SVP

SVP

SVP

PRD

PRD

SVP

EF

FPD

FPD

RTU

EF

EF

EF

EF

EF

FPD

FPD

SVP

SVP

SVP

SVP

PRD

FPD

FPD

SVP

SVP

PRD

EF

PP

SVP

SVP

SVP

SVP

HVS

PP

FPD

FPD

EF

EF

EF

EF

EF

RTU

PP

PP

PP

PP

PRD

PRD

PRD

EF

SVP

SVP

SVP

FPD

FPD

HVS

HVS

PP PP

PP

PP

PP

PP

PP

PP

PP

EF EF EF EF

H

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

EJ

EJ

BUILDING 1 KEY PLAN

A B

C D

MATCH LINE A

MATCH LINE C

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

59'-2"±

11'-7"±

37'-4"±

23'-8"±

35'-6"±

37'-8"±

40'-1"±

11'-2"±

40'-4"±

46'-2"±

37'-9"±

36'-2"±

5'-5"±

4'-7"±

34'-10"±

20'-3"±

29'-7"±

13'±

7'-3"±

2'-7"± 10'-5"±

5'-2"±

5'-7"±

11'-6"±

10'-9"±

15'-4"±

25'-2"±

ROOF 9A

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

(TO EDGE OF ROOF BEYOND)

44'-9"±

96'-2"±

30'-8"±

19'-10"±

27'-7"±

7'-3"±

59'-3"±

53'-9"±

(N.I.C)

(N.I.C)

TYP.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-104

BUILDING 1 ENLARGED

ROOF PLAN DEMO - C

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN DEMO - C

REMOVE AND DISCARD EXISTING METAL FLASHINGS,

INSULATION, AND ROOFING MEMBRANE ACCORDING

TO SPECIFICATIONS. REPAIR EXISTING DECK AS

REQUIRED. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND STORE EXISTING LIGHTNING

PROTECTION SYSTEM. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION. REINSTALL PER

COMPLETION OF NEW WORK FOR EACH ROOF AREA

REMOVE AND DISCARD EXISTING LADDER. REFER TO

SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

REMOVE AND DISCARD EXISTING STONE COPING

JOINT SEALANT. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND DISCARD EXISTING EXPANSION JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

REMOVE AND DISCARD ABANDONED CURBS. REFER

TO SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

REMOVE AND DISCARD EXISTING SCUPPER LINER.

ROOF 3B

ROOF 2A

ROOF 1A

ROOF 5B

ROOF 5C

ROOF 5C.1

ROOF 4D

(N.I.C)

H

H

PRD

PRD

SVP

SVP

FPD

PRD

PRD

PRD

DS

DS

6'-0"

PRD

PRD

PRD

SVP

PRD

EF

EF

PP

PP

EF

EF

EF

EF

EF

EF

EF EF

EF

EF

EF

EF

EF

EF

SVP

SVP

SVP

SVP SVP SVP

PRD

ORD

PRD

ORD

GUDS DS

SVP

SVP

ORD

PRD

ORD

PRD

SVP

SVP

SVP

ORD

PRD

PP

PP

PP

PP

EF

PP

OS

RTU

OS

OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

PRD

EF

EJ

EJ

SVP

SVP

SVP

SVP

EF

PP

PP

PP

PP

PP

PP

PP

PP

PP PP

BUILDING 1 KEY PLAN

A B

C D

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

MATCH LINE B

MATCH LINE D

34'-3"±

18'±

45'±

23'-5"±40'-4"±4'-4"±

16'-1"± 50'-5"±

5'-8"±

20'-3"±

15'-4"±

TYP.

TYP.

TYP.

TYP.

20'±

42'-9"±

23'-3"±

24'-8"±

9'-11"±

12'-6"±

23'±

TYP.

(TO EDGE OF ROOF BEYOND)

(TO EDGE OF ROOF BEYOND)

70'-6"±

(N.I.C)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-105

BUILDING 1 ENLARGED

ROOF PLAN DEMO - D

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN DEMO - D

REMOVE AND DISCARD EXISTING METAL FLASHINGS,

INSULATION, AND ROOFING MEMBRANE ACCORDING

TO SPECIFICATIONS. REPAIR EXISTING DECK AS

REQUIRED. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND STORE EXISTING LIGHTNING

PROTECTION SYSTEM. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION. REINSTALL PER

COMPLETION OF NEW WORK FOR EACH ROOF AREA

REMOVE AND DISCARD EXISTING LADDER. REFER TO

SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

REMOVE AND DISCARD EXISTING STONE COPING

JOINT SEALANT. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND DISCARD EXISTING EXPANSION JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

REMOVE AND DISCARD ABANDONED CURBS. REFER

TO SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

REMOVE AND DISCARD EXISTING SCUPPER LINER.

(N.I.C)

PS PS PS PS

PS

P S

P S

P S

OS

PP

EF

PRD

SVP

SVP SVP

PP

SVP

SVP

EF

SVP

EF

PP PP PP

EF

PP

PP

PP

EF

EF

EF

PP

PP PP PP PP

PP PP

PP

PP

PP

PP

ROOF A1

ROOF A2

104'-3"±

65'-11"±

TYP.

TYP.

RTU RTU RTU RTU

TYP.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-107

BUILDING 12

ROOF PLAN DEMO

N

SCALE: 1/4" = 1'-0"

BUILDING 12 ROOF PLAN DEMO

REMOVE AND DISCARD EXISTING METAL FLASHINGS,

INSULATION, AND ROOFING MEMBRANE ACCORDING

TO SPECIFICATIONS. REPAIR EXISTING DECK AS

REQUIRED. REFER TO SPECIFICATION 011100

SUMMARY OF WORK AND 024100 DEMOLITION

REMOVE AND STORE EXISTING LIGHTNING

PROTECTION SYSTEM. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION. REINSTALL PER

COMPLETION OF NEW WORK FOR EACH ROOF AREA

REMOVE AND DISCARD EXISTING LADDER. REFER TO

SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

REMOVE AND DISCARD EXISTING METAL COPING.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

REMOVE AND DISCARD EXISTING EXPANSION JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 024100 DEMOLITION

REMOVE AND DISCARD ABANDONED CURBS. REFER

TO SPECIFICATION 011100 SUMMARY OF WORK AND

024100 DEMOLITION

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

REMOVE AND DISCARD EXISTING SCUPPER LINER.

ROOF 8B

ROOF 1F

ROOF 1E

ROOF 10A (N.I.C)

ROOF 11A (N.I.C)

ROOF 2C

ROOF 2B

ROOF 3C

ROOF 1B

ROOF 2D.1

ROOF 1C

ROOF 9A

ROOF 7C

ROOF 1G

ROOF 2D.2

ROOF 9C

(N.I.C)

ROOF 1G.1

ROOF 1G.3

GU

PRD

PRD

SVP

GU

GU

PRD

PP

PP PP

PP

PRD

SVP

PP

PP

PP

PP

EF

EF

PRD PRD

PRD

SVP

SVP

RTU

PRD

PRD

EF EF

PRD

PRD

SVP

SVP

FPD

SVP

PP

PP

EF

PRD

RTU

EF EF

SVP SVP

PRD

PRD

PRD

PRD

FPD

PP PP

FPD

SVP

SVP

RTU

RTU

FPD

SVP

SVP

SVP

PRD

PRD

PRD

PRD

PRD

SVP

PP

PP

PP PP

EF

EF

EF

EF EF

EF

RTU

EF

EF

EF

EF

EF

OS

OS

OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

EJ

EF

EF

EF

EF

EF

PP

OS

PRD

FPD

SVP

RTU

EF

EF

PP

RTU

PRD

PRD

EF

PP

EF

EF

PP

PP

EF

EF

EF

EF

EF

EF

PP

PP

PP

PP

RTU

PRD

PRD

PRD

PRD

FPD

FPD

FPD

EF

EF

SVP

SVP

PP

PP

PP PP PP PP

PP

SVP

OS

OS

PRD

PRD

PRD PRD

PRD

PRD

EF

FPD

EF

OS

OS

OS

OS

SVP

FPD FPD

EF

EF

FPD

FPD

FPDFPD

PP

PP

SA

EF

EF

SVP

SVP

SVP

SVP

SVP

SVP

FPD

SA

EF

PP

FPD

PRD

FPD

FPD

SVP

FPD

HVS

FPD

PRD

SVP

RTU

EF

EF

EF

RTU RTU

DS

BUILDING 1 KEY PLAN

A B

C D

MATCH LINE A

MATCH LINE C

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

37'±1'-9"±

57'-8"±

19'-8"± 6'-5"± 14'-2"±

3'-8"±

15'± 42'-9"±

20'±

38'-8"±

19'-4"±

38'±

11'-6"±

33'-4"±

11'-7"±

23'-8"±

16'-3"±

14'-1"±

21'-8"±

46'-7"±

31'-3"±

39'-4"±

40'-5"±

34'-11"±

25'-1"± 30'-3"±

56'-3"±

ROOF 9B

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

RTU

RTU

TYP.

A-501

TYP.

A-501

TYP.

A-502

TYP.

A-503

TYP.

A-502

TYP.

A-502

TYP.

A-503

TYP.

A-502

TYP.

A-501

TYP.

LOW

A-501

TYP.

A-501

TYP.

A-501

TYP.

HIGH

A-501

TYP.

(TO EDGE OF ROOF BEYOND)

17'-5"±

25'-1"± 42'-4"±

41'-7"± 30'-1"±6'±

36'-7"± 36'-5"±

45'-2"±

56'-9"±

26'-1"±

44'-11"± 41'-4"±

27'-9"±

(TO EDGE

OF ROOF

BEYOND)

TYP.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-108

BUILDING 1 ENLARGED

ROOF PLAN NEW - A

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN NEW - A

1 FURNISH AND INSTALL NEW INSULATION, COVER

BOARD, ROOFING MEMBRANE, AND METAL

FLASHINGS ACCORDING TO SPECIFICATIONS.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK, 061000 ROUGH CARPENTRY, 072200 ROOF

BOARD INSULATION, 075216.11 COLD ADHESIVE

STYRENE-BUTADIENE-STYRENE MODIFIED

BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING

AND SHEET METAL, 077100 ROOF SPECIALTIES,

077200 ROOF ACCESSORIES, AND 221400 FACILITY

STORM DRAINAGE

PROPERLY REINSTALL AND COMMISSION EXISTING

LIGHTNING PROTECTION. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION

3 FURNISH AND INSTALL NEW LADDER.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 055000 METAL FABRICATIONS

4 FURNISH AND INSTALL NEW SEALANT AT STONE

COPING JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 079200 JOINT SEALANTS

5 FURNISH AND INSTALL NEW EXPANSION JOINT

BELLOW SYSTEM.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 077100 ROOF SPECIALITIES

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

6 FURNISH AND INSTALL NEW SCUPPER LINER.

SEE NOTES ON A-101 FOR SIZING REQUIREMENTS

7 FURNISH AND INSTALL NEW ROOF AREA DIVIDER

TAPERED INSULATION

/ CRICKET

WALKPADS

ROOF 3A

ROOF 3E

ROOF 2D

ROOF 3D

ROOF 2E

ROOF 4E

ROOF X1

ROOF O

ROOF S

(SMOKE HOUSE)

R O

PRD

SVP

EF

SVP

SVP

SVP

EF

EF

EF

FPD

FPD

PRD

ORD

PRD

ORD

EF

ORD

PRD

ORD

PRD

PRDORD

SVP

EF

SVP

SVP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

SA SA SA

PRD

PRD PRD

FPD FPD

SA

SA

PRD

PRD

EF EF EF

EF

EF

EF EF

RTU

EF

HVS

FPD

SVP

SVP

SVP

PRD

PRD

PRD

PRD

PP

PP

PP

PP

PP

PP PP

FPD

FPD

PP

SVP

SVP

SVP

SVP

RTU

OS

OS

PS

OS

OS

OS

OS

OS

OS

OS

EJ

EJ

PRD

PRD

PS

BUILDING 1 KEY PLAN

A B

C D

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

MATCH LINE B

MATCH LINE D

26'±

41'-3"±

16'±

12'-7"±

9'-1"±

99'-2"±

9'-9"±

4'±

16'-1"±

37'-4"±

30'-3"±

56'-3"±

8'-3"±

31'-10"±

35'-11"± 40'-1"±

45'-2"±

8'±

13'-6"±

TYP.

P

S

A-501

TYP.

A-501

TYP.

A-501

TYP.

A-503

TYP.

A-502

TYP.

A-502

TYP.

A-503

TYP.

A-503

TYP.

A-501

LOW

A-501

A-501

LOW

HIGH

102'-3"±

17'±

(TO EDGE

OF ROOF

BEYOND)

(TO EDGE OF ROOF BEYOND)

(N.I.C)

R O

X

ROOF O

SVP

SVP

PRDORD

SVP

PRD

PRD

PRD

PRD

OS

MATCH LINE B

MATCH LINE D

(N.I.C)

EXISTING HERRINGBONE

BRICK PATTERN

EXISTING 8" CLEANOUT

SCHEDULE 40 PVC

NEW SCHEDULE 40 PVC PIPE

REPLACE BRICK PAVER

HARDSCAPE SYSTEM

AS REQUIRED

A-503

CONNECT ROOF DRAINS WITH

NEW 3" PIPING

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-109

BUILDING 1 ENLARGED

ROOF PLAN NEW - B

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN NEW - B

1 FURNISH AND INSTALL NEW INSULATION, COVER

BOARD, ROOFING MEMBRANE, AND METAL

FLASHINGS ACCORDING TO SPECIFICATIONS.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK, 061000 ROUGH CARPENTRY, 072200 ROOF

BOARD INSULATION, 075216.11 COLD ADHESIVE

STYRENE-BUTADIENE-STYRENE MODIFIED

BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING

AND SHEET METAL, 077100 ROOF SPECIALTIES,

077200 ROOF ACCESSORIES, AND 221400 FACILITY

STORM DRAINAGE

PROPERLY REINSTALL AND COMMISSION EXISTING

LIGHTNING PROTECTION. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION

3 FURNISH AND INSTALL NEW LADDER.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 055000 METAL FABRICATIONS

4 FURNISH AND INSTALL NEW SEALANT AT STONE

COPING JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 079200 JOINT SEALANTS

5 FURNISH AND INSTALL NEW EXPANSION JOINT

BELLOW SYSTEM.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 077100 ROOF SPECIALITIES

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

7 CONNECT OUTLET OF ROOF DRAIN LEADER TO

UNDERGROUND SCHEDULE 40 PVC PIPING

N

SCALE: 1/8" = 1'-0"

COURTYARD DRAINAGE PLAN

6 FURNISH AND INSTALL NEW SCUPPER LINER.

SEE NOTES ON A-101 FOR SIZING REQUIREMENTS

TAPERED INSULATION

ROOF BG

(N.I.C)

ROOF 2F(KITCHEN)

ROOF 4B

ROOF 4A.1

ROOF 4A.2

ROOF 4A

ROOF 5A

ROOF BD.1

ROOF BD.2

ROOF 4C

ROOF BA

(EMS DOCK)

ROOF BF

ROOF BC

ROOF BB

(N.I.C)

(N.I.C)

PRD

PRD

PRD

PRD

GU

GU

DS

PRD

PP

PP

PP

PP

PRD PRD

EF

EF

EF

EF

PP

PP

PP PP PP PP PP PP

PP

H H H

H H H

H

H

PRD

PRD

SVP

EF

EF

EF

EF EF EF

PRD

PRD

PRD

PRD

PRD

PRD

SVP

SVP

SVP

SVP

SVP

SVP

SVP

SVP

SVP

HVS

EF

PRD PRD

SVP

GU

DS

DS

GU

GU

EF

EF

EF

OSOS

SVP

SVP

SVP

HVS

EF

PRD

PRD

EF

SVP

HVS

PP

PP

PP

PP

PP

PP

SVP

SVP

SVP

HVS

EF EF

EF

RTU

PRD

PRD

SVP

SVP

SVP

PRD

PRD

SVP

EF

FPD

FPD

RTU

EF

EF

EF

EF

EF

FPD

FPD

SVP

SVP

SVP

SVP

PRD

FPD

FPD

SVP

SVP

PRD

EF

PP

SVP

SVP

SVP

SVP

HVS

PP

FPD

FPD

EF

EF

EF

EF

EF

RTU

PP

PP

PP

PP

PRD

PRD

PRD

EF

SVP

SVP

SVP

FPD

FPD

HVS

HVS

PP PP

PP

PP

PP

PP

PP

PP

PP

EF EF EF EF

H

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

EJ

EJ

BUILDING 1 KEY PLAN

A B

C D

MATCH LINE A

MATCH LINE C

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

59'-2"±

11'-7"±

37'-4"±

23'-8"±

35'-6"±

37'-8"±

40'-1"±

11'-2"±

40'-4"±

46'-2"±

37'-9"±

36'-2"±

5'-5"±

4'-7"±

34'-10"±

20'-3"±

29'-7"±

13'±

7'-3"±

2'-7"± 10'-5"±

5'-2"±

5'-7"±

11'-6"±

10'-9"±

15'-4"±

25'-2"±

ROOF 9A

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

A-501

TYP.

A-501

TYP.

A-503

TYP.

A-502

TYP.

LOW

A-501

TYP.

A-502

TYP.

A-502

TYP.

A-503

TYP.

A-502

TYP.

A-502

TYP.

A-502

TYP.

A-502

TYP.

44'-9"±

96'-2"±

30'-8"±

19'-10"±

27'-7"±

7'-3"±

59'-3"±

53'-9"±

(N.I.C)

(N.I.C)

(N.I.C)

TYP.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-110

BUILDING 1 ENLARGED

ROOF PLAN NEW - C

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN NEW - C

1 FURNISH AND INSTALL NEW INSULATION, COVER

BOARD, ROOFING MEMBRANE, AND METAL

FLASHINGS ACCORDING TO SPECIFICATIONS.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK, 061000 ROUGH CARPENTRY, 072200 ROOF

BOARD INSULATION, 075216.11 COLD ADHESIVE

STYRENE-BUTADIENE-STYRENE MODIFIED

BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING

AND SHEET METAL, 077100 ROOF SPECIALTIES,

077200 ROOF ACCESSORIES, AND 221400 FACILITY

STORM DRAINAGE

PROPERLY REINSTALL AND COMMISSION EXISTING

LIGHTNING PROTECTION. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION

3 FURNISH AND INSTALL NEW LADDER.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 055000 METAL FABRICATIONS

4 FURNISH AND INSTALL NEW SEALANT AT STONE

COPING JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 079200 JOINT SEALANTS

5 FURNISH AND INSTALL NEW EXPANSION JOINT

BELLOW SYSTEM.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 077100 ROOF SPECIALITIES

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

6 FURNISH AND INSTALL NEW SCUPPER LINER.

SEE NOTES ON A-101 FOR SIZING REQUIREMENTS

TAPERED INSULATION

/ CRICKET

7 FURNISH AND INSTALL NEW ROOF AREA DIVIDER

ROOF 1A

ROOF 5B

ROOF 5C

ROOF 5C.1

ROOF 4D

(N.I.C)

H

H

PRD

PRD

SVP

SVP

FPD

PRD

PRD

PRD

DS

DS

6'-0"

PRD

PRD

PRD

SVP

PRD

EF

EF

PP

PP

EF

EF

EF

EF

EF

EF

EF EF

EF

EF

EF

EF

EF

EF

SVP

SVP

SVP

SVP SVP SVP

PRD

ORD

PRD

ORD

GUDS DS

SVP

SVP

ORD

PRD

ORD

PRD

SVP

SVP

SVP

ORD

PRD

PP

PP

PP

PP

EF

PP

OS

RTU

OS

OS

OS

OS

OS

OS

EJ

EJ

EJ

EJ

PRD

EF

EJ

EJ

SVP

SVP

SVP

SVP

EF

PP

PP

PP

PP

PP

PP

PP

PP

PP PP

BUILDING 1 KEY PLAN

A B

C D

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

MATCH LINE B

MATCH LINE D

34'-3"±

18'±

45'±

23'-5"±40'-4"±4'-4"±

16'-1"± 50'-5"±

5'-8"±

20'-3"±

15'-4"±

TYP.

TYP.

TYP.

TYP.

TYP.

18'±

42'-9"±

23'-3"±

24'-8"±

9'-11"±

12'-6"±

23'±

TYP.

A-502

TYP.

A-503

TYP.

A-501

TYP.

A-502

TYP.

A-503

TYP.

A-503

TYP.

A-501

TYP.

HIGH

A-501

TYP.

LOW

A-501

TYP.

LOW

(TO EDGE OF ROOF BEYOND)

(TO EDGE OF ROOF BEYOND)

70'-6"±

(N.I.C)

(N.I.C)

TYP.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-111

BUILDING 1 ENLARGED

ROOF PLAN NEW - D

N

SCALE: 1/8" = 1'-0"

BUILDING 1 ENLARGED ROOF PLAN NEW - D

1 FURNISH AND INSTALL NEW INSULATION, COVER

BOARD, ROOFING MEMBRANE, AND METAL

FLASHINGS ACCORDING TO SPECIFICATIONS.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK, 061000 ROUGH CARPENTRY, 072200 ROOF

BOARD INSULATION, 075216.11 COLD ADHESIVE

STYRENE-BUTADIENE-STYRENE MODIFIED

BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING

AND SHEET METAL, 077100 ROOF SPECIALTIES,

077200 ROOF ACCESSORIES, AND 221400 FACILITY

STORM DRAINAGE

PROPERLY REINSTALL AND COMMISSION EXISTING

LIGHTNING PROTECTION. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION

3 FURNISH AND INSTALL NEW LADDER.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 055000 METAL FABRICATIONS

4 FURNISH AND INSTALL NEW SEALANT AT STONE

COPING JOINT.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 079200 JOINT SEALANTS

5 FURNISH AND INSTALL NEW EXPANSION JOINT

BELLOW SYSTEM.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 077100 ROOF SPECIALITIES

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

6 FURNISH AND INSTALL NEW SCUPPER LINER.

SEE NOTES ON A-101 FOR SIZING REQUIREMENTS

TAPERED INSULATION

PS PS PS PS

PS

P S

P S

P S

OS

PP

EF

PRD

SVP

SVP SVP

PP

SVP

SVP

EF

SVP

EF

PP PP PP

EF

PP

PP

PP

EF

EF

EF

PP

PP PP PP PP

PP PP

PP

PP

PP

PP

ROOF A1

ROOF A2

104'-3"±

65'-11"±

TYP.

TYP.

RTU RTU RTU RTU

TYP.

A-503

TYP.

A-503

TYP.

A-502

TYP.

A-502

TYP.

A-503

TYP.

A-501

TYP.

A-503

TYP.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-113

BUILDING 12

ROOF PLAN NEW

N

SCALE: 1/4" = 1'-0"

BUILDING 12 ROOF PLAN NEW

1 FURNISH AND INSTALL NEW INSULATION, COVER

BOARD, ROOFING MEMBRANE, AND METAL

FLASHINGS ACCORDING TO SPECIFICATIONS.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK, 061000 ROUGH CARPENTRY, 072200 ROOF

BOARD INSULATION, 075216.11 COLD ADHESIVE

STYRENE-BUTADIENE-STYRENE MODIFIED

BITUMINOUS MEMBRANE ROOFING, 076000 FLASHING

AND SHEET METAL, 077100 ROOF SPECIALTIES,

077200 ROOF ACCESSORIES, AND 221400 FACILITY

STORM DRAINAGE

PROPERLY REINSTALL AND COMMISSION EXISTING

LIGHTNING PROTECTION. REFER TO SPECIFICATION

011100 SUMMARY OF WORK AND 264100 FACILITY

LIGHTING PROTECTION

3 FURNISH AND INSTALL NEW LADDER.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 055000 METAL FABRICATIONS

4 FURNISH AND INSTALL NEW METAL COPING.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 076000 FLASHING AND SHEET METAL

5 FURNISH AND INSTALL NEW EXPANSION JOINT

BELLOW SYSTEM.

REFER TO SPECIFICATION 011100 SUMMARY OF

WORK AND 077100 ROOF SPECIALITIES

ROOFTOP UNIT

ROOF

OUTLINE/PARAPET

GUTTER (GU)

VENT THRU ROOF

(VTR)

PRIMARY ROOF

DRAIN (PRD)

PITCH POCKET (PP)

ROOF OUTLINE/

GRAVE-STOP FASCIA

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

EXHAUST FAN (EF)

SKYLIGHT (S)

S

ROOF ACCESS -

LADDER

STRUCTURAL

RIDGE/HIP

VALLEY

LEGEND

HOT VENT STACK

(HVS)

OVERFLOW SCUPPER

OS

SOIL VENT PIPE

(SVP)

FALL PROTECTION

DEVICE (FPD)

DOWNSPOUT (DS)

OVERFLOW ROOF

DRAIN (ORD)

SATELLITESA

EXPANSION JOINT

EJ

ABANDONED CURB

6 ROOF AREAS A1 & A2: MODIFY EXISTING SCUPPER

OPENING TO RECEIVE A MINIMUM 4" x 10" SCUPPER

LINER

7 ALL ROOF DRAIN LEADERS TO BE A MINIMUM 3"Ø

(DIAMETER)

TAPERED INSULATION

ROOF 8B

ROOF 1F

ROOF 1E

ROOF 10A (N.I.C)

ROOF 11A (N.I.C)

ROOF 2C

ROOF 2B

ROOF 3C

ROOF 1B

ROOF 2D.1

ROOF 1C

ROOF 9A

ROOF 7C

ROOF 1G

ROOF 2D.2

ROOF 9C

(N.I.C)

ROOF 1G.1

ROOF 1G.3

BUILDING 1 KEY PLAN

A B

C D

MATCH LINE A

MATCH LINE C

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

37'±1'-9"±

57'-8"±

19'-8"± 6'-5"± 14'-2"±

3'-8"±

15'± 42'-9"±

20'±

38'-8"±

19'-4"±

38'±

11'-6"±

33'-4"±

11'-7"±

23'-8"±

16'-3"±

14'-1"±

21'-8"±

46'-7"±

31'-3"±

39'-4"±

40'-5"±

34'-11"±

25'-1"± 30'-3"±

56'-3"±

ROOF 9B

8'

8'

8'

8'

8'

8'

8'

8'

4'

4'

4'

4'

8'

8'

8'

8'

3 3

4'

4'

4'

2 2

4' 4'

3 3

3 3

2 2

4'

4'

33 2

2 21

8'

4'

8'

8'

8'

3 3

4'

4'

8'

4' 4'

4'

4' 4'

4'

4' 4'

4'

3 3

12' 12'

12'

(TO EDGE OF ROOF BEYOND)

17'-5"±

25'-1"± 42'-4"±

41'-7"± 30'-1"±6'±

36'-7"± 36'-5"±

45'-2"±

56'-9"±

26'-1"±

44'-11"± 41'-4"±

27'-9"±

(TO EDGE

OF ROOF

BEYOND)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-114

BUILDING 1 WIND ZONE

ENLARGED ROOF PLAN - A

N

SCALE: 1/8" = 1'-0"

BUILDING 1 WIND ZONE ENLARGED ROOF PLAN NEW - A

LEGEND

ROOF AREA 1B, 1C, 1G, 1G.1, 1G.3

WIND ZONE NO. 1: 18.83 PSF

WIND ZONE NO. 2: 31.60 PSF

WIND ZONE NO. 3: 47.56 PSF

WIND ZONE NO. 1

WIND ZONE NO. 3

WIND ZONE NO. 2

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

ROOF AREA 1E, 1F

WIND ZONE NO. 1: 19.25 PSF

WIND ZONE NO. 2: 32.31 PSF

WIND ZONE NO. 3: 48.63 PSF

ROOF AREA 2B, 2C, 2D.1, 2D.2

WIND ZONE NO. 1: 20.93 PSF

WIND ZONE NO. 2: 35.13 PSF

WIND ZONE NO. 3: 52.87 PSF

ROOF AREA 3C

WIND ZONE NO. 1: 22.55 PSF

WIND ZONE NO. 2: 37.84 PSF

WIND ZONE NO. 3: 56.95 PSF

ROOF AREA 7B

WIND ZONE NO. 1: 36.33 PSF

WIND ZONE NO. 2: 57.02 PSF

WIND ZONE NO. 3: 77.72 PSF

ROOF AREA 7C

WIND ZONE NO. 1: 36.24 PSF

WIND ZONE NO. 2: 56.89 PSF

WIND ZONE NO. 3: 77.53 PSF

ROOF AREA 8B

WIND ZONE NO. 1: 37.19 PSF

WIND ZONE NO. 2: 58.37 PSF

WIND ZONE NO. 3: 79.56 PSF

ROOF AREA 8C

WIND ZONE NO. 1: 37.38 PSF

WIND ZONE NO. 2: 58.67 PSF

WIND ZONE NO. 3: 79.96 PSF

ROOF AREA 9A

WIND ZONE NO. 1: 38.50 PSF

WIND ZONE NO. 2: 60.44 PSF

WIND ZONE NO. 3: 82.37 PSF

ROOF AREA 9B

WIND ZONE NO. 1: 39.47 PSF

WIND ZONE NO. 2: 61.95 PSF

WIND ZONE NO. 3: 84.44 PSF

ROOF AREA 9B

WIND ZONE NO. 1: 39.47 PSF

WIND ZONE NO. 2: 61.95 PSF

WIND ZONE NO. 3: 84.44 PSF

ROOF 3A

ROOF 3E

ROOF 2D

ROOF 3D

ROOF 2E

ROOF 4E

ROOF X1

ROOF O

ROOF S

(SMOKE HOUSE)

R O

BUILDING 1 KEY PLAN

A B

C D

M A

T C

H

L

I N

E

B

M A

T C

H

L

I N

E

A

MATCH LINE B

MATCH LINE D

26'±

41'-3"±

16'±

12'-7"±

9'-1"±

99'-2"±

9'-9"±

4'±

16'-1"±

37'-4"±

30'-3"±

56'-3"±

8'-3"±

31'-10"±

35'-11"± 40'-1"±

45'-2"±

8'±

13'-6"±

4'

4'

4'

3 3

2 2

4'

4'

4' 4'

4'

8'

8'

4'

4'

4'

4'

8'

8'

8'

8'8'

8'

8'

8'

3 3

4' 4'

4'

4'

102'-3"±

17'±

(TO EDGE

OF ROOF

BEYOND)

(TO EDGE OF ROOF BEYOND)

(N.I.C)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-115

BUILDING 1 WIND ZONE

ENLARGED ROOF PLAN - B

N

SCALE: 1/8" = 1'-0"

BUILDING 1 WIND ZONE ENLARGED ROOF PLAN NEW - B

LEGEND

WIND ZONE NO. 1

WIND ZONE NO. 3

WIND ZONE NO. 2

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

ROOF AREA 1G.2, 2E

WIND ZONE NO. 1: 21.14 PSF

WIND ZONE NO. 2: 35.48 PSF

WIND ZONE NO. 3: 53.40 PSF

ROOF AREA 2D

WIND ZONE NO. 1: 20.93 PSF

WIND ZONE NO. 2: 35.13 PSF

WIND ZONE NO. 3: 52.87 PSF

ROOF AREA 3A, 3E

WIND ZONE NO. 1: 22.60 PSF

WIND ZONE NO. 2: 37.93 PSF

WIND ZONE NO. 3: 57.08 PSF

ROOF AREA 3D

WIND ZONE NO. 1: 24.40 PSF

WIND ZONE NO. 2: 40.94 PSF

WIND ZONE NO. 3: 61.61 PSF

ROOF AREA 4E

WIND ZONE NO. 1: 25.21 PSF

WIND ZONE NO. 2: 42.31 PSF

WIND ZONE NO. 3: 63.68 PSF

ROOF AREA 6B

WIND ZONE NO. 1: 36.46 PSF

WIND ZONE NO. 2: 57.23 PSF

WIND ZONE NO. 3: 78.01 PSF

ROOF AREA 8D

WIND ZONE NO. 1: 38.47 PSF

WIND ZONE NO. 2: 60.38 PSF

WIND ZONE NO. 3: 82.30 PSF

ROOF AREA O, X1

WIND ZONE NO. 1: 18.83 PSF

WIND ZONE NO. 2: 31.60 PSF

WIND ZONE NO. 3: 47.56 PSF

ROOF AREA S

WIND ZONE NO. 1: 19.09 PSF

WIND ZONE NO. 2: 32.03 PSF

WIND ZONE NO. 3: 48.21 PSF

ROOF AREA S

WIND ZONE NO. 1: 19.09 PSF

WIND ZONE NO. 2: 32.03 PSF

WIND ZONE NO. 3: 48.21 PSF

ROOF BG

(N.I.C)

ROOF 2F(KITCHEN)

ROOF 4B

ROOF 4A.1

ROOF 4A.2

ROOF 4A

ROOF 5A

ROOF BD.1

ROOF BD.2

ROOF 4C

ROOF BA

(EMS DOCK)

ROOF BF

ROOF BC

ROOF BB

(N.I.C)

(N.I.C)

H H H

H H H

H

H

H

BUILDING 1 KEY PLAN

A B

C D

MATCH LINE A

MATCH LINE C

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

59'-2"±

11'-7"±

37'-4"±

23'-8"±

35'-6"±

37'-8"±

40'-1"±

11'-2"±

40'-4"±

46'-2"±

37'-9"±

36'-2"±

5'-5"±

4'-7"±

34'-10"±

20'-3"±

29'-7"±

13'±

7'-3"±

2'-7"± 10'-5"±

5'-2"±

5'-7"±

11'-6"±

10'-9"±

15'-4"±

25'-2"±

ROOF 9A

8'

8'

8'

8'

8'

8'

8'

4'

4'

4'

8' 8'

8'

4'

4'

4'

2 3

3 2

4'

4'

8' 8'

8'

12'

12'

4'

4'

4'

4'

4'

4'

3 3

3 3

4'

4'

(TO EDGE OF ROOF BEYOND)

44'-9"±

96'-2"±

30'-8"±

19'-10"±

27'-7"±

7'-3"±

59'-3"±

53'-9"±

(N.I.C)

(N.I.C)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-116

BUILDING 1 WIND ZONE

ENLARGED ROOF PLAN - C

N

SCALE: 1/8" = 1'-0"

BUILDING 1 WIND ZONE ENLARGED ROOF PLAN NEW - C

LEGEND

WIND ZONE NO. 1

WIND ZONE NO. 3

WIND ZONE NO. 2

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

ROOF AREA 2F

WIND ZONE NO. 1: 22.90 PSF

WIND ZONE NO. 2: 38.43 PSF

WIND ZONE NO. 3: 57.84 PSF

ROOF AREA 4A

WIND ZONE NO. 1: 34.34 PSF

WIND ZONE NO. 2: 53.89 PSF

WIND ZONE NO. 3: 73.45 PSF

ROOF AREA 4A.1, 5A

WIND ZONE NO. 1: 35.48 PSF

WIND ZONE NO. 2: 55.70 PSF

WIND ZONE NO. 3: 75.91 PSF

ROOF AREA 4A.2

WIND ZONE NO. 1: 34.98 PSF

WIND ZONE NO. 2: 54.91 PSF

WIND ZONE NO. 3: 74.83 PSF

ROOF AREA 4B

WIND ZONE NO. 1: 33.88 PSF

WIND ZONE NO. 2: 53.18 PSF

WIND ZONE NO. 3: 72.47 PSF

ROOF AREA 4C

WIND ZONE NO. 1: 25.04 PSF

WIND ZONE NO. 2: 42.01 PSF

WIND ZONE NO. 3: 63.22 PSF

ROOF AREA 7A

WIND ZONE NO. 1: 37.48 PSF

WIND ZONE NO. 2: 58.82 PSF

WIND ZONE NO. 3: 80.17 PSF

ROOF AREA 8A

WIND ZONE NO. 1: 37.19 PSF

WIND ZONE NO. 2: 58.37 PSF

WIND ZONE NO. 3: 79.56 PSF

ROOF AREA BD.1, BD.2

WIND ZONE NO. 1: 19.66 PSF

WIND ZONE NO. 2: 32.99 PSF

WIND ZONE NO. 3: 49.65 PSF

ROOF AREA 9A

WIND ZONE NO. 1: 38.50 PSF

WIND ZONE NO. 2: 60.44 PSF

WIND ZONE NO. 3: 82.37 PSF

ROOF AREA BA, BB, BC

WIND ZONE NO. 1: 18.83 PSF

WIND ZONE NO. 2: 31.60 PSF

WIND ZONE NO. 3: 47.56 PSF

ROOF 1A

ROOF 5B

ROOF 5C

ROOF 5C.1

ROOF 4D

(N.I.C)

H

H

6'-0"

BUILDING 1 KEY PLAN

A B

C D

M A

T C

H

L

I N

E

D

M A

T C

H

L

I N

E

C

MATCH LINE B

MATCH LINE D

34'-3"±

18'±

45'±

23'-5"±40'-4"±4'-4"±

16'-1"± 50'-5"±

5'-8"±

20'-3"±

15'-4"±

20'±

42'-9"±

23'-3"±

24'-8"±

9'-11"±

12'-6"±

23'±

4'

4'

4'

8'

8'

8'

8'8'

8'

8'

8'

8'

8'

16'

16'

3 2

8'

8'

8'

(TO EDGE OF ROOF BEYOND)

(TO EDGE OF ROOF BEYOND)

70'-6"±

(N.I.C)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-117

BUILDING 1 WIND ZONE

ENLARGED ROOF PLAN - D

N

SCALE: 1/8" = 1'-0"

BUILDING 1WIND ZONE ENLARGED ROOF PLAN NEW - D

LEGEND

WIND ZONE NO. 1

WIND ZONE NO. 3

WIND ZONE NO. 2

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

ROOF AREA 1A

WIND ZONE NO. 1: 21.64 PSF

WIND ZONE NO. 2: 36.31 PSF

WIND ZONE NO. 3: 54.64 PSF

ROOF AREA 2A

WIND ZONE NO. 1: 22.51 PSF

WIND ZONE NO. 2: 37.77 PSF

WIND ZONE NO. 3: 56.84 PSF

ROOF AREA 3B

WIND ZONE NO. 1: 24.88 PSF

WIND ZONE NO. 2: 41.75 PSF

WIND ZONE NO. 3: 62.83 PSF

ROOF AREA 4D

WIND ZONE NO. 1: 34.34 PSF

WIND ZONE NO. 2: 53.89 PSF

WIND ZONE NO. 3: 73.45 PSF

ROOF AREA 5B, 5C

WIND ZONE NO. 1: 35.48 PSF

WIND ZONE NO. 2: 55.70 PSF

WIND ZONE NO. 3: 75.91 PSF

ROOF AREA 5C.1

WIND ZONE NO. 1: 35.08 PSF

WIND ZONE NO. 2: 55.07 PSF

WIND ZONE NO. 3: 75.05 PSF

ROOF A1

ROOF A2

104'-3"±

65'-11"±

3 3

3 3

4'

4'

4'

3 3

3 3

4'

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#

REPLACE ROOFS,

PHASE I

603-18-301

ROBLEY REX VA MEDICAL CENTER

LOUISVILLE KY 40206

18-392

100% CONSTRUCTION DOCUMENTS

Engineer of Record:

Raymond

Engineering-Georgia 1224

Royal Drive, Suite 100

Conyers, GA 30094

770-483-9592 Raymond

Ramos, PE, RRC

.\Logo-RaymondEngineering-CMYK.jpg

ARF2021.02.12 JMC

T-684

C:\Users\jonathan.clark\Desktop\Stamp.png

A-119

BUILDING 12

WIND ZONE ROOF PLAN

N

SCALE: 1/4" = 1'-0"

BUILDING 12 WIND ZONE ROOF PLAN NEW

LEGEND

WIND ZONE NO. 1

WIND ZONE NO. 3

WIND ZONE NO. 2

ROOF AREA NOT-IN-

CONTRACT (N.I.C.)

ROOF AREA A1, A2

WIND ZONE NO. 1: 19.10 PSF

WIND ZONE NO. 2: 32.03 PSF

WIND ZONE NO. 3: 48.21 PSF

B E

L O

W

B

L O

C K

I N

G

M

I N

I M

U M

SHEET-METAL PARAPET CAP

SLOPED TO DRAIN TO ROOF

CONTINUOUS WEATHERPROOF

MEMBRANE ON TOP OF WALL

TURNED DOWN BOTH SIDES

CONTINUOUS SHIM

WOOD NAILER ATTACHED

TO SUBSTRATE

FASTENERS APPROX. 8" O.C.

MEMBRANE FLASHING SHEET

ADHERED TO BACKER, MOP- OR

COLD-APPLIED (FOR ROOF SYSTEMS

WITH FACTORY-APPLIED GRANULE

SURFACING, THE MULTIPLE-PLY

MEMBRANE FLASHING CAN BE

INSTALLED BETWEEN THE BASE PLY

AND GRANULE-SURFACED SHEET)

OPTIONAL: EXTENDED FIELD

PLIES ABOVE TOP OF CANT

MULTIPLE-PLY MODIFIED

BITUMEN ROOF MEMBRANE

CANT

COVER-BOARD INSULATION

THERMAL INSULATION

ROOF DECK

M

I N

I M

U M

F L A

S H

I N

G

H

E I G

H T

CONTINUOUS CLEAT

BACKER

GASKETED FASTENERS

B E

L O

W

B

L O

C K

I N

G

M

I N

I M

U M

SHEET-METAL GRAVEL STOP

SET IN COMPATIBLE ROOF

CEMENT, PRIME FLANGE

BEFORE STRIPPING

OPTIONAL: COMPATIBLE

SEALANT AT JUNCTION OF

MEMBRANE AND EDGE

METAL

FASTENERS AT APPROX. 3''

to 6'' O.C., STAGGERED

MODIFIED BITUMEN

MEMBRANE STRIPPING SHEET

(FOR ROOF SYSTEMS WITH

FACTORY-APPLIED GRANULE

SURFACING, THE GRAVEL-

STOP FLANGE AND

MEMBRANE STRIPPING CAN

BE INSTALLED BETWEEN THE

BASE PLY AND GRANULE-

SURFACED SHEET)

MULTIPLE-PLY MODIFIED

BITUMEN ROOF MEMBRANE

COVER-BOARD INSULATION

THERMAL INSULATION

ROOF DECK

ONE PLY OR SEPARATE

MEMBRANE SHEET EXTENDED

BELOW BLOCKING

CONTINUOUS CLEAT

2 X 6 MIN. WOOD NAILER

ATTACHED TO SUBSTRATE --

OVERALL THICKNESS TO

MATCH INSULATION

SMOOTH CONCRETE

INSTALL APPROPRIATE SEALANT

AND TOOL TO FACILITATE WATER

RUNOFF

OPTIONAL: COMPRESSIBLE

ELASTOMERIC SEALANT OR TAPE

TO SPAN IRREGULARITIES

CONCRETE FASTENERS

SEAL TOP OF FLASHING WITH A

COMPATIBLE VERTICAL-GRADE ROOF

CEMENT AND REINFORCEMENT

SHEET-METAL COUNTERFLASHING

FASTENERS APPROX. 8'' O.C.

OPTIONAL: EXTENDED FIELD PLIES

ABOVE TOP OF CANT (NOT SHOWN FOR

CLARITY)

MEMBRANE FLASHING SHEET

ADHERED TO BACKER (FOR ROOF

SYSTEMS WITH FACTORY-APPLIED

GRANULE SURFACING, THE

MULTIPLE-PLY MEMBRANE FLASHING

CAN BE INSTALLED BETWEEN THE

BASE PLY AND GRANULE-SURFACED

SHEET)

MULTIPLE-PLY MODIFIED BITUMEN

ROOF MEMBRANE

COVER-BOARD INSULATION

CANT

THERMAL INSULATION

ROOF DECK

M

I N

I M

U M

F L A

S H

I N

G

H

E I G

H T

BACKER

EXISTING SHEET-METAL REGLET

FASTENERS

OPTIONAL: MEMBRANE SHEET CLOSURE

SECURED AND ADHERED TO WALL

REMOVABLE SHEET-METAL

COUNTERFLASHING

OPTIONAL: EXTENDED FLASHING

FASTENERS APPROX. 8'' O.C.

OPTIONAL: EXTENDED FIELD PLIES

ABOVE TOP OF CANT STRIP (NOT

SHOWN FOR CLARITY)

FLEXIBLE VAPOR RETARDER WITH

COMPRESSIBLE INSULATION

MEMBRANE FLASHING SHEET ADHERED TO

BACKER, MOP- OR COLD-APPLIED. COVER

TOP OF BASE FLASHING WITH VAPOR

RETARDER. (FOR ROOF SYSTEMS WITH

FACTORY-APPLIED GRANULE SURFACING,

THE MULTIPLE-PLY MEMBRANE FLASHING

CAN BE INSTALLED BETWEEN THE BASE PLY

AND GRANULE-SURFACED SHEET)

MULTIPLE-PLY MODIFIED BITUMEN

ROOF MEMBRANE

COVER-BOARD INSULATION

THERMAL INSULATION

ROOF DECK

CANT

F L A

S H

I N

G

H

E I G

H T

M

I N

I M

U M

MASONRY WALL AND FLASHING

BACKER

2 X 6 MIN. WOOD NAILER ATTACHED TO

SUBSTRATE -- OVERALL THICKNESS TO

MATCH INSULATION

EXISTING SHEET-METAL REGLET

FASTENERS

REMOVABLE SHEET-METAL

COUNTERFLASHING

SEAL TOP OF FLASHING WITH A

COMPATIBLE VERTICAL-GRADE

ROOF CEMENT AND

REINFORCEMENT

FASTENERS APPROX. 8'' O.C.

NONCOMBUSTIBLE SURFACE.

PRIME SURFACE AS REQUIRED

OPTIONAL: EXTENDED FIELD

PLIES ABOVE TOP OF CANT

CANT

MEMBRANE FLASHING SHEET

ADHERED TO BACKER (FOR

ROOF SYSTEMS WITH

FACTORY-APPLIED GRANULE

SURFACING, THE MULTIPLE-PLY

MEMBRANE FLASHING CAN BE

INSTALLED BETWEEN THE BASE

PLY AND GRANULE-SURFACED

SHEET)

MULTIPLE-PLY MODIFIED

BITUMEN ROOF MEMBRANE

COVER-BOARD INSULATION

T…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .