S02. VAMC Health Requirements.pdf
PDF 66 KB Posted
- Attached to
- OR Flooring Replacement
- Solicitation number
- 36C25022R0080
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC Contractor Health Requirements
The construction firms’ representatives performing construction services on the Louis Stokes Cleveland VA campus must validate the following additional requirements are in place before starting site construction on campus:
1. Daily visit at check-in station for COVID and temperature screening a. Sticker/device must be worn visibly
2. Annual influenza shot is required for all staff performing work on
Louis Stokes Cleveland VA campus
3. Contractor badge must be obtained and worn by contractor or representative at all times while on campus
The temperature checks are performed on the Louis Stokes Cleveland
VA campus and must be performed immediately when the contractor arrives on site. Temperature checks are currently performed at the main entrance of the clinic building (Building 1A). If at any time an employee of the construction firm is found in deficiency of the listed, a stop work order will be issued for safety of Louis Stokes Cleveland
VAMC patients. Any further questions please refence the below documents
VHA Directive 1192.01 (Attachment 4)
File details come from the government source that posted it. Updated .