S02. Final CD Drawings G-Q.pdf
PDF 10 MB Posted
- Attached to
- Y1DA--RENOVATE & RECONFIGURE CLINICAL SERVICES Federal contract opportunity
- Solicitation number
- Am0001
About this file
This document is an amendment to a solicitation for the Renovate and Reconfigure Clinical Services project at a Veterans Health Administration facility. The amendment adds updated drawings and the latest Infection Control Risk Assessment requirements from the Transmission Isolation Log. The bid opening date remains May 7, 2021 at 12:00PM EST. The amendment does not otherwise modify the terms of the solicitation. The project involves renovations and reconfigurations to clinical services areas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06. 36C25021B0004 0001.pdf | ||
| S02. Final CD Drawings F-M.pdf | ||
| S02. Final CD Drawings E-T.pdf | ||
| S02. VARRCS Bid Addendum No 1 2021 04-15.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10 OFF
7 7
AC-63
SF-4
BBF
ZODY-20 ZODY-20
ZODY-20
ZODY-20
ZODY-20
ZODY-20
SZT-20-401MA1 SZT-20-401MA1
SZT-20-401MA1
SZT-20-401MA1
SZT-20-401MA1
SZT-20-401MA1
FEC
Project Scope Area
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
EAST BLVD.
E.
S
T .
EA
ST
B
LV
D
MAGNOLIA DR.
HA
ZE
L
DR
E. 108 ST.
MT. SINAI DR.
MARTIN LUTHER KING DR.
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231, OCT 1978
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
6"
6"
6"
6"
LOUIS STOKES CLEVELAND VA MEDICAL CENTER
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
DRAWING INDEX
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
SITE PLAN
Scale = None
True North
Fredrick, Fredrick & Heller Engineers, Inc.
Mechanical & Electrical Engineers 672 East Royalton Road, Broadview Heights, Ohio 44147
Plan North
Perspectus Architecture LLC Architect 13212 Shaker Square, Cleveland, Ohio 44120
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORDCONSULTANT
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
Stephen J. Sebesta & Associates, Inc.
Environmental Engineer 30628 Detroit Road, #258, Westlake, Ohio 44145
541-20-101
RENOVATE AND RECONFIGURE CLINICAL SERVICES
G-001
COVER SHEET RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 - -
BID ISSUE
April 9, 2021
GENERAL
G-001 COVER SHEET
G-002 GENERAL INFORMATION
G-101 OVERALL PHASING PLAN
G-111 FIRST FLOOR LIFE SAFETY PLAN PHASE 1
G-112 FIRST FLOOR LIFE SAFETY PLAN PHASE 2
G-113 FIRST FLOOR LIFE SAFETY PLAN PHASE 3
G-114 FIRST FLOOR LIFE SAFETY PLAN PHASE 4
G-115 FIRST FLOOR LIFE SAFETY PLAN PHASE 5
ARCHITECTURAL
A-101 PARTIAL FIRST FLOOR DEMOLITION PLAN PHASES 1 & 2
A-102 PARTIAL FIRST FLOOR DEMOLITION PLAN PHASES 3, 4, 5
A-111 PARTIAL FIRST FLOOR PLAN PHASES 1 & 2
A-112 PARTIAL FIRST FLOOR PLAN PHASES 3, 4, 5
A-121 PARTIAL FIRST FLOOR REFLECTED CEILING PLAN PHASES 1 & 2
A-122 PARTIAL FIRST FLOOR REFLECTED CEILING PLAN PHASES 3, 4, 5
A-401 INTERIOR ELEVATIONS
A-501 INTERIOR DETAILS
A-601 SCHEDULES & DETAILS ᅟ ELECTRICAL
E-001 ELECTRICAL LEGEND AND GENERAL NOTES
E-002 PARTIAL FIRST FLOOR ELECTRICAL KEY PLAN
ED-101 PARTIAL FIRST FLOOR LIGHTING DEMO PLAN - PHASE 1 AND 2
ED-102 PARTIAL FIRST FLOOR LIGHTING DEMO PLAN - PHASE 3 AND 4
ED-103 PARTIAL FIRST FLOOR LIGHTING DEMO PLAN - PHASE 5
ED-111 PARTIAL FIRST FLOOR POWER DEMO PLAN - PHASE 1 AND 2
ED-112 PARTIAL FIRST FLOOR POWER DEMO PLAN - PHASE 3 AND 4
ED-113 PARTIAL FIRST FLOOR POWER DEMO PLAN - PHASE 5
ED-121 PARTIAL FIRST FLOOR FA AND SEC DEMO PLAN - PHASE 1 AND 2
ED-122 PARTIAL FIRST FLOOR FA AND SEC DEMO PLAN - PHASE 3 AND 4
ED-123 PARTIAL FIRST FLOOR FA AND SECURITY DEMO PLAN - PHASE 5
EL-101 PARTIAL FIRST FLOOR LIGHTING PLAN - PHASE 1 AND 2
EL-102 PARTIAL FIRST FLOOR LIGHTING PLAN - PHASE 3 AND 4
EL-103 PARTIAL FIRST FLOOR LIGHTING PLAN - PHASE 5
EP-111 PARTIAL FIRST FLOOR POWER PLAN - PHASE 1 AND 2
EP-112 PARTIAL FIRST FLOOR POWER PLAN - PHASE 3 AND 4
EP-113 PARTIAL FIRST FLOOR POWER PLAN - PHASE 5
EP-141 PARTIAL ROOF/PENTHOUSE ELECTRICAL PLAN
EY-121 PARTIAL FIRST FLOOR FA AND SECURITY PLAN - PHASE 1 AND 2
EY-122 PARTIAL FIRST FLOOR FA AND SECURITY PLAN - PHASE 3 AND 4
EY-123 PARTIAL FIRST FLOOR FA AND SECURITY PLAN - PHASE 5
E-501 ELECTRICAL DETAILS
E-502 ACCESS CONTROL DOOR DETAILS
E-503 ACCESS CONTROL DETAILS
E-504 FIRE ALARM DETAILS
E-505 FIRE ALARM RISER DIAGRAM
E-601 LIGHTING FIXTURE SCHEDULE
E-602 PANELBOARD SCHEDULES
E-701 POWER DISTRIBUTION LEGEND AND GENERAL NOTES
E-702 POWER DISTRIBUTION ONE-LINE DIAGRAM
FIRST FLOOR - KEY PLAN
FIRE PROTECTION
FX-001 FIRE PROTECTION LEGEND, DETAILS, AND NOTES
FX-101 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 2
FX-102 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 4
FX-103 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 5
FX-121 PENTHOUSE FIRE PROTECTION PLAN - PHASE 4
MECHANICAL
M-001 HVAC SYMBOLS AND GENERAL NOTES
MD-101 PARTIAL FIRST FLOOR HVAC DUCTWORK DEMOLITION PLAN - PHASE 2
MD-102 PARTIAL FIRST FLOOR HVAC DUCTWORK DEMOLITION PLAN - PHASE 4
MD-103 PARTIAL FIRST FLOOR HVAC DUCTWORK DEMOLITION PLAN - PHASE 5
MD-104 ROOF/PENTHOUSE HVAC DEMOLITION PLAN - PHASE 2
MD-105 ROOF/PENTHOUSE HVAC DEMOLITION PLAN - PHASE 4
MD-111 PARTIAL FIRST FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 2
MD-112 PARTIAL FIRST FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 4
MD-113 PARTIAL FIRST FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 5
MH-101 PARTIAL FIRST FLOOR HVAC DUCTWORK PLAN - PHASE 2
MH-102 PARTIAL FIRST FLOOR HVAC DUCTWORK PLAN - PHASE 4
MH-103 PARTIAL FIRST FLOOR HVAC DUCTWORK PLAN - PHASE 5
MH-121 ROOF/PENTHOUSE HVAC PLAN - PHASE 4
MP-111 PARTIAL FIRST FLOOR HVAC PIPING PLAN - PHASE 2
MP-112 PARTIAL FIRST FLOOR HVAC PIPING PLAN - PHASE 4
MP-113 PARTIAL FIRST FLOOR HVAC PIPING PLAN - PHASE 5
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-601 HVAC SCHEDULES
M-701 TEMPERATURE CONTROLS
M-702 TEMPERATURE CONTROLS
M-801 AIR BALANCE PLAN
PLUMBING
P-001 PLUMBING SYMBOLS, NOTES, AND SCHEDULES
PD-101 PARTIAL BASEMENT PLUMBING DEMOLITION PLAN - PHASE 2
PD-102 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 2
PD-103 PARTIAL BASEMENT PLUMBING DEMOLITION PLAN - PHASE 4
PD-104 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 4
PL-101 PARTIAL BASEMENT PLUMBING PLAN - PHASE 2
PL-102 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 2
PL-103 PARTIAL BASEMENT PLUMBING PLAN - PHASE 4
PL-104 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 4
PL-105 PARTIAL BASEMENT PLUMBING PLAN - PHASE 5
PL-106 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 5
PG-101 PARTIAL FIRST FLOOR MEDICAL GAS PLAN - PHASE 2
P-501 PLUMBING AND MEDICAL GAS DETAILS
P-901 PLUMBING ISOMETRICS
TECHNOLOGY
T-001 TECHNOLOGY LEGEND AND GENERAL NOTES
T-002 PARTIAL FIRST FLOOR TECHNOLOGY KEY PLAN
TD-101 PARTIAL FIRST FLOOR TECH DEMO PLAN - PHASE 1 AND 2
TD-102 PARTIAL FIRST FLOOR TECH DEMO PLAN - PHASE 3 AND 4
TD-103 PARTIAL FIRST FLOOR TECH DEMO PLAN - PHASE 5
T-101 PARTIAL FIRST FLOOR TECH PLAN - PHASE 1 AND 2
T-102 PARTIAL FIRST FLOOR TECH PLAN - PHASE 3 AND 4
T-103 PARTIAL FIRST FLOOR TECHNOLOGY PLAN - PHASE 5
T-401 RACK LAYOUTS - RM 1B496 AND 1C519
T-501 TECHNOLOGY ROUGH-IN DETAILS
T-502 TECHNOLOGY FACEPLATE DETAILS
T-503 HILL-ROM DETAILS FOR REFERENCE ONLY
INTERIORS
I-101 PARTIAL FIRST FLOOR FINISH PLAN PHASE 1, 2
I-102 PARTIAL FIRST FLOOR FINISH PLAN PHASE 3, 4, 5
I-601 FINISH SCHEDULES, LEGEND & DETAILS
EQUIPMENT
Q-101 PARTIAL FIRST FLOOR FURNITURE AND EQUIPMENT PLAN
HAZARDOUS MATERIALS ABATEMENT
H-101 PARTIAL FIRST FLOOR ASBESTOS ABATEMENT PLAN
H-501 STANDARD ASBESTOS ABATEMENT DETAILS
REVISIONS DATE
BID ISSUE 1/8/21
5/8" Type X gyp. bd.
Mtl. studs
Control joint, both sides
MAX
1/2"
5/8" Type X gyp. bd.
TYP of all control joints located in rated wall assemblies
MAX
1/2"
MAX
1/2"
1 7/8"
3 1/8"
Back to back boxes NOT permitted Stagger Boxes uno.
6"
Partition assembly
Door frame
TYP of all frames that occur at room corner locations, uno.
Joint compound and tape
5/8" gyp. bd.
Mtl.. studs
Control joint
Cont. stud track
Cont. stud track
Channel stud reinf. as required at wall mounted devices
Midpoint at door opening
Cont. channel reinf.
Double studs at jamb opening 20 ga. min., 18
ga. at openings over 3'-0"
Door Opening
Door Opening
Exist. struc. above
Gyp. bd. control joint
Hollow mtl. frame
Mtl. studs coped to fit
Typ. mtl. studs
Door Opening
Joint sealant
Hollow mtl. frame
Tool joints flush to height of base aff.
Note: At each jamb for reinforced concrete block lintels or where steel lintels occur. Control Joints shall extend up vertical flush with door frame (Steel lintels shall be continuous)
Base material may occur
04200- Concrete masonry unit (typical)
MIN
4"
A
See specifications for sealant type.
All joints 1" wide or more are to be laid up in beads and tooled to profile indicated.
All joints are to be primed before bond breaking rod is installed.
Install bond breaking rod with roller to proper depth. No sharp tools permitted.
1.
2.
3.
4.
Notes:
B C
Wall material varies
07 92 00 - Bond breaker rod
07 92 00 - Sealant
Joint Schedule Dimensions
A B C 3/8" 1/8" 1/4"
1/2" 1/8" 3/8"
5/8" 1/8"
3/4" 1/8"
7/8" 1/8"
1" 1/8"
3/8"
3/8"
3/8"
3/8"
1. Do not scale drawings. Contractor(s) are to verify site dimensions and conditions prior to work.
2. Construction shall be in accordance with the requirements of the applicable codes including accessibility standards and the requirements of “Americans with Disabilities Act.”
3. Contractor(s) shall visit the site and correlate the requirements of the documents with the existing conditions.
4. Drawings are diagrammatic and since existing conditions, including areas above accessible ceilings may affect new work, the contractor shall coordinate and alter new work to properly fit the existing conditions. The work shall be performed at no extra cost. The contractor shall verify all conditions and dimensions at the job site prior to the start of construction. If discrepancies are found, the architect shall be notified for clarification before commencing with the work.
5. Details not shown are similar in character to those shown. When specific dimensions, details, or design intent cannot be determined, consult the architect before proceeding with the work.
6. Some masonry and lumber dimensions shown on the drawings are nominal dimensions. Contractor(s) shall coordinate actual dimensions with the job conditions.
Report all discrepancies to the architect.
7. Existing conditions shown on this drawing are not guaranteed to be complete. The contractor(s) shall field verify all existing conditions, dimensions, and materials required for the contracted work. Report all discrepancies to the architect prior to fabrication and erection.
8. The term ‘patch to match’ or ‘cutting and patching’ denotes that repair work is necessary to construct a floor, base, wainscot, wall or ceiling to match its adjacent surface, texture, material, finish and color of adjacent existing surfaces.
9. If materials suspected of containing hazardous materials are encountered, DO NOT DISTURB; immediately notify the architect and owner.
10. Where existing partitions or services have been removed, or new services penetrate existing surfaces, the openings shall be patched to match the existing surface finish, texture, and sheen.
11. Where new openings occur in structural bearing wall, contractor is responsible for temporary supports and/or shoring as required for installation of lintels.
12. Where existing doorways are to be filled in, contractor is responsible for field verifying wall widths.
13. The General Contractor is responsible for installation of all access doors, access panels and frames, including, but not limited to those specific in the construction documents and furnished by other contractors. All access doors and panel locations to be coordinated and approved by the architect prior to installation. The general contractor is responsible for painting all access panels and access doors. General contractor is responsible for coordinating all paint colors with the architect prior to commencing with the work.
14. When power and data receptacles are intended to be adjacent, they should be placed no more than 1’‐0” apart.
II. Fire Resistance Rating
1. Fire rating indicated on a wall shall mean the entire length and height of wall to be fire rated.
2. All piping, ducts, cabinets, etc. that penetrate walls shall be installed in a manner that wil preserve the fire resistance rating of that wall.
3. Preserve all fire resistant ratings of existing wall unless otherwise noted.
III. Dimensioning
1. Interior partitions are dimensioned to face of gypsum board exclusive of finish material, such as ceramic tile or wood paneling. The contractor shall coordinate finish dimensions and face of wall dimensions with finish schedule when critical to the installation of millwork or equipment.
anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic ab abv a/c acous act adj aff alt alum anod approx arch auto board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing bd betw bldg blk blkhd bm bot brdg brg brk bsmt bur cfm cg ci cj clg cl clr cll cntr cmu co col conc conn const cont coord corr cs ctr cubic feet per minute corner guard cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center d dbl deg demo dia dim disp dn dr ds det dwg dwr dw depth double degrees demolition diameter dimension dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior ea ec eifs ej elec elev emerg eq equip es etr ew ewc exh exist exp exp'd ext fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant fa fb fcu f/f fd fdn fe fec fhc fin flr fluor fr ga galv gc gl gr gyp bd gauge galvanized general contractor glass grade gypsum board h hb hc hdbd hdcpd hdwr hdwd hepa hm horiz hpdl hr ht htg htr hvac hw high hose bibb hollow core hardboard handicapped hardware hardwood high efficiency particulate air hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water id in incl insul int inside diameter inch include (inclusive) insulation interior janitor joist jan jst knock down knock out kd ko l lam lav lb lf lim lt ltg lvr length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver marb mas mat max mech memb mechanical, electrical, plumbing mfr min marble masonry material maximum mechanical membrane mep manufacturer minimum not applicable not in contract number nominal not to scale n/a nic no nom nts overall on center on center above finish floor outside diameter overhead door opposite hand overflow roof drain out to out opening opposite optional oa oc ocaff od ohdr oph ovrd o/o op'g opp opt plbg pmld pnl plywd pol pp pr prefin prefab proj psc psf psi pt ptd ptn pvc pvmt plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point painted partition polyvinylchloride pavement qty quantity r ra rad rag rd rec ref reg reinf req'd riser return air radius return air grille roof drain receptacle refrigerator register reinforcement (reinforcing) required solid core schedule smoke detector saddle section sheet similar stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems sc sched sd sdl sect sht sim sp spec spkr spklr spr sq sq in sy ss std stl stor struc sucp sys t/g or t&g tg td tel temp temp'd terr thk thld toc tos tod tom toj top tow typ tongue and groove tempered glass trench drain telephose temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall typical undercut underground unfinished unlimited unless noted otherwise urinal uc ug unfin unlim uno ur vct vert vest vif vinyl composition tile vertical vestibule verify in field w w/ w/o w/w wc wd wh win wg wt wwf width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric yd yard c/c cab't cb cem cl center to center cabinet catch basin cement center line fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet frt frtwd ft ftg furr fvc misc mo mtd mtg mtl mull miscellaneous masonry opening mounted mounting metal mullion pbd pcf perim pg bd pl plas plam particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate res ret rev rm ro rvs resilient return revised (revision) room rough opening reverse
3' -6
1' -6
Shower valve
Shower head
Receptacle
Push plate
Thermostat
Humidistat
8"
4' -0
Phone jack
Light switch
CTW-1 DCS-1
3'
4"
FM-1 18"x36" FM-2 18"x18"
3'-0"
4'
0"
PTD-1
4' -6
RH-1
1'
6"
SND-1
4'
0"
SD-1
1'
7"
TTD-1
4'
6"
Fire extinguisher
Cabinet may occur
House Keeping
4'
6"5' -6
3' -0
Mop basin
Service faucet & controls
MBH-1, TYP
US-1
GB-36 3'-0"
6"
2' -1
0"
GB-18 1'-6"
GB-42 3'-6"
2' -1
0" 3'
-4 "1'-0" 3'-6"
3'-3"
Fa ce o f w al l
Fa ce o f w al l
6' -8
Typical accessory items. Some items may not occur in project.
2' -9
"4' -0
4' -0
8" 8"
Building, wall and detail section mark
Interior/exterior elevation reference
Enlarged plan or detail reference
Column reference grids
Revision reference number
Wall type
Window type
New level line, control point, or datum
New door
Indicates drawing sheet on which plan/detail is shown.
Indicates detail number
Indicates drawing sheet on which elevation is shown
Indicates elevation number
Indicates drawing sheet on which section is shown
Indicates section number
Door number46
XX
A
A2-1
A2-1
A2-1
A
Crown typeXX
Wall finish
A
New Existing
XX
XXX-XX Ceiling Type Ceiling HeightXX'-XX"
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
4/ 8/
:1
2:
A M
G-002
GENERAL INFORMATION RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 TEH TCK
Scale: 1 1/2" = 1'-0"G-002
FIRE RESISTANT CONTROL JOINT1
Scale: 1 1/2" = 1'-0"G-002
TYP ELECTRICAL / JUNCTION BOX4
Scale: 1 1/2" = 1'-0"G-002
TYP FRAME LOCATION2
Scale: 1 1/2" = 1'-0"G-002
TYP GYP BD CONTROL JOINT7
Scale: 1/4" = 1'-0"G-002
TYP GYP BD DETAIL3
Scale: 1/4" = 1'-0"G-002
TYP MSY DETAIL6
Scale: 12" = 1'-0"G-002
TYP SEALANT DETAIL5
GENERAL NOTES
STANDARD ABBREVIATIONS
STANDARD MOUNTING HEIGHTS
STANDARD SYMBOLS
REVISIONS: DATE:
NN
PP
RR
TT
VV
WW
YY
ZZ
AAAA
BBBB
CCCC
SS
UU
Y2 Y2
AA1AA1
AA2AA2
R1 R1
36a
Z4Z4
PH
AS
E
PHASE 1
PHASE 1
PHASE 2
PHASE 2
PHASE 3
PHASE 3
PHASE 4
PH
AS
E4
PHASE 4
PHASE 4
PHASE 4
PHASE 5
Multipurpose Room 1B430
Processing 1B465
Tlt.
1B464
Alcove 1B463
Blood Draw 1 1B468
Reception/ Discharge
1B477
Tlt.
1B478
Tlt.
1B479
Exam 1 1B482
Exam 2 1B480
Exam 3 1B481
Blood Draw 2 1B471
Blood Draw 3 1B474
Control Station 1B485
Exam 5 1B488
Exam 4 1B487
Soil 1B493
TeleHealth 1B492
Exam 6 1B491
Exam 7 1B490
Sub Wait 1B483
Blood Draw 6 1B473
Blood Draw Waiting 1B460
Blood Draw 4 1B470
Blood Draw 5 1B472
Check-In 1B467
Pre Op Waiting 1B476
Storage 1B475
Control Station 1B486
Clean 1B494
Exam 8 1B489
Storage 1B484
Corridor 1B486A
Corridor 1B476B
Kiosks 1B476A
Kiosks 1B460A
Elec 1B462
Corridor 1B466
Corridor 1B403
Passage 1B461
EMS
1B469
Corridor 1B402
Scale 1B476C
MH Office 1B594
MH Office 1B593
MH Office 1B592
MH Office 1B591
CWT Office 1B590
CWT Consult 1B505D
CWT Consult 1B505A
CWT Consult 1B505B EEG Clinic
1B503C
EEG Office 1B503B
EEG Office 1B503A
Passage 1B500B
Office 1B501D
Office 1B501C
Pre Op Office
1B501B
Pre Op Office
1B501A
Office 1B502A
Office 1B502B
Waiting 1B504
CWT Group Rm.
1B506
Storage 1B506A
CWT Work Area
1B508
Elec.
1B507
Kitchenette 1B508A
Corridor 1B589
Corridor 1B500A
Tlt 1B505C
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Patient Alcove 1B410
Tri-C Veterans
Edu.
Connection
Center 1B420
Mainstreet 1B400A
Corridor 1C402
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Corridor 1B400G
Vestibule 1B440
Cubicle Area 1B442
Evidence Room 1B443
Holding Room 1B444
Sec'y 1B457
Work Rm.
1B450
Lt. & Sg.
Office 1B446
Passage 1B445B
Passage 1B445A
Cap't of Patrol
Div./Ops Office 1B447
K-9 Officer Office 1B448
Interview Room 1B449
Capt. of Phys Sec & Tra
Office 1B454
Criminal Inves. Office
1B455
Passage 1B445C
Lockers 1B453
Armory 1B452
Stair 11 1S11
Toilet 1B451
Waiting 1B510
Data 1B159
Corridor 1A400H
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Toilet 1B567A
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Group Therapy 1 1B570C
Group Therapy 2 1B570D
Nurse Screening
1B581
Office 1B571
Exam Room 1B573
Office 1B575
Corridor 1B570G
Office 1B578
Elect.
1B550A
Office 1B579
Office 1B588
TMS Storage 1B587
Office 1B577
Case Manager 1B586
Office 1B576
Office 1B584
Office 1B574
Office 1B582
Office 1B572
Corridor 1B560B
Corridor 1B580
Office 1B585
Office 1B583
EMS
1B561
Office 1B562
Office 1B564
Storage 1B566
Tele-Health 1B566A
Office 1B568
Workroom 1B563A
Mainstreet 1B400B
Dry Storage 1C415
EMS
1C417
Office 1C416
Corridor 1C403
Food Prep.
1C414
Service 2 1C413
Service 1 1C412
Servery 1C411
Corridor 1C400
Corridor 1C404
Cooler 1C414A
Cooler 1C414B
Elec. Room 1B499
IRM
1B496
Eng Closet 1B495
Stair 10 1S10
Hall 1B518
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases
The project will consist of 5 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in calendar days Days from Award
Submission Phase 90 days Day 1-90
Phase 1 (North Access) 30 days Day 91-120
VA Activation 1 days Day 121-121
Phase 2 (North Scope) 150 days Day 122-271
VA Activation 30 days Day 272-301
Phase 3 (Central Accss) 30 days Day 302-331
VA Activation 0 days Day 332-332
Phase 4 (South Scope) 120 days Day 332-451
VA Activation 30 days Day 452-481
Phase 5 (Southeast Scope) 60 days Day 482-541
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
4/ 8/
:3
6:
P M
G-101
OVERALL PHASING PLAN RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 TEH TCK
Scale: 1/8" = 1'-0"G-101
FIRST FLOOR - OVERALL PHASING PLAN1
PHASING DURATIONS
0 4 8 16'
E
TDE = 192' - 10"
TD
E
3' -3
Waiting 1C511
Office 15 1C512
Reception Copy/Work
Rm 1C513
Office 13 1C514
Office 11 1C516
Office 6 1C517
Supplies 1C515
Waiting 1B511
Public Toilet 1B512
Corridor 1B513
EMS
1B514
Office 1B515
Read Consult 1B516
Reception 1B517
Hall 1B518
Staff Lounge 1B519
Staff Toilet 1B520
Storage 1B521
Pat Toilet 1B522
Clean 1B523
Soiled 1B524
Elec.
1B526
Elec.
1B527
Corridor 1C557
Vestibule 1A101A
Corridor 1B589A
Blood Draw 1B431
Blood Draw Waiting 1B430
W.H.
Conference
Room 1B543A
W.H. Office 1B543B
W.H. Office 1B543C
W.H. Office 1B543F
M.H. Office 1B559 W.H. Soiled
1B558 W.H. Office
1B557 Office 1B556
Office 1B555
W.H. Office 1B553
W.H. Work Room 1B551
W.H. Office 1B548
W.H. Office 1B546
W.H. Tlt.
1B545
W.H. Office 1B544
M.H. Office 1B590
W.H. Office 1B554
W.H.
Conf/Stor/Break/Clean
1B552
W.H. Exam Room 1B549
W.H. Exam Room 1B547
W.H. Exam Room
1B543E
W.H.
General
Work Area/Conference
Room 1B589
Corridor 1C557
W.H.
Surgical Service Office 1B462
EMS
1B464
EEG Office 1B461
Tele-Health 1B472
Surgical Service Office 1B473
EEG Office 1B463
SCI Nurse 1B475
EEG Lab 1B466 E.C.
1B465
PIV
1B467
IRM
1B468
Vacant 1B478
Director's Suite Office
1B469
Mailroom / Breakroom
1B468A
Vacant 1B479
Surgical Service Office 1B498
Vacant 1B477
Vacant 1B476
Vacant 1B474
My Healthy Vet
1B471
Hall 1B400C
CWT Open Office 1B236
CWT Office 1B480A
CWT Conf.
Rm
1B482A
Vocera 1B481
Corridor 1B400D
Elec. Room 1B499
IRM
1B496
Eng Closet 1B495
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Patient Alcove 1B410
Tri-C Veterans
Edu.
Connection
Center 1B420
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Vestibule 1B440
Cubicle Area 1B442
Evidence Room 1B443
Holding Room 1B444
Sec'y 1B457
Work Rm.
1B450
Lt. & Sg.
Office 1B446
Passage 1B445B
Passage 1B445A
Cap't of Patrol
Div./Ops Office 1B447
K-9 Officer Office 1B448
Interview Room 1B449
Capt. of Phys Sec & Tra
Office 1B454
Criminal Inves. Office
1B455
Passage 1B445C
Lockers 1B453
Armory 1B452
Stair 11 1S11
Toilet 1B451
Waiting 1B510
Data 1B159
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Toilet 1B567A
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Group Therapy 1 1B570C
Group Therapy 2 1B570D
Nurse Screening
1B581
Office 1B571
Exam Room 1B573
Office 1B575
Corridor 1B570G
Office 1B578
Elect.
1B550A
Office 1B579
Office 1B588
TMS Storage 1B587
Office 1B577
Case Manager 1B586
Office 1B576
Office 1B584
Office 1B574
Office 1B582
Office 1B572
Corridor 1B560B
Corridor 1B580
Office 1B585
Office 1B583
EMS
1B561
Office 1B562
Office 1B564
Storage 1B566
Tele-Health 1B566A
Office 1B568
Workroom 1B563A
Dry Storage 1C415
EMS
1C417
Office 1C416
Food Prep.
1C414
Service 2 1C413
Service 1 1C412
Servery 1C411
Dining 1C410
Veg. Cooler 1C471
Milk & Bread 1C472
Corridor 1C470
Elect.
1C460
Cooler 1C414A
Cooler 1C414B
Passage 1B500B
PH
AS
E
PHASE 1
PHASE 1
TDE = 207' - 11"
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Smoke Barrier
0 HR Smoke Partition
Hazardous Room
Fire Extinguisher Cabinet
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire and Smoke Barrier
E Exit TDE = Total distance to exit
Travel distance path
Scope boundary
Phase area
ICRA Class
Design Code
Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression
Construction Type (Table 20.1.6.1)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (20.3.6.1.3)
Corridor width (20.2.3.2)
Dead End Corridors (20.2.5.2.1)
Smoke Compartments (20.3.7.3.2)
Smoke Barriers (20.3.7.1.1)
Hazardous Area Protection (20.3.2.1, 8.7.1.1) High hazard areas (20.3.2.3)
Travel Distances Room remote point to exit (20.2.6.2.2) Common path of travel (20.2.5.3.1)
Class III
2018 NFPA 101 Life Safety Code
2 hours between Ambulatory Healthcare and Healthcare 1 hour between Ambulatory Healthcare and Business 1 hour between Ambulatory Healthcare and Industrial
Fully Sprinklered
Type II (222), Greater than 2 stories
2 hours 1 hour supporting roof only 2 hours 1 hour support roof only 2 hours 1 hour supporting roof only 2 hours 1 hour 0 hour 0 hour
1 hour for less than 4 stories 2 hours for 4 stories or more
1 hour for existing if building is fully sprinklered 2 hours for 4 stories or more 1 hour for less than 4 stories
No rating
44" minimum
50' maximum
40,000 SF maximum
1 hour
1 hour or extinguishing system and smoke partitions 1 hour and extinguishing system
200' maximum 100' maximum
New Ambulatory Healthcare Occupancies Code Information
2b
2c2d
2e 5 6
9a 9b
9c10
13a
13b
9d
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
4/ 8/
:1
3:
A M
G-111
FIRST FLOOR LIFE SAFETY PLAN
PHASE 1
RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 TEH TCK
Scale: 1/8" = 1'-0"G-111
FIRST FLOOR - LIFE SAFETY PLAN - PHASE 11
LIFE SAFETY LEGEND
LIFE SAFETY CODE INFORMATION
01 SMOKE...
Number Area
1 22,445 SF
2 89,649 SF
2a 14,217 SF 2b 21,752 SF 2c 14,106 SF 2d 18,941 SF 2e 12,788 SF 2f 8,613 SF
3 21,259 SF
4 3,402 SF
5 4,030 SF
6 15,346 SF
7 7,195 SF
8 17,159 SF
9 55,399 SF
9a 15,717 SF 9b 14,781 SF 9c 23,569 SF 9d 1,128 SF
10 6,681 SF
11 577 SF
12 24,591 SF
13 18,213 SF
13a 6,338 SF 13b 12,155 SF
14 10,502 SF
15 10,069 SF
16 14,667 SF
Note: This sheet to be printed in color. If not printed in color, request color sheet from printer
FIRST FLOOR - SMOKE COMPARTMENTS
0 4 8 16'
CODED NOTES LIFE SAFETY
1 Cover exit sign during Phase 2 construction 2 Maintain egress from South to West corridors throughout Phase 2 construction.
3 Provide interim life safety measures to discourage egress North into this corridor.
4 Maintain egress throughout Phase 2 construction 5 Blank-out left directional arrow. Right directional arrow to remain.
6 Remove existing sign during Phase 3 7 Uncover existing sign after Phase 2 is complete 8 Remove exit sign during Phase 4 construction.
9 Maintain egress throughout Phase 4 construction.
10 Maintain egress throughout Phase 5 construction.
11 Provide interim Life Safety measures to inform occupants travel distance to nearest exit exceeds 200 feet
TDE = 192' - 10"
TD
E
3' -3
Vestibule 1A101A
Waiting 1C511
Office 15 1C512
Reception Copy/Work
Rm 1C513
Office 13 1C514
Office 11 1C516
Office 6 1C517
Supplies 1C515
Waiting 1B511
Public Toilet 1B512
Corridor 1B513
EMS
1B514
Office 1B515
Read Consult 1B516
Reception 1B517
Hall 1B518
Staff Lounge 1B519
Staff Toilet 1B520
Storage 1B521
Pat Toilet 1B522
Clean 1B523
Soiled 1B524
Elec.
1B526
Elec.
1B527
Corridor 1C557
MH Office 1B594
MH Office 1B593
MH Office 1B592
MH Office 1B591
CWT Office 1B590
CWT Consult 1B505D
CWT Consult 1B505A
CWT Consult 1B505B EEG Clinic
1B503C
EEG Office 1B503B
EEG Office 1B503A
Passage 1B500B
Office 1B501D
Office 1B501C
Pre Op Office
1B501B
Pre Op Office
1B501A
Office 1B502A
Office 1B502B
Waiting 1B504
CWT Group Rm.
1B506
Storage 1B506A
CWT Work Area
1B508
Elec.
1B507
Corridor 1B589
Corridor 1B500A
Tlt 1B505C
Blood Draw 1B431
Blood Draw Waiting 1B430
Elec. Room 1B499
IRM
1B496
Eng Closet 1B495
Surgical Service Office 004D
EMS
1B464
EEG Office 004E
Tele-Health 004F
Surgical Service Office 004G
EEG Office 1B463
SCI Nurse 004H
EEG Lab 004I E.C.
1B465
PIV
004J
IRM
004K
Vacant 004L
Director's Suite Office
004M
Mailroom / Breakroom
1B468A
Vacant 004N
Surgical Service Office 1B498
Vacant 004O
Vacant 004P
Vacant 004Q
My Healthy Vet
004R
Hall 1B400C
CWT Open Office 1B236
CWT Office 1B480A
CWT Conf.
Rm
1B482A
Vocera 004S
Corridor 1B400D
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Patient Alcove 1B410
Tri-C Veterans
Edu.
Connection
Center 1B420
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Vestibule 1B440
Cubicle Area 1B442
Evidence Room 1B443
Holding Room 1B444
Sec'y 1B457
Work Rm.
1B450
Lt. & Sg.
Office 1B446
Passage 1B445B
Passage 1B445A Cap't of
Patrol Div./Ops
Office 1B447
K-9 Officer Office 1B448
Interview Room 1B449
Capt. of Phys Sec & Tra
Office 1B454
Criminal Inves. Office
1B455
Passage 1B445C
Lockers 1B453
Armory 1B452
Stair 11 1S11
Toilet 1B451
Waiting 1B510
Data 1B159
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Toilet 1B567A
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Group Therapy 1 1B570C
Group Therapy 2 1B570D
Nurse Screening
1B581
Office 1B571
Exam Room 1B573
Office 1B575
Corridor 1B570G
Office 1B578
Elect.
1B550A
Office 1B579
Office 1B588
TMS Storage 1B587
Office 1B577
Case Manager 1B586
Office 1B576
Office 1B584
Office 1B574
Office 1B582
Office 1B572
Corridor 1B560B
Corridor 1B580 Office
1B585
Office 1B583
EMS
1B561
Office 1B562
Office 1B564
Storage 1B566
Tele-Health 1B566A
Office 1B568
Workroom 1B563A
Dry Storage 1C415
EMS
1C417
Office 1C416
Food Prep.
1C414
Service 2 1C413
Service 1 1C412
Servery 1C411
Dining 1C410
Veg. Cooler 1C471
Milk & Bread 1C472
Corridor 1C470
Elect.
1C460
Cooler 1C414A
Cooler 1C414B
PHASE 2
PHASE 2
TD
E
7'
-1 1"
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Smoke Barrier
0 HR Smoke Partition
Hazardous Room
Fire Extinguisher Cabinet
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire and Smoke Barrier
E Exit TDE = Total distance to exit
Travel distance path
Scope boundary
Phase area
ICRA Class
Design Code
Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression
Construction Type (Table 20.1.6.1)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (20.3.6.1.3)
Corridor width (20.2.3.2)
Dead End Corridors (20.2.5.2.1)
Smoke Compartments (20.3.7.3.2)
Smoke Barriers (20.3.7.1.1)
Hazardous Area Protection (20.3.2.1, 8.7.1.1) High hazard areas (20.3.2.3)
Travel Distances Room remote point to exit (20.2.6.2.2) Common path of travel (20.2.5.3.1)
Class III
2018 NFPA 101 Life Safety Code
2 hours between Ambulatory Healthcare and Healthcare 1 hour between Ambulatory Healthcare and Business 1 hour between Ambulatory Healthcare and Industrial
Fully Sprinklered
Type II (222), Greater than 2 stories
2 hours 1 hour supporting roof only 2 hours 1 hour support roof only 2 hours 1 hour supporting roof only 2 hours 1 hour 0 hour 0 hour
1 hour for less than 4 stories 2 hours for 4 stories or more
1 hour for existing if building is fully sprinklered 2 hours for 4 stories or more 1 hour for less than 4 stories
No rating
44" minimum
50' maximum
40,000 SF maximum
1 hour
1 hour or extinguishing system and smoke partitions 1 hour and extinguishing system
200' maximum 100' maximum
New Ambulatory Healthcare Occupancies Code Information
2b
2c2d
2e 5 6
9a 9b
9c10
13a
13b
9d
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
4/ 8/
:1
4:
A M
G-112
FIRST FLOOR LIFE SAFETY PLAN
PHASE 2
RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 TEH TCK
Scale: 1/8" = 1'-0"G-112
FIRST FLOOR - LIFE SAFETY PLAN - PHASE 21
LIFE SAFETY LEGEND
01 SMOKE...
Number Area
1 22,445 SF
2 89,649 SF
2a 14,217 SF 2b 21,752 SF 2c 14,106 SF 2d 18,941 SF 2e 12,788 SF 2f 8,613 SF
3 21,259 SF
4 3,402 SF
5 4,030 SF
6 15,346 SF
7 7,195 SF
8 17,159 SF
9 55,399 SF
9a 15,717 SF 9b 14,781 SF 9c 23,569 SF 9d 1,128 SF
10 6,681 SF
11 577 SF
12 24,591 SF
13 18,213 SF
13a 6,338 SF 13b 12,155 SF
14 10,502 SF
15 10,069 SF
16 14,667 SF
LIFE SAFETY CODE INFORMATION
Note: This sheet to be printed in color. If not printed in color, request color sheet from printer
FIRST FLOOR - SMOKE COMPARTMENTS
0 4 8 16'
CODED NOTES LIFE SAFETY
1 Cover exit sign during Phase 2 construction 2 Maintain egress from South to West corridors throughout Phase 2 construction.
3 Provide interim life safety measures to discourage egress North into this corridor.
4 Maintain egress throughout Phase 2 construction 5 Blank-out left directional arrow. Right directional arrow to remain.
6 Remove existing sign during Phase 3 7 Uncover existing sign after Phase 2 is complete 8 Remove exit sign during Phase 4 construction.
9 Maintain egress throughout Phase 4 construction.
10 Maintain egress throughout Phase 5 construction.
11 Provide interim Life Safety measures to inform occupants travel distance to nearest exit exceeds 200 feet
PHASE 3
PHASE 3
Waiting 1C511
Office 15 1C512
Reception Copy/Work
Rm 1C513
Office 13 1C514
Office 11 1C516
Office 6 1C517
Supplies 1C515
Waiting 1B511
Public Toilet 1B512
Corridor 1B513
EMS
1B514
Office 1B515
Read Consult 1B516
Reception 1B517
Hall 1B518
Staff Lounge 1B519
Staff Toilet 1B520
Storage 1B521
Pat Toilet 1B522
Clean 1B523
Soiled 1B524
Elec.
1B526
Elec.
1B527
Corridor 1C557
Food Operations Manager 1C453
Food General
Store 1C452
Food Operating Manager 1C451
Scullery 1C450
Vestibule 1A101A
MH Office 1B594
MH Office 1B593
MH Office 1B592
MH Office 1B591
CWT Office 1B590
CWT Consult 1B505D
CWT Consult 1B505A
CWT Consult 1B505B EEG Clinic
1B503C
EEG Office 1B503B
EEG Office 1B503A
Passage 1B500B
Office 1B501D
Office 1B501C
Pre Op Office
1B501B
Pre Op Office
1B501A
Office 1B502A
Office 1B502B
Waiting 1B504
CWT Group Rm.
1B506
Storage 1B506A
CWT Work Area
1B508
Elec.
1B507
Corridor 1B589
Corridor 1B500A
Tlt 1B505C
Blood Draw 1B431
Blood Draw Waiting 1B072
Surgical Service Office 1B462
EMS
1B079
EEG Office 1B461
Tele-Health 1B472
Surgical Service Office 1B473
EEG Office 1B080
SCI Nurse 1B475
EEG Lab 1B466 E.C.
1B081
PIV
1B467
IRM
1B468
Vacant 1B478
Director's Suite Office
1B469
Mailroom / Breakroom
1B468A
Vacant 1B479
Surgical Service Office 1B498
Vacant 1B477
Vacant 1B476
Vacant 1B474
My Healthy Vet
1B471
Hall 1B400C
CWT Open Office 1B236
CWT Office 1B480A
CWT Conf.
Rm
1B482A
Vocera 1B481
Corridor 1B400D
Elec. Room 1B499
IRM
1B496
Eng Closet 1B495
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Patient Alcove 1B410
Tri-C Veterans
Edu.
Connection
Center 1B420
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Vestibule 1B440
Cubicle Area 1B442
Evidence Room 1B443
Holding Room 1B444
Sec'y 1B457
Work Rm.
1B450
Lt. & Sg.
Office 1B446
Passage 1B445B
Passage 1B445A
Cap't of Patrol
Div./Ops Office 1B447
K-9 Officer Office 1B448
Interview Room 1B449
Capt. of Phys Sec & Tra
Office 1B454
Criminal Inves. Office
1B455
Passage 1B445C
Lockers 1B453
Armory 1B452
Stair 11 1S11
Toilet 1B451
Waiting 1B510
Data 1B159
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Toilet 1B567A
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Group Therapy 1 1B570C
Group Therapy 2 1B570D
Nurse Screening
1B581
Office 1B571
Exam Room 1B573
Office 1B575
Corridor 1B570G
Office 1B578
Elect.
1B550A
Office 1B579
Office 1B588
TMS Storage 1B587
Office 1B577
Case Manager 1B586
Office 1B576
Office 1B584
Office 1B574
Office 1B582
Office 1B572
Corridor 1B560B
Corridor 1B580
Office 1B585
Office 1B583
EMS
1B561
Office 1B562
Office 1B564
Storage 1B566
Tele-Health 1B566A
Office 1B568
Workroom 1B563A
Dry Storage 1C415
EMS
1C417
Office 1C416
Food Prep.
1C414
Service 2 1C413
Service 1 1C412
Servery 1C411
Dining 1C410
Veg. Cooler 1C471
Milk & Bread 1C472
Corridor 1C470
Elect.
1C460
Cooler 1C414A
Cooler 1C414B
E
E
TDE = 193' - 2"
TD
E
3' -3
TD
E
7' -1
1"
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Smoke Barrier
0 HR Smoke Partition
Hazardous Room
Fire Extinguisher Cabinet
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire and Smoke Barrier
E Exit TDE = Total distance to exit
Travel distance path
Scope boundary
Phase area
ICRA Class
Design Code
Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression
Construction Type (Table 20.1.6.1)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (20.3.6.1.3)
Corridor width (20.2.3.2)
Dead End Corridors (20.2.5.2.1)
Smoke Compartments (20.3.7.3.2)
Smoke Barriers (20.3.7.1.1)
Hazardous Area Protection (20.3.2.1, 8.7.1.1) High hazard areas (20.3.2.3)
Travel Distances Room remote point to exit (20.2.6.2.2) Common path of travel (20.2.5.3.1)
Class III
2018 NFPA 101 Life Safety Code
2 hours between Ambulatory Healthcare and Healthcare 1 hour between Ambulatory Healthcare and Business 1 hour between Ambulatory Healthcare and Industrial
Fully Sprinklered
Type II (222), Greater than 2 stories
2 hours 1 hour supporting roof only 2 hours 1 hour support roof only 2 hours 1 hour supporting roof only 2 hours 1 hour 0 hour 0 hour
1 hour for less than 4 stories 2 hours for 4 stories or more
1 hour for existing if building is fully sprinklered 2 hours for 4 stories or more 1 hour for less than 4 stories
No rating
44" minimum
50' maximum
40,000 SF maximum
1 hour
1 hour or extinguishing system and smoke partitions 1 hour and extinguishing system
200' maximum 100' maximum
New Ambulatory Healthcare Occupancies Code Information
2b
2c2d
2e 5 6
9a 9b
9c10
13a
13b
9d
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
PROJECT
NORTH
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID ISSUE
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CLEVELAND, OHIO
DESIGN AND CONSTRUCTION DOCUMENTS AS INSTRUMENTS OF
SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY
OF PERSPECTUS ARCHITECTURE. THE USE OF THIS DESIGN AND
THESE CONSTRUCTION DOCUMENTS FOR PURPOSES OTHER
THAN THE SPECIFIC PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT © 2021.
1300 East 9th St. Suite 910 Cleveland, Ohio 44114 P. 216.752.1800 F. 216.752.3833
C :\T em p\
Lo ca ls
8\
VA
M
P_ R
R C
S_ M ai n
Bu ild in g_
R
_t kr ej ci pe rs pe ct us ar ch
.c om
.rv t
4/ 8/
:1
4:
A M
G-113
FIRST FLOOR LIFE SAFETY PLAN
PHASE 3
RENOVATE AND RECONFIGURE
CLINICAL SERVICES
541‐20‐101
4/9/21 TEH TCK
Scale: 1/8" = 1'-0"G-113
FIRST FLOOR - LIFE SAFETY PLAN - PHASE 31
LIFE SAFETY LEGEND
LIFE SAFETY CODE INFORMATION
Note: This sheet to be printed in color. If not printed in color, request color sheet from printer
FIRST FLOOR - SMOKE COMPARTMENTS
0 4 8 16'
CODED NOTES LIFE SAFETY
1 Cover exit sign during Phase 2 construction 2 Maintain egress from South to West corridors throughout Phase 2 construction.
3 Provide interim life safety measures to discourage egress North into this corridor.
4 Maintain egress throughout Phase 2 construction 5 Blank-out left directional arrow. Right directional arrow to remain.
6 Remove existing sign during Phase 3 7 Uncover existing sign after Phase 2 is complete 8 Remove exit sign during Phase 4 construction.
9 Maintain egress throughout Phase 4 construction.
10 Maintain egress throughout Phase 5 construction.
11 Provide interim Life Safety measures to inform occupants travel distance to nearest exit exceeds 200 feet
(P at h co nt in ue s
To xit
Pa ss ag ew ay
B2
A)
Waiting 1C511
Office 15 1C512
Reception Copy/Work
Rm 1C513
Office 13 1C514
Office 11 1C516
Office 6 1C517
Supplies 1C515
Waiting 1B511
Public Toilet 1B512
Corridor 1B513
EMS
1B514
Office 1B515
Read Consult 1B516
Reception 1B517
Hall 1B518
Staff Lounge 1B519
Staff Toilet 1B520
Storage 1B521
Pat Toilet 1B522
Clean 1B523
Soiled 1B524
Elec.
1B526
Elec.
1B527
Corridor 1C557
Vestibule 1A101A
Blood Draw 1 1B468
Reception/ Discharge
1B477
Tlt.
1B478
Tlt.
1B479
Exam 1 1B482
Exam 2 1B480
Exam 3 1B481
Blood Draw 2 1B471
Blood Draw 3 1B474
Control Station 1B485
Exam 5 1B488
Exam 4 1B487
Soil 1B493
TeleHealth 1B492
Exam 6 1B491
Exam 7 1B490
Sub Wait 1B483
Blood Draw 6 1B473
Blood Draw Waiting 1B460
Blood Draw 4 1B470
Blood Draw 5 1B472
Check-In 1B467
Pre Op Waiting 1B476
Storage 1B475
Control Station 1B486
Clean 1B494
Exam 8 1B489
Storage 1B484
Corridor 1B486A
Corridor 1B476B
Kiosks 1B476A
Kiosks 1B460A
Elec 1B462
Corridor 1B466
Corridor 1B403
Passage 1B461
EMS
1B469
Corridor 1B402
Scale 1B476C
MH Office 1B594
MH Office 1B593
MH Office 1B592
MH Office 1B591
CWT Office 1B590
CWT Consult 1B505D
CWT Consult 1B505A
CWT Consult 1B505B EEG Clinic
1B503C
EEG Office 1B503B
EEG Office 1B503A
Passage 1B500B
Office 1B501D
Office 1B501C
Pre Op Office
1B501B
Pre Op Office
1B501A
Office 1B502A
Office 1B502B
Waiting 1B504
CWT Group Rm.
1B506
Storage 1B506A
CWT Work Area
1B508
Elec.
1B507
Corridor 1B589
Corridor 1B500A
Tlt 1B505C
Blood Draw 1B431
Blood Draw Waiting 1B430
Elec. Room 1B499
IRM
1B496
Eng Closet 1B495
VSO Office 1B414
Hall 1B412
VSO Office 1B415
VSO Office 1B413
Escort Services 1B411
Patient Alcove 1B410
Tri-C Veterans
Edu.
Connection
Center 1B420
Interview Room 1B441
Files/Copy 1B458
Chief Of Police 1B459
Dispatch & Fire
1B456
VSO Office 1B417
VSO Office 1B416
VSO Office 1B419
VSO Office 1B418
Vestibule 1B440
Cubicle Area 1B442
Evidence Room 1B443
Holding Room 1B444
Sec'y 1B457
Work Rm.
1B450
Lt. & Sg.
Office 1B446
Passage 1B445B
Passage 1B445A
Cap't of Patrol
Div./Ops Office 1B447
K-9 Officer Office 1B448
Interview Room 1B449
Capt. of Phys Sec & Tra
Office 1B454
Criminal Inves. Office
1B455
Passage 1B445C
Lockers 1B453
Armory 1B452
Stair 11 1S11
Toilet 1B451
Waiting 1B510
Data 1B159
Lockers 1B453B
Elect.
1C403A
Closet 1C403B
Breakroom 1B567
Toilet 1B567B
Toilet 1B567A
Corridor 1B567C
Workroom 1B563
Registration 1B560A
Waiting 1B560
Toilet 1B570B
Toilet 1B570A
Corridor 1B570
Group Therapy 1 1B570C
Group Therapy 2 1B570D
Nurse Screening
1B581
Office 1B571
Exam Room 1B573
Office 1B575
Corridor 1B570G
Office 1B578
Elect.
1B550A
Office 1B579
Office 1B588
TMS Storage 1B587
Office 1B577
Case Manager 1B586
Office 1B576
Office 1B584
Office 1B574
Office 1B582
Office 1B572
Corridor 1B560B
Corridor 1B580
Office 1B585
Office 1B583
EMS
1B561
Office 1B562
Office 1B564
Storage 1B566
Tele-Health 1B566A
Office 1B568
Workroom 1B563A
Dry Storage 1C415
EMS
1C417
Office 1C416
Food Prep.
1C414
Service 2 1C413
Service 1 1C412
Servery 1C411
Dining 1C410
Veg. Cooler 1C471
Milk & Bread 1C472
Corridor 1C470
Elect.
1C460
Cooler 1C414A
Cooler 1C414B
PHASE 4
PH
AS
E4
PHASE 4
PHASE 4
PHASE 4
EE
E
TDE = 182' - 8"
TDE = 199' - 7"
TD
E
3' -3
1 HR Fire Barrier
2 HR Fire Barrier
1 HR Smoke Barrier
0 HR Smoke Partition
Hazardous Room
Fire Extinguisher Cabinet
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire and Smoke Barrier
E Exit TDE = Total distance to exit
Travel distance path
Scope boundary
Phase area
ICRA Class
Design Code
Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression
Construction Type (Table 20.1.6.1)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (20.3.6.1.3)
Corridor width (20.2.3.2)
Dead End Corridors (20.2.5.2.1)
Smoke Compartments (20.3.7.3.2)
Smoke Barriers (20.3.7.1.1)
Hazardous Area Protection (20.3.2.1, 8.7.1.1) High hazard areas (20.3.2.3)
Travel Distances Room remote point to exit (20.2.6.2.2) Common path of travel (20.2.5.3.1)
Class III
2018 NFPA 101 Life Safety Code
2 hours between Ambulatory Healthcare and Healthcare 1 hour between Ambulatory Healthcare and Business 1 hour between Ambulatory Healthcare and Industrial
Fully Sprinklered
Type II (222), Greater than 2 stories
2 hours 1 hour supporting roof only 2 hours 1 hour support roof only 2 hours 1 hour supporting roof only 2 hours 1 hour 0 hour 0 hour
1 hour for less than 4 stories 2 hours for 4 stories or more
1 hour for existing if building is fully sprinklered 2 hours for 4 stories or more 1 hour for less than 4 stories
No rating
44" minimum
50' maximum
40,000 SF maximum
1 hour
1 hour or extinguishing system and smoke partitions 1 hour and extinguishing system
200' maximum 100' maximum
New Ambulatory Healthcare Occupancies Code Information
2b
2c2d
2e 5 6
9a 9b
9c10
13a
13b
9d
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .