S02. 598-19-113 100 Pct Drawings.pdf
PDF 45 MB Posted
- Solicitation number
- 36C25621R0123
About this file
This document provides details on a federal contract solicitation to replace fiberglass piping in a chiller plant. The solicitation will be issued on June 11, 2021 through beta.sam.gov for a project valued between $1,000,000 and $5,000,000. The NAICS code is 236220 for specialty trade contractors with a small business size standard of $39.5 million. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Interested offerors must register on VETBIZ and in beta.sam.gov to receive any amendments by email. The work will be performed at the Eugene Towbin Veterans Hospital in North Little Rock, Arkansas. The point of contact for inquiries is Brad Martin via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0123 0001.docx | DOCX document | |
| RFI for Fiberglass Piping w Comments - JDa (002).pdf | ||
| P07. Wage Determination ar32.txt | TXT text file | |
| PAST PERFORMANCE SURVEY FIBERGLASS PIPING.docx | DOCX document | |
| Division Cost Page (002).docx | DOCX document | |
| S02. FIBERGLASS PIPING 36C25621R0123_1.pdf | ||
| S02. 598-19-113 100 Pct Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INFORMATION
REPLACE FIBERGLASS PIPING CHILLER PLANT
VASN 16: (CAVHS) CENTRAL ARKANSAS VETERANS HEALTHCARE SYSTEM
EUGENE J. TOWBIN HEALTHCARE CENTER
NORTH LITTLE ROCK, AK 72114
PROJECT NUMBER: 598-19-113
PROJECT INFORMATION
REPLACE FIBERGLASS PIPING IN THE CHILLER PLANT LOCATED ON
THE GROUND FLOOR MECHANICAL ROOM GJ103-170, AND
REPLACEMENT OF AHU-16
BUILDING SUMMARY
GROSS AREA: N/A
STORIES: N/A
MAIN USE: HEALTHCARE
SECONDARY USES: ASSEMBLY; BUSINESS
AREA BY USE:
MECHANICAL ROOM: 5,463 SF
PROJECT INFORMATION-GO-BY
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
N
N
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
NOT TO SCALE
CAMPUS MAP
NOT TO SCALE
VICINITY MAP
PROJECT
LOCATION
PROJECT
LOCATION
/3
/2
:1
:5
A
M C
U s e rs \a m o rr is \D o c u m e n ts
\5
-1
-1
R e p l_
F G
P ip in g C h ill e r_
P la n t_
A R
C H a la n a .m o rr is .r v t
COVER SHEET CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
2021.03.31 SMc JAC
GI001
JDA PROJECT #: D-19-09
REPLACE FIBERGLASS PIPING CHILLER PLANT
PROJECT No: 598-19-113
EUGENE J TOWBIN V.A. HOSPITAL; BUILDING 170
2200 FT ROOTS DRIVE, NORTH LITTLE ROCK, AR 72114
CONSTRUCTION DOCUMENTS
598-19-113
EJT VAMC NORTH LITTLE ROCK
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
STRUCTURAL ENGINEER
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
SHEET INDEX
NUMBER NAME
35% DESIGN
DEVELOPMENT
2019.11.27
65% DESIGN
DEVELOPMENT
2020.01.20
65% DESIGN
DEVELOPMENT
2020.08.11
65% DESIGN
DEVELOPMENT
2021.01.20
95% DESIGN
DEVELOPMENT
2021.03.24
CONSTRUCTION
DOCUMENTS
2021.03.31
GENERAL
GI001 COVER SHEET X X X X X X
GI002 SYMBOLS & NOTES X X X X X X
GI003 STANDARD ABBREVIATIONS X X X X X X
GI101 LIFE SAFETY PLAN X X X X X X
GC101 ICRA PLAN X X X
CIVIL
CU100 SITE PLAN X X X X
CU101 DEMOLITION PLAN X X X
CU102 NEW CHILLER LINE PLAN X X X
CU103 DETAILS X X X
ARCHITECTURAL
AD101 GROUND FLOOR PLAN - EXISTING X X X X X X
AE101 NEW CONSTRUCTION FLOOR PLAN X X X X
AE301 BUILDING SECTIONS - NEW CONSTRUCTION X X X X X X
MECHANICAL
MD101 CHILLER PLANT FLOOR PLAN - HVAC DEMOLITION X X X X X X
MD201 CHILLER PLANT NORTHWEST 3D VIEW - HVAC DEMOLITION X X X X X X
MD202 CHILLER PLANT NORTHEAST 3D VIEW - HVAC DEMOLITION X X X X X X
MD203 CHILLER PLANT SOUTHEAST 3D VIEW - HVAC DEMOLITION X X X X X X
MD204 CHILLER PLANT SOUTHWEST 3D VIEW - HVAC DEMOLITION X X X X X X
MS101 SITE PLAN - MECHANICAL DEMOLITION X X X X
MS102 SITE PLAN - MECHANICAL NEW CONSTRUCTION X X X X
MH100 MECHANICAL GENERAL NOTES AND LEGEND X X X X X X
MH101 CHILLER PLANT FLOOR PLAN - HVAC NEW CONSTRUCTION X X X X X X
MI101 MECHANICAL PIPING DIAGRAMS X X X X X X
MI102 MECHANICAL PIPING DIAGRAMS X X X X X X
MI103 MECHANICAL PIPING DIAGRAMS X X X X X X
MI104 MECHANICAL PIPING DIAGRAMS X X X X X X
MI110 FIBERGLASS PIPING CONTROL DIAGRAMS X X X X
MJ101 CHILLER PLANT NORTHWEST 3D VIEW - HVAC NEW CONSTRUCTION X X X X X X
MJ102 CHILLER PLANT NORTHEAST 3D VIEW - HVAC NEW CONSTRUCTION X X X X X X
MJ103 CHILLER PLANT SOUTHEAST 3D VIEW - HVAC NEW CONSTRUCTION X X X X X X
MJ104 CHILLER PLANT SOUTHWEST 3D VIEW - HVAC NEW CONSTRUCTION X X X X X X
MK101 MECHANICAL SCHEDULES X X X X X
ELECTRICAL
ED101 CHILLER PLANT FLOOR PLAN - ELECTRICAL DEMOLITION X X X X X X
ES101 SITE PLAN - ELECTRICAL DEMOLITION X X X X X X
ES102 SITE PLAN - ELECTRICAL NEW CONSTRUCTION X X X X X X
EL101 CHILLER PLANT FLOOR PLAN - ELECTRICAL NEW CONSTRUCTION X X X X X X
A
1F157B
D2 / AE512
AE501
AE201
AE201
AE211
20' - 6"
FIRST FLOOR
P-01
SCOPE INDICATORS
DRAWING TITLE
DETAIL CALLOUT
DETAIL INDICATOR FOR SMALL CONDITIONS
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR,
INTERIOR, MULTIPLE
VIEW
BUILDING SECTION INDICATOR
SPACE IDENTIFICATION
OPENING INDICATOR
WINDOW INDICATOR
EQUIPMENT INDICATOR
SHEET NOTES
PARTITION TYPE INDICATOR
NORTH ARROW
INDICATES PROJECT NORTH
INDICATES TRUE NORTH
EXISTING
INDICATES
COLUMN LINE
DESIGNATION
COLUMN LINE INDICATORS
DRAWING REVISION INDICATOR
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED
NEW CONSTRUCTION
VV ITEM - GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
VC ITEM - GOVERNMENT
FURNISHED / CONTRACTOR
INSTALLED
ELEVATION INDICATOR
WALL FINISH INDICATOR
CC ITEM - CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
N
1 1/8" = 1'-0"
View Name
A_4A
BA3034
CASEWORK TAG
LETTER PAIR INDICATES CASEWORK FAMILY:
RE: AE511-514 FOR DETAILS
FIRST PAIR OF NUMBERS INDICATES UNIT
WIDTH (I.E. 30")
SECOND PAIR INDICATES COUNTERTOP
HEIGHT (I.E. 34")
TOILET ACCESSORY TAG
XXXX
JSN
A
NEW
INDICATES
COLUMN LINE
DESIGNATION
CEILING HEIGHT INDICATOR
Room name 1A105
9' - 0"
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/3
/2
:1
:0
A
M C
U s e rs \a m o rr is \D o c u m e n ts
\5
-1
-1
R e p l_
F G
P ip in g C h ill e r_
P la n t_
A R
C H a la n a .m o rr is .r v t
SYMBOLS & NOTES CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
EJT VAMC NORTH LITTLE ROCK
2021.03.31 SMc JAC
598-19-113
GI002
JDA PROJECT #: D-19-09
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
DRAFTING SYMBOLS
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PROTECTION
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/3
/2
:1
:0
A
M C
U s e rs \a m o rr is \D o c u m e n ts
\5
-1
-1
R e p l_
F G
P ip in g C h ill e r_
P la n t_
A R
C H a la n a .m o rr is .r v t
STANDARD ABBREVIATIONS CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
EJT VAMC NORTH LITTLE ROCK
2021.03.31 JDM JAC
598-19-113
GI003
JDA PROJECT #: D-19-09
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
SJI STEEL JOIST SLIDING WINDOW
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SMS SHEET METAL SCREW
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL
UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE
SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASSIFICATION
STIF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUB
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT
STL
STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SNTHETIC
SYS SYSTEM
T
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL,
TEMPERATURE CONTROL PANEL,
OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TLT TOILET
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ______
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TYP TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
U.O.N. UNLESS OTHERWISE NOTED
V
VC VA FURNISHED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE OR
VITRIFIED CLAY TILE
VENT VENTILATION
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED / VA INSTALLED
W
W/ WITH
WD WOOD
WP WALL PROTECTION
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R
R RADIUS OR RISER
RA RETURN AIR
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE, REINFORCED, OR
REINFORCING
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
S
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE, SCHEDULED
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL
FLASH
SHEET METAL (FLASHING)
SHTHG SHEATHING
SIM SIMILAR
SJ SCORED JOINT
SJ SCORED JOINT
NS NARROW STILE
NUM NUMERAL
O
O OXYGEN
O/H OVER HEAD
O/O OUT TO OUT
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE
DIMENSION
OFD OVERFLOW DRAIN
OFF OFFICE
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSIE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OUT OUTLET
OZ OUNCE
P
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTYLINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
OR PURCHASE ORDER POST
OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMAIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE OR QUART
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING
CONCRETE
LYR LAYER
M
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTAIN, MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM O MEDIUM
MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMBO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MIN MINIMUM MINUTE OR MINUTE
MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOICE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGAR
HM HOLLOW METAL OR
HECTOMETER
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HR HOUR
HRS HOURS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATED, INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANANEOUS WATER HEATER
J
J-BOX JUNCTION BOX
JAN JANITOR
K
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCEN FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF
CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF CURB
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR
FIREPROOF OR FLAT PANEL
DOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUT
FWC FABRIC WALL COVERING
G
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON, GALLONS
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
GFRG GLASS-FIBER-REINFORCED
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CTLINDER LOCK
D
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR
DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC, ELECTRICAL
ELEC DR
OP
ELECTRIC DOOR OPENER
ELEV ELEVATOR
ELEVS ELEVATIONS
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C
C CELSIUS CHANNEL OR CHANNEL
CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
C/C CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
C/VA CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CAB CABINET
CAC CEILING ATENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT, CEMENTITIOUS
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR
CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULATING, CIRCULAR
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LIINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
cm2 SQUARE CENTIMETER cm3 CUBIC CENTIMETER
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEAN OUT, OR COMPANY
co2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINAION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR COORDINATION OFFICER
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
A
A LABEL CLASS A DOOR
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADB AUTOMATIC DOOR BOTTOM
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION,
ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE, ALTERNATIVE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLAYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE, APPROXIMATELY
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO-VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL
WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'S
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PROTECTION
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
CBO
GJ100-170
LOADING DOCKLOADING DOCK
CORRIDOR
CGK1-170
ASSIS'T CHIEF
GK111G-170
VEST
GK110-170
STAIR 13
SG13-170
GENRTR RM
GK109-170
CBO
GJ100E-170
MECH ROOM
GK104-170
EXTERIOREXTERIOR
EXTERIOREXTERIOR
EXTERIOREXTERIOR
HOLDING DOCK
GJ102-170
MECH ROOM
GJ103-170
OFFICE
GJ103B-170
ALARM ROOM
GJ103A-170
POWER ROOM
GJ104-170
STAIR 12
SG12-170
C
C
G
G
H
H
J
J
K
K
46 46
48 48
47 47
TRAVEL DISTANCE: 175'
E
E
T R
A V
E L D
IS
T
A N
C E
' 1
T R
A V
E L D
IS
T
A N
C E
90 MIN F.R. DOOR
25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"
125' - 0"
NEW UNRATED PARTITION
NEW / EXISTING 1 HOUR BARRIER
EXISTING PARTITION TO BE REMOVED
EXISTING PARTITION
INDICATES PROJECT BOUNDARY
NEW / EXISTING 2 HOUR BARRIER
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/3
/2
:1
:0
A
M C
U s e rs \a m o rr is \D o c u m e n ts
\5
-1
-1
R e p l_
F G
P ip in g C h ill e r_
P la n t_
A R
C H a la n a .m o rr is .r v t
LIFE SAFETY PLAN CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
EJT VAMC NORTH LITTLE ROCK
2021.03.31 SMc TS
598-19-113
GI101
JDA PROJECT #: D-19-09
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PROTECTION
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
1/8" = 1'-0"E2
LIFE SAFETY PLAN
N
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
PROJECT
AREA
BLDG 170
N
PARTITION LEGEND
SLAB ELEVATION F.F.E. = 287.73'
C
C
G
G
H
H
J
J
K
K
46 46
48 48
47 47
E
E
C1
AE301
F1
AE301
CBO
GJ100-170
LOADING DOCKLOADING DOCK
CORRIDOR
CGK1-170
ASSIS'T CHIEF
GK111G-170
VEST
GK110-170
STAIR 13
SG13-170
GENRTR RM
GK109-170
MECH ROOM
GK104-170
LOADING
DOCK
LOADING
DOCK
EXTERIOREXTERIOR
EXTERIOREXTERIOR
E X
T E
R
IO
R E
X T
E R
IO
R
52 53
56 57 61
MECH ROOM
GJ103-170
OFFICE
GJ103B-170
ALARM ROOM
GJ103A-170
HOLDING DOCK
GJ102-170
POWER ROOM
GJ104-170
STAIR 12
SG12-170
CBO
GJ100E-170
25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"
125' - 0"
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE
AREA CLASS DESIGNATION
TYPE OF CONTRUCTION/PROJECT ACTIVITY TABLE
GROUP 1-LOW RISK
● OFFICE AREAS (NON-
CLINICAL)
PATIENT RISK GROUP TABLE
GROUP 2-MEDIUM RISK
GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK
INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP TYPE A
I I I
III
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION
ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES
ARE NECESSARY.
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.
REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT
BEFORE CONSTRUCTION BEGINS.
3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR
IMPLEMENT CONTROL CUBE METHOD.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERS.
8. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING
WORK AREAS.
9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. WIPE SURFACES TO REMOVE DUST.
1. WIPE WORK SURFACES WITH
DISINFECTANT.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WORK
AREA WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE WORK
WAS BEING PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE
WORK WAS BEING PERFORMED.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER
OR FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING
DEPARTMENT BEFORE CONSTRUCTION BEGINS.
3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE
METHOD BEFORE CONSTRUCTION BEGINS.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS-
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER
EXITS THE WORK AREA.
8. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA WITH
ANTEROOM. REPLACE PER MANUFACTURER'S RECOMMENDATIONS.
9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED EACH BY THE HOSPITAL SAFETY OFFICER,
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT
AND THOROUGHLY CLEANED BY THE HOSPITAL ENVIRONMENTAL
SERVICES DEPARTMENT OR THEIR CONTRACTED ENVIRONMENTAL
SERVICES COMPANY.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERING.
12. VACUUM WITH HEPA FILTERED VACUUM. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE REMOVED.
13. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE
REMOVED.
6. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE
WORK WAS BEING PERFORMED.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CLASS I
CLASS II
CLASS III
CLASS IV
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES BUT IS NOT LIMITED TO:
● REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE IN 50 SQUARE FEET
● PAINTING (BUT NOT SANDING), WALL COVERING
● ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR
ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST
INCLUDES BUT IS NOT LIMITED TO:
● INSTALLATION OF TELEPHONE AND COMPUTER CABLING
● ACCESS TO CHASE SPACES
● CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE B
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES BUT IS NOT LIMITED TO:
● SANDING OF WALLS FOR PAINTING OR WALL COVERING
● REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
● NEW WALL CONSTRUCTION
● MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
● MAJOR CABLING ACTIVITIES
● ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT IS NOT LIMITED TO:
● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
● REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM
● NEW CONSTRUCTION
TYPE D
ICRA GENERAL NOTES
● CARDIOLOGY
● ECHOCARDIOLOGY
● ENDOSCOPY-GI
● PHYSICAL THERAPY
● RADIOLOGY/MRI
● NUCLEAR MEDICINE
● RESPIRATORY CARE (EXCEPT
BRONCHOSCOPY AREA)
● CAFETERIA
● OUTPATIENT AREAS-CLINICS AND OFFICES
(EXCEPTION: TRANSPLANT AND ONCOLOGY)
● EMERGENCY ROOM
● POST ANESTHESIA
● CARE UNITS
● LABOR AND DELIVERY
● PEDIATRICS
● ADMISSION /
DISCHARGE AREA
● LABORATORIES
● PHARMACY
● INPATIENT UNITS (NOT
OTHERWISE
SPECIFIED)
● ALL OPERATING ROOMS INCLUDING LABOR
AND DELIVERY
● ANESTHESIA AND PUMP AREAS
● CENTRAL EQUIPMENT/STERILE SUPPLY
● CARDIAC CATHETERIZATION AND
ANGIOGRAPHY AREAS
● INTERVENTIONAL RADIOLOGY
● RADIATION ONCOLOGY
● ALL INTENSIVE CARE UNITS
● NEWBORN NURSERIES, INCLUDING NICU
● DIALYSIS UNIT
● ONCOLOGY-INPATIENT AND OUTPATIENT
● TRANSPLANT-INPATIENT AND OUTPATIENT
● PHARMACY ADMIXTURE
● NEGATIVE PRESSURE ISOLATION
ROOMS/AREAS (INCLUDING BRONCHOSCOPY
AREA)
TYPE B
II
II
III
III / IV
TYPE C
II
III
III / IV
III / IV
TYPE D
III / IV
IV
IV
IV
A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA.
B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.
C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.
D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.
E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF MATERIALS TO/FROM LIMIT OF WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.
NEW UNRATED PARTITION
NEW / EXISTING 1 HOUR BARRIER
EXISTING PARTITION TO BE REMOVED
EXISTING PARTITION
INDICATES PROJECT BOUNDARY
NEW / EXISTING 2 HOUR BARRIER
ICRA LEVEL 3
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/3
/2
:1
:5
A
M C
U s e rs \a m o rr is \D o c u m e n ts
\5
-1
-1
R e p l_
F G
P ip in g C h ill e r_
P la n t_
A R
C H a la n a .m o rr is .r v t
ICRA PLAN CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
EJT VAMC NORTH LITTLE ROCK
2021.03.31 JLM JLM
598-19-113
GC101
JDA PROJECT #: D-19-09
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PROTECTION
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
1/8" = 1'-0"F1
GROUND FLOOR PLAN - EXISTING
ICRA NOTES FOR GC:
• ICRA DRAWINGS ARE FOR REFFERENCE AND
INFORMATIONAL USE ONLY AND ARE ONLY INTENDED TO
ASSIST IN PRICING DURING THE BIDDING PHASE.
• ICRA DRAWINGS ARE NOT INTENED TO REPLACE EFFORT
GC IS REQUIRED TO PERFORM IN GENERATING INFECTION
CONTROL PLAN WITH VA COR AND VA ICRA OFFICER.
• GC SOLEY RESPONSIBLE FOR COORDINATING INFECTION
CONTROL PLAN WITH VA COR AND VA ICRA OFFICER PRIOR
TO START OF WORK.
• GC IS SOLEY RESPONSIBLE FOR PRICING ALL WORK –
INCLUDING MATERIALS AND LABOR – REQUIRED TO
PROVIDE ICRA PATHS AND BARRIERS; ANY ADDITIONAL
WORK REQUIRED TO PROVIDE COMPLIANCE WITH ICRA
GUIDELINES SHALL BE PROVIDED BY THE GC AT NO
ADDITIONAL COST TO THE GOVERNMENT.
• GC TO NOTIFY VA COR AND AOR IMMEDIATELY DURING THE
BIDDING PHASE IF THERE ARE ANY DISCREPANCIES IN
DRAWINGS AND/OR SPECIFICATIONS REGARDING ICRA
INFORMATION; NOTIFICATION WILL BE SUBMITTED VIA THE
RFI PROCESS OUTLINED IN THE SPECIFICATIONS; ANY
DISCREPANCIES NOT PRESENTED DURING THE BIDDING
PHASE THAT RESULTS IN ADDITIONAL COSTS SHALL BE THE
SOLE RESPONSIBILITY OF THE GC, AND PROVIDED BY THE
GC AT NO ADDITIONAL COST TO THE GOVERNMENT.
• DRAWINGS AND SPECS ARE NOT INTENDED TO DICTATE
MEANS AND METHODS OF GC AND THEIR REQUIREMENT TO
COMPLY WITH THE GUIDELINES OUTLINED IN THE
SPECIFICATIONS.
• CHANGE ORDERS FOR UNPRICED WORK THAT IS REQUIRED
TO ENSURE COMPLIANCE WITH VA ICRA GUIDELINES WILL
NOT BE ACCEPTED.
1. ICRA WORK LIMITS ARE TO ENCOMPASS ALL AREAS WITH
REQUIRED WORK ACROSS ALL DISCIPLINES WHICH
REQUIRES CONTRACTOR TO FULLY FAMILIARIZE
THEMSELVES WITH THE COMPLETE SET OF CONSTRUCTION
DOCUMENTS AND THE INTENDED WORK.
2. ICRA CLASS(ES) SHOWN ARE CONCEPTUAL AND MAY BE
USED AS A STARTING POINT FOR THE CONTRACTOR'S
REQUIRED WORK UNDER SPECIFICATION SECTION 01 35 26
"SAFETY REQUIREMENTS".
3. CONTRACTORS ARE ENCOURAGED TO ATTEND ANY AND
ALL SITE VISITS PROVIDED BY THE VA DURING BIDDING TO
FAMILIARIZE THEMSELVES WITH THE AREAS OF WORK.
4. CONTRACTOR SHALL EXAMINE THE FULL SET OF PLANS
AND DETERMINE IF THERE ARE ADDITIONAL AREAS OF
WORK ( AND THEIR ASSOCIATED ICRA CLASS(ES) ) DURING
BIDDING.
5. CONTRACTOR IS TO CONSIDER AND INCLUDE MONIES FOR
REQUIRED WORK IN ALL PROJECT AREAS AS PART OF
THEIR BASE BID.
6. IF CONTRACTOR IDENTIFIES POTENTIAL CONFLICTS OR
LIMITATIONS IN THEIR ABILITY TO FULLY COMPLY WITH
ICRA SAFETY REQUIREMENTS CONTAINED IN THE BIDDING
DOCUMENTS, THEY SHALL SEEK RESOLUTION IN WRITING
AS INDICATED IN BIDDING INSTRUCTIONS.
7. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL)
INFECTION CONTROL REPRESENTATIVE FOR WORK
OUTSIDE MAJOR AREA.
8. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY
WORK IN THE CEILING PLENUM.
9. PROVIDE TEMPORARY DOOR WITH GASKETING TO
PREVENT THE MOVEMENT OF DUST.
10. PROVIDE TEMPORARY EMERGENCY EXIT FROM
CONSTRUCTION ZONE; HOWEVER, ALL GENERAL
CONSTRUCTION TRAFFIC SHOULD BE THROUGH
VESTIBULE.
11. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT
NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES,
DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF
MATERIALS TO/FROM LIMIT OF WORK. COORDINATE WITH
COR AND SPECIFICATIONS FOR PROCEDURES /
REQUIREMENTS.
GRAPHIC LEGEND
ICRA - GENERAL NOTES
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PROJECT
AREA
BLDG 170
N
KEY PLAN
BUILDING 89
BUILDING 170
Repair Area
LIQUID O2 TANKS
FUEL UGST
FUEL UGST
EX
HA
US
T
EQ
UI
P.
0 20 50 100
Mech. Room
BUILDING 159
BUILDING 69 CURB & GUTTER
LEGEND
STORM DRAIN PIPE
STORM DRAIN STRUCTURE
FENCE
SANITARY SEWER MANHOLE
SANITARY SEWER PIPE
BUILDING
CONCRETE PATCH
UNDERGROUND ELECTRIC LINE
WATER LINE
CHILL WATER LINE
COMMUNICATIONS
WATER VALVE
FIRE HYDRANT
GAS LINE
HANDICAP PARKING SIGN
ELECTRIC
CHAIN LINK FENCE
LIGHT POLE
SIDEWALK
ASPHALT PATCH
FUEL MANHOLES
4" Chiller Line Supply (noted as "deleted" in 1984 As-Builts)
4" Chiller Line Return (noted as "deleted" in 1984 As-Builts)
8" Chiller Line Return
8" Chiller Line Supply
18" Chiller Lines (Supply & Return, 1980 Plan Did Not Specify which Line was Supply or Return)
3" Make Up Chiller Line (1980)
8"Chiller Line Return
8"Chiller Line Supply
6"Chiller Line Return
6"Chiller Line Supply
8" Chiller Line Return 1984
8" Chiller Line Supply 1984
18" Chiller Line 1980
3" Make Up Chiller Line 1980
18" Chiller Line 1980
8" Chiller Line Return
8" Chiller Line Supply
1"=20'
3" C hiller M ake-U p Line (noted as "deleted" in 1984 A s-B uilts)
3" C hiller M ake-U p Line (noted as "deleted" in 1984 A s-B uilts)
NOTES:
1. CONTRACTOR SHALL CONTACT ARKANSAS ONE CALL AND THE VA TO MARK UTILITIES PRIOR TO ANY EXCAVATION.
2. HAND DIG IN TRENCH WITH IN 1 FOOT OF EXISTING UTILITIES.
3. SEWER, WATER, STEAM AND/OR ELECTRICAL UTILITIES SERVICES ARE BURIED IN THE AREA AS SHOWN BUT AT
UNKNOWN DEPTHS, MAINTAIN MINIMUM SEPARATIONS DISTANCES AS REQUIRED.
4. CHILLED WATER PIPING LOCATIONS OBTAINED FROM 1980 & 1984 AS-BUILT PLANS FROM CAVHS AND ARE SHOWN
AS IDENTIFIED IN PLANS AND A JULY 2020 UTILITIES SURVEY.
5. THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO CONNECT THE NEW CHILLED WATER PIPING AS
SHOWN WITH THE EXISTING CHILLED WATER SYSTEM THAT WILL REMAIN AND ESTABLISH AN OPERABLE CHILLED
WATER SYSTEM.
3. CONTRACTOR TO EXCAVATE CHILLED WATER PIPES TRENCHING / EXCAVATION IN ACCORDANCE WITH ALL OSHA
REGULATIONS (29 CFR CH.XVII, SUBPART B)
4. TRENCH SHALL BE EXCAVATED BELOW GRADE & REQUIRED TO PROVIDE A MINIMUM 30" OF PIPE COVER, AS SHOWN
IN ASSOCIATED DETAILS.
BUILDING 89
BUILDING 170
Mech. Room
N
SITE PLAN CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
EJT VAMC NORTH LITTLE ROCK
2021.03.31 JCH KEH
598-19-113
CU100
JDA PROJECT #: D-19-09
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PROTECTION
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
KEY PLAN
1. UPDATED-1980 & 1984 CHILLER LINES 10-06-20
AutoCAD SHX Text
CO
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text
FH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
TCB
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text
CO
AutoCAD SHX Text Existing Sanitary Sewer
AutoCAD SHX Text Existing Communications
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Existing Sanitary Sewer
AutoCAD SHX Text Existing Steam Line / Tunnel
AutoCAD SHX Text Abandoned Pipe
AutoCAD SHX Text Existing Water Lines
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Existing Sanitary Sewer
AutoCAD SHX Text Conc. Patch
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Chiller Plant
AutoCAD SHX Text UG Feeder Line to O2
AutoCAD SHX Text Existing Sanitary Sewer
AutoCAD SHX Text Existing Gas
AutoCAD SHX Text Asphalt Patch
AutoCAD SHX Text Asphalt Patch
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Existing Sanitary Sewer
AutoCAD SHX Text Existing Steam Line
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Existing Steam Line
AutoCAD SHX Text Conc. Pad
AutoCAD SHX Text Approx. Location of Underground Electric Lines
AutoCAD SHX Text Approx. Location of Underground Electric Lines
AutoCAD SHX Text Approx. Location of Underground Electric Line
AutoCAD SHX Text Abandoned Pipe
AutoCAD SHX Text Curb
AutoCAD SHX Text Curb
AutoCAD SHX Text Drive
AutoCAD SHX Text Curb
AutoCAD SHX Text Curb
AutoCAD SHX Text Approx. Location of Underground Electric Line
AutoCAD SHX Text Abandoned Pipe
AutoCAD SHX Text Conc. Patch
AutoCAD SHX Text UG Electric
AutoCAD SHX Text Existing Communications
AutoCAD SHX Text Approx. Location of Fuel Line
AutoCAD SHX Text Approx. Location of Fuel Line
AutoCAD SHX Text Approx. Location of Fuel Line
AutoCAD SHX Text Approx. Location of Underground Electric Line
AutoCAD SHX Text Conc. Pad
AutoCAD SHX Text Sign
AutoCAD SHX Text Approx. Location of Existing Chiller Riser Pipes
AutoCAD SHX Text Drain
AutoCAD SHX Text Drain
AutoCAD SHX Text Drain
AutoCAD SHX Text Clean Out
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text Approx. Location of Underground Electric Line
AutoCAD SHX Text Existing Sanitary Sewer
AutoCAD SHX Text Existing Steam Line / Tunnel
AutoCAD SHX Text D
AutoCAD SHX Text Drain
AutoCAD SHX Text Existing Steam Line / Tunnel
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Existing Sidewalk
AutoCAD SHX Text Existing Steam Lines
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Existing Water Line
AutoCAD SHX Text Steam Line
AutoCAD SHX Text Steam Line
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SS
AutoCAD SHX Text
UGT
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
FH
AutoCAD SHX Text W
AutoCAD SHX Text
8.6'FL
AutoCAD SHX Text
6.75'FL
AutoCAD SHX Text
7.41'FL
AutoCAD SHX Text
7.02'FL
AutoCAD SHX Text
9.58'FL
AutoCAD SHX Text
9.42'FL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Chiller Plant
AutoCAD SHX Text
EXTERIOR AREA OF WORK
Repair Area
LIQUID O2 TANKS
FUEL UGST
FUEL UGST
EX
HA
US
T
EQ
UI
P.
0 20 50 100
Mech. Room
BUILDING 69
DEMO 2-18" Fiberglass Supply & Return Chiller Lines
3" Make Up Chiller Line (per 1980 As-Builts) Remains--DO NOT REMOVE
18" Chiller Line (per 1980 As-Builts) 3" Make Up Chiller Line (per 1980 As-Builts) Remains--DO NOT REMOVE
18" Chiller Line 1980 (per 1980 As-Builts)
8" Chiller Line Return
8" Chiller Line Supply
DEMO: EXCAVATE & REMOVE TWO (2) EXISTING 18" FIBERGLASS CHILLER LINES AND
ASSOCIATED INSULATION, THRUST BLOCKS, FITTINGS, ELBOWS, ETC., AS SHOWN IN
EXISTING TRENCH DETAILS (BELOW).
8" Chiller Line Return
8" Chiller Line Supply 8" Chiller Line Return
8" Chiller Line Supply
6" Chiller Line Return
6" Chiller Line Supply
DEMO: ASPHALT, SIDEWALK, CURB/GUTTER, AND
EXCAVATE & REMOVE TWO (2) EXISTING 18"
FIBERGLASS CHILLER LINES AND ASSOCIATED
INSULATION, THRUST BLOCKS, FITTINGS,
ELBOWS, ETC., AS SHOWN IN EXISTING TRENCH
DETAILS.
PHASING: A MINIMUM OF A 25'-WIDE ROADWAY
ACCESS FOR 2-WAY TRAFFIC MUST BE
MAINTAINED THROUGH THE ASPHALT PARKING
AREA AT ALL TIMES TO ENABLE CONTINUED
LARGE VEHICLE DELIVERIES AND PARKING;
CONTRACTOR MUST NOT EXCAVATE, DEMOLISH,
OR OTHERWISE BLOCK THE 25'-WIDE ROADWAY
ACCESS.
SAFETY: USE APPROPRIATE CONSTRUCTION
FENCING, CONES, FLAGGERS AND OTHER
SAFETY MEASURES TO PROTECT TRAFFIC AND
PEDESTRIANS FROM THE CONSTRUCTION AREA.
1" = 20'
DEMO: SIDEWALK AND EXCAVATE & REMOVE TWO (2) EXISTING 18" FIBERGLASS CHILLER
LINES AND ASSOCIATED INSULATION, THRUST BLOCKS, FITTINGS, ELBOWS, ETC., AS
SHOWN IN EXISTING TRENCH DETAILS (BELOW).
3" C hiller M ake-U p Line (noted as "deleted" in 1984 A s-B uilts)
3" C hiller M ake-U p Line (noted as "deleted" in 1984 A s-B uilts)
NOTES:
1. CONTRACTOR SHALL CONTACT ARKANSAS ONE CALL AND THE VA TO MARK UTILITIES PRIOR TO ANY EXCAVATION.
2. HAND DIG IN TRENCH WITH IN 1 FOOT OF EXISTING UTILITIES.
3. SEWER, WATER, STEAM AND/OR ELECTRICAL UTILITIES SERVICES ARE BURIED IN THE AREA AS SHOWN BUT AT
UNKNOWN DEPTHS, MAINTAIN MINIMUM SEPARATIONS DISTANCES AS REQUIRED.
4. CHILLED WATER PIPING LOCATIONS OBTAINED FROM 1980 & 1984 AS-BUILT PLANS FROM CAVHS AND ARE SHOWN
AS IDENTIFIED IN PLANS AND A JULY 2020 UTILITIES SURVEY.
5. THE CONTRACTOR SHALL PROVIDE ALL ITEMS NECESSARY TO CONNECT THE NEW CHILLED WATER PIPING AS
SHOWN WITH THE EXISTING CHILLED WATER SYSTEM THAT WILL REMAIN AND ESTABLISH AN OPERABLE CHILLED
WATER SYSTEM.
3. CONTRACTOR TO EXCAVATE CHILLED WATER PIPES TRENCHING / EXCAVATION IN ACCORDANCE WITH ALL OSHA
REGULATIONS (29 CFR CH.XVII, SUBPART B)
4. TRENCH SHALL BE EXCAVATED BELOW GRADE & REQUIRED TO PROVIDE A MINIMUM 30" OF PIPE COVER, AS SHOWN
IN ASSOCIATED DETAILS.
4" Chiller Line Supply (noted as "deleted" in 1984 As-Builts)
4" Chiller Line Return (noted as "deleted" in 1984 As-Builts)
EXISTING CHILLER LINE TRENCH DETAILS
NTS
F5
BUILDING 89
BUILDING 170
Mech. Room
N
DEMOLITION PLAN CONSTRUCTION
DOCUMENTS
REPLACE FIBERGLASS PIPING
CHILLER PLANT
EJT VAMC NORTH LITTLE ROCK
2021.03.31 JCH KEH
598-19-113
CU101
JDA PROJECT #: D-19-09
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PROTECTION
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 260
LITTLE ROCK, AR 72202
CIVIL ENGINEER
HODGES ENGINEERING
231 SHORELINE DRIVE
MOUNTAIN HOME, AR 72653
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
1. UPDATED-1980 & 1984 CHILLER LINES 10-06-20
KEY PLAN
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text
FH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
TCB
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text
CO
AutoCAD SHX Text Chain Link Fence
AutoCAD SHX Text Chiller Plant
AutoCAD SHX Text Asphalt Patch
AutoCAD SHX Text Asphalt Patch
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Conc. Pad
AutoCAD SHX Text Curb
AutoCAD SHX Text Curb
AutoCAD SHX Text Drive
AutoCAD SHX Text Curb
AutoCAD SHX Text Curb
AutoCAD SHX Text Conc. Patch
AutoCAD SHX Text UG Electric
AutoCAD SHX Text Conc. Pad
AutoCAD SHX Text Sign
AutoCAD SHX Text Approx. Location of Existing Chiller Riser Pipes
AutoCAD SHX Text Drain
AutoCAD SHX Text Drain
AutoCAD SHX Text Drain
AutoCAD SHX Text Clean Out
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text Vent
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
8.6'FL
AutoCAD SHX Text
6.75'FL
AutoCAD SHX Text
7.41'FL
AutoCAD SHX Text
7.02'FL
AutoCAD SHX Text
9.58'FL
AutoCAD SHX Text
9.42'FL
AutoCAD SHX Text
EXISTING TRENCH CROSS-SECTION (UNDER GROUND)
AutoCAD SHX Text
+/-4" TOPSOIL
AutoCAD SHX Text
+/-2'2" COMPACTED EARTH FILL
AutoCAD SHX Text
+/-6" MIN. OF COMPACTED SAND FILL MATERIAL AROUND PIPE
AutoCAD SHX Text
+/-18" CHILLER PIPE & INSULATION
AutoCAD SHX Text
EXISTING TRENCH CROSS-SECTION (UNDER SIDEWALK)
AutoCAD SHX Text
+/-4" CONCRETE, 3,500 PSI
AutoCAD SHX Text
SAWCUT EXISTING SIDEWALK
AutoCAD SHX Text
+/-1'10" COMPACTED EARTH FILL
AutoCAD SHX Text
SAWCUT EXISTING SIDEWALK
AutoCAD SHX Text
+/-4" COMPACTED BASE
AutoCAD SHX Text
+/-6" MIN. OF COMPACTED SAND FILL MATERIAL AROUND PIPE
AutoCAD SHX Text
+/-18" CHILLER PIPE & INSULAATION
AutoCAD SHX Text
EXISTING TRENCH CROSS-SECTION (UNDER FOOTING)
AutoCAD SHX Text
BOTTOM OF FOOTING
AutoCAD SHX Text
+/-12" EARTH FILL
AutoCAD SHX Text
+/-6" MIN. OF SAND FILL MATERIAL AROUND PIPE
AutoCAD SHX Text
18" CHILLER PIPE & INSULATION
AutoCAD SHX Text
FOOTING
AutoCAD SHX Text
EXISTING TRENCH CROSS-SECTION (UNDER ASPHALT)
AutoCAD SHX Text
+/-3" ACHM SURFACE W/ TACK COAT
AutoCAD SHX Text
SAWCUT EXISTING ASPHALT
AutoCAD SHX Text
1'9" COMPACTED EARTH FILL
AutoCAD SHX Text
SAWCUT EXISTING ASPHALT
AutoCAD SHX Text
+/-6" CONCRETE, 3,500 PSI
AutoCAD SHX Text
+/-6" MIN. OF COMPACTED SAND FILL MATERIAL AROUND PIPE
AutoCAD SHX Text
+/-18" CHILLER PIPE & INSULATION
AutoCAD SHX Text
EXISTING TRENCH CROSS-SECTION (UNDER CONCRETE)
AutoCAD SHX Text
+/-9" CONCRETE, 4,000 PSI
AutoCAD SHX Text
SAWCUT EXISTING CONCRETE
AutoCAD SHX Text
+/-1'9" COMPACTED EARTH FILL
AutoCAD SHX Text
SAWCUT EXISTING CONCRETE
AutoCAD SHX Text
+/-6" MIN. OF COMPACTED SAND FILL MATERIAL AROUND PIPE
AutoCAD SHX Text
+/-18" CHILLER PIPE
AutoCAD SHX Text
EXISTING TRENCH CROSS-SECTION (UNDER CURB)
AutoCAD SHX Text
CONCRETE CURB FLOW LINE, 3,500 PSI
AutoCAD SHX Text
SAWCUT EXISTING CONCRETE
AutoCAD SHX Text
+/-1'9" COMPACTED EARTH FILL
AutoCAD SHX Text
SAWCUT EXISTING CONCRETE
AutoCAD SHX Text
+/-6" MIN. COMPACTED SAND MATERIAL AROUND PIPE
AutoCAD SHX Text
+/-18" CHILLER PIPE
AutoCAD SHX Text
TOP OF CONCRETE CURB, 3,500 PSI
AutoCAD SHX Text
(PER 1984 AS-BUILTS - NOT TO SCALE)
AutoCAD SHX Text
(PER 1984 AS-BUILTS - NOT TO SCALE)
AutoCAD SHX Text
(PER 1984 AS-BUILTS - NOT TO SCALE)
AutoCAD SHX Text
(PER 1984 AS-BUILTS - NOT TO SCALE)
AutoC…
This is the start of the file's text. The full file is on GovTribe.