Division Cost Page (002).docx
DOCX document 39 KB Posted
- Solicitation number
- 36C25621R0123
About this file
This document contains a division cost page outlining the costs for replacing fiberglass piping at a VA medical center, as well as details of a related federal contract opportunity posted on SAM.gov.
The division cost page breaks down anticipated project costs by division such as general requirements, concrete, HVAC and electrical. It provides a total baseline cost for replacing the fiberglass piping at the Eugene Towbin Veterans Hospital in North Little Rock, Arkansas, estimated between $1 million and $5 million.
The federal contract opportunity is a 100% SDVOSB set-aside to solicit offers for this piping replacement project. The NAICS code is 236220 for nonresidential plumbing, heating, and air-conditioning contractors. The solicitation number is 36C25621R0123 and offers are due by June 11, 2021. The point of contact is Brad Martin and questions can be sent to his email address provided. Offerors must register on VETBIZ and SAM to be eligible for award. The project location and requirements are consistent with details in the division cost page.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0123 0001.docx | DOCX document | |
| RFI for Fiberglass Piping w Comments - JDa (002).pdf | ||
| S02. 598-19-113 100 Pct Drawings.pdf | ||
| P07. Wage Determination ar32.txt | TXT text file | |
| PAST PERFORMANCE SURVEY FIBERGLASS PIPING.docx | DOCX document | |
| S02. FIBERGLASS PIPING 36C25621R0123_1.pdf | ||
| S02. 598-19-113 100 Pct Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION OF SF 1442 BLOCK # 17 CONTINUED
Project: Replace Fiberglass Piping Date:
| MATERIAL |
| LABOR |
| EQUIPMENT |
| TOTAL |
| DIVISION 01: |
| GENERAL REQUIREMENTS |
| DIVISION 02: |
| EXISTING CONDITIONS |
| DIVISION 03: |
| CONCRETE |
| DIVISION 04: |
| MASONRY |
| DIVISION 05: |
| METALS |
| DIVISION 06: |
| WOOD, PLASTICS & COMPOSITES |
| DIVISION 07: |
| THERMAL & MOISTURE PROTECTION |
| DIVISION 08: |
| OPENINGS |
| DIVISION 09: |
| FINISHES |
| DIVISION 10: |
| SPECIALTIES |
| DIVISION 11: |
| EQUIPMENT |
| DIVISION 12: |
| FURNISHINGS |
| DIVISION 13: |
| SPECIAL CONSTRUCTION |
| DIVISION 14: |
| CONVEYING EQUIPMENT |
| DIVISION 21: |
| FIRE SUPPRESSION |
| DIVISION 22: |
| PLUMBING |
| DIVISION 23: |
| HVAC |
| DIVISION 25: |
| INTEGRATED AUTOMATION |
| DIVISION 26: |
| ELECTRICAL |
| DIVISION 27: |
| COMMUNICATIONS |
| DIVISION 28: |
| ELECTRONIC SAFETY AND SECURITY |
| DIVISION 31: |
| EARTHWORK |
| DIVISION 32: |
| EXTERIOR IMPROVEMENTS |
| DIVISION 33: |
| UTILITIES |
SUBTOTAL COST:
GENERAL LIABILITY / INSURANCE:
OVERHEAD & PROFIT:
BOND:
PROJECT TOTAL COST: