This is a Sources Sought Notice for a chiller repair project at the VA Loma Linda Healthcare System (VALLHCS). The solicitation seeks qualified small businesses, with a preference for Service-Disabled Veteran Owned Small Businesses, to repair Chiller #2, which has experienced performance issues including a refrigerant leak, lost EVAP shaft seals, and LP level actuator problems. The contract requires comprehensive repair services including leak detection, refrigerant recovery, component replacement, system testing, and documentation, with work to be performed between February 2026 and January 2027.
Key details include a response deadline of January 5, 2026 at 11:00am Mountain Time, NAICS code 238220, and a potential contract value around $19.0 million. Interested contractors must be registered in SAM and provide a capability statement with company details, business type, and technical expertise. The work involves repairing critical HVAC infrastructure to maintain hospital climate control, with specific requirements for EPA-compliant refrigerant handling, equipment replacement, testing, and cleanup, following various OSHA, NFPA, and VA healthcare facility standards.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought Notice Sources Sought Notice
| SUBJECT* |
| CHILLER #2 EVAP REPAIR 02/01/2026-01/31/2027 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 87108 |
| SOLICITATION NUMBER* |
| 36C26226Q0202 |
| RESPONSE DATE/TIME/ZONE |
| 01-05-2026 11:00am MOUNTAIN TIME, DENVER, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| J041 |
| NAICS CODE* |
| 238220 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
NCO22
New Mexico VA Health Care System 1501 San Pedro Drive SE Albuquerque NM 87108
POINT OF CONTACT*
Contract Specialist Jordan Alonzo jordan.alonzo@va.gov (505)767-6094
PLACE OF PERFORMANCE
| ADDRESS |
| Department of Veterans Affairs |
VA Loma Linda HealthCare Systems
VALLHCS
11201 Benton St.
Loma Linda California
| POSTAL CODE |
| 92357 |
| COUNTRY |
| USA |
DESCRIPTION
This is a SOURCES SOUGHT ANNOUNCEMENT ONLY. It is neither a solicitation announcement nor a request for proposals or quotes and does not obligate the Government to award a contract. Requests for a solicitation will not receive a response. Responses to this source sought must be in writing. The purpose of this sources sought announcement is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), HubZone and other Small Businesses interested and capable of providing the services described below. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition. Responses to this notice shall include the following: (a) company name (b) address (c) point of contact (d) phone, fax, and email (e) Unique Entity ID (f) Cage Code (g) Tax ID Number (h) Type of small business, e.g. Services Disabled Veteran Owned small Business, Veteran-owned small business, 8(a), HUBZone, Women Owned Small Business, Small disadvantaged business, or Small Business HUBZone business and (i) must provide a capability statement that addresses the organizations qualifications and ability to perform as a contractor for the work described below.
VA Loma Linda Health Care Systems (VALLHCS) requires repair of the Chiller #2.
Important information: The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will in no way be bound to this information if any solicitation is issued. The VA is mandated by Public Law 109-461 to consider a total set-aside for Service-Disabled Veteran Owned Small Business set aside. However, if response by Service-Disabled Veteran Owned Small Business firms proves inadequate, an alternate set-aside or full and open competition may be determined. No sub-contracting opportunity is anticipated. The North American Classification System (NAICS) code for this acquisition is 238220/ $19.0 Million.
Notice to potential offerors: All offerors who provide goods or services to the United States Federal Government must be registered in the System for Award Management (SAM) at www.sam.gov. Additionally, all Service Disabled Veteran Owned Businesses or Veteran Owned Businesses who respond to a solicitation on this project must be registered with the Department of Veterans Affairs Center for Veterans Enterprise VetBiz Registry located at Veteran Small Business Certification (sba.gov). All interested Offerors should submit information by e-mail to jordan.alonzo@va.gov. All information submissions to be marked Attn: Jordan Alonzo, Contract Specialist and should be received no later than on 01/05/2025 at 11:00am MDT.
D.1 STATEMENT OF WORK
1. Contract Title VA Loma Linda Healthcare System’s (VALLHCS) Chiller #2 EVAP Repair
2. Background VALLHCS needs to address an unforeseen repair to Main Hospital Plant Chiller #2 EVAP Repair. The hospital’s HVAC system is critical to maintain appropriate climate control, supporting the comfort and safety of patients, staff, and sensitive medical equipment. Despite regular maintenance and operational precautions, chiller # 2 has experienced multiple performance issues due to a refrigerant (freon) leak, loss of EVAP shaft seals and LP level actuator which compromises cooling efficiency and increases operational cost. monitoring chiller performance and optimizing energy usage has malfunction and requires replacement. Immediate repair and replacement are necessary to restore full functionality, prevent potential HVAC system breakdowns and ensure continued service to VALLHCS.
PARTS and EQUIPMENT LIST:
| PARTS |
| QUANTITY |
| EVAP shaft seals |
| 2 |
| Oil recovery valve |
| 1 |
| miscellaneous |
| 1 |
3. Objective Contractor shall provide all labor, materials, tools, equipment, required parts, and connections for the repairs of Chiller #2 EVAP. Contractor shall promptly address the identified issues with chiller #2 by locating and repairing the freon leak and replacing Evap shaft seals, LP level actuator. This will restore the chiller’s optimal performance, reduce potential health and safety risk due to temperature inconsistencies and improve overall efficiency of the HVAC system.
4. SCOPE:
The contractor shall provide all necessary labor, materials, tool, equipment, and supervision to repair the chiller #2 freon leak and replacement of the electromagnetic flow meters.
EVAP shaft seals / LP Level actuator
· Contractors shall lock out tag out heat exchangers.
· Contractor shall provide (2) Evap shaft seals
· Contractor shall disconnect and remove existing failed shaft seals supply and return lines for the heat exchanger.
· Contractor shall install two (1) new LP level actuators on the supply and return lines for the heat exchanger.
Assessment and Leak detection
· Contractor shall lock out tag out chiller #2.
· Contractor shall perform a comprehensive assessment of chiller #2 to identify all leak points.
· Contractor shall use EPA -compliant methods to recover remaining refrigerant from chiller#2.
· Contractor shall weigh recovered refrigerant and determine loss.
Freon Leak Repair
· Contractor shall repair any detected leaks to ensure containment to prevent further leakage.
· Contractor shall remove old oil recovery valves that are leaking and associated parts.
· Contactor shall install new oil recover valves and all associated parts.
Testing and Validation
· Contractor shall pressurize and leak check Chiller #2.
· Contractor shall ensure all leaks and repairs are sealed.
· Contractor shall evacuate charge with recovered refrigerant.
Reporting and Documenting
· Contractor shall document refrigerant loss and notify Plant Supervisor.
· Contractor shall document and provide statement of additional refrigerant needed.
· Contractor shall wait for approval of additional refrigerant cost before charging chiller #2.
· Contractor shall upon approval refill Chiller #2 with the appropriate amount and type of refrigerant (FREON) R 134A as specified by OEM guidelines.
· Contractor shall start up and test for proper operation.
Clean up.
· Contractor shall remove and dispose of all waste and removed materials.
· Contractor shall leave work area neat and free of debris.
4.1 Specific Requirements
a. Contractor shall schedule start date with POC or designee five (5) business days in advance.
b. Contactor personnel shall have valid Loma Linda PIV badges before starting work.
c. Contractor shall coordinate energy source LOCK OUT /TAG OUT procedures with VALLHCS Plant Supervisor before starting work. When work is complete, Contractor shall notify the VALLHCS Plant Supervisor that energy sources will be restored and require verification.
d. Contractor’s supervisor or lead technician are to check in with VALLHCS Plant Supervisor, or in their absence, with Graphics Control prior to work each day.
e. Contractor shall conform to the following standards, policies, regulations, governing agency, and any other local, state, or Federal guidelines that are not listed here.
· OSHA 29CFR Regulations, www.osha.gov
· NFPA 90A, Standard for the Installation of Air Conditioning and Ventilating systems, www.nfpa.org
· NFPPA 101 life Safety Codes
· ANSI/ASHRAE Standard 111-2008(RA2017) for testing adjusting and balancing of building HVAC systems.
· ANSI/ASHRAE/ASHE Standard 170-2017 for ventilation of health Care facilities
· VHA MASTER SPECIFICATIONS, MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) - Office of Construction & Facilities Management (va.gov)
1. Section 23 05 11 Common work results for HVAC
2. Section 23 05 93 Testing, Adjusting and Balancing for HVAC
3. Section 23 05 08 00 Commissioning of HVAC Systems
4.2 Services Not Covered:
4.2.1. Any work other than as specified in the contract shall be identified as a non-priced task, and if determined by the Contracting Officer (CO) to be within the overall scope of the contract, work shall be added by a modification to the contract. Any work requested that is identified as outside the scope of the contract shall be addressed by the facility as a separate procurement.
5. Security Requirements The C&A requirements do not apply, and Security Accreditation Package is not required.
This service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.
6. Data Rights:
6.1. The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
7. Period of Performance Work Hours
Normal hours of operation are Monday through Friday from 8:00 am to 4:30 pm Pacific time. All work is expected to be performed generally during normal hours of coverage unless requested or approved by the COR or his/her designee.
Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.
Work performed outside the normal hours of coverage must be approved by the COR or his/her designee.
All time shall be approved in advance by the Contracting Officer’s Representative (COR). Allow 5-days for approval of any alternate working hours needed.
Federal Holidays
| New Year’s Day |
| January 01 |
| Martin Luther King’s Birthday |
| Third Monday in January |
| President’s Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Juneteenth |
| June 19 |
| Independence Day |
| July 04 |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veterans Day |
| November 11 |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25 |
If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.
8. Identification, Check-in, Parking, and Smoking Regulations Identification
The vendor's employees shall wear visible identification at all times while on VALLHCS premises. Contractor employees shall report to VA Police upon entry to the VALLHCS facility to get a visitor badge. Contractor employees are required to be escorted by the COR or designee’s office once on campus prior to commencement of work. During emergencies contractor personnel shall check in with VALLHCS Police if the VALLHCS COR or designee is not available.
All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
Parking
It is the responsibility of the contract personnel to park in the appropriate designated parking areas. Parking information is available from VA Police & Security Service Office. The Contractor assumes full responsibility for any parking violations.
Smoking
Veterans Health Administration (VHA) Directive 1085, dated March 5, 2019, provides a comprehensive smoke-free policy for patients, visitors, contractors, volunteers, and vendors, at the Department of Veterans Affairs (VA), Veterans Health Administration (VHA) health care facilities. This updated VHA directive implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities, as defined in this directive, based on scientific evidence regarding the adverse health effects of secondhand and thirdhand smoke exposures.
The Assistant Deputy Under Secretary for Health for Administrative Operations (10NA) and the Assistant Deputy Under Secretary for Health for Clinical Operations (10NC) are responsible for the contents of this directive. Questions may be referred to VHA Smoke Free: vhasmokefree@va.gov.
This VHA directive is scheduled for recertification on or before the last working day of March 2024. This VHA directive will continue to serve as national VHA policy until it is recertified or rescinded.
Weapons and Contraband
Possession of weapons or contraband is prohibited and shall be subject to arrest and termination from future performance under this contract. Enclosed containers, including tool kits, shall be subject to search. Violations of VALLHCS regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
Safety
All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VALLHCS shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract.
Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Every effort shall be made to safeguard human life and property.
Contractor shall comply with all applicable Federal, State, and local requirements regarding workers’ health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137.
Contractor shall provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely.
9. Contractor Personnel
Contractor’s Program Manager
The Contractor shall provide a contract program manager who shall be responsible for the performance of the work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor’s Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
Contractor’s Employees
The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC).
10. Contractor Qualifications & Other Responsibilities Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government.
The Government reserves the right to accept or reject Contractor’s employee for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer.
11. Insurance Coverage The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee’s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.
The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.
Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.
Contractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.
12. Invoicing and Payment Overtime & Holiday Pay
Any overtime and/or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.
Contractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for “availability” or “on-call” services unless otherwise provided herein.
Invoices
Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes.
The Government shall not authorize payment until such time that the VALLHCS COR all properly executed and signed documentation.
No advance payments shall be authorized. Payment shall be made on a monthly arrears for services provided during the billing month in arrears in accordance with FAR 52.212-4, para. (i). Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.
Payment of invoices may be delayed if the appropriate invoices as specified in the contract are not completed and submitted as required.
| *= Required Field |
| Sources Sought Notice |
Sources Sought Notice
File details come from the government source that posted it. Updated .