S02. 36C24826R0114 FINAL.pdf
PDF 771 KB Posted
- Solicitation number
- 36C24826R0114
About this file
I am unable to access the content of the file at this location. While the metadata indicates this is a government contract file (solicitation number 36C24826R0114) posted by the Department of Transportation on September 9, 2026, I cannot read the PDF document itself to provide the detailed summary you requested.
To complete this task, please either:
- Provide the text content of the PDF file
- Share the document through a method that allows me to access and read its contents
- Upload the file directly to our conversation
Once I can access the document content, I will deliver a comprehensive summary following your specified format and requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0001 SOW - Chemistry CPRR and Automation - 092826.docx | DOCX document | |
| 0001 Attachment 1 Reagents Attachment A.xlsx | XLSX spreadsheet | |
| 0001 52.212-1 ADDENDUM to FAR 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services.docx | DOCX document | |
| 36C24826R0114 0001.pdf | ||
| 0001 Questions and Answers.docx | DOCX document | |
| Attachment 2 Business Associate Agreement example.pdf | ||
| Attachment 1 Reagents Attachment A.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C24826R0114 09-09-2026
Moneque Rodriguez 813-550-9486 10-07-2026
13:00 EDT
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
10,000 Bay Pines Blvd Bay Pines FL 33744
X
334516
1000 Employees
NET 30 Days
N/A
MCC: 90D
Department Of Veteran Affairs C.W. Bill Young VA Medical Center and Lee County VA Medical Center 10,000 Bay Pines Blvd.
Bay Pines FL 33744
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8) C.W. Bill Young VA Medical Center 10000 Bay Pines Blvd.
Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin TX 78714-9971
See CONTINUATION Page
The Government anticipates awarding a single award Indefinite Delivery Indefinite Quantity contract for Chemistry Cost-Per-Reportable-Result with Automation System for Bay Pines VA Healthcare System.
Period of Performance: Date of Award – September 30, 2031
See CONTINUATION Page
516-3670160-033-822300-2625 010022300
Moneque Rodriguez Contracting Officer
36C24826R0114
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 STATEMENT OF WORK
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
B.4 DELIVERY SCHEDULE
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION)
C.2 52.216-18 ORDERING (AUG 2020)
C.3 52.216-19 ORDER LIMITATIONS (OCT 1995)
C.4 52.216-22 INDEFINITE QUANTITY (NOV 2025) (DEVIATION)
C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
C.6 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
(DEVIATION APR 2026)
C.7 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
C.8 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
C.10 52.240-93 BASIC SAFEGUARDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (DEVIATION) (NOV 2025)
C.11 VAAR 852.247-71 DELIVERY LOCATION (OCT 2018)
C.12 MANDATORY WRITTEN DISCLOSURES
C.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Attachment 1: Reagents Attachment A.
Attachment 2: Business Associate Agreement example
SECTION E - SOLICITATION PROVISIONS
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (OCT 2025) (DEVIATION)
E.2 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES
E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
E.4 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
E.5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025)
(DEVIATION)
E.6 52.225-6 TRADE AGREEMENTS CERTIFICATE (FEB 2021)
E.7 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
(OCT 2018)
E.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
E.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
E.11 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (OCT 2025) (DEVIATION)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C248 Moneque Rodriguez
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Upon Delivery and Government Acceptance
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 STATEMENT OF WORK
Dated: September 08, 2026
TITLE: Chemistry Cost Per Reportable Result (CPRR) Agreement with Automation System
1. Purpose
This Statement of Work (SOW) defines the scope, objectives, deliverables, responsibilities, pricing structure, and implementation requirements for the provision of Chemistry Cost Per Reportable Result (CPRR) services, including an automation system, at the Bay Pines VA Healthcare System. Under the CPRR pricing methodology, the contractor shall provide the equipment, reagents, consumables, maintenance, service, and other required support specified in this SOW at the established price per reportable result.
The purpose of this fixed price indefinite delivery indefinite quantity (IDIQ) contract is to provide comprehensive chemistry laboratory testing services through a Cost Per Reportable Result (CPRR) pricing model that includes chemistry analyzers, automation systems, reagents, consumables, maintenance, middleware, interfaces, training, and operational support. The contract is intended to improve laboratory efficiency, standardize operational costs, enhance patient safety, reduce downtime, and support timely and accurate reporting of chemistry test results within the VA electronic health record environment.
2. Background
Bay Pines VA Healthcare System requires a fully integrated chemistry laboratory solution under a Cost Per Reportable Result (CPRR) pricing model. The solution shall be capable of interfacing with existing Veterans Health Administration (VHA) systems, laboratory analyzers, and associated clinical information systems.
The Chemistry CPRR solution, including the automation system, shall support:
Automated chemistry laboratory result processing
Instrument connectivity and interface management
Workflow standardization
Quality assurance and quality control tracking
Data integrity and audit compliance
Reduction in manual intervention and transcription errors
Improved turnaround time for laboratory results
Regulatory and VA policy compliance
The system will integrate into the existing VA information technology environment while maintaining cybersecurity, privacy, and interoperability standards.
3. Scope of Work
3.1 The Contractor shall provide all labor, supervision, materials, equipment, software, transportation, installation, configuration, validation, maintenance, and support required to provide a fully operational integrated chemistry and immunochemistry laboratory automation solution.
3.2 The solution shall include:
Clinical Chemistry analyzers integrated with Immunochemistry analyzers
Total Laboratory Automation (TLA) track system
Middleware and data management systems
Reagents, calibrators, controls, supplies, and consumables
Hardware, software, and operating system support
Installation and system validation
Preventive maintenance and repair services
End-user and administrator training
Technical and applications support
3.3 All work shall comply with:
Food and Drug Administration (FDA) requirements
College of American Pathologists (CAP) standards
Clinical Laboratory Improvement Act (CLIA) requirements
VA policies and cybersecurity requirements
Manufacturer specifications
Applicable Federal, State, and local regulations
4. Place of Performance
4.1. Services and equipment will be provided at the following locations:
C.W. Bill Young VA Medical Center (CWBYVAMC)
Bld.100 – Room 2B-110 Bay Pines, FL 33744
Lee County VA Healthcare Center (LCHCC) 2489 Diplomat Parkway East Room 1B-106 Cape Coral, FL 33909
NOTE: Additional performance locations may be added during the contract ordering period only through a bilateral contract modification executed by the Contracting Officer and the Contractor. Any such modification shall address, as applicable, changes to estimated quantities, CPRR unit pricing, equipment and automation requirements, implementation and transition requirements, and the IDIQ contract maximum. No additional location shall be added, and no performance at an additional location shall commence, without an executed bilateral contract modification.
5. REQUIRED TEST MENU (referred to as Attachment A):
Refer to Attachment A for a list of tests and estimated usage by the laboratory. Test menu requirement may be met by using alternate FDA approved reagents adapted to the proposed analytical solution for no more than 5 tests. Annual test volumes provided with this contract are based upon prior history and are not a guaranteed minimum. New tests within the scope of the contract may be added to the test menu. The Contractor shall provide all reagents and materials required for test validation, with associated costs included in the applicable CPRR unit price. Tests outside the existing scope or established pricing shall require a bilateral contract modification.
The Contractor shall perform specimen integrity checks/indices on all applicable specimens, with associated costs included in the CPRR unit price.
If, at any time during the contract period, the Contractor is unable to perform a test included in the contract and the Government is required to obtain that test from another source, the Contractor shall reimburse the Government for all additional costs incurred for the referral testing, including any associated processing and shipping costs.
Note: Volumes listed are estimated workload based on historical data and are not guaranteed minimums.
Note: All bolded and italicized are considered STAT (immediate) tests
CPRR / Assay Description Combined Estimated
Annual Quantity Unit
CWBYVAMC
Estimated
Annual Volume
LCHCC
Estimated
Annual Volume
Acetaminophen 53 EA 53 0
Adrenocorticotrophic hormone (ACTH) 500 EA 500 0
Albumin 147,930 EA 122,817 25,113
Alk Phos (ALP) 146,097 EA 121,026 25,071
Alpha-1 Antitrypsin 746 EA 746 0
Alpha -2 Macroglobulin 100 EA 100 0
Alpha-fetoprotein 2,849 EA 2,849 0
ALT, Activated 158,678 EA 131,165 27,513
Amikacin 109 EA 109 0
Ammonia 881 EA 725 156
Amphetamines 21,678 EA 19,298 2,380
Amylase 1,675 EA 1,508 167
Anti-cyclic citrullinated peptide (Anti-CCP) 598 EA 598 0
Apolipoprotein A-1 150 EA 150 0
Apolipoprotein B 200 EA 200 0
AST, Activated 160,312 EA 130,332 29,980
Barbituates 21,678 EA 19,298 2,380
Benzodiazepines 21,678 EA 19,298 2,380
Beta2microglobulin 146 EA 146 0
B-HCG 2,571 EA 2,550 21
B-Hydroxyburate 2,405 EA 2,405 0
Bilirubin, Direct 2,965 EA 2,253 712
Bilirubin, Total 146,107 EA 121,040 25,067
NT-pro BNP 5,120 EA 4,740 380
BUN 196,081 EA 163,467 32,614
Buprenorphine 21,678 EA 19,298 2,380
C3 698 EA 698 0
C4 698 EA 698 0
CA 125 44 EA 44 0
CA 19-9 570 EA 570 0
Calcium 183,486 EA 153,496 29,990
Cannabinoids 21,678 EA 19,298 2,380
Carbamazepine 126 EA 111 15
CEA 420 EA 376 44
Ceruloplasmin 698 EA 698 0
Chloride 183,524 EA 153,445 30,079
Cholesterol 150,756 EA 80,232 70,524
CK-MB 163 EA 163 0
CO2 183,433 EA 153,452 29,981
Cocaine 21,678 EA 19,298 2,380
Cortisol 1,514 EA 1,279 235
Creatine Kinase (CK) 9,416 EA 8,890 526
Creatinine, Enzymatic 248,462 EA 176,929 71,533
CRP (including wrCRP and/or hsCRP) 8,106 EA 7,061 1,045
Cyclosporin 56 EA 56 0
Cystatin-C 14,876 EA 13,376 1,500
DHEA-S 121 EA 121 0
Digoxin 286 EA 286 0
Erythropoietin (EPO) 1,067 EA 1,067 0
Estradiol 1,436 EA 1,436 0
Ethanol (Blood) 6,096 EA 3,716 2,380
Ethanol (Urine) 21,679 EA 19,299 2,380
Fentanyl 21,679 EA 19,299 2,380
Ferritin 11,948 EA 9,676 2,272
Folate 12,277 EA 8,660 3,617
Follicle stimulating hormone 1,573 EA 1,194 379
Free PSA 1,900 EA 1,413 487
Free T3 1,031 EA 1,031 0
FreeT4 16,570 EA 14,196 2,374
Gentamicin 10 EA 10 0
GGT 1,227 EA 1,227 0
Glucose 184,316 EA 154,280 30,036
Haptoglobin 631 EA 631 0
HbA1C 59,684 EA 44,256 15,428
HDL 107,083 EA 80,199 26,884
Hep A antibody Total 2,667 EA 2,667 0
Hep A IgM 1,630 EA 1,630 0
Hep B core IgM 3,156 EA 3,156 0
Hep B core Total 3,112 EA 3,112 0
Hep B surface Antibody 3,449 EA 3,449 0
Hep B surface Antigen 3,661 EA 3,661 0
Hep B surface Antigen Confirmatory 55 EA 55 0
Hep C Antibody 7,832 EA 7,832 0
HIV (4th or 5th Generation) 7,335 EA 7,335 0
Homocysteine 230 EA 190 40
HSV-1 IgG 684 EA 684 0
HSV-2 IgG 684 EA 684 0
IgA 1,193 EA 1,127 66
IgG 880 EA 809 71
IgM 869 EA 801 68
Insulin 200 EA 200 0
Insulin like growth factor 1 240 EA 240 0
Phosphorus 10,362 EA 9,573 789
IPTH 5,031 EA 4,013 1,018
Iron 12,179 EA 10,107 2,072
UIBC 12,108 EA 10,106 2,002
Lactate 5,251 EA 5,161 90
LDH 1,029 EA 1,029 0
LDL, Direct 96,137 EA 80,036 16,101
Lipase 4,077 EA 3,892 185
Lipoprotein a 500 EA 500 0
Lithium 604 EA 498 106
Luteinizing hormone 1,567 EA 1,194 373
Magnesium 34,775 EA 31,436 3,339
Methadone 21,679 EA 19,299 2,380
Methotrexate 36 EA 36 0
Microalbumin 30,370 EA 24,471 5,899
Myoglobin 32 EA 32 0
Opiates 21,679 EA 19,299 2,380
Oxycodone 21,679 EA 19,299 2,380
Phenobarbitol 11 EA 9 2
Phenytoin 86 EA 86 0
PO4 29,425 EA 28,295 1,130
Potassium 184,447 EA 154,293 30,154
Prealbumin 391 EA 364 27
Procalcitonin 6,339 EA 6,339 0
Progesterone 1,536 EA 1,536 0
Prolactin 1,373 EA 1,045 328
Protein (Blood & Urine) 153,847 EA 128,211 25,636
Protein (CSF) 1,923 EA 1,625 298
PSA free 1,080 EA 921 159
PSA 50,931 EA 41,549 9,382
Rheumatoid Factor 1,065 EA 1,033 32
Salicylate 1,630 EA 1,630 0
SARS-CoV-2 - IgG 120 EA 120 0
SARS-CoV-2S (spike) 120 EA 120 0
Sex Hormone Binding Globulin (SHBG) 491 EA 355 136
Sodium 185,592 EA 155,498 30,094
T3, Free 1,357 EA 1,031 326
T3, Total 1,162 EA 967 195
T4, Free 16,925 EA 14,196 2,729
T4, Total 15,392 EA 13,707 1,685
Tacrolimus 731 EA 731 0
Theophylline 15 EA 15 0
Thyroglobulin 382 EA 382 0
Thyroglobulin Ab 690 EA 690 0
Thyroid peroxidase Ab 549 EA 549 0
Tobramycin 24 EA 24 0
Testosterone, Free (Calculated) 6,484 EA 5,330 1,154
Testosterone, Total 6,557 EA 5,247 1,310
Tramadol 19,306 EA 16,363 2,943
Transferrin 12,203 EA 10,127 2,076
Triglyceride 51,185 EA 42,125 9,060
Troponin, High-Sensitivity 11,213 EA 11,188 25
TSH 77,780 EA 63,644 14,136
Uric Acid 15,780 EA 13,241 2,539
Valproic Acid 806 EA 686 120
Vancomycin 1,646 EA 1,646 0
Vitamin B12 47,146 EA 37,387 9,759
Vitamin D (25-OH) 52,579 EA 43,977 8,602
6. Requirements
6.1 General Requirements
The contractor is required to furnish all of the following to all locations defined within the contract (as a single price, CPRR):
Instrumentation hardware and software to include but not limited to analyzers, automation track system, operating system, printers, monitor screens, Uninterruptible Power Supply (UPS), etc.
All Reagents, Calibrators, and Quality Control materials.
All consumables and user-defined replacement parts necessary to operate the contractor's equipment, including secondary, aliquot tubes.
Upgrades to and maintenance of hardware and software necessary to fulfill the test requirements and allow for continuous operation.
On- and Off-site training for end users and key operators.
Delivery and installation of equipment at no additional charge as well as removal of test system and return shipping costs at end of contract.
Equipment and assay installation and full validation of system hardware and software as well as assay performance studies (to include but not limited to assay correlations to existing instrumentation, carryover, linearity, dilution validation, precision, accuracy, reference range studies, and normal range studies).
Complete system software verification, including initial rule build and validation, including but not limited to routing rules and auto-verification for the entire defined test menu. This applies to the initial test menu and any new assays added via modification of the contract throughout the life of the contract.
Support for the modification to vendor-owned automation track system’s software with the addition of or modification to 3rd-party connections.
Standard Operating Procedures (SOP) for all assays, maintenance tasks, and equipment operation shall be provided by the vendor.
6.2 CPRR pricing shall be based on the collective annual test volume for all testing locations (same price regardless of test location).
6.3 The VA Healthcare Network facilities will only pay for the patient test results reported to the patient’s medical record. There shall be no minimum monthly charge.
6.4 CPRR shall be based on a tiered volume with additional savings as testing volume increases. Failure to adequately charge for estimated cost on volume as disclosed will not incur additional charges. Inflated reagent estimates if not consumed will not be charged.
Annual test volumes provided are based upon historical reported result data and are not guaranteed a minimum.
New tests may be added as requested via contract modification as baseline cost per test (CPT) or reduced pricing on the cost per reportable result (CPRR) without instrumentation hardware and software or service costs added.
All reagents for instrument verification and test method validation, per College of American Pathologists (CAP) and VA guidelines, are to be supplied by the contractor at no additional cost to the government.
If at any time during the contract period, testing for the defined test menu is not available on this list, the Contractor shall provide, or reimburse the government, any additional costs associated with the procurement of another source of satisfactory test performance (i.e. reference laboratory, alternate testing instrument, etc.).
6.5 Space Allocations per Facility:
The proposed solution must fit within the allocated space using existing drains (all locations). The proposed automation solution shall be designed to support future expansion and integration without requiring significant modification to the laboratory footprint or core automation infrastructure.
C.W. Bill Young VA Medical Center (allocated space must also include the Sysmex XN 9100 with 2- XN10, 2-XN20, 1-SP50, 1-BT50, and 1 DI60 TLA)
Lee County VA Healthcare Center
7. Instrumentation Requirements
7.1 Integrated Chemistry-Immunochemistry System Requirements
System shall have automation and front-loading capabilities.
System shall prioritize automation. Site(s) with an automation line shall have both chemistry and immunoassay systems integrated and connected to the automation line. Site(s) without an automation line shall have chemistry and immunoassay systems connected and integrated.
Be space efficient and can be installed within the existing floor space square footage with proper egress for safety. The equipment proposed must accommodate workflow to ensure easy access to other parts/departments of the laboratory o Relocated equipment within the laboratory space must stay within the same room.
o “Affixed equipment” means equipment affixed or anchored to real property or requiring dismantlement for relocation.
Secondary or backup analyzer(s) provided must be manufactured by the same Contractor receiving the award and use(s) the same reagents and test methodology for each test performed to allow for standardized test builds.
o Using third-party analyzer(s) to meet test menu requirements is not acceptable.
o Using third-party equipment for automation is acceptable.
o Third party open channel assay on contractors’ solution is acceptable.
Contractor shall maintain an adequate replacement part inventory locally to minimize downtime associated with transporting parts to analyzer’s site. An adequate inventory would include parts that are known/could need to be changed frequently and should be kept either on-site or locally in a storage facility. Sufficient parts for routine maintenance to be kept onsite.
If the integrated system requires a water system outside the Government-maintained water system, the Contractor to install and maintain an appropriately sized water system for the duration of the contract at the Contractor’s expense. The water system is to provide an acceptable quality and quantity of water to the analyzers according to the required specifications.
Each analyzer should include an Uninterruptible Power Supply (UPS) with replacement when necessary.
System shall be capable of handling primary tube sampling from collection tubes of various sizes and from various manufacturers.
System shall be capable of sampling from tubes of various types, i.e.
flat-bottom, round-bottom, sample cups, pour-off cups, false-bottom tubes, and tube inserts.
System shall have ability to continuously load patient samples, reagents, quality control and/or calibrator materials during operation.
System shall have ability to repeat and reflex test, auto-rerun and auto-dilute without user intervention.
System shall have accurate capacity for monitoring reagent usage, maintain/store sufficient on-board supplies/reagents for 24 hours of patient testing on the combined platform, and provide reagent inventory upon request, in real time.
System shall have RFID technology for rapid on-board reagent placement and tracking
System shall have bidirectional interface capabilities.
System shall have ability to perform serum indices, defined as the qualitative assessment of lipemia, icterus, and hemolysis.
System shall have ability to detect fibrin or clots and short samples during sample aspiration.
System shall have no requirement for sample pre-treatment.
System shall have ability to generate Critical and/or abnormal result flags.
System shall have ability to lock out/suppress reagent packs if there are QC failures.
System shall have the capability to add/adapt commercially available reagents not produced by the Contractor.
System shall have minimal carryover risk. Contract shall be responsible for completing carryover studies at installation and meeting CLIA guidelines for acceptable results.
Calibration requirement frequency for all tests not to exceed once per 24 hours per instrument.
Quality control testing requirement frequency for all tests not to exceed once per 24 hours per instrument.
95% of reagents shall be ready-to-use.
7.2 Chemistry Instrumentation Requirements
Provide clinical chemistry analyzer(s) with sufficient capacity and throughput to meet the volume demands as defined in the Test Menu Attachment A – Volume Estimates and Individual Test Pricing.
Throughput criteria:
At CWBYVAMC: minimum of 1000 tests per hour per instrument At LCHCC: minimum of 450 tests per hour per instrument
Provide chemistry analyzers with standardized assay testing methodology to facilitate optimal workload distribution and backup capacities as specified in the equipment list.
Shall have a minimum of 60 chemistry reagent test slots per instrument for CWY and 40 for Lee County.
STAT Chemistry test results shall be available in 15 minutes from the time loaded on the analyzer to when results are available to maintain or improve current turn-around-time (TAT).
7.3 Immunochemistry Instrumentation Requirements
Provide immunochemistry analyzer(s) with sufficient capacity and throughput to meet the volume demands as defined in the Test Menu (Attachment A – Volume Estimates and Individual Test Pricing.
Throughput criteria:
At CWBYVAMC: minimum of 250 tests per hour per instrument
At LCHCC: minimum of 100 tests per hour per instrument
Provide immunochemistry analyzers with standardized assay testing methodology to facilitate optimal workload distribution and backup capacities as specified in the equipment list.
Analyzer shall have ability to aspirate the sample and release the tube, so additional tests can be run without delays.
Cardiac STAT immunoassay incubation times shall not to exceed 10 minutes to meet chest pain center accreditation requirements and maintain or improve current turnaround time (TAT).
Routine immunoassay incubation times not to exceed 30 minutes to maintain or improve current TAT.
Analyzer shall have proven solution to mitigate carryover.
A Troponin test which meets the International Federation of Clinical Chemistry and Laboratory Medicine (IFCC) definition of high sensitivity.
High/Ultra-sensitive reagent-based assay shall be utilized to alleviate interferences
State carryover claim and design solutions to mitigate carryover.
Analyzer shall have ability to duplicate repeat infectious disease testing without operator intervention.
7.4 Power for Chemistry and Immunochemistry Instrumentation
Individual components require no more than 50 amps, 110V or 220V. It is acceptable for peripheral equipment such as the monitor, computer, and printer, to be plugged into separate outlets or UPS.
Installed within the existing power capability that exists for each laboratory, regarding both emergency and normal power.
7.5 Automation Requirements:
Must provide evidence that the proposed solution can meet the space requirements. The CWBYVAMC automation system shall include an FDA-cleared interface to the Sysmex-9100 system.
Shall have capacity to add automation connectivity for future requirements during the term of the delivery order/s. Any additions will be negotiated and require the signature of the CO and delivery order/s contract holder.
Shall have capability to establish a remote connection for the purpose of instrument troubleshooting, software updates, and generating test volumes for invoice purposes.
System Manager — receives specimen and records time, directs the scheduling, routing, and tracking of specimen carriers on the conveyor system from loading to final disposition. The information system component of this automation system shall be able to communicate with Lab Information System (LIS) for ordering information to be sent from LIS to the
System manager and shall include but not be limited to: order code or name, tube type, accession number, container ID, and receipt date and time.
Non-linear configuration of conveyor system for transportation of specimens to analyzers for optimal space utilization in lab and minimal disruption of current workflow and space. Pre/post analytical processors shall fit within currently allocated space.
Sorter/Outlet station — sorts specimen tubes/aliquots into appropriate racks/targets based on the tests to be done (includes off-line instrument, reference lab or manual procedure by preselected rules) and archives specimens. Automated delivery and organization of specimens to outlet station based on bar-coded information.
Refrigerator storage — Minimum storage capacity of 20,000 specimens Maximum heights not to exceed 95 inches Support automated specimen disposal rules Support specimens by defined criteria for disciplines not connected to the track, including specimens being sent to the reference laboratory.
CWBYVAMC shall have a minimum of two (2) automation centrifuges capable of handling different tube sizes simultaneously and have adjustable time and RPM settings. Centrifuges shall have ability to produce sufficient separation of serum or plasma from its cellular constituents.
Process at least 350 tubes per hour Automated placement of specimens into and removal from centrifuges with minimum loading and unloading times for maximum productivity.
CWBYVAMC shall have an aliquoter for offline testing/sendouts.
Ability to make barcode-labeled aliquot tubes that mirror the primary tube labeling for offline processing.
Shall have the decapper/recapper/sealer system in an enclosed environment to prevent distribution of bio-hazardous aerosols.
Decapper shall have the ability to remove different cap types, e.g. systems own caps, hemogard, screw caps, and rubber stoppers. This is necessary to maintain employee safety by reducing the exposure to body fluids and maintain workflow and turnaround time.
Automation system shall have the ability to process 99% all of chemistry specimens, including whole blood and urine through the automation system.
Contractor shall provide and install a suitable compressed air system sufficient for the automation system if needed.
7.6 System Data Management Requirements:
A bi-directional bar-coded computer interface system compatible with the current VA LIS. The fully operational interface (both hardware and software) shall be immediately available for implementation to the VA computerized hospital information system CPRS/VistA.
Capability to establish a remote connection for the purpose of instrument troubleshooting, reagent management, software updates, and delivering test volumes for invoice generation.
HaveISA/MOU/ERA established with the VA OI&T (Office of Information and Technology) to allow for the implementation of remote diagnostics connectivity.
All connectivity hardware and installation to be provided by the Contractor.
Minimum of 25 thin client middleware licenses for Bay Pines VAHCS laboratories.
Software management features with capability to prepare data for auto validation prior to host transmission.
Sufficient data storage for 2 years of workload data and immediate access to more than 5,000 patient records per day, including instrument identification (houses PHI and PII).
All equipment shall be compatible or have the ability to act as a pass-through to Data Innovations Instrument Manager (DI) for auto verification of patient results.
Ability to manage rules for optimal specimen handling with ability to send automated comments to patient host records.
Ability to perform repeat testing or add-on testing through Data Management system.
Compatible with external Government Contractor software Unity Real Time Quality Control (QC) program.
Updates to Data Management software are provided at no additional charge when they become available.
Provide license(s) and hardware if needed for Data Innovations or other middleware at no additional charge to the VA.
All software and software licenses, interfaces, and hardware (e.g. servers, printers, monitors, UPS, etc.) shall be included with cost of hardware required disclosed for removal if needed.
The contractor is responsible for complete system software verification, including initial rule build and validation, at installation and anytime new assays added via modification of contract throughout the life of the contract.
The contractor is responsible for assisting the Government with automation track operating system modifications (e.g. routing rules) when 3rd party connection is added/modified. The Government agrees to assume the cost of connection license for any Government-owned/contracted equipment at the Government’s request.
7.7 Additional Requirements
The contractor must provide all monitors (minimum 32”) for the contractor’s data management system/automation track system as applicable.
The system shall include documents providing information on:
Electrical specifications Water consumption specifications Heat output specifications Noise level specifications
The system must have the ability to print patient test results / quality control results on a paper non-network connected printer in the event of a complete hospital network outage.
The contractor must provide all printers, including all components for printer functionality and printing (excluding paper) The analyzer system must have the capability to produce a chartable patient report, including the following mandatory characteristics:
o Facility Name o Facility Address o Facility Laboratory Medical Director o Laboratory CLIA Number o Test Result o Test Normal Reference Range o Test Unit of Measure o Test Critical Values / Flags
7.8 Upgrades / Replacement of Equipment within the TLA System Request for upgrades or replacement hardware/software, due to workload increase, excessive instrumentation failures will be evaluated as needed or at least annually with communication to the Contractor for modification of the contract. A high incidence of such problems with any equipment/analyzer or assay within the test menu supplied may indicate probable non-compliance with the terms of this contract and will entitle the government to its replacement with other analyzer(s) that can produce the required criteria of this contract satisfactorily.
“Downtime” is defined as any time the equipment is not available for patient testing due to malfunction, unacceptable quality control, software system errors, or hardware failures. This includes time used for end-user troubleshooting, conversations with technical support or on-site engineer repair/support.
Standard acceptable performance for the life of the contract is defined as a period of 30 consecutive calendar days by operating in conformation with the contractor's technical specification without prolonged downtime (>4 hours) per instance more than 3 times within 30 days, or more than 10 instances of downtime (of any length of time) within 30 days. In the event the equipment or an assay does not meet the standard acceptable performance for 30 consecutive days, the Government will notify the contractor of the ongoing unacceptable performance, and the performance will be monitored for an addition 90 consecutive days. If after 120 calendar days from the initial date of unacceptability, the vendor does not resolve the performance concerns to meet the Government’s expectations, the Government, through the Contracting Officer, may request a replacement of the equipment / assay or terminate the order upon mutual agreement.
Removal of the existing instrument by the contractor shall be performed within 30 days following the acceptance of replacement equipment without additional charge to the government.
Enhancements to the contractor's equipment shall be delivered to the government site and installed by the contractor within 60 days of their issuance or date of first commercial availability.
The Contractor shall provide all upgrades to the equipment hardware and operating system software without additional charge to the Government.
7.9 Adding New Analyzers to the Total Lab Automation System
Additional laboratory equipment or analyzers may be connected to the Total Laboratory Automation (TLA) system through a bilateral contract modification. The modification shall establish, as applicable, any additional requirements, pricing, and implementation responsibilities. Following execution of the modification, the Contractor shall provide the technical support and application specialist(s) necessary for installation, connection, and validation of the additional equipment or analyzers.
Validation of the TLA system shall be performed in accordance with Government-defined guidelines and acceptance criteria. The Contracting Officer’s Representative (COR) shall review all installation and validation documentation for technical acceptance.
Enhancements or upgrades to Contractor-provided equipment that are necessary to maintain the required functionality and performance of the TLA system shall be delivered and installed by the Contractor within 60 days. The costs of such enhancements or upgrades shall be included in the established CPRR pricing.
7.10 Adding New Assays to the Existing Analyzers
Additional assays may be added to the existing test menu through a bilateral contract modification. The modification shall establish, as applicable, any additional requirements, CPRR pricing, and implementation responsibilities. Following execution of the modification, the Contractor shall install and validate the assay in accordance with Section 6, General Requirements for a CPRR Contract. The assay shall be available for Government acceptance within 30 days after execution of the modification.
8. Installation/Implementation
8.1 PHASE-IN/PHASE OUT REQUIREMENT - Due to the time required to implement the requirements of this contract, including equipment installation, system integration, validation, training, and transition activities, a phase-in/phase-out period is required to ensure continuity of laboratory operations and prevent disruption to patient care.
8.2 Phase-in requirements: The implementation of the requirements described in this solicitation shall be completed no later than 180 days or based on the mutually agreed upon timeline by the Contractor and Government after award. This timeline is based on a reasonable attempt of the Contractor to complete all of the necessary implementation requirements within the stated timeframe. Contractor shall not be penalized for implementation timelines that extend beyond the 120-day timeframe, if the extension is through no fault of the Contractor and is a result of delays due to the Government (i.e., construction/ remodeling of facilities). Upon award, the transition period for the awarded Contractor to have all equipment and peripherals installed and operational shall be 90 days from the date of award through 120 days or based on the mutually agreed-upon timeline by the Contractor and VA. This requirement includes the implementation of auto verification and the transmission of QC data to an external real-time QC service. During this same period, all initial training of VA personnel in the operation and maintenance of said award shall also be completed with exceptions due to delays at the fault of the Government.
The new Contractor must be able to coordinate with the laboratory and install the new equipment while the current Contractor’s equipment is still in operation in order to prevent any lapse of service for laboratory testing.
At the end of 120 days from award of the Contract, the awarded Contractor has full and sole responsibility for services under the awarded delivery order/s.
8.3 Phase-out Requirements: During the phase-out period, the incumbent contractor shall be fully responsible for all work performed under this Statement of Work (SOW). Up to 180 calendar day phase out period may be required. The incumbent contractor shall cooperate fully to permit an orderly changeover of laboratory workload. The incumbent contractor shall allow the new contractor and government personnel access on a non-interference basis, to observe the day-to-day operations and to become familiar with the work requirements and procedures.
8.4 Within one week from the date of award, the CO, CORs and the Contractor will hold a kickoff meeting to discuss implementation.
8.5 Acceptance and Performance: This paragraph establishes a standard of quality performance that is to be met before any equipment listed on the delivery order/s is accepted by the Government. This also includes replacement, substitute machines and machines that are added or field modified after a system has demonstrated successful performance. The acceptance period begins on the installation date.
Acceptance will occur once the analyzers/equipment have met the standard performance for a period of 30 consecutive calendar days by operating in conformance with the Contractor’s technical specification or as proposed in the contract at an effectiveness level of 90% or more.
8.6 Start-Up Reagents: The Contractor provides all reagents, calibrators, controls, consumable items, disposable items, parts, accessories, and any other items included on the list of supplies defined in the contract and required to establish instruments for operation for performance of acceptance testing. The Contractor performs, to the satisfaction of the Government, all validation studies including precision, method comparison with current analyzer, accuracy (recovery), linearity
(reportable range), calibration verification, carryover studies, verification of reference interval, dilution validations, and determination of sensitivity and specificity at no cost to the Government.
8.7 In the event that equipment does not meet the standard of performance during the initial 30 consecutive calendar days, the standard of performance tests continues on a day-by-day basis until the standard of performance is met for a total of 30 consecutive days.
8.8 If the equipment fails to meet the standard of performance after 90 calendar days from the installation date, the Government may request a replacement or terminate the delivery order/s. (The Contractor will receive revenue for tests reported during the 90-day acceptance period.).
8.9 Operational use time for performance testing for a system is defined as the accumulated time during which the machine is in actual use. System failure downtime is the period of time when any analyzer in the system is inoperable due to equipment failure. Downtime for each incident starts from the time the Government makes a bona fide attempt to contact the Contractor’s designated representative at the prearranged contact point until the system or analyzer(s) is returned to the Government in proper operating condition.
8.10 During the performance period for a system, a minimum of 100 hours of operational use time with productive or simulated work required begins as a basis for computation of the effectiveness level. However, in computing the effectiveness level, the actual number of operational use hours will be used when in excess of the minimum of 100 hours.
8.11 The Government will maintain daily records to satisfy the requirements of this paragraph and notifies the Contractor in writing of the date of the first day of the successful period of operation. Operations use time and downtime will be measured in hours and whole minutes.
9. Service and Maintenance
Contractor provides equipment repair and preventative maintenance on all primary and back-up instrumentation and any incremental support equipment, e.g. water system, covered under the delivery order/s award, and UPS.
9.1 Maintenance plan: Contractor provides manufacturer’s daily, weekly, monthly, quarterly and periodic maintenance plan, outlining time required for hands on and automated tasks.
9.2 Support Services: Contractor provides telephone assistance 24-hours/day, 365 days per year with a call back response of 1 hour. Following determination that service is required, technical on–site support provided under the terms of the contract and provided for emergency repairs 365 days per year within twenty-four
(24) hours of the time of notification of the malfunction for medical center lab(s) - CWBYVAMC lab. For Community Based Outpatient Clinic (CBOC) lab(s) – LCHCC lab, during normal operating hours, within twenty-four (24) hours of the time of notification of the malfunction. If both primary and backup analyzers are not able to perform a test listed as STAT, Contractor shall have defined, approved contingency plan(s) to ensure continuation of testing. Contractor provides maintenance (labor and parts) to keep the equipment in good operating condition and subject to security regulations. The Government will provide the Contractor access to the equipment to perform maintenance service according to the maintenance and service terms.
9.3 Incident/ Service Reports: Contractor to furnish a malfunction report on the instrument upon completion of each repair call. The report includes, at a minimum, the following: (a) date and time notified; (b) date and time of arrival; (c) serial number, type and model number(s) of equipment; (d) time spent for repair;
(e) description of malfunction and repair; and (f) proof of repair that includes documentation of quality control being performed and within range, as applicable.
Contractor shall notify the lab supervisor/management if repair is significant enough to require calibration and/or validation following the repair. Contractor shall perform all calibration and/or validation as applicable for the instrument to be ready for patient testing.
9.4 Daily maintenance: Instrumentation requires minimal hands-on daily maintenance.
9.5 Preventative Maintenance: Contractor shall provide regular, scheduled maintenance coordinated with the lab supervisor/management to assure the continued reliable operation of the equipment. These preventive maintenance visits are of a frequency that conforms to the manufacturer's operation and maintenance instructions for the supported equipment.
9.6 Emergency Repair: Emergency repairs to be performed after notification that the equipment is inoperative. Contractor shall provide the Government with a designated point of contact and shall make arrangements to enable its maintenance representative to receive such notification. Contractor shall perform emergency repair service within 24 hours of time of notification of the malfunction. Contractor shall provide all parts and labor needed to repair the malfunction. Travel, per diem and other expenses associated with the repair shall be borne by the Contractor.
9.7 Maintenance Support: Service repair person locally based within the geographical area.
9.8 Maintenance Credit for Equipment Malfunction: If a machine remains inoperative due to a malfunction through no fault or negligence of the Government for more than 24 hours, the Contractor shall be assessed damages at the rate of 1/30 of the preceding average three-month CPRR billings times the total number of days certified as downtime with each incident starts from the time the user makes a bona fide attempt to contact the Contractor's designated representative at the prearranged contact point until the machine is returned to good operating order less any non-contracted maintenance (emergency repairs) days.
9.9 Replacement of Laboratory Equipment: During the contract period, should the repair record of any laboratory equipment reflect a downtime of 10% or more of the normal working days in one calendar month, a determination will be made by the representative of the Government to replace the initial laboratory equipment with new equipment. The responsibility of maintaining the equipment furnished in good condition shall be solely that of the Contractor.
9.10 Failure Mean Time Disclosure: Contractor states the failure mean time (between failure and mean time to repair) for each piece of equipment offered. Contractor shall provide redundant systems to eliminate need of emergency backup equipment.
9.11 Upgrades or Replacement: Request for instrumentation upgrades or replacement, due to workload increase, menu changes, technological upgrades, excessive instrumentation failures/malfunctions, breakdowns, or service calls, will be evaluated as needed/annually with communication to the Contractor for modification of the contract. A high incidence of problems with any equipment/analyzer supplied may indicate probable non-compliance with the terms of this contract and will entitle the facility/clinic to its replacement with another analyzer(s) that can produce the required criteria of this contract satisfactorily to the user. Removal of instrument by the Contractor performed within 60 days after request.
9.12 FDA Approved Instruments and Methods: Only instruments which are FDA approved will be considered and shall be operational and interface with VA Laboratory Computer systems and upgrades. Test methods shall be FDA approved with limited recalls due to product failures. This shall be a "turn-key" system.
9.13 Operator Procedure Manuals: One Operator’s manual along with CLSI compliant procedures shall be furnished for each instrument model supplied per site.
10. Service and Technical Support The Contractor shall provide full service on-site technical support for all vendor-owned equipment, including the automation track system, to keep the equipment in good operating condition and subject to security regulations.
On-Site Support Coverage:
CWBYVAMC
Twenty-four (24) hours per day
Seven (7) days per week
Including Federal holidays
LCHCC
Monday through Friday
Eight (8) hours per day
8:00 AM to 4:00 PM
11. Requirements While Working at the Facilities
The Contractor’s employees approved by the COR will wear visible identification at all times while on the premises of the facilities within the NCO. Identification will include but not be limited to a company identification card, including the company name, employee name, title, and a photograph of the employee. Contractor employees will maintain a professional appearance commensurate to their industry.
It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .