S02 BID SHEET NEW.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C24221B0014
About this file
This solicitation is for a construction project to replace condenser water piping at the Brooklyn VA Medical Center in Brooklyn, New York. The project involves replacing condenser water piping from the chiller plant to the cooling towers on the roof of Building 4. The work includes replacing valves, installing electrical heat tracing and a centrifugal separator/cleaner package.
The solicitation provides three bid items. The base bid, Item I, is for the condenser water piping replacement project with an estimated construction cost of $2,913,396 and a completion time of 260 calendar days. Item II is an alternate bid to use Aquatherm piping made of polypropylene in lieu of steel, with an estimated additional cost reduction to $2,663,396. Item III is an alternate bid to include lead paint abatement with the base work, further reducing the estimated cost to $2,463,396 and completion time to 230 calendar days. The solicitation is available through the Department of Veterans Affairs and responses are due by the date specified on www.beta.SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 2.pdf | ||
| 36C24221B0014 0002.docx | DOCX document | |
| RFI ANSWERS.pdf | ||
| 36C24221B0014 0001.docx | DOCX document | |
| S02 ALL POSTERS.pdf | ||
| S02 Participation Goals for Minorities and Females.pdf | ||
| S02 SPECS.pdf | ||
| S02 VA ID PACKAGE 06-18-2019.pdf | ||
| 36C24221B0014_1.docx | DOCX document | |
| S02 Safety or Environmental Violations and Experience Modification Rate.pdf | ||
| S02 DRAWINGS.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Replace Condenser Water Piping Building 4 Project No: 630A4-13-403
STATEMENT OF BID ITEM(S)
A. BASE BID ITEM I: Work includes general construction, replacement of condenser water piping from chiller plant to cooling towers on the roof on the east side of Building 4. Replacement of valves controlling flow in these lines, electrical heat tracing of piping, and installation of centrifugal separator/cleaner package.
Construction Estimate: $2,913,396 Completion Time: 260 calendar days
B. BID ITEM II: BASE BID ITEM I use of Aquatherm Piping (Polypropylene (PP-R)) on entire system in lieu of steel. To include flange connections, piping, elbows as needed.
Construction Estimate: $2,663,396 Completion Time: 260 calendar days
C. BID ITEM III: BASE BID ITEM II base bid item I and costs associated with scraping and repainting lead paint structural steel.
Construction Estimate: $2,463,396 Completion Time: 230 calendar days