S02 - Attachment - Price Breakdown Sheet.docx

DOCX document 26 KB Posted

Attached to
Director’s Quarters Telecommunications Infrastructure Installation
Solicitation number
36C26125R0074
Issued by

About this file

The file is a Price Breakdown Sheet for the Director's Quarters Telecommunications Infrastructure Installation project. The document provides a detailed cost breakdown across multiple divisions including General Requirements, Existing Conditions, Communications, and Earthwork, with categories for Material, Labor, Equipment, and Other costs. The pricing template allows contractors to itemize expenses, with sections for overhead, profit, bonds, and insurance, resulting in a total proposal price.

The associated federal contract opportunity is a Task Order Proposal Request specifically for Veterans Integrated Service Network 21 (VISN 21) Multiple-Award Construction Contract (MACC) contractors. The project scope involves directionally boring up to 200 linear feet to install underground conduit, coaxial cabling, weatherproof boxes, and associated services to prepare a residence for future COMCAST internet connectivity. Only pre-awarded contractors from Network Contracting Office 21 (NCO 21) are eligible to submit proposals for this Department of Veterans Affairs project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment : Price Breakdown Sheet, Directors Quarters Telecommunications Infrastructure Installation

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Condition
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 27 - Communications
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 31 - Earthwork
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
TOTAL Proposal
$
$
$
$
$

NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.

The offeror agrees to perform the work required at the prices specified above in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due. (Failure to insert any number means the offeror accepts the minimum days in the TORFP letter.)

NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

Signature Date

File details come from the government source that posted it. Updated .