S02 Attachment IV - Bid Item Cost Breakdown WS.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Y1DA--652-18-930 ER Headwall Renovation Federal contract opportunity
Solicitation number
36C24622B0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document contains a bid item cost breakdown template for a federal construction project. The template requires offerors to provide detailed cost estimates by construction division for a project with Number 36C24622B0010 to renovate ER headwalls at a Veterans Affairs medical center. Offerors must include labor and material costs by division and also provide overhead, profit and bond percentages to calculate total base offer costs. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--652-18-930 ER Headwall Renovation, newest first.
File Type Posted
36C24622B0010 0002.docx DOCX document
S07-Abstract of Offerors Renovate ER headwalls 36C24622B0010 signed.pdf PDF
Renovate ER Department Site Visit.pdf PDF
36C24622B0010 0001.docx DOCX document
Attachment V Davis-Bacon Act WD VA20220049.pdf PDF
Attachment I Renovate Emergency Department HeadWall SOW.pdf PDF
Drawing Package.pdf PDF
36C24622B0010_1.docx DOCX document
Specification Package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ITEM I (BASE BID)

BID ITEM I (BASE BID) Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .