S02_Attachment- _IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1PZ--852CM3040 - Jefferson Barracks Crypt Conversion Section 1KK - Construction IFB (VA-20-00056531)
- Solicitation number
- 36C78620B0010_1A
About this file
The attached document is a contractor cost estimate worksheet for the Jefferson Barracks Crypt Conversion project solicitation number 36C78620B0010_1A issued by the Department of Veterans Affairs National Cemetery Administration. The cost estimate worksheet requires lump sum pricing for 16 construction divisions that may be utilized for the project, including general requirements, concrete, masonry, metals, finishes, equipment, plumbing, HVAC, electrical, and earthwork. Contractors must also provide separate lump sums for bonds, overhead, and profit to derive a grand total price. The solicitation is an invitation for bid for construction services to convert existing crypt structures at the Jefferson Barracks National Cemetery to accommodate casketed and cremated remains interments. Pricing is requested in a lump sum format with optional cost line items for additional work that may be added through contract modifications. The deadline to submit pricing is not provided in this document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN3 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 01 | |||||
| General Requirements | |||||
| Division 02 | |||||
| Existing Conditions | |||||
| Division 03 | |||||
| Concrete | |||||
| Division 04 | |||||
| Masonry | |||||
| Division 05 | |||||
| Metals | |||||
| Division 06 | |||||
| Wood, Plastic, and Composites | |||||
| Division 07 | |||||
| Thermal and Moisture Protection | |||||
| Division 08 | |||||
| Openings (Doors, Windows, etc...) | |||||
| Division 09 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 14 | |||||
| Fire Suppression | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $
File details come from the government source that posted it. Updated .