S02 - Attachment D1 - QASP _Diagnostic Med Physicist.pdf
PDF 420 KB Posted
- Solicitation number
- 36C25026Q0156
About this file
This is a Quality Assurance Surveillance Plan (QASP) for a Diagnostic Medical Physicist contract with the U.S. Department of Veterans Affairs, Network Contracting Office 10.
The QASP establishes the framework for monitoring contractor performance against defined standards. The Contracting Officer is Michelle C. Ford (Michelle.Ford2@va.gov), and the Contracting Officer's Representative is Mary Ann Spilker, Radiation Safety Officer. The document outlines five key performance measures: (1) Qualifications of Key Personnel—all Diagnostic Medical Physicists must maintain current board certification per ACR standards at 100% compliance; (2) Physics reports documenting TJC requirements for diagnostic imaging equipment testing at 100% compliance; (3) Policies and Standard Operating Procedures for each ACR-accredited modality with 95% availability and 90% acceptable quality level; (4) Quarterly Continuous Quality Improvement reports for ACR-accredited modalities at 100% standard and 95% acceptable quality level; and (5) Administration/record maintenance requiring written reports within 30 working days of inspection completion at 95% standard and 90% acceptable quality level. The contractor must perform annual inspections of all required imaging equipment within 14-month intervals to ensure compliance with NHPP, VHA, Joint Commission, and ACR requirements. Surveillance methods include direct observation (100% supervision during equipment inspections), periodic sampling when deficiencies are suspected, and random sampling for work verification. Performance Assessment Meetings occur quarterly, and the COR must notify the Contracting Officer of deficiencies within three business days. The document includes a Contract Discrepancy Report form for documenting and resolving unacceptable performance issues.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Diagnostic Medical Physicist
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place?
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Michelle C. Ford, Michelle.Ford2@va.gov
Organization or Agency: U.S. Department of Veterans Affairs - Network Contracting Office 10
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Mary Ann Spilker, Radiation Safety Officer________________________________________
c. Other Key Government Personnel – Key personnel are any personnel on call for the contracted service.
mailto:Michelle.Ford2@va.gov
3. CONTRACTOR REPRESENTATIVES
The following employee of the contractor is to serve as the contractor’s program manager for this contract.
Program Manager: ____ _________________________________________
Alternate Manager: _____________________________________________
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix below, in the Performance Work Statement (PWS), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: Appropriate and continuous supervision during all equipment inspections.
b. PERIODIC SAMPLING. Sample is taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected.
c. RANDOM SAMPLING. Verification of work performed. The contractor shall perform annual inspections, not to exceed 14 months, of all required imaging equipment to ensure compliance with the current requirements of the NHPP, VHA, JC, and ACR.
Measure
PWS
Paragraph Reference
Indicator/ Performance Standard
Standard for Quality
Level
Acceptable Quality Level
Method of Surveillance
Met AQL/Did Not Meet
AQL
Qualifications of Key
Personnel
Part II: Para 1
All contract Diagnostic Medical Physicist(s) shall have current board certification in accordance with ACR Standards for imaging equipment.
100% 100%
Periodic and annual sampling of
DMP
certification
YES ☐
NO☐
Physics reports documenting
TJC
requirements for physics testing of diagnostic imaging equipment.
3.7.2
Diagnostic imaging equipment is tested with Physics reports documenting equipment meets requirements of TJC standards.
100% 100%
Periodic sampling of physics testing reports and certification
YES ☐
NO☐
Policies and Standard Operating Procedures (SOP) for each ACR accredited modality.
3.7.3
Contract Diagnostic
Medical Physicist(s) shall be available and on location as needed to properly perform tasks as specified
95% 90%
Periodic sampling of reports and protocols
YES ☐
NO☐
Quarterly Continuous
Quality Improvement (CQI) reports for each modality with
ACR
accredited.
3.7.4
Implement requirements of
ACR QC manuals for each modality with ACR accreditation documented in quarterly reports
100% 95%
Periodic sampling of work performed
YES ☐
NO☐
provided to CQI committees.
Administration- Maintains appropriate records
Part II:
Requirements-
Section 1- Paragraph “a”
Written reports shall be provided within 30 working days of completion of inspection.
95% 90%
Periodic sampling of reports and signed protocols
YES ☐
NO☐
Privacy, Confidentiality and HIPAA
Part III:
Supporting
Information – Paragraph A
Contractor is aware of all laws, regulations, policies and procedures relating to
Privacy, Confidentiality and
HIPAA and complies with all standards Zero breaches of privacy or confidentiality
100% 100%
Contractor shall adhere to HIPPA/Priva cy rules required by
VAMC,
reports violations per VA
Directive 6500.6.
YES ☐
NO☒
6. CPARS RATINGS ASSIGNED TO QASP ITEMS:
a. Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL:
Contractor always meets the standard. Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Contractor almost always meets the standard, always performs over the Acceptable Quality Level. Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Contractor occasionally meets the standard, but more often meets the Acceptable Quality Level.
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract.
Also, there should have been NO significant weaknesses identified.
MARGINAL:
Contractor most often meets the Acceptable Quality Level, occasionally does not meet the Acceptable Quality Level and CDRs have been reported.
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Contractor has history of not meeting Acceptable Quality Level. Significant efforts have been made to bring Contractor into performance. Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
7. DOCUMENTING PERFORMANCE
a. Acceptable Performance: The Government shall document performance. Any report may become a part of the supporting documentation for any contractual action
b. Unacceptable performance: When unacceptable performance occurs, the COR shall inform the Contractor. This shall normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the Contracting Officer (CO). In turn, the CO shall present the CDR to the Contractor.
The Contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the Contractor has to present this corrective action plan to the COR. The Government shall review the Contractor's corrective action plan to determine acceptability.
Any CDRs shall become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. PROCEDURES
The COR shall inspect to ensure Contractor compliance with the appropriate section of the Statement of Work (SOW) periodically. The evaluator shall record results of inspection, noting the date and time of inspection. If inspection indicates unacceptable performance, the COR shall notify the CO of the deficiencies within 3 business days. Contractor shall be given notification to correct the deficiencies within a reasonable amount of time, on a case-by-case basis. The CO shall have the final authority on the amount of time the Contractor has to correct the deficiency.
9. FREQUENCY OF MEASUREMENT
During contract performance, the COR shall periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed. Performance Assessment Meetings shall be conducted quarterly.
The Government may, at its discretion, choose any time, announced or unannounced, to have VA personnel inspect the contractor’s files
The COR shall meet with the Contractor quarterly to assess performance and shall provide a written assessment.
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
COR NAME/TITLE DATE
CONTRACTOR NAME/TITLE DATE
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO
PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| 2. GOVERNMENT ROLES AND RESPONSIBILITIES |
| 3. CONTRACTOR REPRESENTATIVES |
| 4. PERFORMANCE STANDARDS |
| 5. METHODS OF QA SURVEILLANCE |
| 6. CPARS RATINGS ASSIGNED TO QASP ITEMS: |
| 7. DOCUMENTING PERFORMANCE |
| 8. PROCEDURES |
| 9. FREQUENCY OF MEASUREMENT |
| 10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP |
File details come from the government source that posted it. Updated .