S02 - Attachment B - QASP.docx
DOCX document 15 KB Posted
- Attached to
- R614--FY21: On-Site Document Shredding Federal contract opportunity
- Solicitation number
- 36C24821Q0019
About this file
This document contains an attachment to a federal solicitation outlining a Quality Assurance Surveillance Plan for on-site document shredding services. The solicitation is from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 seeking shredding services on an ongoing basis. The QASP specifies that the government will periodically evaluate the contractor's performance in accordance with standards for shredded material samples, schedule compliance, and accuracy of certificate of destruction files. Incentives for favorable performance include positive contractor evaluations, while disincentives such as negative evaluations or termination may apply after three instances of noncompliance with the standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24821Q0019 0002.docx | DOCX document | |
| S02 - Attachment B - BPVAHCS Campus Map.jpg | JPG image | |
| S02 - Attachment A - Revised Price Cost Schedule.docx | DOCX document | |
| 36C24821Q0019 0001.docx | DOCX document | |
| S02 - Attachment C - VA Directive 6371.pdf | ||
| 36C24821Q0019.docx | DOCX document | |
| S02 - Attachment D - VHA Directive 1192.01.pdf | ||
| S02 - Attachment A - Price Cost Schedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
Quality Assurance
The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP).
| Performance Objective |
| Quality Standard |
| Method of Surveillance |
| Incentive/Disincentive |
Shredding Samples
| Random samples taken from shredded material for evaluation. |
| Periodic surveillance by the COR. |
| · Incentives: Favorable contractor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
· Repeated violation (more than 3 instances may result in termination of services.
Schedule Compliance
| Services must be done in accordance with the schedule. |
| Periodic surveillance by the COR |
| · Incentives: Favorable contractor performance evaluation |
| Certificate of Destruction Files |
| Accuracy of certificates of destruction files |
| Periodic surveillance by the COR |
| · Incentives: Favorable contractor performance evaluation |
File details come from the government source that posted it. Updated .