This file provides drawings related to a federal solicitation for ductwork and piping replacement services. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 for project number 546-16-113 to replace ductwork and piping and conduct duct cleaning at Building 1. Interested parties should submit price proposals by June 29, 2023 at 1:00PM. The solicitation seeks these mechanical system replacement and maintenance services for a Veterans Affairs facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IF SHEET MEASURES LESS THAN 30x42 IT IS A

REDUCED PRINT. ADJUST SCALE ACCORDINGLY

LOCATION MAP

N

F

A

D

I

ET

D S T

N U

E

TM

AP

R

E NT O

S

A

T SE FO

REM

ACI

N

VE RATE

A

FAI R

F

S

Miami VA Healthcare System 1201 NW 16th St.

Miami, Florida 33125

PROJECT NO. 546-16-113

REPLACE DUCTWORK AND PIPING

AND CONDUCT DUCT CLEANING

BUILDING 1

STATE OF FLORIDA

N.T.S.

N MIAMI

KEY WEST

MIAMI

TAMPA

ORLANDO

PENSACOLA

TALLAHASSEE

GAINESVILLE VAMC

JACKSONVILLE

OCALA CBOC

VILLAGES CBOC

VALDOSTA CBOC

WEST

PALM

BEACH

MIAMI VA

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

DALE A. BACIK, P.E.

36564

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:5

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

LOCATION, SITE PLAN, AND SHEET

INDEX

12/09/2020 DAB MES

546-16-113

G-001

INDEX OF DRAWINGS

Sheet Number Sheet Name

M-D222 PHASE D - 2ND FLOOR - LAB EXHAUST - SOUTH

M-D321 PHASE D - 2ND FLOOR - HYDRONIC PIPING PLAN - SOUTH

M-801 CONTROLS & GRAPHICS - AHU-14

M-802 CONTROLS & GRAPHICS - AHU-18

M-803 CONTROLS & GRAPHICS - AHU-17

M-804 CONTROLS & GRAPHICS - AHU-20

M-805 CONTROLS & GRAPHICS - AHU-24

M-806 CONTROLS & GRAPHICS - ACU-25

M-807 CONTROLS & GRAPHICS - ACU-26

M-808 CONTROLS & GRAPHICS - ACU-27

M-809 CONTROLS & GRAPHICS - ACU-28

M-810 CONTROLS & GRAPHICS - ACU-29

M-811 CONTROLS & GRAPHICS - ACU-30

M-812 CONTROLS & GRAPHICS - ACU-31

M-813 CONTROLS & GRAPHICS - ACU-32

M-814 CONTROLS & GRAPHICS - ACU-33

M-815 CONTROLS & GRAPHICS - ROOM PRESSURE MONITOR

M-816 CONTROLS & GRAPHICS - SINGLE DUCT TERMINAL UNIT w/ HW REHEAT

M-817 CONTROLS & GRAPHICS - AHU-18 HEAT EXCHANGER

M-818 CONTROLS & GRAPHICS - AHU-14 HEAT EXCHANGER

M-901 PHASE A - 2ND FLOOR - ROOM PRESSURE - NORTH

M-902 PHASE A - 2ND FLOOR - ROOM PRESSURE - SOUTH

E-001 LEGEND, NOTES & ABBREVIATIONS

E-A121 PHASE A - 2ND FLOOR - LIGHTING DEMOLITION - NORTH

E-A221 PHASE A - 2ND FLOOR - LIGHTING RENOVATION - NORTH

E-A231 PHASE A - 3RD FLOOR - POWER RENOVATION - NORTH

E-B121 PHASE B - 2ND FLOOR - LIGHTING DEMOLITION - NORTH

E-B221 PHASE B - 2ND FLOOR - LIGHTING RENOVATION - NORTH

E-C121 PHASE C - 2ND FLOOR - LIGHTING DEMOLITION - SOUTH

E-C221 PHASE C - 2ND FLOOR - LIGHTING RENOVATION - SOUTH

E-C232 PHASE A - 3RD FLOOR - POWER RENOVATION - SOUTH

E-D121 PHASE D - 2ND FLOOR - LIGHTING DEMOLITION - SOUTH

E-D122 PHASE D - 2ND FLOOR - LIGHTING RENOVATION - SOUTH

E-601 DETAILS & SCHEDULES

INDEX OF DRAWINGS

Sheet Number Sheet Name

G-001 LOCATION, SITE PLAN, AND SHEET INDEX

A-A101 PHASE A - 2ND FLOOR - RCP DEMOLITION - NORTH

A-A102 PHASE A - 2ND FLOOR - RCP RENOVATION - NORTH

A-B101 PHASE B - 2ND FLOOR - RCP DEMOLITION - NORTH

A-B102 PHASE B - 2ND FLOOR - RCP RENOVATION - NORTH

A-C101 PHASE C - 2ND FLOOR - RCP DEMOLITION - SOUTH

A-C102 PHASE C - 2ND FLOOR - RCP RENOVATION - SOUTH

A-D101 PHASE D - 2ND FLOOR - RCP DEMOLITION - SOUTH

A-D102 PHASE D - 2ND FLOOR - RCP RENOVATION - SOUTH

M-001 NOTES & LEGEND

M-002 SCHEDULES

M-003 DETAILS

M-004 DETAILS

M-A121 PHASE A - 2ND FLOOR - DEMOLITION PLAN - NORTH

M-A131 PHASE A - 3RD FLOOR - DEMOLITION PLAN - MECHANICAL ROOM

M-A221 PHASE A - 2ND FLOOR - DUCTWORK - NORTH

M-A222 PHASE A - 2ND FLOOR - LAB EXAHUST - NORTH

M-A321 PHASE A - 2ND FLOOR - HYDRONIC PIPING - NORTH

M-A331 PHASE A - 3RD FLOOR - HYDRONIC PIPING PLAN - NORTH

M-A332 PHASE A - 3RD FLOOR - RENOVATION PLAN - MECHANICAL ROOM

M-B121 PHASE B - 2ND FLOOR - DEMOLITION PLAN - NORTH

M-B221 PHASE B - 2ND FLOOR - DUCTWORK - NORTH

M-B222 PHASE B - 2ND FLOOR - LAB EXAHUST - NORTH

M-B321 PHASE B - 2ND FLOOR - HYDRONIC PIPING - NORTH

M-C121 PHASE C - 2ND FLOOR - DEMOLITION PLAN - NORTH

M-C122 PHASE C - 2ND FLOOR - DEMOLITION PLAN - SOUTH

M-C221 PHASE C - 2ND FLOOR - DUCTWORK - NORTH

M-C222 PHASE C - 2ND FLOOR - DUCTWORK - SOUTH

M-C223 PHASE C - 2ND FLOOR - LAB EXHAUST - SOUTH

M-C321 PHASE C - 2ND FLOOR - HYDRONIC PIPING PLAN - NORTH

M-C322 PHASE C - 2ND FLOOR - HYDRONIC PIPING PLAN - SOUTH

M-C331 PHASE C - 3RD FLOOR - HYDRONIC PIPING PLAN - SOUTH

M-C332 PHASE C - 3RD FLOOR - HYDRONIC PIPING ISOMETRICS

M-D121 PHASE D - 2ND FLOOR - DEMOLITION PLAN - SOUTH

M-D221 PHASE D - 2ND FLOOR - DUCTWORK - SOUTH

Revisions: Date

Revision 1 12/7/2020

C-205G

DIETIT' M

TOILET

C-205N

PNT

LAB

2B130LAB

2B132

OFFICE

2B134

CORRIDOR

C2-C4

COPY ROOM

C-209

TELEPHONE

CLOSET

T-08

TELEPHONE

CLOSET

T-07

OFFICE

2B133A

STORAGE

2B133B LAB

2B133

OFFICE

C213

OFFICE

2B131

LAB

2B129

OFFICE

2B128

LAB

2B128A

OFFICE

2B128B

LAB

2B128C

LAB

2B128C1

LAB

2B128C2

LAB

2B127

OFFICE

2B126

OFFICE

2B127B

CORRIDOR

C2-C6

WALK-IN

FREEZER

T-09

LAB

2B117

LAB

2B118

LAB

2B123

LAB

2B122A

CORRIDOR

2B122

BRK. RM.

2B121

OFFICE

2B124

OFFICE

2B125A

LAB

2B125B

LAB

2B125

CLINICAL OFFICE

2B115

OFFICE

2B114

• CEILINGS IN HATCHED AREA TO BE DEMOLISHED. SOME CEILING HEIGHTS

AND TYPES ARE CHANGING, EXISTING SUPPORTS CAN BE REUSED IF THEY

MEET THE REQUIREMENTS FOR NEW CEILINGS.

• ANY EXISTING CONDITIONS DAMAGED BY THE CONTRACTORS THROUGHOUT

THE COURSE OF WORK SHALL BE RESTORED TO PREVIOUS CONDITION AT

THE CONTRACTORS EXPENSE.

• VA RESPONSIBLE TO MOVE FURNITURE, FIXTURES, AND EQUIPMENT OUT OF

ALL AREAS WITHIN THIS PHASE OF SCOPE PRIOR TO CONSTRUCTION AND

REPLACE AFTER COMPLETION OF WORK.

• VA REPORTS NO ASBESTOS WITHIN OR ABOVE CEILING IN 2015 ASBESTOS

REPORT.

• ALL RATED WALLS ARE EXISTING TO REMAIN AND TO NOT BE MODIFIED.

GENERAL NOTES

1.

2.

3.

4.

5.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:2

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE A - 2ND FLOOR - RCP

DEMOLITION - NORTH

12/09/2020 CJF DKS

546-16-113

A-A101

N Scale:

PLAN

3/16" = 1'-0"1 A - 2ND FLOOR CEILING - DEMOLITION PLAN - NORTH

C

NW NC NE

CECW

SW SC SE

TOILET

C-205N

PNT

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

8' - 9"

A.F.F.

GWB on Mtl Stud

8' - 9"

A.F.F.

GWB on Mtl Stud

8' - 6" A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

9' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0" A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

GWB on Mtl Stud

8' - 8"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

2' x 2' ACT

7' - 6"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"A.F.F.

GWB on Mtl Stud

8' - 0"A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

OFFICE

2B134

LAB

2B132

LAB

2B130

WALK-IN

FREEZER

T-09

CLINICAL OFFICE

2B115

LAB

2B117

LAB

2B118

CORRIDOR

C2-C7

OFFICE

2B124

OFFICE

2B125A

LAB

2B123

LAB

2B122A

BRK. RM.

2B121

LAB

2B125B

LAB

2B125

OFFICE

2B127B

OFFICE

2B126

LAB

2B127LAB

2B128C

LAB

2B128C1

LAB

2B128C2

LAB

2B128A

OFFICE

2B128

OFFICE

2B128B

LAB

2B129

OFFICE

2B131

OFFICE

C213

LAB

2B133

OFFICE

2B133A

CORRIDOR

C2-C4

CORRIDOR

C2-C6

A.F.F.

GWB on Mtl Stud

8' - 9"

A.F.F.

GWB on Mtl Stud

8' - 9"

STORAGE

2B133B

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

7' - 8"

CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR COMMENTS

ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG

"ULTIMA" 1911, 15/16"

BEVELED TEGULAR,

WHITE, 2'X2'

GRID: PRELUDE XL 15/16"

P-6 PAINT SHERWIN WILLIAMS SW 7006 EXTRA WHITE GLOSS LEVEL 1

FINISH LEGEND

• CONTRACTOR TO ADJUST ALL FIRE SPRINKLERS TO NEW CEILING HEIGHTS

WHERE HEIGHTS HAVE CHANGED.

• PROVIDE ACCESS PANEL WHERE REQUIRED FOR MECHANICAL AND

ELECTRICAL EQUIPMENT ABOVE GWB CEILING.

• LAB CEILINGS SHALL BE MOLD AND MOISTURE RESISTANT.

GENERAL NOTES

1.

2.

3.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:4

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE A - 2ND FLOOR - RCP

RENOVATION - NORTH

12/09/2020 CJF DKS

546-16-113

A-A102

N Scale:

PLAN

3/16" = 1'-0"1 A - 2ND FLOOR CEILING - RENOVATION PLAN - NORTH

C

NW NC NE

CECW

SW SC SE

KEYNOTE LEGEND

1 PROVIDE 18"X 18" CEILING ACCESS PANEL IN HARD CEILING, COORDINATE WITH

MECHANICAL PLANS. TYPICAL.

2 EXISTING SPRINKLER HEAD, TYPICAL.

3 EMERGENCY SHOWER TO BE UNINSTALLED AND PROTECTED FOR DEMOLITION PHASE AND

REINSTALLED IN RENOVATION PHASE.

TOILET

C-205N

PNT

LAB

2B103

OFFICE

2B102

LAB

2B101

CORR.

C2-C12

OFFICE

2B104

LAB

2B106

CORR.

2C-C11

LAB

2B109

OFFICE

2B105

OFFICE

2B107

OFFICE

2B108

OFFICE

2B100A

OFFICE

2B111

OFFICE

2B112

OFFICE

2B110

CORR.

C2-C10

LAB

2B118B

LAB

2B118A

LAB

2B120A

LAB

2B120

STORAGE

T2

-B15

STORAGE

E2-B5

• CEILINGS IN HATCHED AREA TO BE DEMOLISHED. SOME CEILING HEIGHTS

AND TYPES ARE CHANGING, EXISTING SUPPORTS CAN BE REUSED IF THEY

MEET THE REQUIREMENTS FOR NEW CEILINGS.

• ANY EXISTING CONDITIONS DAMAGED BY THE CONTRACTORS THROUGHOUT

THE COURSE OF WORK SHALL BE RESTORED TO PREVIOUS CONDITION AT

THE CONTRACTORS EXPENSE.

• VA RESPONSIBLE TO MOVE FURNITURE, FIXTURES, AND EQUIPMENT OUT OF

ALL AREAS WITHIN THIS PHASE OF SCOPE PRIOR TO CONSTRUCTION AND

REPLACE AFTER COMPLETION OF WORK.

• VA REPORTS NO ASBESTOS WITHIN OR ABOVE CEILING IN 2015 ASBESTOS

REPORT.

• ALL RATED WALLS ARE EXISTING TO REMAIN AND TO NOT BE MODIFIED.

GENERAL NOTES

1.

2.

3.

4.

5.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:4

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE B - 2ND FLOOR - RCP

DEMOLITION - NORTH

12/09/2020 CJF DKS

546-16-113

A-B101

N Scale:

PLAN

3/16" = 1'-0"1 B - 2ND FLOOR CEILING - DEMOLITION PLAN - NORTH

C

NW NC NE

CECW

TOILET

C-205N

PNT

A.F.F.

GWB on Mtl Stud

8' - 4"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

8' - 4"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

2' x 2' ACT

8' - 0" A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0" A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"A.F.F.

2' x 2' ACT

7' - 8"

LAB

2B103

OFFICE

2B104 LAB

2B106

LAB

2B101

OFFICE

2B102

CORR.

C2-C12

OFFICE

2B105 OFFICE

2B107

OFFICE

2B100A

OFFICE

2B112

OFFICE

2B111

OFFICE

2B110

CORR.

C2-C10

CORR.

2C-C11

STORAGE

T2

-B15

STORAGE

E2-B5

LAB

2B120A

LAB

2B118A

LAB

2B118B

OFFICE

2B108

LAB

2B109 A.F.F.

GWB on Mtl Stud 9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

LAB

2B120

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

8' - 0"A.F.F.

2' x 2' ACT

8' - 0"

Room 2B100C

Room 2B100B

Room 2B100D

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

STERILE

2B113

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR COMMENTS

ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG

"ULTIMA" 1911, 15/16"

BEVELED TEGULAR,

WHITE, 2'X2'

GRID: PRELUDE XL 15/16"

P-6 PAINT SHERWIN WILLIAMS SW 7006 EXTRA WHITE GLOSS LEVEL 1

FINISH LEGEND

• CONTRACTOR TO ADJUST ALL FIRE SPRINKLERS TO NEW CEILING HEIGHTS

WHERE HEIGHTS HAVE CHANGED.

• PROVIDE ACCESS PANEL WHERE REQUIRED FOR MECHANICAL AND

ELECTRICAL EQUIPMENT ABOVE GWB CEILING.

• LAB CEILINGS SHALL BE MOLD AND MOISTURE RESISTANT.

GENERAL NOTES

1.

2.

3.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:0

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE B - 2ND FLOOR - RCP

RENOVATION - NORTH

12/09/2020 CJF DKS

546-16-113

A-B102

N Scale:

PLAN

3/16" = 1'-0"1 B - 2ND FLOOR CEILING - RENOVATION PLAN - NORTH

C

NW NC NE

CECW

SW SC SE

KEYNOTE LEGEND

1 PROVIDE 18"X 18" CEILING ACCESS PANEL IN HARD CEILING, COORDINATE WITH

MECHANICAL PLANS. TYPICAL.

2 EMERGENCY SHOWER TO BE UNINSTALLED AND PROTECTED FOR DEMOLITION PHASE AND

REINSTALLED IN RENOVATION PHASE.

3 EXISTING SPRINKLER HEAD, TYPICAL.

OFFICE

2A102B

TOILET

C-255

CORR.

C2-C9

OFFICE

2A102

OFFICE

2A102A

OFFICE

2A103C

OFFICE

2A103

CORR.

C2-13

MALE BATH

2A104

FEMALE BATH

2A125

LAB

2A107

CORR.

D2-C13

STORAGE

2A109

LAB

2A108

OFFICE

2A105

OFFICE

2A106

LAB

2A111OFFICE

2A112

CONFERENCE/OFFICE

2A110

OFFICE

2A124

LAB

2A127

LAB

2A126

• CEILINGS IN HATCHED AREA TO BE DEMOLISHED. SOME CEILING HEIGHTS

AND TYPES ARE CHANGING, EXISTING SUPPORTS CAN BE REUSED IF THEY

MEET THE REQUIREMENTS FOR NEW CEILINGS.

• ANY EXISTING CONDITIONS DAMAGED BY THE CONTRACTORS THROUGHOUT

THE COURSE OF WORK SHALL BE RESTORED TO PREVIOUS CONDITION AT

THE CONTRACTORS EXPENSE.

• VA RESPONSIBLE TO MOVE FURNITURE, FIXTURES, AND EQUIPMENT OUT OF

ALL AREAS WITHIN THIS PHASE OF SCOPE PRIOR TO CONSTRUCTION AND

REPLACE AFTER COMPLETION OF WORK.

• VA REPORTS NO ASBESTOS WITHIN OR ABOVE CEILING IN 2015 ASBESTOS

REPORT.

• ALL RATED WALLS ARE EXISTING TO REMAIN AND TO NOT BE MODIFIED.

GENERAL NOTES

1.

2.

3.

4.

5.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:1

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE C - 2ND FLOOR - RCP

DEMOLITION - SOUTH

12/09/2020 CJF DKS

546-16-113

A-C101

N Scale:

PLAN

3/16" = 1'-0"1 C - 2ND FLOOR CEILING - DEMOLITION PLAN - SOUTH

C

NW NC NE

CECW

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

8' - 4"

A.F.F.

2' x 2' ACT

8' - 4"

A.F.F.

2' x 2' ACT

8' - 0"A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

9' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

9' - 0"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

2' x 2' ACT

7' - 8"

CORR.

C2-C9

OFFICE

2A102B

TOILET

C-255

OFFICE

2A102

OFFICE

2A102A

OFFICE

2A103C

OFFICE

2A103

MALE BATH

2A104

LAB

2A107

FEMALE BATH

2A125

LAB

2A126

LAB

2A127

CORR.

C2-13

OFFICE

2A124

CONFERENCE/OFFICE

2A110

OFFICE

2A112

CORR.

D2-C13

OFFICE

2A106

OFFICE

2A105

LAB

2A108

STORAGE

2A109

LAB

2A111

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

GWB on Mtl Stud

9' - 0"

A.F.F.

2' x 2' ACT

9' - 0" A.F.F.

GWB on Mtl Stud 8' - 0"

A.F.F.

GWB on Mtl Stud

7' - 6" A.F.F.

GWB on Mtl Stud 7' - 6"

CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR COMMENTS

ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG

"ULTIMA" 1911, 15/16"

BEVELED TEGULAR,

WHITE, 2'X2'

GRID: PRELUDE XL 15/16"

P-6 PAINT SHERWIN WILLIAMS SW 7006 EXTRA WHITE GLOSS LEVEL 1

FINISH LEGEND

• CONTRACTOR TO ADJUST ALL FIRE SPRINKLERS TO NEW CEILING HEIGHTS

WHERE HEIGHTS HAVE CHANGED.

• PROVIDE ACCESS PANEL WHERE REQUIRED FOR MECHANICAL AND

ELECTRICAL EQUIPMENT ABOVE GWB CEILING.

• LAB CEILINGS SHALL BE MOLD AND MOISTURE RESISTANT.

GENERAL NOTES

1.

2.

3.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:1

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE C - 2ND FLOOR - RCP

RENOVATION - SOUTH

12/09/2020 CJF DKS

546-16-113

A-C102

N Scale:

PLAN

3/16" = 1'-0"1 C - 2ND FLOOR CEILING - RENOVATION PLAN - SOUTH

C

NW NC NE

CECW

SW SC SE

KEYNOTE LEGEND

1 PROVIDE 18"X 18" CEILING ACCESS PANEL IN HARD CEILING, COORDINATE WITH

MECHANICAL PLANS. TYPICAL.

2 EXISTING SPRINKLER HEAD, TYPICAL.

LAB

2A128

OFFICE

2A129

OFFICE

2A130

STORAGE

2A120A

OFFICE

2A120

OFFICE

2A120B

OFFICE

2A117

LAB

2A118

CORR.

D2-C12

LAB

2A116C

LAB

2A116B

LAB

2A116

LAB

2A115

LAB

2A114

CORR.

D2-C13

CORR.

D2-C11

OFFICE

2A123A

OFFICE

2A123

JANITOR

D-265

LAB

2A121

CORRIDOR

D2-C10

LAB

2A122

LAB

2A122A

• CEILINGS IN HATCHED AREA TO BE DEMOLISHED. SOME CEILING HEIGHTS

AND TYPES ARE CHANGING, EXISTING SUPPORTS CAN BE REUSED IF THEY

MEET THE REQUIREMENTS FOR NEW CEILINGS.

• ANY EXISTING CONDITIONS DAMAGED BY THE CONTRACTORS THROUGHOUT

THE COURSE OF WORK SHALL BE RESTORED TO PREVIOUS CONDITION AT

THE CONTRACTORS EXPENSE.

• VA RESPONSIBLE TO MOVE FURNITURE, FIXTURES, AND EQUIPMENT OUT OF

ALL AREAS WITHIN THIS PHASE OF SCOPE PRIOR TO CONSTRUCTION AND

REPLACE AFTER COMPLETION OF WORK.

• VA REPORTS NO ASBESTOS WITHIN OR ABOVE CEILING IN 2015 ASBESTOS

REPORT.

• ALL RATED WALLS ARE EXISTING TO REMAIN AND TO NOT BE MODIFIED.

GENERAL NOTES

1.

2.

3.

4.

5.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:2

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE D - 2ND FLOOR - RCP

DEMOLITION - SOUTH

12/09/2020 CJF DKS

546-16-113

A-D101

N Scale:

PLAN

3/16" = 1'-0"1 D - 2ND FLOOR CEILING - DEMOLITION PLAN - SOUTH

C

NW NC NE

CECW

A.F.F.

GWB on Mtl Stud

8' - 0" A.F.F.

GWB on Mtl Stud 8' - 0"

A.F.F.

GWB on Mtl Stud

8' - 6"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

2' x 2' ACT

7' - 8"

A.F.F.

2' x 2' ACT

7' - 8"

A.

F.

F.

G

W B on M tl St ud 9'

0"

LAB

2A128

OFFICE

2A129

OFFICE

2A130

CORRIDOR

D2-C10

LAB

2A121

LAB

2A122

LAB

2A122A

OFFICE

2A120

OFFICE

2A120B

LAB

2A118

OFFICE

2A117

CORR.

D2-C12 LAB

2A116

LAB

2A116B

LAB

2A116C

LAB

2A115

LAB

2A114

CORR.

D2-C13

CORR.

D2-C11

OFFICE

2A123A

OFFICE

2A123

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0"

A.F.F.

2' x 2' ACT

8' - 0" A.F.F.

GWB on Mtl Stud

8' - 6"

A.F.F.

GWB on Mtl Stud

8' - 4"

A.F.F.

GWB on Mtl Stud

8' - 6"

A.F.F.

GWB on Mtl Stud

8' - 0"

A.F.F.

GWB on Mtl Stud

8' - 6"

A.F.F.

GWB on Mtl Stud

8' - 6"

CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR COMMENTS

ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG

"ULTIMA" 1911, 15/16"

BEVELED TEGULAR,

WHITE, 2'X2'

GRID: PRELUDE XL 15/16"

P-6 PAINT SHERWIN WILLIAMS SW 7006 EXTRA WHITE GLOSS LEVEL 1

FINISH LEGEND

• CONTRACTOR TO ADJUST ALL FIRE SPRINKLERS TO NEW CEILING HEIGHTS

WHERE HEIGHTS HAVE CHANGED.

• PROVIDE ACCESS PANEL WHERE REQUIRED FOR MECHANICAL AND

ELECTRICAL EQUIPMENT ABOVE GWB CEILING.

• LAB CEILINGS SHALL BE MOLD AND MOISTURE RESISTANT.

GENERAL NOTES

1.

2.

3.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:3

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

PHASE D - 2ND FLOOR - RCP

RENOVATION - SOUTH

12/09/2020 CJF DKS

546-16-113

A-D102

N Scale:

PLAN

3/16" = 1'-0"1 D - 2ND FLOOR CEILING - RENOVATION PLAN - SOUTH

C

NW NC NE

CECW

SW SC SE

KEYNOTE LEGEND

1 PROVIDE 18"X 18" CEILING ACCESS PANEL IN HARD CEILING, COORDINATE WITH

MECHANICAL PLANS. TYPICAL.

2 EMERGENCY SHOWER TO BE UNINSTALLED AND PROTECTED FOR DEMOLITION PHASE AND

REINSTALLED IN RENOVATION PHASE.

3 EXISTING SPRINKLER HEAD, TYPICAL.

MECHANICAL LEGEND

DUCTWORK SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

SQUARE CEILING DIFFUSER

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

10ø

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW ROUND DUCT (INSIDE DIMENSIONS: DIAMETER)

EXISTING DUCT TO REMAIN

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

45°

AIR TERMINAL SYMBOLS

AIR TERMINAL UNIT

WITH REHEAT COIL

PIPING SYMBOLS

HOT WATER HEATING SUPPLY

CHILLED WATER SUPPLY

CHILLED WATER RETURN

DRAIN LINE

HOT WATER HEATING RETURN

HHWS

HHWR

CHWR

CHWS

D

X EXISTING PIPE TO BE REMOVED

GENERAL PIPING SYMBOLS

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

PIPE UP

PIPE DOWN

VALVE SYMBOLS

DUCTWORK SYMBOLS

MOTORIZED CONTROL DAMPER

M

EQUIPMENT ANNOTATIONS

1-ATU27-1

BUILDING NO. WHERE EQUIPMENT IS LOCATED

ITEM (AIR TERMINAL UNIT SHOWN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

SERVED BY AIR HANDLING UNIT NO. 27

10x8 NEW RECTANGULAR DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

10x8ø NEW OVAL DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

BALL VALVE

CHECK VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

GATE VALVE

FLEXIBLE CONNECTION

THREE-WAY CONTROL VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

WYE STRAINER (WITH BALL VALVE & HOSE

CONNECTION)

AUTOMATIC FLOW CONTROL VALVE

CALIBRATED BALANCING VALVE

GLOBE VALVE

(E)10ø EXISTING ROUND DUCT (INSIDE DIMENSIONS: DIAMETER)

(E)10x8 EXISTING RECTANGULAR DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

(E)10x8ø EXISTING OVAL DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

AIR TERMINAL UNIT

WITHOUT REHEAT COIL

CONTROLS DEVICE SYMBOLS

SPACE TEMPERATURE SENSOR - WALL MOUNTT

ROOM PRESSURE MONITOR - WALL MOUNTRPM

COMBINED SPACE TEMPERTURE & HUMIDITY SENSOR - WALL MOUNTT/H

DRAWING SYMBOLS

DRAWING MATCHLINE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

group mes

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700

COA # 8304

CHARLES J. FLASK, P.E.

76470

DALE A. BACIK, P.E.

FULLY SPRINKLERED

REVISION 1 12/28/2020

VA MEDICAL CENTER MIAMI, FL.

1/

/2

6:

:5

PM

REPLACE DUCTWORK AND

PIPING AND CONDUCT DUCT

CLEANING BUILDING 1

NOTES & LEGEND

12/09/2020 CJF DKS

546-16-113

M-001

GENERAL NOTES

1 THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK

TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER THIS CONTRACT.

DRAWINGS SHOULD NOT BE SCALED. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO FIELD VERIFY SPACE ALLOCATED PRIOR TO ORDERING

EQUIPMENT.

2 PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE,

AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE

AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE

ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT

REQUIREMENTS SHALL GOVERN.

3 THE CONTRACTOR SHALL EXAMINE THE EXISTING CONDITIONS UNDER WHICH

HE SHALL OPERATE AND VERIFY THE EXTENT OF WORK REQUIRED TO

COMPLETE THE WORK UNDER THIS CONTRACT.

4 CONTRACTOR SHALL COORDINATE AND SEQUENCE PHASING OF PROJECT

DEMOLITION, CLEANING, AND CONSTRUCTION WORK.

5 CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

6 THE CONTRACTOR SHALL SUBMIT 5 COPIES OF SHOP DRAWINGS AND

EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.

7 THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS

IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL

INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND

MATERIALS, CONFIGURATIONS, START-UP PARAMETERS, SETTINGS, WIRING

DIAGRAMS, AS INSTALLED AND OPERATING INFO, CERTIFIED TECHNICAL

PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC.

PROVIDE AN INDEX AND ASSOCIATED DIVIDERS.

8 THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON

SITE TO MARK UP AS-BUILT CONDITIONS WHICH WILL BE TRANSFERRED INTO

CAD FORMAT AND PROVIDED TO THE OWNER ON COMPACT DISK.

9 ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF

THE TOTAL PROJECT COST.

10 THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND

SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND

AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

11 CLOSE OUT DOCUMENTS: CONTRACTOR SHALL MAINTAIN A SET OF AS-BUILT

DRAWINGS AND KEEP CURRENT DURING CONSTRUCTION OF THE PROJECT.

THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND

CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE

TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION

COMPLETION.

12 CONTRACTOR SHALL PROPERLY SEAL CAULK ALL CONDENSATE/REFRIGERANT

LINE PENETRATIONS THROUGH FIRE/SMOKE RATED WALLS (PER CODE).

13 ALL DUCTWORK/ DIFFUSERS/ GRILLES PENETRATING FIRE RATED CEILING/

WALLS SHALL CONTAIN FIRE DAMPERS, PER DETAILS.

14 CONTRACTOR SHALL VERIFY WALL/FLOOR TYPES PRIOR TO WORK INSTALLING

FIRE AND/OR SMOKE DAMPERS IN DUCT WORK AT ALL FIRE/SMOKE RATED

WALL/FLOOR PENETRATIONS. PER SPEC.

MECHANICAL ABBREVIATIONS

(E) EXISTING

AFF ABOVE FINISHED FLOOR

AFM AIR FLOW MEASURING DEVICE

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

ATU AIR TERMINAL UNIT

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BOS BOTTOM OF STRUCTURE

CAV CONSTANT AIR VOLUME

CD CEILING SUPPLY AIR DIFFUSER

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

COR CONTRACTING OFFICER'S REPRESENTATIVE

CU CONDENSING UNIT

CTE CONNECT TO EXISTING

DD DUCT MOUNTED SMOKE DETECTOR

EA EXHAUST AIR

EF EXHAUST FAN

FBC FIRE DAMPER

FD FIRE DAMPER

FMC FLORIDA MECHANICAL CODE 2014

FO FLAT OVAL

FPM FEET PER MINUTE

FSD COMBINATION FIRE SMOKE DAMPER

GPM GALLONS PER MINUTE

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HP HORSEPOWER OR HEAT PUMP

IN INCH

MCA MINIMUM CIRCUIT AMPACITY

MOCP MAXIMUM OVERCURRENT PROTECTION

NC NOISE CRITERIA

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

RA RETURN AIR

RG RETURN AIR GRILLE

SA SUPPLY AIR

SD SMOKE DAMPER

SF SQUARE FEET

SR SUPPLY AIR REGISTER

TAB TEST AND BALANCE

TOD TOP OF DUCT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

WG WATER GAUGE

MECHANICAL NOTES

1 THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH SUBMITTED EQUIPMENT TO ENSURE ALL INLET/OUTLET CONNECTIONS COORDINATE WITH FIELD INSTALLED DUCTWORK AND MAKE ANY NECESSARY DUCT MODIFICATIONS TO ENSURE PROPER OPERATION OF MECHANICAL EQUIPMENT. INCLUDING ACCESS TO CONTROLS, AND ABILITY TO MAINTAIN EQUIPMENT.

2 SUBMITTALS SHALL MEET SCHEDULED DESIGN CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO CFMS, EAT(DB/WB), ESP, CAPACITIES, VOLTAGES/PHASES, MCA/MOCP, SONES, ETC.

3 ALL DUCT CONSTRUCTION, INSTALLATION, AND SUPPORTS ARE TO COMPLY WITH LATEST EDITION OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE DUCT. ALL DUCTWORK SHALL BE 2"

PRESSURE CLASS UNLESS OTHERWISE NOTED.

4 ROUND DUCTS AND FITTINGS SHALL BE SPIRAL SEAM CONSTRUCTION, MANUFACTURED FROM G60 GALVANIZED STEEL ACCORDING TO ASTM A653/A924 AND AS SPECIFIED. RECTANGULAR DUCTWORK SHALL BE MANUFACTURED FROM G60 GALVANIZED SHEET METAL STEEL ACCORDING TO ASTM A653/A653M AND AS SPECIFIED.

5 ALL WALL-MOUNTED THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT AN ELEVATION OF 48" ABOVE FINISHED FLOOR TO THE TOP UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF WALL-MOUNTED THERMOSTATS SHALL BE COORDINATED WITH OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTATS SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OR

REPRESENTATIVE IN THE FIELD.

6 ALL SUPPLY AIR DIFFUSERS SHALL BE 4-WAY THROW UNLESS NOTED OTHERWISE. CONTRACTOR SHALL PAINT INSIDE EACH RETURN GRILLE'S PLENUM AND DUCT CONNECTION FLAT BLACK TO CONCEAL CONNECTION. COORDINATE AIR DEVICE LOCATIONS WITH LIGHTING FIXTURES AND FIRE SPRINKLER HEADS. PRIOR TO INSTALLATION, THE CONTRACTOR IS TO REFER TO THE ARCHITECTURAL REFLECTED CEILING

PLAN FOR ACTUAL FINAL LOCATIONS OF AIR DEVICES.

7 DIFFUSERS/GRILLES SHALL NEVER BE INSTALLED ON SURFACE OF ACOUSTICAL LAY-IN TILE. ALL DIFFUSERS/GRILLES IN LAY-IN CEILINGS SHALL BE LAY-IN PANEL MOUNT. REFER TO SCHEDULE. GYPSUM BOARD

SURFACE MOUNT DIFFUSERS SHALL NOT BE BEVEL MOUNT.

8 CONTRACTOR SHALL COORDINATE DIFFUSER/GRILLE LOCATIONS WITH STRUCTURE IN EXPOSED SITUATIONS IN ORDER TO ENSURE AIR IS NOT DIRECTLY SUPPLIED OR RETURNED OVER STRUCTURE OR OTHER TRADE COMPONENTS SUCH AS FIRE SPRINKLER PIPING, PLUMBING PIPING, ETC., CAUSING DUST ACCUMULATION. DUCTWORK ALONG WITH DIFFUSER/GRILLE LOCATIONS SHALL BE INSTALLED SYMMETRICALLY WITH ANY ADJACENT DUCTWORK/GRILLES. CENTER DIFFUSERS/GRILLES BETWEEN STRUCTURAL MEMBERS WHERE DUCTWORK AND STRUCTURAL MEMBERS ARE EXPOSED. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL INSTALLATION APPEARANCE AND SHALL MAKE APPROPRIATE CHANGES WHERE DIRECTED BY ARCHITECT/ENGINEER AT THEIR OWN EXPENSE WHERE ITEMS ARE NOT INSTALLED PER ABOVE STANDARDS.

9 CONTRACTOR SHALL PROVIDE A COPY OF THE TEST AND BALANCE REPORT BY AN AABC OR NEBB CERTIFIED AGENCY. THIS REPORT MUST BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL INSPECTION. THE CONTRACTOR MUST ALSO PROVIDE ALL REPORTS REQUIRED BY THE SPECIFICATION. OUTDOOR TEMPERATURE (DB); OUTSIDE AIR (DB/WB & CFM); SUPPLY AIR AT UNIT DISCHARGE (DB/WB & CFM);

RETURN AIR {MIXED} (DB/WB & CFM); LEAVING COIL (DB/WB); DIFFUSER/GRILLE (DB/WB); EQUIPMENT (EWT/LWT); EQUIPMENT (EAT/LAT); EQUIPMENT (GPM); EQUIPMENT (PRESSURES). OUTSIDE AIR CFM SHALL BE MEASURED DIRECTLY AND NOT CALCULATED FROM THE DIFFERENCE BETWEEN SUPPLY AIR CFM AND RETURN AIR CFM.

10 ALL AIR HANDLING UNITS SHALL BE MECHANICALLY ATTACHED TO OTHER AIR DISTRIBUTION SYSTEM COMPONENTS. AIR HANDLING UNITS LOCATED OUTSIDE THE CONDITIONED SPACE SHALL BE SEALED USING APPROVED CLOSURE SYSTEMS CONFORMING TO THE APPROVED CLOSURE AND MECHANICAL APPLICATION REQUIREMENTS OF FLORIDA BUILDING CODE.

11 ALL DUCTWORK MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED WALL TO FACILITATE INSPECTION.

12 THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES INSTALLATION SCHEDULES. FIXED WORK SUCH AS DUCTWORK AND PLUMBING SHALL BE INSTALLED PRIOR TO ANY TRADE WORK THAT CAN BE EASILY RELOCATED OR OFFSET SUCH AS ELECTRICAL CONDUITS, SMALL WATER LINES, ETC. IDEALLY DUCTWORK SHALL BE INSTALLED FIRST.

13 PENETRATIONS THROUGH SMOKE OR FIRE-RATED ASSEMBLIES: PENETRATIONS FOR PIPES, CONDUITS OR OTHER PURPOSES THROUGH ASSEMBLIES (FLOORS, ROOF, WALLS, PARTITIONS, ETC.) WITH A REQUIRED FIRE RESISTANCE RATING SHALL BE SEALED TO THE PENETRATING MEMBER IN AN APPROVED MANNER WHICH MAINTAINS THE REQUIRED FIRE RESISTANCE RATING OF THE ASSEMBLY.

14 WHERE HOLES FOR PENETRATIONS ARE FORMED CIRCULAR OR CORE-BORED, THE PENETRATION SHALL BE PROTECTED WITH FIRE-SEAL BRAND SMOKE AND FIRE STOP FITTINGS BY O-Z GEDNEY, LINK-SEAL BRAND BY

THUNDER LINE, OR EQUAL APPROVED BY ENGINEER.

15 WHERE HOLES FOR PENETRATIONS ARE IRREGULAR (NON-CIRCULAR) IN SHAPE, THE PENETRATION SHALL BE PROTECTED WITH DOW CORNING 3-6548, SILICONE RTV FOAM, 3M FIRE BARRIER PENETRATION SEAL

SYSTEM, OR EQUAL APPROVED BY THE ENGINEER.

16 INTENT OF MECHANICAL NOTES ON DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT CONTRACTOR OF EXISTING CONDITIONS. CONTRACTOR IS TO VISIT THE SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK, AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS, AND TO COORDINATE WITH ELECTRICAL, PLUMBING, AND FIRE PROTECTION

SUBCONTRACTORS, BEFORE ANY CONSTRUCTION WORK.

17 FLEXIBLE AND RIGID ROUND DUCT TAKE-OFFS FOR DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER NECK. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 5'-0".

18 INSTALL DUCTWORK AS HIGH AS POSSIBLE, TIGHT TO BOTTOM OF STRUCTURE, UNLESS NOTED OTHERWISE. COORDINATE DUCT ELEVATIONS WITH RAIN LEADERS, WATER PIPING, SANITARY DRAINS, AND MAJOR

ELECTRICAL -CONDUITS.

19 CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND/SUPPORT MECHANICAL EQUIPMENT AND MATERIALS.

20 PROVIDE A TRAP IN ALL CONDENSATE PIPING LOCATED AT THE AIR HANDLING EQUIPMENT. INSULATE ALL CONDENSATE LINES WITH 1/2" CLOSED CELL FOAM INSULATION. ALL PIPING EXPOSED TO EXTERNAL

ELEMENTS SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM SHEETING.

21 PROVIDE A 4" HIGH CONCRETE HOUSEKEEPING PAD UNDER ALL MECHANICAL EQUIPMENT, UNLESS NOTED OTHERWISE. PADS SHALL BE 4" LARGER THAN EQUIPMENT ON ALL SIDES.

22 ALL UNDERGROUND PIPING SHALL HAVE A MINIMUM 3'-0" OF COVER, UNLESS NOTED OTHERWISE.

23 IT IS THE RESPONSIBILITY OF THE MECHANICAL INSTALLER TO PATCH AND REPAIR ANY DUCT OPENINGS WHICH RESULT FROM THE RELOCATION OR ELIMINATION OF ANY EXISTING AIR DEVICES. THE PATCH IS TO BE OF A SIMILAR MATERIAL TO THE REPAIRED DUCT AND TO BE SEALED IN ACCORDANCE WITH SMACNA STANDARDS.

24 AIR HANDLING EQUIPMENT WARRANTIES SHALL BE EQUAL TO OR EXCEED WARRANTY OF SCHEDULED EQUIPMENT, UNLESS NOTED OTHERWISE.

25 INSTALL DUCT SMOKE DETECTOR IN RETURN AIR DUCT OR PLENUM UPSTREAM OF ANY FILTERS OR OUTSIDE AIR CONNECTIONS, FOR ALL SYSTEMS WITH DESIGN CAPACITY GREATER THAN 2,000 CFM AND WHERE

INDICATED ON PLANS.

26 LOCATIONS OF DUCT MOUNTED SMOKE DETECTORS SHOWN ON DRAWINGS ARE REFERENCE LOCATIONS ONLY. FINAL PLACEMENT OF DETECTORS IN DUCTWORK SHALL MEET THE REQUIREMENTS OF THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE A PRESSURE DIFFERENTIAL TEST AND MANUFACTURER'S TEST KIT. A COPY OF ALL TEST DATA SHALL BE MADE AVAILABLE AT FINAL INSPECTION. PROVIDE A READILY ACCESSIBLE DUCT ACCESS DOOR FOR INSPECTING AND SERVICING EACH DETECTOR. PROVIDE CEILING/WALL ACCESS PANELS WHERE INSTALLED IN INACCESSIBLE LOCATIONS; ACCESS PANELS IN RATED CONSTRUCTION SHALL BEAR A U.L. LABEL. ELECTRICAL CONTRACTOR SHALL PROVIDE WIRE TO DETECTOR. MECHANICAL CONTRACTOR SHALL INSTALL DETECTOR WITHIN THE DUCTWORK.

27 PROVIDE SEISMIC RESTRAINTS FOR DUCTWORK AND PIPING CONFORMING TO THE LATEST EDITION OF THE "SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING SYSTEMS."

28 PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF EACH FIRE RATED WALL. DUCTWORK OR PIPING SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.

29 PROVIDE TURNING VANES IN ALL RECTANGULAR SUPPLY AIR DUCT ELBOWS WITH ANGLES FROM 45 DEGREES TO 90 DEGREES PER FIGURES 2-3, 2-4, 2-5 OF THE 1995 SMACNA DUCT CONSTRUCTION STANDARDS.

PROVIDE SINGLE WALL VANE CONSTRUCTION FOR DUCTS UP TO 48" WIDE, AND DOUBLE WALL VANE CONSTRUCTION FOR LARGER DIMENSIONS.

30 DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS (FREE AREA).

31 ALL HVAC EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS UNLESS INDICATED OTHERWISE.

32 MECHANICAL CONTRACTOR SHALL SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS. REFRIGERANT PIPING SHALL BE TYPE "L" COPPER WITH SOLDERED OR BRAZED JOINTS AND 1" CLOSED CELL INSULATION. ALL PIPING EXPOSED TO EXTERNAL ELEMENTS SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM SHEETING. PRE-CHARGED LINES AND SOLDER ON SHORT 90'S ARE NOT ACCEPTABLE. CONTRACTOR SHALL USE SWEEPING 90'S AT EVERY BEND WITH EXCEPTION OF EQUIPMENT CONNECTIONS.

33 CONTRACTOR SHALL PROVIDE A PERMANENT/PROFESSIONAL LABEL FOR EACH PIECE OF EQUIPMENT, ASSOCIATED THERMOSTAT(S) AND/OR SENSOR(S).

34 EQUIPMENT LOCATION IDENTIFICATIONS AT CEILINGS: WHERE VALVES, EQUIPMENT SUCH AS VAV BOXES, FANS, ETC., CIRCUIT BREAKERS, OR OTHER ITEMS SUBJECT TO ROUTINE SERVICE, ARE MOUNTED IN A CONCEALED AREA ABOVE A CEILING, THE CEILING MUST BE MARKED WITH A LABEL UNDER THE SERVICED DEVICE. THE LABEL SHALL CARRY APPROPRIATE IDENTIFICATION TAG.

35 DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND OTHER MECHANICAL SYSTEM COMPONENTS SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING SUSPENSION SYSTEM.

36 METAL DUCTWORK SHALL BE CONNECTED TO MECHANICAL EQUIPMENT WITH FLEXIBLE DUCT CONNECTORS EQUAL TO DURO DYNE "SUPER METAL-FAB" WITH EXCELON FABRIC; "GRIP LOC" SEAM; 24 GAGE METAL TABS. INSULATION SHALL BE INSTALLED OVER METAL TABS AS TO NOT CAUSE FRICTION ON FABRIC.

37 FLEXIBLE DUCT SHALL HAVE CONTINUOUS TEAR RESISTANT LINER ENCASED BY INSULATING MATERIAL WITH AN OUTER VAPOR JACKET CONFORMING TO UL181 UNLESS THE FLEX DUCT MEETS THE CRITERIA STATED

IN FLORIDA BUILDING CODE SECTION 419.3.6.4.

38 COORDINATE AIR DEVICE LOCATIONS WITH LIGHTING FIXTURES AND FIRE SPRINKLER HEADS.

39 CONTRACTOR SHALL SUPPLY PIPE SUPPORTS 4'-0" ON CENTERS FOR REFRIGERANT LINES AND CONDENSATE LINES. SUPPORTS SHALL BE PER DETAILS.

ROOM PRESSURE SCHEDULE

ROOM

NUMBER

ROOM NAME

ON PLAN

ROOM TYPE PER

VA DESIGN GUIDELINES

ROOM

AREA (SF)

CEILING

HEIGHT (FT)

VOLUME MAX SUP.

O.A.

MIN SUP.

O.A.

TOTAL

EXHAUST TOTAL AC/H REQD.

AC/H T.U. CODE T.U. OCCUR. # CFM A.H.U.

2A102 OFFICE Offices 157 9.00 1413 150 150 75 6.37 4 TU-2A-02-3 TU-2A-02 3 150 AH18 2A102A OFFICE Offices 157 9.00 1413 150 150 75 6.37 4 TU-2A-02-4 TU-2A-02 4 150 AH18 2A102B OFFICE Offices 277 9.00 2493 300 300 200 7.22 4 TU-2A-02-2 TU-2A-02 2 300 AH18 2A103 OFFICE Offices 399 9.00 3591 450 450 400 7.52 4 TU-2A-03-1 TU-2A-03 1 450 AH18

2A103C OFFICE Offices 102 9.00 918 90 90 75 5.88 4 TU-2A-03-2 TU-2A-03 2 90 AH18 2A104 MALE BATH Locker Room (with Toilets) 260 9.00 2340 200 200 300 7.69 10 TU-2A-20-2 TU-2A-20 2 200 AH18 2A105 OFFICE Offices 174 9.00 1566 95 65 0 2.49 4 TU-2A-23-1 TU-2A-23 1 95 AH18 2A106 OFFICE Offices 122 9.00 1098 95 65 0 3.55 4 TU-2A-23-2 TU-2A-23 2 95 AH18 2A107 LAB Biochemistry 538 9.00 4842 810 810 900 11.15 6 TU-2A-21-1 TU-2A-21 1 810 AH18 2A108 LAB Biochemistry 521 9.00 4689 780 780 830 10.62 6 TU-2A-24-1 TU-2A-24 1 780 AH18 2A109 STORAGE Medical Records 158 9.00 1422 150 150 150 6.33 4 TU-2A-25-2 TU-2A-25 2 150 AH18 2A110 CONFERENCE Conference Room 302 9.00 2718 450 450 350 9.93 4 TU-2A-19-1 TU-2A-19 1 450 AH18 2A111 LAB Biochemistry 477 9.00 4293 780 780 800 11.18 6 TU-2A-25-1 TU-2A-25 1 780 AH18 2A112 OFFICE Offices 310 9.00 2790 250 250 200 5.38 4 TU-2A-18-1 TU-2A-18 1 250 AH18 2A114 LAB Biochemistry 423 9.00 3807 780 780 900 14.18 6 TU-2A-26-1 TU-2A-26 1 780 AH18 2A115 LAB Biochemistry 458 9.00 4122 780 780 900 13.10 6 TU-2A-27-1 TU-2A-27 1 780 AH18 2A116 LAB Biochemistry 81 9.00 729 275 275 375 30.86 6 TU-2A-28-1 TU-2A-28 1 275 AH18

2A116B LAB Biochemistry 351 9.00 3159 450 450 475 9.02 6 TU-2A-28-2 TU-2A-28 2 450 AH18 2A116C LAB Biochemistry 173 9.00 1557 250 250 275 10.60 6 TU-2A-28-3 TU-2A-28 3 250 AH18 2A117 OFFICE Offices 87 9.00 783 100 100 125 9.58 4 TU-2A-11-4 TU-2A-11 4 100 AH18 2A118 LAB Biochemistry 218 9.00 1962 350 350 400 12.23 6 TU-2A-12-1 TU-2A-12 1 350 AH18 2A120 OFFICE Offices 221 9.00 1989 350 275 375 11.31 4 TU-2A-11-1 TU-2A-11 1 350 AH18

2A120A STORAGE Clean Utility/Storage Room 24 9.00 216 20 20 0 5.56 4 TU-2A-11-2 TU-2A-11 2 20 AH18 2A120B OFFICE Offices 171 9.00 1539 350 275 375 14.62 4 TU-2A-11-3 TU-2A-11 3 350 AH18 2A121 LAB Biochemistry 449 9.00 4041 680 680 750 11.14 6 TU-2A-10-1 TU-2A-10 1 680 AH18 2A122 LAB Biochemistry 289 9.00 2601 350 350 380 8.77 6 TU-2A-13-1 TU-2A-13 1 350 AH18

2A122A LAB Biochemistry 139 9.00 1251 250 250 300 14.39 6 TU-2A-13-2 TU-2A-13 2 250 AH18 2A123 OFFICE Offices 188 9.00 1692 175 175 100 6.21 4 TU-2A-15-1 TU-2A-15 1 175 AH18

2A123A OFFICE Offices 188 9.00 1692 175 175 100 6.21 4 TU-2A-14-1 TU-2A-14 1 175 AH18 2A124 OFFICE Offices 219 9.00 1971 150 150 100 4.57 4 TU-2A-17-1 TU-2A-17 1 150 AH18 2A125 FEMALE BATH Locker Room (with Toilets) 290 9.00 2610 375 375 450 10.34 10 TU-2A-20-1 TU-2A-20 1 375 AH18 2A126 LAB Biochemistry 435 9.00 3915 600 600 700 10.73 6 TU-2A-04-1 TU-2A-04 1 600 AH18 2A127 LAB Biochemistry 392 9.00 3528 650 650 0 11.05 6 TU-2A-05-1 TU-2A-05 1 650 AH18 2A128 LAB Biochemistry 408 9.00 3672 650 650 1225 20.02 6 TU-2A-06-1 TU-2A-06 1 650 AH18 2A129 OFFICE Offices 612 9.00 5508 700 700 725 7.90 4 TU-2A-07-1 TU-2A-07 1 700 AH18 2A130 OFFICE Offices 171 9.00 1539 150 150 100 5.85 4 TU-2A-08-1 TU-2A-08 1 150 AH18

2B100A OFFICE Offices 100 9.00 900 95 95 80 6.33 4 TU-2B-25-1 TU-2B-25 1 95 AH14 2B100B OFFICE Offices 100 9.00 900 95 95 80 6.33 4 TU-2B-25-2 TU-2B-25 2 95 AH14 2B100C OFFICE Offices 100 9.00 900 95 95 80 6.33 4 TU-2B-25-3 TU-2B-25 3 95 AH14 2B100D OFFICE Offices 100 9.00 900 95 95 80 6.33 4 TU-2B-25-4 TU-2B-25 4 95 AH14 2B101 LAB Biochemistry 336 9.00 3024 600 600 700 13.89 6 TU-2B-28-1 TU-2B-28 1 600 AH14 2B102 OFFICE Offices 168 9.00 1512 150 150 0 5.95 4 TU-2B-27-1 TU-2B-27 1 150 AH14 2B103 LAB Biochemistry 371 9.00 3339 600 600 700 12.58 6 TU-2B-12-1 TU-2B-12 1 600 AH14 2B104 OFFICE Offices 216 9.00 1944 300 300 200 9.26 4 TU-2B-13-1 TU-2B-13 1 300 AH14 2B105 OFFICE Offices 94 9.00 846 115 115 0 8.16 4 TU-2B-26-1 TU-2B-26 1 115 AH14 2B106 LAB Biochemistry 209 9.00 1881 500 500 650 20.73 6 TU-2B-14-1 TU-2B-14 1 500 AH14 2B107 OFFICE Offices 94 9.00 846 115 115 0 8.16 4 TU-2B-26-2 TU-2B-26 2 115 AH14 2B108 OFFICE Offices 94 9.00 846 115 115 0 8.16 4 TU-2B-26-3 TU-2B-26 3 115 AH14 2B109 LAB Biochemistry 220 9.00 1980 700 700 800 24.24 6 TU-2B-15-1 TU-2B-15 1 700 AH14 2B110 OFFICE Offices 135 9.00 1215 145 145 125 7.16 4 TU-2B-24-1 TU-2B-24 1 145 AH14 2B111 OFFICE Offices 96 9.00 864 115 115 100 7.99 4 TU-2B-24-2 TU-2B-24 2 115 AH14 2B112 OFFICE Offices 74 9.00 666 85 85 65 7.66 4 TU-2B-24-3 TU-2B-24 3 85 AH14 2B113 STERILE Sterile Storage 29 9.00 261 0 0 0 0.00 4 TU-2B-15-2 TU-2B-15 2 0 AH14 2B114 OFFICE Offices 106 9.00 954 125 125 55 7.86 4 TU-2B-11-1 TU-2B-11 1 125 AH14 2B115 OFFICE Offices 105 9.00 945 125 125 55 7.94 4 TU-2B-11-2 TU-2B-11 2 125 AH14 2B117 LAB Biochemistry 346 9.00 3114 380 380 460 8.86 6 TU-2B-17-1 TU-2B-17 1 380 AH14 2B118 LAB Biochemistry 218 9.00 1962 550 550 650 19.88 6 TU-2B-19-1 TU-2B-19 1 550 AH14

2B118A LAB Biochemistry 143 9.00 1287 250 250 350 16.32 6 TU-2B-16-2 TU-2B-16 2 250 AH14 2B118B LAB Biochemistry 128 9.00 1152 250 250 350 18.23 6 TU-2B-16-3 TU-2B-16 3 250 AH14 2B120 LAB Biochemistry 70 9.00 630 200 200 0 19.05 6 TU-2B-23-1 TU-2B-23 1 200 AH14

2B120A LAB Biochemistry 328 9.00 2952 800 800 1100 22.36 6 TU-2B-23-2 TU-2B-23 2 800 AH14 2B121 BRK. RM. Lounge (no Refrig) 31 9.00 279 0 0 20 4.30 4 TU-2B-22-1 TU-2B-22 1 0 AH14 2B122 CORRIDOR Corridors 21 9.00 189 0 0 0 0.00 4 TU-2B-21-1 TU-2B-21 1 0 AH14

2B122A LAB Biochemistry 123 9.00 1107 170 170 200 10.84 6 TU-2B-21-2 TU-2B-21 2 170 AH14 2B123 LAB Biochemistry 185 9.00 1665 225 225 260 9.37 6 TU-2B-20-1 TU-2B-20 1 225 AH14 2B124 OFFICE Offices 48 9.00 432 75 75 0 10.42 4 TU-2B-22-2 TU-2B-22 2 75 AH14 2B125 LAB Biochemistry 420 9.00 3780 600 600 650 10.32 6 TU-2B-18-1 TU-2B-18 1 600 AH14

2B125A OFFICE Offices 89 9.00 801 100 100 0 7.49 4 TU-2B-18-3 TU-2B-18 3 100 AH14 2B125B LAB Biochemistry 174 9.00 1566 400 400 650 24.90 6 TU-2B-18-2 TU-2B-18 2 400 AH14 2B126 OFFICE Offices 117 9.00 1053 85 85 0 4.84 4 TU-2B-07-1 TU-2B-07 1 85 AH14 2B127 LAB Biochemistry 835 9.00 7515 1400 1400 1500 11.98 6 TU-2B-06-1 TU-2B-06 1 1400 AH14

2B127B OFFICE Offices 129 9.00 1161 125 125 0 6.46 4 TU-2B-31-1 TU-2B-31 1 125 AH14 2B128 OFFICE Offices 74 9.00 666 135 100 75 9.01 4 TU-2B-03-1 TU-2B-03 1 135 AH14

2B128A LAB Biochemistry 316 9.00 2844 630 740 840 17.72 6 TU-2B-04-1 TU-2B-04 1 630 AH14 2B128B OFFICE Offices 43 9.00 387 100 100 0 15.50 4 TU-2B-04-2 TU-2B-04 2 100 AH14 2B128C LAB Biochemistry 127 9.00 1143 230 230 280 14.70 6 TU-2B-05-1 TU-2B-05 1 230 AH14

2B128C1 LAB Biochemistry 48 9.00 432 100 100 0 13.89 6 TU-2B-05-2 TU-2B-05 2 100 AH14 2B128C2 LAB Biochemistry 39 9.00 351 50 50 100 17.09 6 TU-2B-05-3 TU-2B-05 3 50 AH14

2B129 LAB Biochemistry 469 9.00 4221 800 800 880 12.51 6 TU-2B-02-1 TU-2B-02 1 800 AH14 2B130 LAB Biochemistry 320 9.00 2880 650 620 750 15.63 6 TU-2B-10-1 TU-2B-10 1 650 AH14 2B131 OFFICE Offices 108 9.00 972 175 175 150 10.80 4 TU-2B-01-4 TU-2B-01 4 175 AH14 2B132 LAB Biochemistry 320 9.00 2880 1200 1200 1400 29.17 6 TU-2B-09-1 TU-2B-09 1 1200 AH14 2B133 LAB Biochemistry 350 9.00 3150 530 530 680 12.95 6 TU-2B-01-1 TU-2B-01 1 530 AH14

2B133A OFFICE Medical Records 132 9.00 1188 175 175 150 8.84 4 TU-2B-01-2 TU-2B-01 2 175 AH14 2B133B STORAGE Clean Utility/Storage Room 31 9.00 279 25 25 0 5.38 4 TU-2B-01-3 TU-2B-01 3 25 AH14 2B134 OFFICE Offices 257 9.00 2313 240 240 200 6.23 4 TU-2B-08-1 TU-2B-08 1 240 AH14 C209 COPY ROOM Multipurpose Room 150 8.00 1200 125 125 0 6.25 4 TU-2B-30-1 TU-2B-30 1 125 AH14 C213 OFFICE Offices 107 9.00 963 175 175 150 10.90 4 TU-2B-01-5 TU-2B-01 5 175 AH14 C2-13 CORRIDOR Corridors 421 9.00 3789 275 275 0 4.35 4 TU-2A-16-1 TU-2A-16 1 275 AH18 C243 FREEZER Multipurpose Room 95 8.00 760 0 0 0 0.00 4 TU-2B-23-3 TU-2B-23 3 0 AH14 C-255 TOILET Toilets - Public 35 9.00 315 0 0 55 10.48 10 TU-2A-02-1 TU-2A-02 1 0 AH18

C2-C10 CORRIDOR Corridors 407 9.00 3663 250 250 0 4.10 4 TU-2B-16-1 TU-2B-16 1 250 AH18 C2-C11 CORRIDOR Corridors 246 9.00 2214 150 150 0 4.07 4 TU-2B-29-1 TU-2B-29 1 150 AH14 C2-C12 CORRIDOR Corridors 163 9.00 1467 0 0 0 0.00 4 TU-2B-29-2 TU-2B-29 2 0 AH14 C2-C4 CORRIDOR Corridors 1,040 8.00 8320 600 600 0 4.33 4 TU-2B-30-2 TU-2B-30 2 600 AH14 C2-C6 CORRIDOR Corridors 573 9.00 5157 500 500 0 5.82 4 TU-2B-32-1 TU-2B-32 1 500 AH14 C2-C7 CORRIDOR Corridors 416 9.00 3744 275 275 0 4.41 4 TU-2B-22-3 TU-2B-22 3 275 AH14 C2-C9 CORRIDOR Corridors 1,195 9.00 10755 400 400 0 2.23 4 TU-2A-01-1 TU-2A-01 1 400 AH18 D-265 JANITOR Clean Utility/Storage Room 82 9.00 738 100 100 160 13.01 4 TU-2A-14-2 TU-2A-14 2 100 AH18

AIR TERMINAL UNIT SCHEDULE

T.U. AREAS SERVED NOMINAL

SIZE

AIRFLOW HOT WATER HEATING COIL BASIS OF DESIGN

REMARKS

MAX. (CFM) MIN. (CFM) MIN. (CFM) E.A.T. L.A.T. E.W.T. L.W.T. GPM

COIL

CAPACITY

(Btu/h)

PIPE

RUNOUT

(inch)

MANUFACTURER TYPE

TU-2A-01 C2-C9-CORRIDOR 6 400 400 400 55 90 180 160 1.52 15190 3/4 PRICE C.V.

TU-2A-02 C-255-TOILET / 2A102B-OFFICE / 2A102-OFFICE / 2A102A-OFFICE 8 600 600 600 55 90 180 160 2.28 22785 3/4 PRICE C.V.

TU-2A-03 2A103-OFFICE / 2A103C-OFFICE 8 540 540 540 55 90 180 160 2.05 20507 3/4 PRICE C.V.

TU-2A-04 2A126-LAB 8 600 600 600 55 90 180 160 2.28 22785 3/4 PRICE C.V.

TU-2A-05 2A127-LAB 8 650 650 650 55 90 180 160 2.47 24684 3/4 PRICE C.V.

TU-2A-06 2A128-LAB 8 650 650 650 55 90 180 160 2.47 24684 3/4 PRICE C.V.

TU-2A-07 2A129-OFFICE 8 700 700 700 55 90 180 160 2.66 26583 3/4 PRICE C.V.

TU-2A-08 2A130-OFFICE 6 150 150 150 55 90 180 160 0.57 5696 3/4 PRICE C.V.

TU-2A-09 D2-C11-CORRIDOR 6 150 150 150 55 90 180 160 0.57 5696 3/4 PRICE C.V.

TU-2A-10 2A121-LAB 8 680 680 680 55 90 180 160 2.58 25823 3/4 PRICE C.V.

TU-2A-11 2A120-OFFICE / 2A120A-STORAGE / 2A120B-OFFICE / 2A117-OFFICE 10 820 820 820 55 90 180 160 3.11 31140 3/4 PRICE C.V.

TU-2A-12 2A118-LAB 6 350 350 350 55 90 180 160 1.33 13291 3/4 PRICE C.V.

TU-2A-13 2A122-LAB / 2A122A-LAB 8 600 600 600 55 90 180 160 2.28 22785 3/4 PRICE C.V.

TU-2A-14 2A123A-OFFICE / D-265-JANITOR 6 275 275 275 55 90 180 160 1.04 10443 3/4 PRICE C.V.

TU-2A-15 2A123-OFFICE 6 175 175 175 55 90 180 160 0.66 6646 3/4 PRICE C.V.

TU-2A-16 C2-13-CORRIDOR 6 275 275 275 55 90 180 160…