S02 - Attachment 4 - Price Matrix.pdf
PDF 70 KB Posted
- Solicitation number
- 36C24825R0032
About this file
This is a pricing matrix template form for a construction project to renovate interior corridors at a VA facility. The template is structured as a Base Offer Cost Breakdown that allows offerors to itemize labor and material costs across 24 construction divisions, including general requirements, existing conditions, concrete, masonry, metals, wood/plastic, thermal/moisture protection, doors/windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety & security, earthwork, exterior improvements, utilities, and transportation.
The form includes fields for project number, date, project title, project location, and offeror details. Below the itemized divisions, there are sections to calculate overhead percentage, profit percentage, and bond percentage (all currently set at 0.00%), along with subtotal calculations and final total price. The template is blank with no costs filled in, serving as a standardized format for contractors to submit their detailed cost proposals for the VA corridor renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: Date:
Project Title Project Location Offeror Name Offeror Street Offeror City State Zip
Item Labor Cost Material Cost Total Cost
Division 1 $- $- $-
Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - -
Division 8 - - -
Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - -
Division 14 - - -
Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - - Division 27 - - - Division 28 - - -
Division 31 - - - Division 32 - - -
Division 33 - - -
Wood and Plastic
Base Offer Cost Breakdown
Description
General Requirements
Existing Conditions Concrete Masonry Metals
Electrical
Thermal & Moisture Protect
Doors and Windows
Finishes Specialties Equipment Furnishings Special Construction
Conveying Equipment
Fire Suppression Plumbing
HVAC
Communications Electronic Safety & Security
Earthwork Exterior Improvements
Utilities
Division 34 - - -
Overhead % - Profit % - Bond % -
$- $- $- Total Price
Transportation Subtotal
Division Subtotals :
0.00% 0.00% 0.00%
Overhead/Profit Subtotals :
File details come from the government source that posted it. Updated .