S02 - Attachment 4 - Price Matrix.pdf

PDF 70 KB Posted

Attached to
Renovate Interior Corridors of Building 1, Floors 2 & 3
Solicitation number
36C24825R0032
Issued by

About this file

This is a pricing matrix template form for a construction project to renovate interior corridors at a VA facility. The template is structured as a Base Offer Cost Breakdown that allows offerors to itemize labor and material costs across 24 construction divisions, including general requirements, existing conditions, concrete, masonry, metals, wood/plastic, thermal/moisture protection, doors/windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety & security, earthwork, exterior improvements, utilities, and transportation.

The form includes fields for project number, date, project title, project location, and offeror details. Below the itemized divisions, there are sections to calculate overhead percentage, profit percentage, and bond percentage (all currently set at 0.00%), along with subtotal calculations and final total price. The template is blank with no costs filled in, serving as a standardized format for contractors to submit their detailed cost proposals for the VA corridor renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: Date:

Project Title Project Location Offeror Name Offeror Street Offeror City State Zip

Item Labor Cost Material Cost Total Cost

Division 1 $- $- $-

Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - -

Division 8 - - -

Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - -

Division 14 - - -

Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - - Division 27 - - - Division 28 - - -

Division 31 - - - Division 32 - - -

Division 33 - - -

Wood and Plastic

Base Offer Cost Breakdown

Description

General Requirements

Existing Conditions Concrete Masonry Metals

Electrical

Thermal & Moisture Protect

Doors and Windows

Finishes Specialties Equipment Furnishings Special Construction

Conveying Equipment

Fire Suppression Plumbing

HVAC

Communications Electronic Safety & Security

Earthwork Exterior Improvements

Utilities

Division 34 - - -

Overhead % - Profit % - Bond % -

$- $- $- Total Price

Transportation Subtotal

Division Subtotals :

0.00% 0.00% 0.00%

Overhead/Profit Subtotals :

File details come from the government source that posted it. Updated .