S02 Attachment 3 Drawings.pdf
PDF 36 MB Posted
- Solicitation number
- 36C26223B0015
About this file
This document outlines a federal contract opportunity from the Department of Veterans Affairs to provide construction services for upgrading a building management system. The solicitation number is 36C26223B0015 and seeks bids to perform work under Project 605-20-401, upgrading the building management system at the VA Medical Center in Loma Linda, California. An attachment to the solicitation provides 36MB of drawings related to the required construction services. Bids are due based on the timeline laid out in the full solicitation document. The opportunity is designated for small businesses within VISN 22.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
E
I R
I R
E
W
I R
E
UNK PBUNK PB
MAIN ENTRANCE
BARTON ROAD
B E
N T
O N
S T
R E
E T
PARKING STRUCTURE
VALOR BUILDING
BLDG. 32
CANCER CENTER
BLDG. 31
AUDIOLOGY BUILDING
BLDG. 30
BLDG. 10
MAIN HOSPITAL
BLDG. 1
PHARMACY
BLDG. 20
FACILITIES
MANAGEMENT -
BOILER AND CHILLER
PLANTS
BUILDING 1 SOUTH
EYE CLINIC
BLDG. 51
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:4
:0
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
G-001
COVER SHEET
1 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000 JANUARY 25, 2023
100% BID DOCUMENTS
605-20-40121-328-Q31
UPGRADE BUILDING MANAGEMENT
SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000
VA PROJECT #: 605-20-401
TM
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 7
G-002 GENERAL INFORMATION 2 7
G-003 ICRA INFORMATION AND DETAILS 3 7
G-004 PRE-CONSTRUCTION RISK ASSESSMENT (PCRA) 4 7
1.LS101 BUILDING 1 FIRST FLOOR LIFE SAFETY PLAN - MAIN HOSPITAL AND ANNEX 5 7
1.LS102 BUILDING 1 FIRST FLOOR LIFE SAFETY PLAN - CLC 6 7
30.LS103 BUILDING 30 FIRST FLOOR LIFE SAFETY PLAN 7 7
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 54
1.M-100 BUILDING 1 BASEMENT MECHANICAL PLAN 2 54
1.M-101 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA A 3 54
1.M-102 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA B 4 54
1.M-103 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA C 5 54
1.M-104 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA D 6 54
1.M-105 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA E 7 54
1.M-106 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA F 8 54
1.M-107 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA G 9 54
1.M-108 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA H 10 54
1.M-109 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA I 11 54
1.M-110 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREA J 12 54
1.M-111 BUILDING 1 FIRST FLOOR MECHANICAL PLAN - AREAS K AND L 13 54
1.M-201 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA A 14 54
1.M-202 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA B 15 54
1.M-203 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA C 16 54
1.M-204 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA D 17 54
1.M-205 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA E 18 54
1.M-206 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA F 19 54
1.M-207 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA G 20 54
1.M-208 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREA H 21 54
1.M-209 BUILDING 1 SECOND FLOOR MECHANICAL PLAN - AREAS K AND L 22 54
1.M-212 BUILDING 1 ROOF MECHANICAL PLAN - AREA M 23 54
1.M-301 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA A 24 54
1.M-302 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA B 25 54
1.M-303 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA C 26 54
1.M-304 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA D 27 54
1.M-305 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA E 28 54
1.M-306 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA F 29 54
1.M-307 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA G 30 54
1.M-308 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREA H 31 54
1.M-309 BUILDING 1 THIRD FLOOR MECHANICAL PLAN - AREAS K AND L 32 54
1.M-401 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA A 33 54
1.M-402 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA B 34 54
1.M-403 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA C 35 54
1.M-404 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA D 36 54
1.M-405 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA E 37 54
1.M-406 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA F 38 54
1.M-407 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA G 39 54
1.M-408 BUILDING 1 FOURTH FLOOR MECHANICAL PLAN - AREA H 40 54
1.M-505 BUILDING 1 PENTHOUSE/ROOF MECHANICAL PLAN 41 54
30.M-101 BUILDING 30 FIRST FLOOR MECHANICAL PLAN 42 54
30.M-102 BUILDING 30 ROOF MECHANICAL PLAN 43 54
M-501 MECHANICAL CONTROLS 44 54
M-502 MECHANICAL CONTROLS 45 54
M-601 MECHANICAL SCHEDULES - LEVEL 1 46 54
M-602 MECHANICAL SCHEDULES - LEVEL 1 47 54
M-603 MECHANICAL SCHEDULES - LEVELS 1 AND 2 48 54
M-604 MECHANICAL SCHEDULES - LEVEL 2 AND 3 49 54
M-605 MECHANICAL SCHEDULES - LEVEL 3 50 54
M-606 MECHANICAL SCHEDULES - LEVEL 3 AND 4 51 54
M-607 MECHANICAL SCHEDULES - LEVEL 3 AND 4 52 54
M-608 MECHANICAL SCHEDULES - LEVEL 4 AND ADDITIONAL 53 54
M-609 MECHANICAL SCHEDULES - ADDITIONAL 54 54
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 8
1.E-100 BUILDING 1 BASEMENT ELECTRICAL PLAN 2 8
1.E-101 BUILDING 1 FIRST FLOOR ELECTRICAL PLAN 3 8
1.E-102 BUILDING 1 SECOND FLOOR ELECTRICAL PLAN 4 8
1.E-103 BUILDING 1 THIRD FLOOR ELECTRICAL PLAN 5 8
1.E-104 BUILDING 1 FOURTH FLOOR ELECTRICAL PLAN 6 8
30.E-101 BUILDING 30 FIRST FLOOR ELECTRICAL PLAN 7 8
E-601 BMS FIBER RISER DIAGRAM 8 8
VA MEDICAL CENTERPROJECT LOCATION
PROJECT SITE PLAN
DocuSign Envelope ID: 158CC959-98EE-4EEA-98E8-D15488881D69
1/26/2023
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES
BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE
VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:0
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
G-002
GENERAL INFORMATION
2 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000 JANUARY 25, 2023
100% BID DOCUMENTS
605-20-40121-328-Q31
TM
GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERS
1, 30
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
LOMA LINDA BMS UPGRADE
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA
FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES
(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE
PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE
SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY
DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.
IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE
USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION
PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE
OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000 JANUARY 25, 2023
100% BID DOCUMENTS
605-20-40121-328-Q31
TM
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
1, 30
VA LOMA LINDA HEALTH CARE SYSTEM
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
G-004
PRE-CONSTRUCTION RISK
ASSESSMENT (PCRA)
4 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000 JANUARY 25, 2023
100% BID DOCUMENTS
605-20-40121-328-Q31
TM
1, 30
OPEN AREA
FD
FD
FD
FS
FD
C1-12
1B-50D
C1-123
1A-124
1A-125 1A-126 1A-130 1A-131
1A-128
1A-129
1A-113
1A-107
1A-10
1A-1161A-117 1A-1181A-1191A-120
1A-121
1A-122
1A-106
1A-08
1A-09
1B-27A
1B-29A
1B-29B 1B-28E
1B-28G
1B-28B
1B-28
1B-43
1B-411B-48
1B-50
1B-50B
1B-50
1B-50C 1B-51D1B-51E
1B-51
1B-49
1B-51C
1B-50A1B-51A
1B-51F
1B-51K
1B-51H
1B-51I
1A-132 1A-133
1A-138
C1-115
1A-139 1A-137 1A-136 1A-135 1A-134
1F-10F1F-10D1F-10C
1B-12B
1C-32
1A-302A
1A-302B
1A-302D
1A-301 1A-303
1A-303A
1A-304 1A-305
1A-310
1A-311
1A-312
1A-313 1A-314 1A-315 1A-316 1A-317
1A-318
1A-3061A-307
1A-319
1A-308
1A-320
1A-309
1A-321
1A-302C
C107
C1-56
C1-37
C1-25
C1-81
1F-35
C1-42
1D-04
1D-04A 1D-06A
1D-06
1C-15A
1C-04
1C-27
1B-04A
1B-06
1B-04D
1B-04
1B-04C1B-04B
1A-4031A-404
1A-02A
1A-02B
1A-02C
1A-02D
C1-38D
1A-68A
1A-70A
SB01-1
1C-29
C1-44
1C-22
1F-21
1F-23
1F-20
1C-25C
1C-33G
C1-47
1C-27C
1C-25D
1C-25E
1C-25
1C-25F
1C-25G
C1-43
1C-24
1C-24A
SB01-3
C1-67
1C-06
1C-05
1C-11
1C-12
C1-63
1C-14A
1C-14C EL01-S4 EL01-S5
1C-03
1D-19
1D-01
1D-09A
SH01-5
1D-01B
1D-17
1D-16A
1D-16
1D-10
1D-11
1D-12 1D-13
1D-08A
1D-08
1D-05A
1D-05
1D-03
1D-14
1C-26E
1C-26A
1C-32A
1C-26C
1C-26D
1C-26
1C-18 1C-17 1C-16 1C-15
C1-45
SB01-2
SB01-2A
1B-45
1B-44
1B-42
1B-40
1C-20
1B-16A
1B-16B
1B-031B-02
1B-16
1B-14
1B-13
1B-12A
1B-11
C1-30
1B-321B-17
1B-18
1B-19
1B-31 1B-30
C1-33
C1-29
1B-25
1B-24
1B-231B-221B-21
1B-10
1B-08
C1-17
C1-08
1A-72C
ST01-3
1C-23
C1-06
SB01-1A
1A-76
1A-74
1A-76A
C1-41
1A-84G
1A-84H
1A-84N
1A-84I
1A-84D 1A-84F1A-84E
C1-54
1A-84B
SH01-4
EL01-P1
1F-03A
1F-03
1F-03B 1F-01
C1-49
1A-84M 1A-84L
1A-84O1A-84P1A-84Q
1A-84K
1A-84R1A-84S1A-84U
C1-53
1F-09
1F-09A 1F-08
1F-07
1F-06
1F-19
1C-28
1C-30B 1C-32C
1C-04B
1C-04C
C1-40
1C-04A
1C-33A
1C-28A
1C-28C
1C-33
C1-62
1F-22
C1-60
C1-58
1F-38
1F-38C
1F-10G1F-10E 1F-09F
C1-59
C1-57
C1-48
1F-09D1F-02
1F-36
1C-07
1C-07B1C-07C1C-07A
1C-33E 1E-33F
1C-33M 1C-33L 1C-33K 1C-33J 1C-33H 1C-09
1C-37E1C-37B
1C-37A
1C-37
1C-38
1F-261F-25
1F-24
1E-301E-32 1E-34
1F-28
1F-29C
1F-30 1F-30A
1F-42 1F-41
1F-39C
1F-35D
1F-35A
1F-34B1F-34C
1E-15
1A-84
C1-52
1A-84T
1A-88
1A-82D 1A-82E 1A-82F 1A-82G
C1-41A
1A-82B
1A-82A
1A-82H
1A-82I
1A-82J
1A-77
1C-14A
1A-72
SB01-7A
SB01-7
1F-34D
1F-34E 1F-34
C1-57A
1F-35B
1F-35C
1F-35E
1F-39
1F-39A
1F-39B
1F-40
C1-65
1F-29A
1F-29
1F-29B
1E-33
1F-27
1E-47
1E-49
1F-38A
1F-38B
1F-21A
1F-22A
1C-36
ST01-6
EL01-S8
EL01-S7
EL01-S6
1C-34
C1-61
C1-51
1C-37D
1E-02
1E-03
1E-04
1C-33F
1C-33O
1C-33R
1C-08
SB01-8A
SB01-8
SH01-9
C1-65A
C1-64
1F-43 1F-05
C1-55
C1-28
EL01-P2
1C-31
1C-30
EL01-B2
SH01-6
1C-26F
1C-32B
DW01-2
1C-28B
1C-32D
1C-04D
1C-04F
1C-04G
C1-46
SB01-6
SB01-6A
SH01-8
1D-18
1C-03
1C-02
1C-03A
1C-01
ST01-5
C1-18
1C-14B
1D-16B
1D-16C
C1-83
ST01-9
C1-82
1D-15
1D-07
1D-09
C1-80
1D-20
1D-20A
EL01-A1
1D-02
1D-02A
SH01-3
SB01-4
SB01-4A
1C-15B
1C-27B
1C-25A
DW01-1
C1-38
1A-88A
1A-84W
1A-84X
1A-84V
1A-83B
1A-83A
1A-92
1A-84C
1A-84J
ST01-4
C1-11
1A-82C
1A-302F
1A-72B
1A-72A
1A-71
1A-70
1A-69
1A-68
EL01-S3
EL01-S2
EL01-S1
C1-26
1C-22A
1C-21 1B-51
1B-51B
1B-54
1B-52
1B-46
1B-46B
C1-34 1B-42A
1B-40A
SH01-2
ST01-2
C1-22
1B-28C
1B-28F 1B-28A
1B-28H
1B-28D
1B-27
1B-26D
1B-26D
1B-26B
1B-26A
1B-26
1B-25A
1B-29
1B-29C
1B-29D
1B-09
C1-20
MA01-1
C1-19 1B-04E
1B-05 1B-07
SH01-1
ST01-1
1C-26B
1A-04
1A-05 1A-06 1A-08 1A-09
1A-101A-11
1A-84Y
1A-02
1A-02E
1A-02F1A-02H1A-02J 1A-02G1A-02I
1A-02K
1A-07
1A-03
1A-01
1A-102
1A-101A
1A-101B
SB01-5
SB01-5A
C1-35
SB01-3A
1A-112
1C-104
1C-102
1A-101
1A-11
1B-16A. 1
1A-82K
1C-24B
1B-51J
1B-51G
1C-04B
1C-06A
1F-09E
1A-114
1C-15C
1C-10
1C-04A1C-04C
1F-34A
C1-03
C1-01
1A-266
1A-233A
1A-2341A-234A
1A-208
1A-206
1A-238
1A-236
1A-207
1A-240
1A-209
1A-210A
1A-210
1A-210B 1A-225
1A-222 1A-220 1A-242
1A-264
1A-233
1A-232
1A-221
C1-02B
1A-237A
1A-270
1A-201
1A-203
1A-200
C1-01C
C1-01B
C1-02A
C1-02
C1-01A
1A-237
1A-235
1A-2711A-2721A-231
1A-2581A-241
1A-213
1A-205
1A-204
C1-05 C1-04
1A-260
1A-211
1A-256
1A-201A
1A-230
1A-262
1A-202
1A-268
1A-227
1A-212
EL01-T4
EL01-T1
1A-263
1A-200AS
1A-200S
1A-400S
1A-84
1F-09B
1F-09C
C1-50
1A-631 1A-629 1A-634
1A-632
1A-627B
1A-625 1A-637B
1A-621
1A-615
1A-617
1A-612
1A-624
1A-626
1A-628
1A-53
1A-54
1A-55 F3
1A-56
1A-613A
1C-25B
1C-27E
1C-27A
1C-27D 1C-27F
1A-611
1A-621
CORR
LAB
WORK RM
OFFICE
EXAM RM EXAM RM EXAM RM PHARMACIST
CLEAN UTIL
TOILET
EXAM
EXAM
WAITING RMEXAM RM
EXAM RMEXAM RMEXAM RM
EXAM RM
EXAM
EXAM
EXAM
BEDDING
ANIMAL WRD
ANIMAL WRD
PROCEDURE
PROCEDURE
ANIMAL WRD
ANTE ROOM
RADIATION SAFETY
STORAGE
CT SCANNER
DEXA
OFFICE
WORK RM
LAB
OFFICE
LAB
OFFICE
LABLAB
CORR CORR
EXAM RM
CORR
SOCIAL WORK EXAM RM EXAM RM EXAM RM EXAM RM
OFFICEOFFICEOFFICE
DEVELOPER
DECON RM
CORR
CORR
CORR
WAITING RM
RECEPTION
MEDICAL
EXAM RM
EXAM RM
PHARMACY
SUPERVISOR
PHARMACY
EXAM RM EXAM RM EXAM RM EXAM RM EXAM RM
EXAM RM
EXAM RMEXAM RM
EXAM RM
EXAM RM
SOCIAL WORKER
EXAM RM
CASE MANAGERS
OPEN AREA
CORR
CORR
CORR
CORR
CORR
OFFICE
CORR
ELEC
OFFICE OFFICE
PLUMBING
STORAGE
WAREHOUSE
PHARMACY
SECLUSION
TRAINING
WORK RM
POL-SECUR
ARMORYNCIC
PUB TOILETPUB TOILET
OFFICE
OFFICE
OFFICE
OFFICE
CORR
STAFF TOI
STAFF TOI
SERVBAY
LOCKERS
CORR
STORAGE
STAFF LCKR
STAFF LCKR
WORK RM
SUBSTANCE
FREEZER
CORR
VAULT
WAITING RM
OFFICE
BREAK ROOM
OFFICE
OFFICE
CORR
WORK RM
OFFICE
SERVBAY
CORR
CHIEF OFF
WAREHOUSE
OFFICE
STORAGE
CORR
STORAGE
ELEV ELEV
VEST
GENERATOR
EQUIP RM
ELEC
SHAFT
FIRE PUMP
BOILERS/CHILLERS RM
GRAPH CTRL
BOILER RM
COMPACTOR
PAINT SHOP
STORAGE PAINT SHOP
OFFICE
AC UNIT
OFFICE
STRL UNIT
ELEC
MAINT
WASHING RM
PREP RM
WIPE DN RM
STORAGE
MECH
SUPPLY RM
TWO SUPERVISOR'S WORK ROOM WORK ROOM TECH OFF
CORR
SERVBAY
EQUIP RM
LAB
EMS
HSKPG
ANIMAL SUR
SUPV OFFCHIEF OFF
STERILIZER & SUPPLIES
ANIMAL PREP
STORAGE
DEVELOPER
RECOVERY
CORR
LAUNDRYCOLD RM
KITCHEN
WATER PURIFICATION
ANIMAL WARD ANIMAL WRD
ENTRANCE
DIRTY HALLWAY
NECROPSY
ANIMAL WRD
ANIMAL WRDANIMAL WRDANIMAL WRD
COLD RM
CORR
CORR
CORR
STORAGE
STAIR
STORAGE
CORR
EQUIP RM
ANTEROOMAGENT CASHIER RM
CORR
EXAM RM
EXAM RM
EXAM
EXAM RM
OFFICE EXAM RMEXAM RM
CORR
RECEPTION
SHAFT
ELEV
OFFICE
PAT ADVOC
OFFICE WOUNDED
CORR
EXAM
EXAM
EXAM RMEXAMEXAM
WORK AREA
EXAM RMCAST RM-1
CORR
LAUNDRY
POLICE ADMIN
LINEN
STORAGE
EYE WASH
MTRL MGMNT
CHIEF OFF
CORR
PHRM CACHE
CLEAN DISH ROOM
SEW
LINEN
KITCHEN
CORR
OFFICE
CORR
CORR
AUDITORIUM
AV EQUIPMENT
OFFICEOFFICE
BREAK ROOM
CORR
CORR
CORR
STAFF TOI
CORR
REFRIGERAREFRIGERASTORAGE
COOKS WORKROOM STORAGE
REFRIGERA FREEZER REFRIGERA FREEZER REFRIGERA
WORK ROOMWORK ROOM
FOOD SERVICE MANAGER
INFO CTR
EMS
STAFF LCKRSTAFF LCKR
PAT EFFECT
CONF RMLAUNDRY
NURSE STAT
BREAK RM
SACRISTY
MEDIT-CHPL NAVE
OFFICE OFFICE
OFFICE
STORAGE
OFFICEOFFICE
MECH
WAIT AREA
CORR
WORK RM
OPERATORS
OFFICE OFFICE OFFICE
CORR
TOILET
OFFICE
OFFICE
OFFICE
PAT RM 4B
ADMISSIONS
EQUIP RM
SERVBAY
CHIEF OFF
OFFICE
RECEPTION
CORR
UTIL RM
OFFICE
OFFICE
ANTEROOM
OFFICE
OFFICE
STAFF TOI
CORR
EMS
CORR
MEDIT-CHPL
KITCHEN
MED RM
CONG BATH
RESTROOM
STORAGE
RESTROOM
STAFF TOI
STAFF TOI
SIGNAGE RM
STAIR
SOUTH
SOUTH
SOUTH
MECH RM
ELEV LOB
CORR
CORR
KITCHEN
CONG BATH
EMS
EMS
CHEMICAL
STORAGE
STORAGE
EQUIP RM
SERVBAY
SHAFT
CORR
CORR
OFFICE
CORR
ELEV LOB
ELEV
DMBWTR ACC
STAFF TOI
ELEV
SHAFT
TRANSITION
EMS
DUMBWAITER
STERILIZER
NOURISH ST
ASSIST OFF
SHOP
BREAK RM
CORR
SERVBAY
EQUIP RM
SHAFT
BOOS PUMP
PUB TOILET
PUB TOILET
REPRODUCT
EMS CLOSET
STAIR
ELEV LOB
LOCKSMITH
PRI TOI
SUPV OFF
CORR
STAIR
CORRIDOR
LOCKERS
TRANSPORTATION
CORR
STORAGE
EQUIP RM
ELEV
MAINT
MAINT
SHAFT
SERVBAY
EQUIP RM
COMPUTER FACILITY
BUFFER ROOM
PHARMACY
DUMBWAITER
LOBBY
EMS CLOSET
REST RM
LOCKER
MALE TOILET
WOMENS
CORR
EXAM RM
EXAM RM
STAIR
CORR
VEST
OFFICE
EMS CLOSET
STAFF LCKR
OFFICE
STAFF LCKR
NORTH ELEV
NORTH ELEV
NORTH ELEV
ELEV LOB
ELEVATOR LOBBY
STORAGE
LAB
STERILIZER ACCESS
STERILIZER
CORR
MECH RM
SOUND BOOTH
SHAFT
STAIR
ENTRANCE
ANIMAL WRD
ANIMAL SUR
CLEAN
AUTOCLAVE
RESEARCH
FEED
STORAGE
CAGE WASH-DRTY
CAGEWASH
EQUIP RM
CGWSH-CLN
COLD RM
ANIMAL WRD
ANIMAL WRD
COLD RM
CORR
EMS
CORR
STORAGE
SHOWER SHOWER
SHAFT
STAIR
STORAGE
STORAGE
OFFICE OFFICE OFFICE
OFFICE
WAITING
TOILET
OFFICE
WAITING
OFFICEOFFICEOFFICE OFFICEOFFICE
INFORMATION
MENS
PUBLIC
RESTRM
WOMENS
PUBLIC
RESTRM
MAIN
ENTRANCE
EXAM RM
STORAGE
STORAGE
CANTEEN
LOBBY
STORAGE
OFFICE
ELECTRICAL
HALL
EXAM
CONF RM
MECH
ANIMAL SUR
CHECK -IN DESK
OFFICE
OFFICE
OFFICE
HAC
CORRIDOR
OFFICE
OFFICE OFFICE
EXAM
WORK RM
RESEARCH/ATTENDING
OFFICE
EXAM
EXAM
ELEC RM
SOUND
BOOTH
SOUND
BOOTH
SOUND
BOOTH
/ HAC
OFFICEOFFICE
OFFICE
WAREHOUSE
DOCK
OFFICE
ELEVATOR
ELEVATOR
ELEVATOR
OFFICE
WARRIER
OFFICE
OFFICE
OFFICE
SERVICE
OFFICE
OFFICE
OFFICEOFFICE
MECH
WORK STATION
CORR
CORR
EXAM 10
ISO TOILET
ISOL ROOM 5BAR TOILET
ROOM 3
BAR EXAM
BAR TOILET
SOILED UTIL
BAR TRIAGE
MED ROOM
EXAM 1
ON-CALL
LOUNGE
LOCKER
TLT/SH
STF
TOILET
HOLD 5
BAR PSYCH
HOLD 6
PSYCH
TOILET
WH CHAIR
ISO EXAM6
AOD/HBA CHECK-IN
WORK STATION
CORR
VESTIBULE
QUIET/ CONSULT
WAITING RM
CORR
CORR
CORR
CORR
TOILET
WORK STATION
ISO EXAM 7
ANTE ROOM
LIFE SUPPORT UNITLIFE SUPPORT UNITEXAM 9EXAM 8
WH CHAIR
EXAM 21
EXAM 1
PSYCH
EXAM 4EXAM 2
TRIAGE
CORR
CORR
FOR RESULTS
WAITING CLEAN UTIL
CORR
PSYCH
TOILET
VESTIBULE
WOMEN
JAN
EXAM 20
MEN
PATIENT
TRANSPORT
ELEV
PATIENT
TRANSPORT
ELEV
CYL
EXAM-TREAT
ISOL RM
WORK RM
NURSE OFF
EXAM-TREAT
EXAM-TREAT
EXAM RM
URGNT CARE
CLERK
RESTROOM
EXAM-TREAT
EXAM-TREAT
EXAM-TREAT
CORR
PRI TOI
TOILET
SLEEP RM
MED RM
EXAM-TREAT
CLEAN LIN
SOIL LINENBREAK ROOM
EXAM RM
SHELL
SHELL
CORR
SUPPLY
ROOM
WORK RM
OFFICE
OFFICE
OFFICE OFFICE
CORRIDOR
CORRIDOR
STORAGE
SHELL
CORRIDOR
OFFICES
SHELL
CORRIDOR
OFFICE
OFFICE
OFFICE
HOUSE KEEPING
AID
MAIN ENTRY
CORR
NON HD
STORAGE
NON HD
WC420P
WC420P
W C420
P
WC420P
WC420P
W C
P W C
4 20 P
W C
420P
W C
P
W C420
P
W C
P
W C
420P
WC420P
W C
P
W C
P
W C
P
WC420P
W C
P
FE
PTS
SECURITY GATE
SECURITY GATE
OVER HEAD DOOR
OVER HEAD DOOR
OVER HEAD DOOR
G A
TE
DN
UP
UP
UP
UP
DN
UP
UP
DN
UP
UP
U P
U P
DN
UP
UP
UP
UP
UP
UP
U P
U P
UP
UP
UP
RAMP UP
DN
UP
DN
RAMP
UP
UP
RAMP UP
S
SS SSS S
S SSS S
S
S S
S S
S S
S
S S
S S
S S
S S
S SS S S S SS
S
S S
S
S S
S S
S S
S
S
S
S
S
S S
S
S S
S S
S S
S S
S
S
S
S
S
S
S
SS SSS
SS S
S
S
S
SS SSSS
S
S
S
SS
S
S
SS S
SS S
S
S
S S
S
S
S
S S
S
S
S
S
S
SS
SS SSSS
S
SS
S
SS S
SS S
S
SS
S
SS
S SS SSS S SS SS S
S
SS SS S S SS SS
S
AREA 'H'AREA 'G'
AREA 'F'AREA 'E'
AREA 'D'AREA 'C'
AREA 'B'AREA 'A'
ANNEX
1234567
8910111213141516171819202122232425
D
E
F
G
H
I
J
K
L
M
N
AREA 'K
AREA 'L'
EGRESS
REQUIRED:
COMMON PATH OF TRAVEL
(per NFPA 101 18.2.5.3)
EXIT ACCESS TRAVEL
(per NFPA 101 19.2.6.2.1)
DEAD-END CORRIDOR
(PER NFPA 101 - 19.2.5.2)
REQUIRED # OF EXITS
(per NFPA 101 7.4.1.1 AND
7.4.13 THRU 7.4.1.6)
ALL EGRESS EXISTING
EGRESS WIDTH
(PER NFPA 101 - TABLE 7.2.2.2.1.2
(8)) - EXIT DOORS
EXISTING STAIRS WITH 36" DOORS
AND 44" WIDE STAIRS
(LESS THAN 2000 OCCUPANTS)
100'-0" MAXIMUM
150'-0" MAXIMUM DISTANCE FULLY
SPRINKLERED
- EXISTING - NOT BEING
MODIFIED BY THIS PROJECT
30'-0" FULLY SPRINKLERED
OCCUPANCY:
TOTAL SQUARE
FOOTAGE:
MAIN BUILDING - 168,501 SF
ANNEX BUILDING - 29,537 SF
1.
2.
TRAVEL DISTANCE INCREASE
(per NFPA 101-19.2.6.2.2)
150"-0" MAXIMUM DISTANCE, WHEN
NOT WHOLLY IN A SMOKE
COMPARTMENT.
INCREASE TRAVEL DISTANCE 50' IF
BUILDING IS SPRINKLERED.
MAIN BUILDING - 702 PERSONS
ANNEX BUILDING - 123 PERSONS
THIS IS A CONTROLS UPGRADE PROJECT AND NO CHANGES
ARE MADE TO THE EXISTING LAYOUT THAT WILL AFFECT THE
EXISTING LIFE SAFETY OF THE BUILDING. DURING
CONSTRUCTION, CONTRACTOR IS TO COORDINATE LIFE SAFETY
REQUIREMENTS OF EACH PHASE AND PROVIDE NECESSARY
SIGNAGE AND ALTERNATIVE ROUTING IF REQUIRED.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:0
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
1.LS101
BUILDING 1 FIRST FLOOR LIFE SAFETY
PLAN - MAIN HOSPITAL AND ANNEX
5 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000 JANUARY 25, 2023
100% BID DOCUMENTS
605-20-40121-328-Q31
TM
PROPOSED USE:
OWNED BY: FEDERAL
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE:
PRIMARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
(NFPA 101 - TABLE 19.1.6.1)
Relevant Code Goes Here
Relevant Code Goes Here
2021 Plumbing Code
2020 Electrical Code
2010 ADA Standards for Accessable Design
2021 NFPA 101
Department of Veterans Affairs: HVAC Design Manual, Nov 1, 2017 Rev. Nov.
UPGRADE BUILDING MANAGEMENT
SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000
DEPARTMENT OF VETERANS AFFAIRS
CODE INFORMATION
NORTH
0 2010 40
Scale: 1" = 20'-0"
BUILDING 1 FIRST FLOOR LIFE SAFETY PLAN - MAIN HOSPITAL AND ANNEX
EGRESS DATA
LIFE SAFETY NOTE
TYPE II (222)
2021 INTERNATIONAL MECHANICAL CODE
N
AREA OF
WORK
KEY PLAN
SCALE: NO SCALE
A B
C
E F
D
G H
I J
K/L
M N
BLDG 30
K-2209CA
XTO N
LAVATORYVITR
EOU S CH
IN A
K-2209CA
XTON
LAVATORYVITR
EOUS CH
INA
K-2209CA XTO
N
LAVATORYVITR EOU
S CH IN
A
K-2209CAXTO
N
LAVATORYVITREOU
S CHIN
A
K-2209CA XTO
N
LAVATORYVITR EOU
S CH
IN
A
K-2209CA
XTON
LAVATORYVITR
EOUS CH
IN
A
K-2209CA
XTO N
LAV
ATO RY
VITREOU
S CHINA
K-2209CA
XTON
LAV
ATORY
VITREOU
S CHINA
K-2209CAXTO
N
LAVATO
RY
VITREO
US CHINA
K-2209CAXTO
N
LAVATO
RY
VITREO
US CHINA
K-2209CA
XTO
N
LAVATORYVITR
EOU
S CHIN
A
K-2209CA
XTO
N
LAVATORYVITR
EOU
S CHIN
A
K-2209CA
XTON
LAV
ATORY
VITREOU
S CHINA
K-2209CA
XTO N
LAV
ATO RY
VITREOU
S CHINA
K-2209CA
XTO
N
LAV
ATO
RY
VITR
EOU
S CHIN
A
K-2209CA
XTO N
LAV
ATO RY
VITR
EOU S CH
IN
A
K-2005KING
STON
C_
LAVATOR
Y
VITR
EOUS CH
IN
A
K-2005KINGSTO
N
C_LAVATOR
Y
VITREOUS CHINA
K-2005KINGSTO
N
C_LAVATOR
Y
VITREOUS CHINA
K-2005KING
STO
N
C_
LAVA
TORY
VITR
EOU
S CHIN
A
PTS
C1-73
C1-77
C1-75
1E-63
1E-64B
C1-85
1E-100
1E-621E-61
1E-109A
1E-06
C1-68
1E-56 1E-55 1E-54 1E-53 1E-52
1E-51
1E-50
1E-48
C1-91
1E-36
1E-35
C1-69
C1-92
C1-66
C1-74
C1-86
1E-29
1E-27
1E-25
1E-23
1E-21
1E-26
1E-24
1E-22
1E-20
1E-18
1E-17
1E-15
1E-16
1E-14
1E-19
1E-43A
1E-37
1E-38
1E-40
1E-42
1E-44
1E-64
1E-65
1E-79 1E-80
1E-77 1E-78
1E-96
1E-97
1E-98
1E-101
1E-103
1E-104
1E-108
1E-109
1E-112
1E-113
1E-115
1E-116
1E-118
1E-119
1E-121
1E-124
1E-41
1E-05B
1E-07 1E-08
C1-79
1E-09 1E-10
1E-11
1E-12
1E-148 1E-146
C1-87
1E-145
1E-84
1E-143
1E-85
1E-142
1E-87
1E-140 1E-139
1E-88 1E-90
1E-137 1E-136
1E-91
C1-88
1E-93
1E-134
1E-66
1E-67
1E-68
1E-69 1E-70 1E-70A
1E-149A
ST01-87
1E-149 1E-148A 1E-145A 1E-142A 1E-139A 1E-136A
1E-133
1E-132
1E-131
1E-130
1E-125
1E-128
C1-90
1E-73
1E-74
1E-75 1E-76
1E-81
1E-82
1E-83 1E-86 1E-89 1E-92
C1-89
1E-95
1E-45A
1E-45
1E-44A
1E-42A
1E-40A
1E-38A
1E-37A
C1-72
C1-71
1E-43
1E-31
1E-57A
1E-57
1E-58
1E-59 1E-60
1E-64C
1E-64A
1E-28
1E-13
1E-01
1E-29A
1E-27A
1E-25A
1E-23A
1E-21A
1E-19A
1E-05A
1E-06A
1E-07A 1E-08A 1E-10A
1E-12A
SH01-11
ST01-8
1E-107
1E-106
1E-105
1E-102
1E-99
1E-123 1E-122
1E-120
1E-117
1E-114
1E-111
1E-48A
1E-50A1E-51A
1E-52A1E-54A 1E-56A
SH01-10
ST01-7
1F-29B
1E-46
1E-110
1H121-D
1H120A1H122-A
1H120
1H05-A 1H05
1H03-A
1H06-B1H06-A
1H03-B
1H01
1H20 1H-124
1H21
1H115-A 1H115
1H113 1H113-A
1H111-A 1H111
1H109
1H109-A
1H107-A 1H107
1H131-A
1H105
1H103
1H03
1H-102
1H-104
1H-106
1H-108
1H-110
1H-112
1H-114
1H-116
1H-118
1H-126 1H-128A
1H-128
1H122
1H121-C 1H121-B
1H07 1H11
1H06
1H117
1H21-A
1H119
1H09
1H121 1H123
1H125-A1H127-A 1H129-A
1H06-C
1H1251H1271H1291H1311H133
1H133-A1H135-A
1H135
1G-101
1G-103
1G-105
1G-107
1G-109
1G-111
1G-113
1G-117
1G-119
1G-121
1G-123
1G-126
1G-129
1G-143
1G-120
1G-141
1G-118
1G-116
1G-114
1G-112
1G-135
1G-110
1G-131
1G-102
1G-130
1G-132
1G-134
1G-136
1G-138
1G-140
1G-144
1G-146
1G-148
C1-100
C1-142
C1-140 C1-141
C1-143
1G-102A
1G-127
1G-148A
1G-146A
1G-144A
1G-140A
1G-103A 1G-101A
1G-107A
1G-105A
1G-111A
1G-109A
1G-117A
1G-113A
1G-121A
1G-119A
1G-127A
1G-123A
CORR
CORR
CORR
OFFICE
RECREATION
CORR
PAT RM 2B
PRI TOIOFFICE
PAT RM 1B
CORR
TRANSITION RM PAT RM 2B PAT RM 2B PAT RM 2B PAT RM 2B
PAT RM 1B
PAT RM 1B
PAT RM
CORR
SOILED UTI
CLEAN UTIL
CORR
WAITING RM
NURSE STAT
CORR
CORR
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
SHARED OFFICE
SOCIAL WRK
DIR OFF
MNGR OFF
MNGR OFF
MED RM
SOILED UTI
CLEAN UTIL
PAT RM 2B
SHARED OFFICE
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
DINING
MECH
STORAGE
EMS
SOCIAL WRK MNGR OFF
RESTROOM
CONG BATH
PAT RM 2B
PAT RM 1B
PAT RM 1B
PAT RM 1B
MECH
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
SOILED UTI
RECREATION
RECREATION
WORK RM
PAT RM 1B
SPS ( CLEAN SUPPLY )
CORR
PAT RM 2B PAT RM 2B
PAT RM 2B
PAT RM 4B
PAT RM 2B PAT RM 2B
CORR
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B PAT RM 2B
PAT RM 2B PAT RM 2B
PAT RM 2B PAT RM 2B
PAT RM 2B
CORR
PAT RM 2B
REPORT RM
MECH
EMS
EMS
DIETITIAN PAT TOIL
PAT LGE
PRI TOI
STAIR
BREAK RM PAT TOIL PAT TOIL PAT TOIL PAT TOIL RESTROOM
STORAGE
MED RM
MECH
NOURISH ST
EMS
RESTROOM
FAMILY DINING
RESTROOM
RESTROOM
OFFICE
LAUNDRY
DIR OFF
PAT RM 2B
PAT TOIL PAT TOIL PAT TOIL PAT TOIL
WAITING RM
STORAGE
PAT TOIL
PAT RM 2B
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
CORR
CORR
OFFICE
STORAGE
OFFICE
OFFICE
THERAPY RM
OFFICE
OFFICE
STORAGE
OFFICE
WORK RM
RESTROOM
MED RM
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
STAFF OFF
PAT TOIL
PAT TOIL PAT TOIL HOPTL BATH
HOPTL BATH
SHAFT
STAIR
PAT RM 1B
RESTROOM
RESTROOM
RESTROOM
RESTROOM
STORAGE
RESTROOM
RESTROOM
RESTROOM
RESTROOM
RESTROOM
PAT TOIL
PAT TOILPAT TOIL
PAT TOILPAT TOIL
PAT TOIL
SHAFT
STAIR
RESTROOM
MECH RM
REHAB CARE
CO - ORDER OFFICE
VESTIBULE
RM
CLO
TOILET 12TOILET 13
RESIDENT 13
NURSE CORR
NURSE
NURSENURSE
NURSE
VESTIBULE
STAFF
CORRIDOR
STORAGE
EXIT
VESTIBULE
TOILET 07
RESIDENT
RESIDENT 04
TOILET 08
TOILET 09
RESIDENT 03
RESIDENT 02
TOILET 10
TOILET 11
RESIDENT 01
KITCHEN
MULTIPURPOSE
CORR
CONCIERGE
LAUNDRY RM
SOILED UTILITY
ELECTRICAL RM
ELECTRICAL ROOM
OFFICE
COMM
CLEAN
UTILITY
MEDICATION
STAFF
LOCKERSTF
TLT
HK/EMS
STORAGE
TRANSITION RM
O2-C O2-S
CORR
CORR
CORR
OFFICE
CRASH CART
CLINICAL
WORKRM
CORR
LIVING RM
STORAGE
TOILET 01TOILET 02
TOILET 03
NURSE
RESIDENT
BARIATRIC 06
RESIDENT 07RESIDENT 08RESIDENT 09
TOILET 04
RESIDENT 10
TOILET 05TOILET 06
RESIDENT 11
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
BARIATRIC
ROOM
BARIATRIC
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
RESIDENT ROOM
ADA/ABA
MEDITATION
KITCHEN
FAMILY
LAUNDRY
HOUSEKEEPING
WOMEN'S
MEN'S
MEDS
UTILITY
CLEAN
UTILITY
SOILED
ELEC.
COMM.
MECHANICAL
LOCKER/LOUNGE
STAFF
TV/LIVING
OFFICE
DIRECTORS
OFFICE
CLINIC
ROOM
CONFERENCE
ROOM
EQUIPMENT
ROOM
RESIDENT
ROOM
RESIDENT
RESIDENT ROOM
ADA/ABA
RESIDENT ROOM
ADA/ABA
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
RESTROOM
STAFF
RESIDENT ROOM
ADA/ABA
RESIDENT 12
7'-6 1_
FEC
FEC
FEC FEC
FEC
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
O A V
N O A V
N O A V
N O A V
N O A V
N O A V
NOAV
NOAV
NOAV
NOAV
NOAV
FEC
LADDER
ROOF ACCESS
FEC
PYXIS
N O A V
N O A V
WASHER
DRYER
UP
DN
UP
DN
UP
32" FLA T S C R E E N
32" FLA T S C R E E N
D o o r is r e v e rs ib le to a ll o w ri g h t o r le ft h a n d s w in g
W 8X
W 8X28 W 8X28
W 8X28
W X2
W 8X3
W X3
W X3
W X 3 1
W X 3 1
W X
W X
W X 3
W X 3
W X3
W X 3
W 8X
W 8X
W 10X45
W 10X45
W 0 X45
W 0 X45
W 0X45
W 1 0 X45
W 1 0 X45
W 0X
W 0X
W 0 X45
W 1 0 X45
W 0 X45
S
S
S
S
S
S
SS SSS S SS SS SS SS
SS S
S
THIS IS A CONTROLS UPGRADE PROJECT AND NO CHANGES
ARE MADE TO THE EXISTING LAYOUT THAT WILL AFFECT THE
EXISTING LIFE SAFETY OF THE BUILDING. DURING
CONSTRUCTION, CONTRACTOR IS TO COORDINATE LIFE SAFETY
REQUIREMENTS OF EACH PHASE AND PROVIDE NECESSARY
SIGNAGE AND ALTERNATIVE ROUTING IF REQUIRED.
AREA 'I' AREA 'J'
AREA 'H'
CLC 2
AREA 'G'
26 8910111213141516171819202122232425
D
C
AREA 'N'
AREA 'M'
EGRESS
REQUIRED:
DEAD-END CORRIDOR
(PER NFPA 101 - 19.2.5.2)
ALL EGRESS EXISTING
EGRESS WIDTH
(PER NFPA 101 - TABLE 7.2.2.2.1.2
(8)) - EXIT DOORS
EXISTING STAIRS WITH 36" DOORS
AND 44" WIDE STAIRS
(LESS THAN 2000 OCCUPANTS)
100'-0" MAXIMUM
300'-0" MAXIMUM DISTANCE FULLY
SPRINKLERED
- EXISTING - NOT BEING
MODIFIED BY THIS PROJECT
30'-0" FULLY SPRINKLERED
OCCUPANCY: HEALTH CARE - OUTPATIENT
- 240 SF/PERSON
TOTAL SQUARE
FOOTAGE:
CLC - 74,726 SF
1.
2.
TRAVEL DISTANCE INCREASE
(per NFPA 101-19.2.6.2.1)
150"-0" MAXIMUM DISTANCE, WHEN
NOT WHOLLY IN A SMOKE
COMPARTMENT.
INCREASE TRAVEL DISTANCE 50' IF
BUILDING IS SPRINKLERED.
COMMON PATH OF TRAVEL
(per NFPA 101 18.2.5.3)
EXIT ACCESS TRAVEL
(per NFPA 101 19.2.6.2.1)
REQUIRED # OF EXITS
(per NFPA 101 7.4.1.1 AND
7.4.13 THRU 7.4.1.6)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:0
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
1.LS102
BUILDING 1 FIRST FLOOR LIFE SAFETY
PLAN - CLC
6 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000 JANUARY 25, 2023
100% BID DOCUMENTS
605-20-40121-328-Q31
TM
NORTH
0 2010 40
PROPOSED USE:
OWNED BY: FEDERAL
CODE ENFORCEMENT JURISDICTION: FEDERAL
APPLICABLE CODES:
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE:
PRIMARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
(NFPA 101 - TABLE 19.1.6.1)
Relevant Code Goes Here
Relevant Code Goes Here
2021 Plumbing Code
2020 Electrical Code
2010 ADA Standards for Accessable Design
2021 NFPA 101
Department of Veterans Affairs: HVAC Design Manual, Nov 1, 2017 Rev. Nov.
UPGRADE BUILDING MANAGEMENT
SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.,
LOMA LINDA, CA 92357-1000
DEPARTMENT OF VETERANS AFFAIRS
CODE INFORMATION
LIFE SAFETY NOTE
Scale: 1" = 20'-0"
BUILDING 1 FIRST FLOOR LIFE SAFETY PLAN - CLC
EGRESS DATA
TYPE II (222)
2021 INTERNATIONAL MECHANICAL CODE
N
AREA OF
WORK
KEY PLAN
SCALE: NO SCALE
A B
C
E F
D
G H
I J
K/L
M N
BLDG 30
C
B
A
129A
133A
128A
131A
123120
132A
118 119
127A
130A
108 107
124121
105 104
126A 127 128 129
133132131130
ELEC.
TELECOM
WAITING AREA
CORRIDOR
CORRIDOR
CORRIDOR
WOMENS
MENS
AUDIOMETRIC
AUDIOMETRIC
AUDIOMETRIC
TEST HOLDING RM
AUDIOMETRIC
AUDIOMETRIC
HEARING AID/
FITTING RM 1
HEARING AID/
FITTING RM 4
MECH.
AUDIOMETRIC
HEARING AID/
FITTING RM 6
HEARING AID/
FITTING RM 5
AUDIOMETRIC
HEARING AID/
FITTING RM 2
AUDIOMETRIC
CHIEF OFFICE
CLINICAL SUPPORT
OFFICE
CERUMEN
MANAGEMENT ROOM
INTAKE ROOM
HEARING AID
FABRICATION LAB/MOD
HEARING AID/
FITTING RM 3
GENERAL
HEARING AID
FITTING RM 7
BREAKROOM
AUDIOMETRIC SUITES
STAFF UNISEX
TOILET
COPY / MAIL / FILES RECEPTION
CONTROL
ROOM SUITE 4SUITE 3
CONTROL
ROOM SUITE 5
CONTROL
ROOM SUITE 6
CONTROL
ROOM
SUITE 7
CONTROL
ROOM
CONTROL
ROOM
SUITE 8SUITE 2
CONTROL
ROOM
SUITE 1
CONTROL
ROOM
STORAGESPACE FOR
FUTURE STAIR
SPACE FOR
FUTURE
ELEVATOR
SPACE FOR
FUTURE STAIR
ALIGN
A
LI
G N
R E
F
F.E.C.
F.E.C.
F.E.C. F.E.C.
WH
S S
S
SS
SS
SS
S S
S
THIS IS A CONTROLS UPGRADE PROJECT AND NO CHANGES
ARE MADE TO THE EXISTING LAYOUT THAT WILL AFFECT THE
EXISTING LIFE SAFETY OF THE BUILDING. DURING
CONSTRUCTION, CONTRACTOR IS TO COORDINATE LIFE SAFETY
REQUIREMENTS OF EACH PHASE AND PROVIDE NECESSARY
SIGNAGE AND ALTERNATIVE ROUTING IF REQUIRED.
A
2 3 4 54.64.33.42.8
B.0
B.2
B.5
C
D
EGRESS
REQUIRED:
DEAD-END CORRIDOR
(PER NFPA 101 - 19.2.5.2)
ALL EGRESS EXISTING
EGRESS WIDTH
(PER NFPA 101 - TABLE 7.2.2.2.1.2
(8)) - EXIT DOORS
EXISTING STAIRS WITH 36" DOORS
AND 44" WIDE STAIRS
(LESS THAN 2000 OCCUPANTS)
100'-0" MAXIMUM
300'-0" MAXIMUM DISTANCE FULLY
SPRINKLERED
- EXISTING - NOT BEING
MODIFIED BY THIS PROJECT
30'-0" FULLY SPRINKLERED
OCCUPANCY:
HEALTH CARE - OUTPATIENT
- 240 SF/PERSON
TOTAL SQUARE
FOOTAGE:
BUILDING 30 - 7,648 SF
1.
2.
TRAVEL DISTANCE INCREASE
(per NFPA 101-19.2.6.2.1)
150"-0" MAXIMUM DISTANCE, WHEN
NOT WHOLLY IN A SMOKE
COMPARTMENT.
INCREASE TRAVEL DISTANCE 50' IF
BUILDING IS SPRINKLERED.
COMMON PATH OF TRAVEL
(per NFPA 101 18.2.5.3)
EXIT ACCESS TRAVEL
(per NFPA 101 19.2.6.2.1)
REQUIRED # OF EXITS
(per NFPA 101 7.4.1.1 AND
7.4.13 THRU 7.4.1.6)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:0
A
M C
U s e rs
\o m a n ts c h
\D o c u m e n ts \A
G I_
-3 -V
A L o m a L in d a
B M
S o m a n ts c h
.r v t
30.LS103
BUILDING 30 FIRST FLOOR LIFE
SAFETY PLAN
7 7OKM
UPGRADE BUILDING
MANAGEMENT SYSTEM
LOMA LINDA VA HEALTH CARE SYSTEM
11201 BENTON ST.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .