This statement of work describes a design-build contract opportunity for water infiltration corrections to buildings 1, 3, and 60 and their connecting corridor at the Veterans Affairs North Texas Health Care System campus in Dallas, Texas. The contractor will investigate water entry points, design and implement corrective measures such as rerouting drainage away from structures, repairing gutters and downspouts, sealing wall penetrations, installing waterproofing, and performing remediation on the affected modular building. The work must be completed within 270 days of notice to proceed for an anticipated cost of $1-2 million. Submissions are due by July 9, 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Correct Building 1, 3, & 60 Water Infiltration
STATEMENT OF WORK
Correct Water Infiltration in Modular Building TT54 and Building Corridors 1- 3, & 60
#549-17-108 Veterans Affairs North Texas Health Care System (VANTHCS)
DALLAS, TEXAS 75216
GENERAL SCOPE OF WORK:
Provide all labor, materials, tools and equipment, and design-build services necessary to design and provide directions specific tasks to accomplish the project as described below. The project will be a design build project, the contractor/architect will correct water infiltration, correct deficiencies, and repair water damage to connecting corridor and perform remediation work of modular building TT54 due to water infiltration as well as restore and renovate exterior and interior space for safe occupational and functional use. All investigative reports and drawings will be provided for review. The contractor will incorporate findings and provide full set of drawings and specifications at 65%, 95% and 100% review. The review period will allow for two weeks for the government review before incorporating any changes or corrections. The contractor team will inspect the connecting corridor envelope located near the modular building TT54, investigate all possible avenues of water diversion from existing modular building roof drains as well as intersecting corridor roof and other possible avenues of entry. The contractor will develop a schedule, which may include phasing to accomplish tasks. The purpose of this project is to correct or create the path for water to run off away from the intersecting corridor roof and the modular building to existing storm drains. This will also include the inspection all gutters and down spouts which may have to be repaired, replaced, or added. Drains are all to be tested to ensure that they are open to mains. Clean and re-seal all wall penetrations inside and outside of buildings. Install waterproofing materials as appropriate on exterior walls at the subsurface levels.
All work will take place within the footprint of the connecting corridor for buildings 1, 3, 60 and adjacent modular building TT54. The connecting corridor is active and work disruption will be kept to a minimum. All work will take place during regular day shift.
The work shift will be 7:00 a.m. to 5:00 p.m., Monday through Friday, except for federal holidays. No work will be performed during the holidays or weekends, unless cleared with the COR. Contractor may use a small storage container and set at a location designated by the COR. Parking for workers will be in the remote southeast gravel lot.
The contractor may have one vehicle near the work site for transportation of materials and personnel. All other vehicle will be parked in south remote parking.
Design shall be based on Veterans Affairs (VA) criteria and specifications as found at https://www.cfm.va.gov/TIL/, As-Built Drawings to be provided: One (1) Large Scale Drawing, two (2) ½ size drawings, and 1 CDs with specifications using the latest version of AutoCAD.
https://www.cfm.va.gov/TIL/
BACKGROUND:
The project is located at 4500 S Lancaster Rd., Dallas, TX 75216. Building TT54 and Intersecting Corridor for Building 1, 3 and 60 are located on the VANTHCS hospital grounds next to the north perimeter road. The water infiltration is mainly concentrated in the corridor intersection between building No. 1 and 60. TT54 is a 50’ W X 102’-7” L modular building that is located adjacent to and at the West Side of this corridor intersection. See attached highlighted site plans, pictures, and building layout. Building TT54 has received water damage that requires remediation and renovation to make it habitable. All drawings are diagrammatic. The contractor will be responsible for field verification.
STATEMENT OF PROJECT ACTIVITIES:
There will be remediation required and build back required in some areas due to water damage. During the remediation period the contractor shall be responsible for the protection of affected areas of building(s) the contractor will maintain a negative air environment to ensure no contaminants spread throughout active areas. A/C units will be protected as well to ensure no mold or other growth affects upper floors. The JV team shall take measures to keep employees, veterans and visitors from injury while performing any abatement or cleanup work. The contractor team shall cordon off areas and post signage where work will be performed and will coordinate with the COR on all activities. The contractor will take all precautions so that noise, construction dust or debris is not released into the areas where guest are located. If this does occur the contractor shall immediately clean up area so that debris is not disbursed to the other areas. The contractor shall comply with all OSHA, ICRA, and fire and safety regulations during the performance of work. The contractor will provide a work schedule and will notify the COR when moving to new work areas. This project work will be performed per OSHA 1910 and 1926, workers must be trained in proper mold remediation.
Contractors must have Certified Mold Remediator Certification (CMR) and wear proper Personal Protective Equipment (PPE) required to perform interior work.
The contractor team is to submit samples of waterproofing material that may be used to permanently seal all voids in the walls at the subsurface levels. Submit sample of down spouts, rain gutters and drains. All areas where water is leaving building structure (roof, down spouts etc.) will be diverted to provide correct drainage away from building.
Contractor will warranty all workmanship and labor for a period of 1 yr. from the time contract is complete. In addition, the contractor will provide equipment or material warranties from the manufactures as provided.
The anticipated cost range for this project is between $1,000,000.00 and $2,000,000.00. Work is to be completed 270 days after the NTP.
The contractor team will use fill dirt to bring surface level to maintain slope to drain away runoff where possible. Where this is not feasible the contractor will consider various methods to include but not limited to berms, dry wells, grading, swells, and French drain systems to divert water away from buildings.
All existing drains both interior and exterior will be inspected and tested to ensure that water will flow to main storm drains.
The contractor team shall install as many landscape drains grates necessary to provide removal of surface water. The contractor will provide a proposed drawing conveying where system will be connected and how it will remove water away from building structure. Contractor to provide submittal sample of materials that may be used e.g.
perforated pipe, geotextile fabrics, grates, gravel, grasses, and concrete.
Landscape redone to correct slope, drainage or otherwise damaged areas will be repaired with a drought resistant sod such as Bermuda, St. Augustine or Zoysia.
The contractor team will inspect all facia boards behind gutters and replace all damaged, broken, or rotted material.
The contractor team will re-seal and caulk all expansion joints of buildings.
The contractor team will paint all surfaces and submit color samples for approval.
The contractor team will install all new ceiling tiles in existing grid any damage ceiling grids will be replaced, contractor to verify.
One week’s notification will be given prior to specific areas needing to be closed off to through traffic. The contractor team will use an approved work schedule of anticipated tasks to be performed. Contract will start with a kick-off-meeting, at which time the notice to proceed (NTP) will be issued. The contractor team shall keep a project log of daily activities, and submittal log. The contractor will follow all workplace safety training/practices per OSHA standards. The contractor will obtain an approved ICRA form prior to commencing any work on site. The contractor shall be responsible for storage of materials and work tools off-site in approved location by the COR.
Contractor will implement construction safety requirements as follows to include but not limited to these issues addressed.
Accident Prevention Plan Requirements
Prior to commencing work contractors must submit for approval Accident Prevention Plan. The prime contractor will write this plan for the specific work and hazards of the contract and implementing in detail, the requirements for safety and occupational health. This plan shall be reviewed and accepted by facility Construction Safety Officer and project CCR / Engineer prior to commencement of work at the job site. The plan shall be developed by qualified personnel and shall be signed by a competent person and a representative of management.
The prime contractor shall integrate all subcontractor activities into the Safety and Health Program, make the program available to all contractor and subcontractor employees and ensure all subcontractors integrate the provisions of the plan into their work activities.
The plan shall include:
a. Title, signature and phone number of the plan preparer
b. Title, signature and phone number of the plan approver
c. Background information on the project:
d. Contractor, contract number, project name, description of work to be performed and location of work to be performed, contractor accident experience such as OSHA 200 forms, corporate safety trend analysis, and a listing of phases of work and hazardous activities requiring hazard analysis.
Statement of safety & health policy:
1) Administrative responsibilities for implementing the plan
2) Identification and accountability of personnel responsible for accident prevention
3) Means for controlling work activities of subcontractors and suppliers
4) Responsibilities of subcontractors
5) Plans for safety orientation of new employees / sub-contractors
6) Require project superintendent and sub-contractor leads / supervisors attend facility construction safety orientation prior to starting work.
7) Plans for continued safety training
8) Plans must identify monthly supervisor safety meeting and weekly worker safety meetings. Meetings shall be documented including date, attendance, subjects, and the name of individuals who conducted the meeting and submitted to the facility Construction Safety Officer (CSO).
• Provisions for safety inspections to include
• Work site/material and equipment inspection
• Means for recording inspection results
• Timetable for correction of deficiencies
• Procedures for follow-up inspections to ensure correction
9) Responsibilities for investigation and reporting accidents/exposure
10) All accidents incident to the project will be investigated & reported within 24 hours
11) Accidents that result in a fatality, two or more persons admitted to a hospital or significant property damage will be reported immediately to the Contracting Officer. Contractors are responsible for notifying OSHA.
12) First aid treatments shall be reported and recorded daily.
13) Responsibilities for maintaining accident data, reports and logs
14) Emergency response capabilities for disasters
15) Emergency Plans will include emergency phone numbers and shall be tested periodically. Plans shall include escape procedures, employee accounting following an emergency evacuation, rescue and medical duties, means of reporting emergencies and persons to be contacted.
16) Plans for maintaining job cleanup and safe access
17) Public safety requirements (fencing/signs)
18) Prevention of alcohol/drug abuse on the job
19) Hazard communication program must include the following:
• A list of hazardous chemicals known to be present
• Methods used to inform employees of the hazards
• Methods used to protect the workers Personal Protective Equipment (PPE)
• Containers must be present and labeled
• MSDS sheets for all chemicals used shall be submitted to the project
Construction Control Representative (CCR)
Facility life safety systems:
When life safety systems are to be disrupted, ensure procedures are incorporated to maintain equivalent levels of fire protection and provide formal notification to the facility prior to disabling any part of the fire protection and notification systems. Procedures shall be approved by facility CSO & project CCR prior to implementation. Listed below are acceptable alternatives.
a. Fire watch
b. Replace pendant sprinklers with extended coverage upright sprinklers
c. Installation of temporary fire detection system using heat detection with a separate fire panel that shall interface with the facility fire alarm system.
Safety requirements for the hazards identified on the job site such as (but not limited to):
a. Fall protection
b. Alternate measures for impaired fire protection systems (sprinkler, fire alarm, etc.)
c. Asbestos exposure
d. Confined space entry
e. Lock out/tag out
f. Excavations
g. Machinery and mechanized equipment
h. Hand and power tools
i. Contingency plan for severe weather
j. Hot work (welding, torch cutting, brazing etc.), no hot work shall be performed without required burn permit issued by safety service
k. Flammable storage
Hazard Analysis:
Prior to beginning EACH PHASE OF WORK, an activity hazard analysis shall be prepared by the contractor performing that work. Work shall not proceed until the hazard analysis has been accepted by facility Construction Safety Officer and project Construction Control Representative (CCR)/Contracting Officers Representative (COR).
Hazard analysis shall identify the principal steps to be accomplished in sequential order to accomplish the operation. Equipment used in the operation shall be listed in the hazard analysis required Inspections for equipment and machinery shall be listed on the hazard analysis form.
The analysis shall at minimum include the following:
a. Define the activity being performed
b. Identify the sequence of work to be accomplished
c. Identify the specific hazards that are anticipated
d. Identify the control measures that shall be implemented to reduce each hazard to an acceptable level
Safety Orientation requirement:
It is a VA North Texas Health Care facility requirement that project superintendent, Quality assurance personnel, project sub-contractor supervisors and any other project team member deemed the competent person shall attend a facility construction safety orientation offered every 3rd Thursday of each month from 9:00 am – 10:00am Building 9 conference room B.
NOTE: Be advised all construction disciplines shall conform with applicable OSHA standards
Management Statement: No information, except that inclusive of delivery of this contract, will be shared with the contractor in any follow up communications.
None of the information in this contract includes any personal identifiable (employee) information (PII) or personal health information (PHI).
Exterior – In between TT-54 and Connecting Corridor
TT-54 Interior
Connecting Corridor