S02 - ATTACHMENT 12 - VHA Required Div 01 Spec Sections.docx
DOCX document 19 KB Posted
- Attached to
- C1DZ--EHRM Infrastructure and Data Center Upgrades - Atlanta, GA Federal contract opportunity
- Solicitation number
- 36C77622R0089
About this file
This presolicitation notice seeks Standard Form 330 submissions from firms interested in providing architect-engineer services for the EHRM Infrastructure and Data Center Upgrades project located at the Atlanta VA Health Care System. Firms must submit their SF 330 responses by May 23, 2022 at 3:00 PM Eastern Time in order to be considered for the design and construction period services, which include developing construction documents, working drawings, specifications, reports and construction phase support. The project has an anticipated value between $20-50 million and requires a full design team. The contract will be awarded as a 100% SDVOSB set-aside. Selection will be based on specialized experience with IT and data center projects, professional qualifications, capacity, past performance, and geographic location. Required disciplines include architecture, engineering, fire protection and project management.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .