S02 - ATTACHMENT 04 - Cerner FDS Solution dated 4-12-2019.pdf

PDF 160 KB Posted

Attached to
C1DZ--EHRM Infrastructure and Data Center Upgrades - Atlanta, GA Federal contract opportunity
Solicitation number
36C77622R0089
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a presolicitation notice for architect-engineering services related to EHRM infrastructure and data center upgrades at the Atlanta VA Medical Center. The scope of work includes design and construction documents for network infrastructure installation, IT system renovations and upgrades, including networking fiber optics, structured cabling, electrical distribution, UPS systems, HVAC, and telecommunications room modifications. Firms are required to submit an SF330 with specialized experience in similar healthcare IT projects, professional qualifications in required engineering disciplines including architecture, electrical and mechanical engineering, and experience providing construction period services. The contract will be a 100% small business set-aside for SDVOSB concerns. Responses are due by May 23, 2022. Selection will be based on specialized experience, professional qualifications, capacity, past performance, and knowledge of the project location. The secondary criterion is geographic proximity to the project site.

View the file

Other files for this federal contract opportunity

Other files attached to C1DZ--EHRM Infrastructure and Data Center Upgrades - Atlanta, GA, newest first.
File Type Posted
S02 - ATTACHMENT 19 - VHA COVID-19 Supplemental Contract Requirements 12-14-21.pdf PDF
S02 - ATTACHMENT 12 - VHA Required Div 01 Spec Sections.docx DOCX document
S02 - ATTACHMENT 06 - EHRM Matrix Leased Facilities.pdf PDF
S02 - ATTACHMENT 18 - VHA Directive 1061.pdf PDF
S02 - ATTACHMENT 16 - Infrastructure Standard for Telecommunications Spaces.pdf PDF
S02 - ATTACHMENT 15 - Program Guide PG-18-15 Vol_C-2008.pdf PDF
S02 - ATTACHMENT 13 - Sensitive Infrastructure Data Classification FOUO Memo.pdf PDF
S02 - ATTACHMENT 09 - ANSI-TIA-EIA-568-B.1 Horizontal Cabling.pdf PDF
S02 - ATTACHMENT 08 - SOCAMS 6 Design Alert 1-7.pdf PDF
S02 - ATTACHMENT 14 - 01 32 16.01 EHRM Arch and Eng CPM Schedule Spec.docx DOCX document
S02 - ATTACHMENT 11 - VA OEHRM Site Infrastructure Requirements - 2_0_Signed.pdf PDF
S02 - ATTACHMENT 10 - Help Guide CBOC RLP Development.pdf PDF
S02 - ATTACHMENT 07 - US Dept of VA OIT Design Guide Template.pdf PDF
S02 - ATTACHMENT 03 - AVAHCS Campus Map.pdf PDF
S02 - ATTACHMENT 02 - 508-22-700 Planning Document (1)-G-001.pdf PDF
36C77622R0089.docx DOCX document
S02 - ATTACHMENT 17 - Seasonal Influenza with Vaccines.pdf PDF
S02 - ATTACHMENT 05 - EHRM Matrix Owned Facilities.pdf PDF
S02 - ATTACHMENT 01 - SOW.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12 April 2019

VA Systems Engineering Solution Cerner EHRM Forward-Deployed Servers – General Solution

Data Center & Infrastructure Engineering conducted a systems engineering assessment of the equipment requirements to implement the Cerner forward-deployed server stack. The assessment was based on engineering best practices, published VA standards, conditions and capabilities at VA medical centers, and equipment lists provided by Cerner as of 1 April 2019.

Assessments of deployment sites shall be accomplished based on the conservative solution presented below in order to obtain a repeatable and consistent application process.

There are 9.4kW of permanent equipment and 14.1kW of initial (permanent and temporary) equipment being deployed to each site that require redundant power distribution and heat rejection. At the 50% aggregate power usage level for the stack, assessments and designs using the Standard Density (SD) IT enclosure model require the following:

• Approximately 3.5kW of required power for IT equipment racked in each cabinet.

• Four (4) IT equipment cabinets, preferably contiguous (initial). One (1) of four (4) cabinets designated primarily for “temporary” Cerner equipment that will be removed from the facilities at a future point, leaving the enclosure position for future site IT equipment needs.

• Three (3) IT equipment cabinets (permanent).

• Infrastructure equipment (cabinets, branch circuits, Zone PDUs, Rack PDUs) provided per specifications of published v2.2 Infrastructure Standard for Telecommunications Spaces.

• 15kW of available UPS capacity on redundant (A/B) UPS systems.

• Twelve (12) preferably contiguous breaker spaces to install four (4) each 30A 3-phase circuit breakers to support four (4) IT equipment cabinets, mirrored on A/B redundant power distribution panels.

• 15kW of available sensible heat rejection capability maintaining N+1 redundancy on the overall cooling system supporting the space.

• Ability to direct cooling/reject generated heat at the 3.5kW (1 ton) per enclosure level in planned/available floor space without negatively impacting other IT equipment load heat rejection.

• Underfloor or overhead ‘whip’ branch circuit power distribution. Each pair of IT equipment enclosures receives a pair (one A side, one B side) 3-phase 30A branch circuit connected to the Zone PDU for the pair of enclosures. Each pair of IT equipment enclosures receives one (1) Zone PDU with dual (A/B) 30A (L21-

30) inputs and quad (A,A,B,B) 20A (L21-20) outputs connected to Rack PDUs. Each IT equipment enclosure receives dual (A/B) Rack PDUs.

• Overhead cable tray for telecommunications distribution. Redundant structured cabling provided to IT equipment enclosure positions connecting back to Horizontal Distribution Areas (HDA).

• Category 6a copper distribution (entire channel components at 6a) within the MCR and from the TR to the

WAO.

• OM4 (minimum) fiber distribution (entire channel components at same performance category) within the MCR and from the MCR to the TRs.

---Nothing Follows---