S02 - Attachment 10 -VHA Master Specifications.docx

DOCX document 48 KB Posted

Attached to
Y1DA--Water Infilltration Corrections Buildings 1, 3 and 60 Corridor
Solicitation number
36E77620R0025
Issued by

About this file

This solicitation requests proposals for a design-build contract to correct water infiltration issues and perform repairs at three buildings and an adjacent modular building on the campus of the Veterans Affairs North Texas Health Care System in Dallas, Texas. The scope of work includes investigating water entry points, developing design documents, and performing corrective construction work. Proposals are due by March 20, 2020, and the contract is set aside for Service-Disabled Veteran-Owned Small Businesses. The period of performance is approximately 270 calendar days with a budget between $1 million and $2 million. The Department of Veterans Affairs will evaluate proposals in accordance with FAR Parts 15, 19, and 36.

View the file

Other files

File Type Posted
S02 - Attachment 12 - Section 01 42 19 Reference Standards SCE 11-19-2018.docx DOCX document
S02 - Attachment 5 - Construction Wage Determinations (Dallas County).pdf PDF
S02 - Attachment 6 - Labor Standard Wage Determination (Dallas County).pdf PDF
S02 - Attachment 13 - Section 01 33 23 Shop Drawings SCE 11-19-2018.docx DOCX document
S02 - Attachment 8 - Past Performance Questionnaire.docx DOCX document
S02 - Attachment 2 - Statement of Work - Water Infiltration Bldgs 1_3 and 60 - (5-13-2020 YMR) - Final.pdf PDF
36E77620R0025.docx DOCX document
S02 - Attachment 9 - Release of Claims.docx DOCX document
S02 - Attachment 11 - 01 32 16 16 - Project Schedule.docx DOCX document
S02 - Attachment 1 - Specification 00 11 21 RFP to DB Spec - Water Filtration Project (5-13-2020 YMR).doc DOC document
S02 - Attachment 16 - Quality Control Requirements Plan SCE 11-19-2018.docx DOCX document
S02 - Attachment 4 - Water Intrusion and Mold Management (WIMM).pdf PDF
S02 - Attachment 15 - Section 01 57 19 Temporary Environmental Controls SCE 11-19-2018.doc DOC document
S02 - Attachment 14 - Section 01 35 26 Safety Requirements SCE 11-19-2018.docx DOCX document
S02 - Attachment 7 - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
S02 - Attachment 3 - Mold and Moisture Control Program.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14

05-01-20

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO.
DIVISION AND SECTION TITLES
DATE

DIVISION 00 SPECIAL SECTIONS

00 01 15
List of Drawing Sheets
05-20

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
03-20
01 32 16.01
Architectural and Engineering CPM Schedules
03-20
01 32 16.13
Network Analysis Schedules – Major Construction Project Design-Bid-Build
03-20
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
03-20
01 32 16.16
Network Analysis Schedules (Design-Build Only)
03-20
01 32 16.17
Network Analysis Schedules – Major Design/Build Projects
06-19
01 33 23
Shop Drawings, Product Data, and Samples
05-17
01 35 26
Safety Requirements
05-20
01 42 19
Reference Standards
09-19
01 45 00
Quality Control
03-19
01 45 29
Testing Laboratory Services
11-18
01 45 35
Special Inspections
03-19
01 57 19
Temporary Environmental Controls
01-11
01 58 16
Temporary Interior Signage
07-15
01 74 19
Construction Waste Management
09-13
01 81 13
Sustainable Construction Requirements
10-17
01 81 13.01
Sustainability Certification Requirements – LEED NC V3
09-15
01 81 13.02
Sustainability Certification Requirements – LEED NC V4
09-15
01 81 13.11
Sustainability Certification Requirements – LEED HC V3
09-15
01 81 13.21
Sustainability Certification Requirements – GREEN GLOBES
09-15
01 91 00
General Commissioning Requirements
10-15
01 91 00.01
DVA/USACE Projects General Commissioning Requirements
08-19

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
08-16
02 41 00
Demolition
08-17
02 65 00
Underground Storage Tank Removal
08-16
02 82 11
Traditional Asbestos Abatement
04-19
02 82 13.13
Glovebag Asbestos Abatement
09-15
02 82 13.19
Asbestos Floor Tile and Mastic Abatement
09-15
02 82 13.21
Asbestos Roofing Abatement
09-15
02 82 13.31
Asbestos Transite Abatement
09-15
02 82 13.41
Asbestos Abatement for Total Demolition Project
04-15
02 83 33.13
Lead-Based Paint Removal and Disposal
08-16

DIVISION 03 – CONCRETE

03 23 00
Stressing Tendons
07-11
03 30 00
Cast-in-Place Concrete
07-19
03 30 53
(Short-Form) Cast-in-Place Concrete
02-16
03 37 13
Shotcrete
07-19
03 41 13
Precast Concrete Hollow Core Planks
07-11
03 41 33
Precast Structural Pretensioned Concrete
02-19
03 45 00
Precast Architectural Concrete
02-19
03 51 13
Cementitious Wood Fiber Decks
09-11
03 51 16
Gypsum Concrete Roof Decks
09-11
03 52 00
Lightweight Concrete Roof Insulation
05-15
03 55 11
Gypsum Concrete Floor Decks
07-11

DIVISION 04 – MASONRY

04 01 00
Maintenance of Masonry
02-16
04 05 13
Masonry Mortaring
10-17
04 05 16
Masonry Grouting
02-16
04 20 00
Unit Masonry
08-17
04 72 00
Cast Stone Masonry
02-15

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-18
05 21 00
Steel Joist Framing
11-18
05 31 00
Steel Decking
02-16
05 36 00
Composite Metal Decking
10-15
05 40 00
Cold-Formed Metal Framing
05-16
05 50 00
Metal Fabrications
08-18
05 51 00
Metal Stairs
10-15

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17
06 16 63
Cementitious Sheathing
02-16
06 20 00
Finish Carpentry
08-16

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 01 50.19
Preparation for Re-Roofing
02-16
07 08 00
Facility Exterior Closure Commissioning
11-16
07 08 00.01
DVA/USACE Projects Facility Exterior Closure Commissioning
08-19
07 11 13
Bituminous Dampproofing
02-16
07 12 00
Built-Up Bituminous Waterproofing
09-11
07 13 00
Sheet Waterproofing
04-13
07 13 52
Modified Bituminous Sheet Waterproofing
08-16
07 14 21
Latex Mastic Deck Covering
05-15
07 18 13
Pedestrian Traffic Coatings
05-15
07 21 13
Thermal Insulation
10-17
07 21 23
Loose-Fill Insulation
02-16
07 22 00
Roof and Deck Insulation
02-16
07 24 00
Exterior Insulation and Finish Systems
02-16
07 27 26
Fluid-Applied Membrane Air Barrier, Vapor Permeable
02-16
07 27 27
Fluid-Applied Membrane Air Barrier, Vapor Retarding
02-16
07 31 13
Asphalt Shingles
02-16
07 31 26
Slate Shingles
02-16
07 31 29.13
Wood Shingles
02-16
07 32 13
Clay Roof Tiles
02-16
07 40 00
Roofing and Siding Panels
10-15
07 51 00
Built-Up Bituminous Roofing
08-18
07 51 13.11
Hot-Applied Built-Up Asphalt Roofing
08-16
07 51 13.13
Cold-Applied Built-Up Asphalt Roofing
08-16
07 52 16.11
Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
08-16
07 52 16.12
Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
08-16
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
02-16
07 54 16
Ethylene Interpolymer (KEE) Roofing
10-15
07 54 19
Polyvinyl-Chloride (PVC) Roofing
12-18
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
08-16
07 56 00
Fluid-Applied Roofing
05-15
07 57 13
Sprayed Polyurethane Foam Roofing
10-15
07 60 00
Flashing and Sheet Metal
07-14
07 61 16
Batten Seam Copper Roofing
10-15
07 71 00
Roof Specialties
10-15
07 72 00
Roof Accessories
10-15
07 81 00
Applied Fireproofing
10-17
07 84 00
Firestopping
02-16
07 92 00
Joint Sealants
10-17
07 95 13
Expansion Joint Cover Assemblies
02-16

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
08-16
08 11 73
Sliding Metal Fire Doors
02-16
08 14 00
Interior Wood Doors
02-16
08 17 10
Integrated Door Assemblies
02-16
08 31 13
Access Doors and Frames
02-16
08 33 00
Coiling Doors and Grilles
02-16
08 33 13
Coiling Counter Doors
02-16
08 34 36
Darkroom Doors
07-15
08 34 53
Security Doors and Frames
05-15
08 34 59
Vault Doors and Day Gates
02-16
08 35 13.13
Accordion Folding Doors
05-15
08 36 13
Sectional Doors
05-15
08 38 16
Flexible Traffic Doors
02-16
08 41 13
Aluminum-Framed Entrances and Storefronts
08-16
08 42 33
Revolving Door Entrances
05-15
08 44 13
Glazed Aluminum Curtain Walls
04-20
08 51 13
Aluminum Windows
04-20
08 51 13.11
Side-Hinged Aluminum Windows
08-16
08 51 23
Steel Windows
02-16
08 51 69.11
Aluminum Storm Windows
05-15
08 56 19
Pass Windows
02-16
08 56 53
Blast Resistant Windows
02-16
08 56 59
Service and Teller Window Units
02-16
08 56 66
Detention Window Screens
02-16
08 63 00
Metal-Framed Skylights
10-15
08 71 00
Door Hardware
04-20
08 71 13
Automatic Door Operators
02-16
08 71 13.11
Low Energy Power Assist Door Operators
08-16
08 80 00
Glazing
10-15
08 90 00
Louvers and Vents
05-15

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
02-15
09 06 00
Schedule for Finishes
04-15
09 22 16
Non-Structural Metal Framing
06-18
09 23 00
Gypsum Plastering
10-15
09 24 00
Portland Cement Plastering
10-15
09 26 00
Veneer Plastering
10-15
09 29 00
Gypsum Board
04-20
09 30 13
Ceramic/Porcelain Tiling
09-15
09 51 00
Acoustical Ceilings
12-18
09 54 23
Linear Metal Ceilings
10-15
09 63 13
Brick Flooring
02-16
09 63 40
Stone Flooring
10-15
09 65 13
Resilient Base and Accessories
02-16
09 65 16
Resilient Sheet Flooring
05-18
09 65 19
Resilient Tile Flooring
05-18
09 66 13
Portland Cement Terrazzo Flooring
10-15
09 66 16
Terrazzo Floor Tile
10-15
09 67 23.20
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
07-14
09 67 23.30
Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3)
07-14
09.67.23.40
Resinous Poured In Place Resilient Flooring (RES-4)
07-14
09 67 23.50
Resinous (Epoxy Terrazzo) Flooring (RES-5)
07-14
09 67 23.60
Resinous (Urethane and Epoxy Mortar) Flooring (RES-6)
07-14
09 68 00
Carpeting
10-15
09 68 21
Athletic Carpeting
10-15
09 69 00
Access Flooring
10-15
09 72 16
Vinyl-Coated Fabric Wall Covering
10-15
09 72 31
Polypropylene Fabric Wall Covering
05-15
09 84 33
Sound-Absorbing Wall Units
10-15
09 91 00
Painting
01-16
09 94 19
Multicolor Interior Finishing
08-16
09 96 59
High-Build Glazed Coatings
07-14

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
10-15
10 11 23
Tackboards
10-15
10 13 00
Directories
05-15
10 14 00
Signage
10-15
10 21 13
Toilet Compartments
12-15
10 21 16
Shower and Dressing Compartments
08-16
10 21 23
Cubicle Curtain Tracks
05-15
10 22 13
Wire Mesh Partitions
10-15
10 22 19
Demountable Partitions
04-16
10 22 26.13
Accordion Folding Partitions
04-19
10 25 13
Patient Bed Service Walls
01-20
10 26 00
Wall and Door Protection
10-15
10 28 00
Toilet, Bath, and Laundry Accessories
02-16
10 44 13
Fire Extinguisher Cabinets
08-18
10 75 00
Flagpoles
02-16

DIVISION 11 – EQUIPMENT

11 05 12
General Motor Requirements for Equipment
11-11
11 12 00
Parking Control Equipment
02-16
11 17 36
Package Transfer Units
02-13
11 26 00
Unit Kitchens
11-11
11 27 00
Photographic Processing Equipment
11-11
11 40 11
Custom Fabricated Food Service Equipment
11-11
11 40 21
Food Service Equipment-Utility Distribution System
11-11
11 41 00
Food Storage Equipment
11-11
11 41 21
Walk-In Coolers and Freezers
05-15
11 44 00
Food Cooking Equipment
11-11
11 48 00
Cleaning and Disposal Equipment
11-11
11 53 13
Laboratory Fume Hoods
05-15
11 53 23
Laboratory Refrigerators
11-11
11 53 53
Biological Safety Cabinets Laminar Airflow Stations
01-11
11 53 61
Custom Fabricated Laboratory Equipment
11-11
11 53 71
Solution Warming Cabinets
11-11
11 71 01
Medical Washing and Sterilizing Equipment
02-11
11 71 02
Laboratory Washing and Sterilizing Equipment
10-11
11 73 00
Ceiling Mounted Patient Lift System
01-17
11 78 00
Mortuary Equipment
11-11
11 78 13
Mortuary Refrigerators
11-11
11 79 13
Hydrotherapy Equipment
11-11
11 82 19
Packaged Incinerators
11-11

DIVISION 12 – FURNISHINGS

12 22 16
Drapery Track and Accessories
05-15
12 24 00
Window Shades
08-17
12 24 21
Lightproof Shades
05-15
12 31 00
Manufactured Metal Casework
05-15
12 32 00
Manufactured Wood Casework
09-15
12 34 00
Manufactured Plastic Casework
10-15
12 35 70.21
Medication Cabinet
02-16
12 36 00
Countertops
12-18
12 56 70.11
Suspended Table
02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-14
13 17 23
Therapeutic Pools
05-15
13 17 23.11
Therapeutic Pool Accessories
05-15
13 19 13
Kennel Enclosures and Gates
02-16
13 21 29
Constant Temperature Rooms
08-16
13 34 19
Metal Building Systems
08-16
13 49 00
Radiation Protection
02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11
Traction and Winding Drum Dumbwaiter
03-20
14 21 00
New Traction Elevators
10-19
14 21 10
Modernization of Traction Elevators
10-19
14 21 11
Traction Cartlift
03-20
14 24 00
New Hydraulic Elevators
10-19
14 24 10
Modernization of Hydraulic Elevators
10-19
14 24 11
Hydraulic Cartlift
03-20
14 24 24
Renovation Hydraulic Elevator (Custom Written by VACO)
14 26 26
Renovation Traction Elevator (Custom Written by VACO)
14 91 33
Gravity Soiled Linen Chutes
03-20
14 91 82
Gravity Trash Chutes
03-20

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression System
11-16
21 08 00.01
DVA/USACE Projects Commissioning of Fire Suppression Systems
08-19
21 12 00
Manual Dry Standpipe Systems
06-15
21 13 13
Wet-Pipe Sprinkler Systems
06-15
21 13 16
Dry-Pipe Sprinkler Systems
01-15
21-22-00
Clean Agent Fire Suppression Systems
05-15
21-30-13
Electric-Driven, Fire Pumps
05-15
21-30-16
Diesel-Driven, Fire Pumps
05-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
07-16
22 05 12
General Motor Requirements for Plumbing Equipment
09-15
22 05 19
Meters and Gages for Plumbing Piping
09-15
22 05 23
General-Duty Valves for Plumbing Piping
09-15
22 05 33
Heat Tracing for Plumbing Piping
09-15
22 07 11
Plumbing Insulation
09-19
22 08 00
Commissioning of Plumbing Systems
11-16
22 08 00.01
DVA/USACE Projects Commissioning of Plumbing Systems
08-19
22 11 00
Facility Water Distribution
11-19
22 11 23
Domestic Water Pumps
09-15
22 12 16
Facility Elevated, Potable-Water Storage Tanks
09-15
22 13 00
Facility Sanitary and Vent Piping
09-15
22 13 23
Sanitary Waste Interceptors
09-15
22 13 29
Sanitary Sewerage Pumps
09-15
22 13 29.13
Wet-Pit Mounted, Vertical Sewerage Pumps
09-15
22 13 33
Packaged, Submersible Sewerage Pump Units
09-15
22 14 00
Facility Storm Drainage
09-15
22 14 29
Sump Pumps
09-15
22 14 33
Packaged, Pedestal Drainage Pump Units
09-15
22 14 36
Packaged, Submersible, Drainage Pump Units
09-15
22 15 00
General Service Compressed-Air Systems
09-15
22 31 11
Water Softeners
09-15
22 33 00
Electric Domestic Water Heaters
09-15
22 34 00
Fuel-Fired Domestic Water Heaters
09-15
22 35 00
Domestic Water Heat Exchangers
12-16
22 40 00
Plumbing Fixtures
09-15
22 42 26
Commercial Disposers
09-15
22 61 13.74
Dental Compressed-Air Piping
09-15
22 61 19.74
Dental Compressed-Air Equipment
09-15
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
09-15
22 62 19.74
Dental Vacuum and Evacuation Equipment
09-15
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
09-15
22 66 00
Chemical-Waste Systems for Laboratory and Healthcare Facilities
09-15
22 67 19.16
Reverse-Osmosis Water Equipment
09-15
22 67 21
Water Dealkalizing System
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 10
Common Work Results for Boiler Plant and Steam Generation
04-20
23 05 11
Common Work Results for HVAC
02-20
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
02-20
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 51
Noise and Vibration Control for Boiler Plant
04-20
23 05 93
Testing, Adjusting, and Balancing for HVAC
02-20
23 05 93.01
DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC
08-19
23 07 11
HVAC and Boiler Plant Insulation
02-20
23 08 00
Commissioning of HVAC Systems
02-20
23 08 00.01
DVA/USACE Projects Commissioning of HVAC Systems
08-19
23 08 11
Demonstrations and Tests for Boiler Plant
04-20
23 09 11
Instrumentation and Control for Boiler Plant
02-20
23 09 23
Direct-Digital Control System for HVAC
09-11
23 10 00
Facility Fuel Systems
04-20
23 11 23
Facility Natural-Gas Piping
04-20
23 21 11
Boiler Plant Piping Systems
02-20
23 21 13
Hydronic Piping
02-20
23 21 23
Hydronic Pumps
02-20
23 22 13
Steam and Condensate Heating Piping
02-20
23 22 23
Steam Condensate Pumps
04-20
23 23 00
Refrigerant Piping
02-20
23 25 00
HVAC Water Treatment
02-20
23 31 00
HVAC Ducts and Casings
02-20
23 34 00
HVAC Fans
02-20
23 36 00
Air Terminal Units
02-20
23 37 00
Air Outlets and Inlets
02-20
23 38 13
Commercial-Kitchen Hoods
02-20
23 40 00
HVAC Air Cleaning Devices
03-20
23 50 11
Boiler Plant Mechanical Equipment
11-17
23 51 00
Breechings, Chimneys, and Stacks
04-20
23 52 25
Low-Pressure Water Heating Boilers
04-20
23 52 28
Low Pressure Steam Boilers
04-20
23 52 33
Water-Tube Boilers
04-20
23 52 39
Fire-Tube Boilers
04-20
23 56 00
Solar Energy Heating System
03-20
23 57 33
Geothermal Energy – Direct Use (Heating Applications)
03-20
23 64 00
Packaged Water Chillers
03-20
23 65 00
Cooling Towers
03-20
23 72 00
Air-to-Air Energy Recovery Equipment
03-20
23 73 00
Indoor Central-Station Air-Handling Units
03-20
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
03-20
23 81 00
Decentralized Unitary HVAC Equipment
03-20
23 81 23
Computer-Room Air-Conditioners
03-20
23 81 43
Air-Source Unitary Heat Pumps
03-20
23 81 46
Water-Source Unitary Heat Pumps
03-20
23 81 49
Ground-Source Heat Pump
03-20
23 82 00
Convection Heating and Cooling Units
03-20
23 82 16
Air Coils
03-20
23 84 00
Humidity Control Equipment
03-20

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10
Advanced Utility Metering System
02-10

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 13
Medium-Voltage Cables
01-17
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceway and Boxes for Electrical Systems
01-18
26 05 36
Wireways for Radiology Equipment
01-18
26 05 39
Underfloor Raceways for Electrical Systems
01-18
26 05 41
Underground Electrical Construction
01-17
26 05 73
Overcurrent Protective Device Coordination Study
01-18
26 08 00
Commissioning of Electrical Systems
11-16
26 08 00.01
DVA/USACE Projects Commissioning of Electrical Systems
08-19
26 09 23
Lighting Controls
01-18
26 11 16
Secondary Unit Substations
01-18
26 12 19
Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
01-18
26 13 13
Medium-Voltage Circuit Breaker Switchgear
01-17
26 13 16
Medium-Voltage Fusible Interrupter Switches
01-17
26 20 11
Isolated Power Systems
01-18
26 22 00
Low-Voltage Transformers
01-18
26 23 00
Low-Voltage Switchgear
01-17
26 23 13
Generator Paralleling Controls
01-17
26 24 13
Distribution Switchboards
01-18
26 24 16
Panelboards
01-18
26 24 19
Motor Control Centers
01-18
26 25 11
Busways
01-17
26 26 00
Power Distribution Units for Static Uninterruptible Power Systems
01-18
26 27 26
Wiring Devices
01-18
26 29 11
Motor Controllers
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 32 13
Engine Generators
01-18
26 33 53
Static Uninterruptible Power Supply
01-17
26 35 26
Harmonic Filters
01-18
26 36 23
Automatic Transfer Switches
01-17
26 41 00
Facility Lightning Protection
01-17
26 42 00
Cathodic Protection
01-17
26 43 13
Surge Protective Devices
01-17
26 51 00
Interior Lighting
01-18
26 55 71
Medical and Surgical Lighting Fixtures
01-18
26 56 00
Exterior Lighting
01-18

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
09-19
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 05 61
Leased Space, Communication Equipment and Systems
06-15
27 08 00
Commissioning of Communications Systems
11-16
27 08 00.01
DVA/USACE Projects Commissioning of Communications Systems
08-19
27 10 00
Control, Communication and Signal Wiring
06-15
27 11 00
Communications Equipment Room Fittings
06-15
27 15 00
Communications Structured Cabling
01-16
27 31 00
Voice Communications Switching and Routing Equipment
06-15
27 31 31
Voice Communications Switching and Routing Equipment - Extension
06-15
27 32 41
Two-Way Radio Equipment and Systems
10-18
27 41 31
Master Antenna Television Equipment and Systems
06-15
27 51 16
Public Address and Mass Notification Systems
10-18
27 51 23
Intercommunications and Program Systems
06-15
27 52 23
Nurse Call and Code Blue Systems
10-18
27 52 41
Miscellaneous Medical Systems
06-15
27 53 19
Distributed Radio Antenna (Within Building) Equipment and System
10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and Security
10-18
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 08 00.01
DVA/USACE Projects Commissioning of Electronic Safety and Security Systems
08-19
28 13 00
Physical Access Control System
10-11
28 13 16
Physical Access Control System and Database Management
09-11
28 13 53
Security Access Detection
09-11
28 16 00
Intrusion Detection System
10-11
28 23 00
Video Surveillance
09-11
28 26 00
Electronic Personal Protection System
09-11
28 31 00
Fire Detection and Alarm
10-11
28 52 31
Emergency Call System
06-15

DIVISION 31 – EARTHWORK

31 20 00
Earthwork
07-16
31 20 11
Earthwork (Short Form)
10-12
31 23 19
Dewatering
10-12
31 23 23.33
Flowable Fill
10-12
31 32 23
Pressure Grouting Soil Stabilization
10-12
31 62 00
Driven Piles
10-12
31 63 16
Auger Cast Grout Piles
10-12
31 63 26
Drilled Caissons
10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
08-16
32 12 16
Asphalt Paving
09-15
32 14 16
Brick Unit Paving
08-16
32 17 23
Pavement Markings
08-16
32 31 13
Chain Link Fences and Gates
06-18
32 31 40
High Security Fences and Gates
08-16
32 84 00
Planting Irrigation
08-16
32 90 00
Planting
08-16

DIVISION 33 – UTILITIES

33 08 00
Commissioning of Site Utility Systems
11-16
33 08 00.01
DVA/USACE Projects Commissioning of Site Utility Systems
08-19
33 10 00
Water Utilities
03-17
33 30 00
Sanitary Sewer Utilities
06-13
33 40 00
Storm Sewer Utilities
12-17
33 46 13
Foundation Drainage
10-11
33 51 00
Natural-Gas Distribution
10-11
33 63 00
Steam Energy Distribution
09-17

DIVISION 34 – TRANSPORTATION

34 71 13
Passive Vehicle Barriers
04-18
34 75 13.13
Active Vehicle Barriers
08-16

DIVISION 48 – Electrical Power Generation

48 14 00
Solar Energy Electrical Power Generation System
10-17
48 15 00
Wind Energy Electrical Power Generation System
10-17
48 16 23
Geothermal Energy Electrical Power Generation System
10-17

00 01 10-1

File details come from the government source that posted it. Updated .