STATEMENT OF WORK

REFURBISH IRRIGATION WELL

FORT LYON NATIONAL CEMETERY

15700 COUNTY ROAD HH, LAS ANIMAS, CO 81038-9426

A. The Contractor: Shall furnish all labor, material, equipment, and supervision necessary to pull and reinstall the three irrigation submersible pumps with new stainless steel riser pipes;

video record the well casing; and refurbish the well casing by scrub and jet at Fort Lyon

National Cemetery in accordance with drawings, specifications, and per applicable standards and requirements.

B. System Description and Background:

1. The irrigation well, established in 2011, has a design capacity of 600 gallons per minute

(gpm) at about 250 feet of total dynamic head (TDH), consisting of two (2) Grundfos

300S250-7, 25-horsepower (HP) submersible pump sets (6-inch diameter) providing 300 gpm each and a Grundfos 16S15-14, 2-HP pressure maintenance submersible pump set.

The 25-HP pump sets are 74 inches in length and the pump setting depth is 36 feet from the bottom of the pump sets. The well depth is 40 feet total, with 36-inch steel casing and a screened interval of 23 to 38 feet.

2. The well discharge and control equipment are housed in a pre-fabricated wooden structure, approximately 14 feet by 9 feet, with a 2-foot by 4-foot skylight for pump access.

3. The pumps were replaced in 2018 with stainless steel because of significant corrosion but were reinstalled on the same carbon steel riser pipe.

C. The Work: The Work shall include, but shall not be limited to the following (not necessarily in the order indicated):

1. The Contractor shall disassemble the pumps’ discharge heads and pull all three riser pipes and pump. Access shall be through the existing skylight. The Contractor shall selectively disassemble and secure the existing pump sets until such time as they are reinstalled. Inspect all equipment for corrosion and notify the COR of any discovered issues.

2. Perform an initial video and camera survey to verify existing conditions: Verify the condition of the well casing/screen and percent blockage of the screened interval. Verify the static water depth. Provide two copies of the DVD with video and pictures: one to the

COR and one to the District Engineer in Denver, CO.

3. Remove incrustation by mechanically scrubbing the length of well casing from pump setting height to TD with plastic-bristled scratcher. Jet well while scratching and remove loosened material by air lift, bailing, or other means. Collect and dispose of debris off site, and control discharge of wastewater to prevent site erosion.

4. Perform a second video survey to verify the condition of the refurbished well. Provide two copies of the DVD with video and pictures: one to the COR and one to the District

Engineer in Denver, CO.

5. Reassemble pump sets, pump cables, and airline. Reset the pump sets reset at the original depth (36 feet, at least 4 feet from the well bottom) with new 6-inch 304 stainless steel flanged riser pipe for the two (2) 25-HP pump sets from pump setting to well discharge.

Install new 1-1/4-inch riser pipe (of the same material) for the pressure maintenance pump.

6. Connect, install, and set equipment including but not limited to:

a. Mechanical and electrical disconnection the pumps and motors, and riser pipe assembly.

b. Hoisting/rigging for the installation of the pump, pump motor, and associated piping.

c. All labor, material, and equipment associated with testing the completed assembly and providing documented test results.

7. After completion of all equipment, component, and material installations, perform a full system functional test and demonstrate to the COR the full operation/functionality of the newly repaired well. Perform a pumping test in accordance with industry standards to determine actual pumping capacity (GPM), total head (ft), and pumping level (ft).

D. General Conditions:

1. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

2. Thoroughly clean up the work area at the end of each day’s work, and at completion of the project. Leave premises clean and free of waste, scrap, used equipment, or other material intentionally or incidentally delivered to the site by Contractor or Contractor’s personnel. Haul away & dump debris and waste to an approved disposal site.

3. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site not to be removed and do not unreasonably interfere with the work required under this contract. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting

Officer.

4. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

5. All utilities required for the continuous operation of all existing facilities shall be maintained in service at all times except when disruptions are needed. The Contractor shall inform the Cemetery Director and the Contracting Officer (CO) in writing for such disruptions and obtain approval from the CO in writing at least 2 weeks prior to such need. When option exists, implement options to minimize interruption of services to the facilities.

6. The Contractor shall coordinate with the Cemetery Director for parking, material storage, temporary portable restroom facilities, and any other needs for the work. Public access to the National Cemetery shall not be impaired.

7. The Contractor shall assume sole responsibility for safety of all persons on or about the construction site, in accordance with applicable laws and codes. Guard all materials in accordance with the safety provisions according to OSHA and Associated General

Contractors of America (AGC).

E. Standards of Employee Conduct:

1. The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work, appearance, and procedures performed by the contractor at this cemetery shall reflect this nation’s concern for those interred there. Due to the sensitive mission of the cemetery, contractor personnel must exercise and exhibit absolute decorum, composure, and stability at all times.

2. Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here, while performing work in the National Cemetery.

These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 5901.

3. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine. Uniform shirts and hats are preferred. Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Protective/safety clothing and shoes shall meet or exceed OSHA and state requirements.

4. Behavior and language must be appropriate, reverent, and respectful at all times.

5. Eating and drinking (except water) is prohibited in the work areas and within sight of a committal shelter during a service.

6. Use of intoxicating beverages, any tobacco products, and illegal drugs on the Cemetery premises is strictly prohibited.

7. Contractor personnel shall not lean, sit, or stand on or against headstones or monuments.

No tools, equipment or other items will be placed or leaned on headstones or monuments.

8. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The

Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the

Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the

COR and is later found invalid and/or unreasonable by the Contracting Officer.

F. Time of Completion: The project shall be completed within 45 calendar days after Award.

Work outside of the Cemetery’s normal operating hours of 7 am to 4:30 pm CT, Monday through Friday, may be permitted only by prior approval of the COR. Requests shall be submitted at least three (3) working days in advance.

G. Code Compliance: All work shall be performed in accordance with the specifications. It shall be the Contractor's responsibility to comply with all the applicable local, state and federal laws and regulations. The Contractor shall apply and obtain all applicable permits to comply with local, State and Federal regulations and requirements. The Contractor shall remove and dispose of all waste materials and construction debris and comply with all applicable local, State and Federal regulations and requirements. All waste materials and debris specified shall be removed from the Cemetery grounds by the Contractor at its own expenses, including all applicable permits and fees.

H. Contractor Quality Control:

1. The Contractor shall guarantee that all work done under this contract shall be free from defaults and no faulty materials or workmanship with one (1) year warranty. The

Contractor hereby agrees to repair or replace deficiencies within the specified time frame by the direction of the CO at Contractor's own expense and shall be corrected to the satisfaction of the Government.

2. A competent and experienced English-speaking Contractor Supervisor/Superintendent shall be provided by the Contractor whenever work is being performed, other than trash and debris pick-up. The Contractor Supervisor shall review and approve submittals, ensure all specifications are being met, inspect the quality of work performed, ensure contract work does not conflict with ceremonies and funerals, ensure employees are is adequately supervised and proper conduct maintained, and certify the completed work for payment and other purposes.

I. Submittals After Award: Submit manufacture’s literature for all products and materials to the

COR for review/approval.

J. Attachments:

1. Attachment 1, Pictures of corroded equipment (just prior to replacement);

2. Attachment 2, Original installation drawings.

K. Project completion: The project site shall be protected and/or restored to a condition equal to that existing prior to the commencement of work. Upon completion of contract, deliver work complete and undamaged. Existing work disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

END OF STATEMENT OF WORK

ATTACHMENT 1

PICTURES

Figure 1: Pulling pump (in 2018) Figure 2: Riser pipe laid out

Figure 3: Close-up of corrosion (on short section) Figure 4: Corrosion (on short section)