This document is a presolicitation notice from the Department of Veterans Affairs seeking statements of qualifications from architect-engineering firms for design services related to an EHRM Infrastructure Upgrades project at the Western Colorado Health Care System in Grand Junction, Colorado. The project scope involves network infrastructure installation, IT system renovations and upgrades, with a magnitude of construction between $10-20 million. Statements of qualifications are due by June 9, 2022. The selection will evaluate firms based on specialized experience designing similar healthcare IT and network infrastructure projects, professional qualifications, capacity, past performance, and knowledge of the project locality. The contract is set aside for service-disabled veteran-owned small businesses. The selected firm must complete design and be bid-ready within 271 calendar days of award.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements