- Z2DA--Provide Dedicated Steam Supply Line to SPS
- Solicitation number
- 36C24825R0101
About this file
These are mechanical engineering design drawings for a dedicated steam supply line project at the San Juan VA Medical Center in Puerto Rico. The 12-page drawing set (Sheets GI001-M601) details the renovation and installation of new steam and condensate piping across multiple building levels, including sub-basement, basement, and boiler plant roof levels. Key technical specifications include installing high-pressure steam (110 PSI) and medium-pressure steam (50 PSI) piping, pressure reducing valves (PRV-05), steam traps, expansion loops, and flow meters. The project involves removing existing abandoned piping, routing new steam lines, providing steam trap assemblies, and ensuring proper support and insulation for the new piping infrastructure. The design is prepared for the U.S. Department of Veterans Affairs, with the project number 672-23-108, and is marked as a 100% design submission dated 12-02-2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
NOT TO SCALE
AREA MAP
NOT TO SCALE
TRUE
NORTH
TRUE
NORTH
PLAN
NORTH
PLAN
NORTH
PROJECT LOCATION
PROJECT LOCATION
PROVIDE DEDICATED STEAM
SUPPLY LINE TO SPS
PROJECT NUMBER: 672-23-108
100% DESIGN SUBMISSION
SAN JUAN VA MEDICAL CENTER
10 CASIA STREET
SAN JUAN, PR 00921 33201 USA
SHEET INDEX
GI001
SHEET
NO. DRAWING TITLE
GENERAL
SHEET
NO.
COVER SHEET
MECHANICAL
MECHANICAL LEGEND, ABBREVIATIONS, AND NOTESM001
SUB-BASEMENT LEVEL - DEMOLITION MECHANICAL PLANMD101
SUB-BASEMENT LEVEL - ENLARGED DEMOLITION MECHANICAL PLANMD401
SUB-BASEMENT LEVEL - NEW WORK MECHANICAL PLANM101
MECHANICAL NOTESM002
BASEMENT LEVEL - NEW WORK MECHANICAL PLANM102
BOILER PLANT ROOF LEVEL - NEW WORK MECHANICAL PLANM103
SUB-BASEMENT LEVEL - ENLARGED NEW WORK MECHANICAL PLANM401
MECHANICAL DETAILSM501
MECHANICAL DETAILSM502
MECHANICAL SCHEDULESM601
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
COVER SHEET
GI001
11/25/2024 panderson Text Box
ISSUED FOR CONSTRUCTION
panderson Rectangle
PIPING SYMBOLS AND ABBREVIATIONSHVAC SYMBOLS AND ABBREVIATIONS
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
ROUND DUCT SIZE TAG (DIAMETER)
DUCT BEING DEMOLISHED
RECTANGULAR SUPPLY/OUTSIDE AIR
DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR
DUCT RISE
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR
DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP ROUND EXHAUST/RELIEF AIR DUCT RISE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
CONNECT NEW TO EXISTING
EXISTING PIPE TAG
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
PIPE SIZE TAG (DIAMETER)
LIMIT OF DEMOLITION
NEW WORK NOTES
DEMOLISHED WORK NOTES
ACCESS DOOR ON TOP OF DUCT
ACCESS DOOR ON SIDE OF DUCT
ACCESS DOOR ON BOTTOM OF DUCT
SHEET NOMENCLATURE
M P # # #
SERIES
0 - SYMBOLS AND NOTES
1 - PLAN VIEWS
3 - ELEVATIONS AND SECTIONS
4 - LARGE SCALE - PLANS AND SECTIONS
5 - SCHEMATICS AND DETAILS
6 - SCHEDULES
8 - CONTROLS
EQUIPMENT
TAG
EQUIPMENT TAG
SYMBOL
TYPE (SEE SCHEDULE)
CFM
ACTIVE SLOT LENGTH
(PLENUM LENGTH)
GRILLES, REGISTERS & DIFFUSERS TAG
DAMPER TAGS AND ABBREVIATIONS
PROJECT ABBREVIATIONS
DATA DEVICE TAGS AND ABBREVIATIONS
MECHANICAL EQUIPMENT TAGS
CONDENSER WATER SUPPLY (FROM TOWER)
CONDENSER WATER RETURN (TO TOWER)
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PUMPED CONDENSATE DISCHARGE
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
STEAM VENT PIPE
REFRIGERANT SUCTION AND REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
MAKE-UP WATER
DRAIN PIPING
CONDENSATE DRAIN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP SUCTION
CONTINUOUS BLOWDOWN
BOILER WATER SAMPLE
BOILER BLOWOFF
FEEDWATER SAMPLE (FROM DEAERATOR)
OVERFLOW
COMPRESSED AIR
NATURAL GAS MAIN FUEL
NATURAL GAS IGNITER FUEL
FUEL OIL SUPPLY
FUEL OIL RETURN
SOFTENED WATER
SUPPLY
DIFFUSER
NECK SIZE
CFM
RETURN
GRILLE
EXHAUST
GRILLE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
DESCRIPTION DESCRIPTION
M
VALVE SYMBOLS AND ABBREVIATIONS
SCHEMATIC VIEW ELEVATION VIEW NAME AND ABBREVIATIONS
GATE VALVE - GV
GLOBE VALVE - GLBV
CHECK VALVE - CV
ANGLE GLOBE VALVE - AGLBV
BUTTERFLY VALVE - BFV
BALL VALVE - BV
THREE WAY VALVE - TWV
PRESSURE REGULATING VALVE - PRV
PRESSURE SAFETY VALVE - PSV
PLUG VALVE - PV
WYE STRAINER
WYE STRAINER (WITH BALL VALVE
AND HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN
AND QUICK-COUPLE HOSE CONNECTOR
FLEXIBLE CONNECTION
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY
VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL
VALVE
THREE-WAY TWO POSITION CONTROL
VALVE
AUTOMATIC BALANCING CONTROL
VALVE
CIRCUIT SETTER VALVE
WATER BALANCE DEVICE
GATE VALVE WITH GLOBE-VALVED
BYPASS
CONTROL VALVE (CV) - FLOAT-
OPERATED
WATER LEVEL CONTROLLER
FLOW METER
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
EXPANTION LOOP - SEE SCHEDULE AND DETAIL
STEAM TRAP INCLUDING PIPING ACCESSORIES
SEE DETAIL
THERMOMETER
PRESSURE GAGE
VENTURI FLOW METER
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
UNION
AUTOMATIC AIR VENT
MANUAL AIR VENTMV
QUICK-COUPLE HOSE CONNECTOR
SYMBOLS SYMBOLS NAME
LPS
LPR
MPS
MPR
HPS
HPR
PCD
SV
HWS
GHS
HWR
GHR
RS/RL
CWS
CWR
CHS
CHR
MW
D
CD
FWPD
FWPS
CTPD
CTPS
BO
CBD
BWS
FWS
OFL
A
G
G(I)
FOS
FOR
SW
DCW
DHW
(E) 2"
(E) 2"
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
HUMIDITY SENSOR
HUMIDISTAT
TEMPERATURE & HUMIDITY
SENSOR
DISPLAY
THERMOSTAT
SENSOR
PRESSURE SENSOR
RTU-XX
TU-XX
(E)RTU-XX
(E)TU-XX
VAV BOX
48"x2 1/2"
(E)LINEAR BAR
GRILLE
6"Ø A
8"Ø
B
6"x6" C
Room
22"x8"
22"/8"
22"Ø
(E)22"Ø
FD
SD
AVD
MVD
BDD
FSD
MANUAL VOLUME
DAMPER
BACKDRAFT DAMPER
COMBINATION
FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
AUTOMATIC VOLUME
DAMPER
AD
TH
S
DIS
T
H
CO2
CO
HS
NO2
PS
IRH INFRARED HEATER
IU INDUCTION UNIT
JB JUNCTION BOX
JL JUSTIFIED LEFT
JR JUSTIFIED RIGHT
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LOOP LOCK ONLY OPEN POSITION
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOCP MINIMUM OVERCURRENT PROTECTION
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD
AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
QNTY QUANTITY
RA RETURN AIR
RAF RETURN AIR FAN
RAT RETURN AIR TEMPERATURE
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS/RL REFRIGERANT SUCTION AND
REFRIGERANT LIQUID
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SEA SMOKE EXHAUST AIR
SEN SENSIBLE HEAT
SF SUPPLY FAN
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
TAB TESTING, ADJUSTING, BALANCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
V VENT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VP VACUUM PUMP
VR VACUUM (STEAM CONDENSATE)
RETURN
W WATTS
Wb WET-BULB (TEMPERATURE)
WFMS WATER FLOW MEASURING STATION
WG WATER GAGE
WPD WATER PRESSURE DROP
YR YEAR
EJ EXPANSION JOINT
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FCU FAN COIL UNIT
FD FLOOR DRAIN
FF FINAL FILTER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FLAT ON TOP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HTX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACD AUTOMATIC CONTROL DAMPER
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR-HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
AS AIR SEPARATOR
B BOILER
BAS BUILDING AUTOMATION SYSTEM
BBR BASE BOARD RADIATOR
BE BOTTOM ELEVATION
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CV CONSTANT AIR VOLUME
CC COOLING COIL
CD COOLING COIL CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CH CHILLER
CHP CHILLED WATER PUMP
CHS/R CHILLER WATER
CL CENTER LINE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER
REPRESENTATIVE
CP CONDENSATE PUMP
CST CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CWP CONDENSER WATER PUMP
DDC DIRECT DIGITAL CONTROLS
DIA DIAMETER
DI DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
ES EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
NECK SIZE
CFM
NECK SIZE
CFM
(S) STEAM
(H) HVAC
(P) PIPING
(D) DEMO
MECHANICAL
SERIES
LC
EL-00
DST-00
WINTER 69.4°F DB
SUMMER 91.0°F db/77.7°F wb
PERFORMANCE AND DESIGN DATA
OUTDOOR AIR CONDITIONS
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES
M001
MECHANICAL SHEET INDEX
SHEET
NUMBER SHEET TITLE
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES
M002 MECHANICAL NOTES
MD101 SUB-BASEMENT LEVEL - DEMOLITION MECHANICAL PLAN
MD401 SUB-BASEMENT LEVEL - ENLARGED DEMOLITION MECHANICAL PLAN
M101 SUB-BASEMENT LEVEL - NEW WORK MECHANICAL PLAN
M102 BASEMENT LEVEL - NEW WORK MECHANICAL PLAN
M103 BOILER PLANT ROOF LEVEL - NEW WORK MECHANICAL PLAN
M401 SUB-BASEMENT LEVEL - ENLARGED NEW WORK MECHANICAL PLAN
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
11/25/2024 panderson Text Box
ISSUED FOR CONSTRUCTION
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
MECHANICAL NOTES
M002
A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS, BOTH
EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS WELL AS
THOSE WHICH CAN BE REASONABLY ANTICIPATED INCLUDING, BUT NOT
LIMITED TO ARCHITECTURAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND
OTHER SYSTEMS INVOLVED ON THIS PROJECT.
B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM AND
SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN THE UNITED
STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION
LIBRARY, INCLUDING BUT NOT LIMITED TO THE PHYSICAL SECURITY MANUAL,
HVAC DESIGN MANUAL, AND STEAM, HEATING HOT WATER, AND OUTSIDE
DISTRIBUTION SYSTEM DESIGN MANUAL. ALL WORK SHALL ALSO CONFORM
TO ALL FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO
THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL
CODE.
C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR
RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A LEVEL OF
QUALITY AND WORKMANSHIP CONSISTENT WITH THESE DOCUMENTS. ANY
DEVIATIONS BETWEEN THE INSTALLATION INSTRUCTIONS AND THESE
DOCUMENTS WILL BE BROUGHT TO THE ATTENTION TO THE COR BEFORE ANY
COURSE OF ACTION BY THE CONTRACTOR IS INITIATED, INCLUDING
PURCHASE OF EQUIPMENT.
D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND ILLUSTRATED
IN THESE DRAWINGS. LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS
INDICATED ON THESE DRAWINGS ARE APPROXIMATE AND SUBJECT TO
ADJUSTMENTS IN THE FIELD. OFFSET DUCTS, PIPING, AND SHIFT EQUIPMENT
AS REQUIRED TO AVOID INTERFERENCE AND CONFLICTS IN THE FIELD.
COORDINATE DUCT AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH
PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING
STRUCTURAL MEMBERS.
E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO
BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL VISIT THE
SITE AND COMPLETE MEASURED SURVEY AND CREATE LAYOUT DRAWINGS AS
REQUIRED BY THE SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL
LAYOUT DRAWINGS ARE APPROVED BY THE COR.
F. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS. WHERE
DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES TO
ACCOMMODATE LINER.
G. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.
H. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY BUILDING
STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL MEMBERS
WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.
I. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED APPURTENANCES
SHALL NOT RESTRICT EQUIPMENT SERVICE AND MAINTENANCE ACCESS.
EXISTING SUPPORTS SHALL BE MODIFIED TO PROVIDE FOR EQUIPMENT
SERVICE AND MAINTENANCE ACCESS.
J. DUCT SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH SMACNA HVAC
DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE -SECOND EDITION
EXCEPT THAT HANGER WIRE SHALL NOT BE USED TO SUPPORT DUCTS OR
EQUIPMENT, AND HANGERS THAT REQUIRE PENETRATION OF DUCT WITH
BOLTS, RIVETS, SCREWS, WIRES OR ANY OTHER FASTENER SHALL NOT BE
USED.
K. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER SUPPORT FOR
DUCT AND PIPING TO COORDINATE WITH NEW EQUIPMENT AND WALL
LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS, ETC) AT EQUIPMENT AND ON
EACH SIDE OF NEW WALLS SO FULL WEIGHT OF DUCT AND PIPING IS
SUPPORTED FROM STRUCTURE AND EQUIPMENT AND NEW WALLS BEAR NO
WEIGHT.
L. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL EQUIPMENT,
DEVICES, AND ALL APPURTENANCES REQUIRING POWER TO THE COR FOR
REVIEW AND APPROVAL AS PART OF COORDINATION FOR THIS PROJECT. LIST
ALL ELECTRICAL REQUIREMENT CHARACTERISTICS, INCLUDING BUT NOT
LIMITED TO VOLTAGE, AMPERAGE, PHASE, DISCONNECTING MEANS, OVER
CURRENT PROTECTION AND ALL CHARACTERISTICS FOR A FULLY
FUNCTIONAL AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS
FOR VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.
M. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT SHALL BE
RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT RESULTS IN A
FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM. CONTRACTOR SHALL
RELOCATE ALL EXISTING CONTROLS, SENSORS, PROBES, OR OTHER DEVICES
AND PROVIDE NEW WIRING, CONDUIT, AND/OR TUBING TO EXTEND SUCH
DEVICES AS NECESSARY TO PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL
OR BETTER THAN EXISTING. PROTECT AND STORE ALL SUCH RELOCATED
DEVICES.
GENERAL MECHANICAL NOTES DEMOLITION MECHANICAL NOTES
A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM THE
PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS, ELECTRICAL
CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS, ACCESSORIES AND
ALL APPURTENANCES THAT ARE RENDERED USELESS OR ABANDONED BY
THE REMOVAL OF THE INDICATED EQUIPMENT.
B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK, PIPING,
EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR SHALL
PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM DAMAGE.
CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT, PIPING, EQUIPMENT,
AND ANY OTHER DEVICE FROM CONSTRUCTION DUST AND DEBRIS.
C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT IS IN-
SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY
INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS TO THE
SATISFACTION OF THE COR AND HOSPITAL STAFF.
A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN
CONTINUOUS OPERATION OF THE HOSPITAL.
B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE WORK OF
THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF NO LONGER THAN
ONE HOUR. CONTRACTOR SHALL GIVE REASONABLE NOTICE TO COR
BEFORE ANY SUCH SHUTDOWN OR INTERRUPTION.
C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE WORK
DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL SCHEDULE THE
EVENT A MINIMUM OF 3 WEEKS PRIOR TO COMMENCING WORK. ALL SUCH
SHUTDOWNS AND INTERRUPTIONS SHALL BE MINIMIZED AND SHALL UTILIZE
WEEKENDS, FEDERAL HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL
OPERATIONS ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE
COR.
D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE
HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED
CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE DOCUMENTS.
AS PART OF SCHEDULING AN INTERRUPTION OR SHUTDOWN, THE
CONTRACTOR SHALL PROVIDE THE COR WITH A DETAILED SHUTDOWN PLAN
INDICATING THE SYSTEMS AFFECTED, INCLUDING BUT NOT LIMITED TO
ARCHITECTURAL, ELECTRICAL, MECHANICAL, PLUMBING, FIRE PROTECTION,
AND OTHER SYSTEMS INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO
BE PERFORMED, THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING
AND MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS
CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE
PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE THE
EVENT FOR APPROVAL.
E. CONTROL OF ALL CONSTRUCTION-ASSOCIATED HAZARDS THAT AFFECT
FACILITIES, OCCUPANTS OR SERVICES SHALL BE ADDRESSED BY THE
CONTRACTOR AS PART OF THE PRE-CONSTRUCTION RISK ASSESSMENT.
CONTRACTOR SHALL COORDINATE ALL WORK WITH THE FACILITY SAFETY
MANAGER/OFFICER. CONTRACTOR SHALL FURNISH ALL MATERIALS AND
MEANS AND METHODS TO MEET THE REQUIREMENTS IN SPECIFICATION
SECTION 013526 SAFETY REQUIREMENTS, INCLUDING FILTRATION,
MAINTAINING NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, DUST
CONTROL, AND USE OF A PORTABLE CEILING ACCESS MODULE IN AREAS
OUTSIDE THE CONSTRUCTION AREA. THE CONTRACTOR SHALL SUBMIT PLAN
IN ACCORDANCE WITH THESE DOCUMENTS.
PHASING MECHANICAL NOTES
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
A. DATA LINK COMMUNICATION IS ETHERNET (ISO 8802-3) AND BACNET/IP.
B. GROUND CABLE SHIELDS, DRAIN CONDUCTORS, AND EQUIPMENT TO
ELIMINATE SHOCK HAZARD AND TO MINIMIZE GROUND LOOPS, COMMON-
MODE RETURNS, NOISE PICKUP, CROSS TALK, AND OTHER IMPAIRMENTS.
C. CABLE CONDUCTORS SHALL PROVIDE PROTECTION AGAINST INDUCTION IN
CIRCUITS. CROSSTALK ATTENUATION WITHIN THE SYSTEM SHALL BE IN
EXCESS OF -80 DB THROUGHOUT ALL FREQUENCY RANGES USED.
D. CABLE RUNS: KEEP CABLE RUNS AS SHORT AS POSSIBLE. ALLOW EXTRA
LENGTH FOR CONNECTING TO THE TERMINAL BOARD. DO NOT BEND FLEXIBLE
COAXIAL CABLES IN A RADIUS LESS THAN TEN TIMES THE CABLE OUTSIDE
DIAMETER.
E. LABEL SYSTEM’S CABLES ON EACH END. TEST AND CERTIFY CABLES IN
WRITING TO THE VA BEFORE CONDUCTING PROOF-OF-PERFORMANCE
TESTING. MINIMUM CABLE TEST REQUIREMENTS ARE FOR IMPEDANCE
COMPLIANCE, INDUCTANCE, CAPACITANCE, SIGNAL LEVEL COMPLIANCE,
OPENS, SHORTS, CROSS TALK, NOISE, AND DISTORTION, AND SPLIT PAIRS ON
ALL CABLES IN THE FREQUENCY RANGES USED. MAKE AVAILABLE ALL CABLE
INSTALLATION AND TEST RECORDS AT THE DEMONSTRATION TO THE VA.
F. POWER WIRING SHALL NOT BE RUN IN CONDUIT WITH COMMUNICATIONS
TRUNK WIRING OR SIGNAL OR CONTROL WIRING OPERATING AT 100 VOLTS
OR LESS.
G. PROVIDE NEMA 4 ENCLOSURE FOR EXTERIOR LOCATIONS.
H. PROVIDE BACNET-COMPLIANT ROUTER, BRIDGE, SWITCH, HUB, MODEM,
GATEWAY, INTERFACE, AND SIMILAR COMMUNICATION EQUIPMENT TO
INTEGRATE INTO THE EXISTING SYSTEM.
I. FIT ALL EQUIPMENT CONTAINED IN CABINETS OR PANELS WITH SERVICE
LOOPS, EACH LOOP BEING AT LEAST 300 MM (12 INCHES) LONG. EQUIPMENT
FOR FIBER OPTICS SYSTEM SHALL BE RACK MOUNTED, AS APPLICABLE, IN
VENTILATED, SELF-SUPPORTING, CODE GAUGE STEEL ENCLOSURE. CABLES
SHALL BE SUPPORTED FOR MINIMUM SAG.
J. OPTICAL DIGITAL COMMUNICATION FIBER, IF USED, SHALL BE MULTIMODE OR
SINGLE MODE FIBER, 50/125 MICRON FOR MULTIMODE OR 10/125 MICRON FOR
SINGLE MODE MICRON WITH SC OR ST CONNECTORS AS SPECIFIED IN
TIA-568-C.1. TERMINATIONS, PATCH PANELS, AND OTHER HARDWARE SHALL
BE COMPATIBLE WITH THE SPECIFIED FIBER. FIBER-OPTIC CABLE SHALL BE
SUITABLE FOR USE WITH THE 100BASE-FX OR THE 100BASE-SX STANDARD (AS
APPLICABLE) AS DEFINED IN IEEE STD 802.3.
GENERAL CONTROL ELEMENT REQUIREMENT
11/25/2024 panderson
"X
B O
D =4
'-1
UP
34"∅ P.A.
16"∅
P.A
20"∅
20"∅ P.A. UP
26"∅
"X
B O
D =4
'-1 0"
"X
"X
D N
20"X10"
B O
D =6
'-0
B O
D =6
'-7
UP
UP
BOD=4'-5"B
O
D =1
'-6
S.A. UP
S.A. UP
UP
B O
D =1
'-8
D U
C T
S
IL
E N
C E
R
BOD=3'-6"
F.D. @ BSMT. FL. SLAB
"∅ BOD=1'-0"
MD-1
22"∅ S.A. UP
26"∅
BOD=2
'-9
BOD=1'-6"
DUCT
20"∅
20"∅
B .O
.D
4' -0
16"∅
18"∅
SILENCER
22"∅
22"∅
38"∅
42"∅
BOD=6'-4"
B O
D =1
6' -0
BOD=18'-0"BOD=18'-0"
BOD=18'-0"
B .O
.D
'-5
B .O
.D
'-6
B.O.D.=15'-6"
18"∅ B.O.D.=17'-7"
22"∅
UP
B O
D =1
4' -6
56"X17"
BOD=18'-0"
22"∅
BOD=18'-0"
BOD=5'-3"
16"X11" UP
"X
UP
UP
F A
N
LOUVER
20"X14" 18"X8"
18"X12" B O
D =3
'-5
96"X60"
LOUVER
EF-6
CU #4 CU #3 CU #2 CU #1
CU
CU
FRAME
C.P.
PIT #2
DS
(TYP.3)DS
CU
CU
DS
DS
CU
FRAME
DS
DS
DS
CU
DS
DS
CU
FRAME
DS
CU
D S
DS
DS
PIT #4
1-EF-1
CU
DS
DS
DS
DS
A/C UNIT
12,000 BTU
T
O N
C U
ROOM #165
FSD-1 FD-1FD-1 FSD-1
ROOM #167
AH-9
HTP-2
HTP-1
SF-1B
FD
HWH-1R HWH-2R
CHWP
HWSP
HM-1
XT-1
AS-1
TGM
INVERTER
12,000 BTU
CU
(TYP.3)
REFRIGERANT
COMPRESSOR
REFRIGERANT
CU
TGM INVERTER
18,000 BTU CU
FRAME (TYP.)
TGM-DC
INVERTER 12,000
BTU
18,000 BTU
A/C UNIT
SF-1A
(ON FLOOR)
SF-1C
(ON FLOOR)
A/C UNIT
36,000 BTU
A/C UNIT
12,000 BTU
CONTROL
PANELAHU-1
(NUCLEAR
MEDICINE)
A H
U -1
(P E
T /C
T
COMPRESS AIR TANK
REFRIGERANT COMPRESSOR
5 TON
CU
A/C UNIT TGM
INVERTER
18,000 BTU
A/C UNIT
12,000 BTU
A/C UNIT
12,000 BTU
A/C UNIT
A/C UNIT
A/C UNIT
12,000 BTU
A/C UNIT
18,000 BTU
F
G
H
I
J
K
L
M
N
P
Q
R
S
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 201.3 2.3 3.4 4.5 5.5 6.6 7.7 8.8 9.8 12.2 13.3 14.3 15.4 16.5 17.6 18.8 19.8
MD401
(E)2 1/2"ø HPR
(E)PRV-07
(E )2
"ø H
P S
(E)PRV-06
(E)PRV-05
(E)2"ø HPS
(E)3/4"ø HPR
(E)2"ø HPS
(E)3/4"ø HPR
(E)2"ø HPS
(E )2
"ø M
P S
(E)2"ø MPS
(E)1"ø HPR(E)1"ø HPR
(E)2"ø MPS
(E)2"ø HPS
(E )2
"ø M
P S
(E)2"ø HPR (E)2"ø MPS
(E )3
"ø H
P S
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
SUB-BASEMENT LEVEL - DEMOLITION MECHANICAL PLAN
MD101
1/16" = 1'-0"MD101
1 SUB-BASEMENT LEVEL - DEMOLITION MECHANICAL PLAN
0 16' 32'8'
GENERAL NOTES
A. CONTRACTOR SHALL NOT REMOVE ANY STEAM PIPING UNTIL ALL OF THE
NEW PIPING IS INSTALLED AND READY FOR SHUTDOWN FOR
RECONNECTION.
11/25/2024 panderson
34"∅ P.A.26"∅
"∅ BOD=1'-0"
MD-1
22"∅ S.A. UP
3"∅ CHS
& CHR
4"∅ CHS
& CHR
UP
10"∅ CHS
& CHR
UP
UP
3/4"∅ CHS
& CHR
3/4"∅ CHS
& CHR
UP
J
K
L
M
N
P
9 10 11 12 13 149.8 12.2 13.3 14.3
(E )3
"ø H
P S
(E)PRV-07(E)2"ø MPS
(E )2
"ø H
P S
(E )2
"ø M
P S
(E)1"ø HPR
(E)2"ø MPS
(E )2
"ø H
P S
(E)PRV-05
(E)PRV-06
(E)3/4"ø HPR
(E)2"ø HPS
(E)2"ø HPS
(E)1 1/2"ø MPS
(E)2"ø HPS
(E)2"ø HPS
(E)2"ø MPS
(E )2
/2
"ø H
P R
(E)2"ø MPS
(E)3/4"ø HPR
(E)2 1/2"ø HPR
(E)2 1/2"ø HPR
(E)1"ø HPR
(E)2 1/2"ø HPR
MD401
MD401
MD401
MD401
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
SUB-BASEMENT LEVEL - ENLARGED DEMOLITION MECHANICAL
PLAN
MD401
1/8" = 1'-0"MD401
1 SUB-BASEMENT LEVEL - ENLARGED DEMOLITION MECHANICAL PLAN
8' 16'4'0
# MD401 DEMOLITION NOTES
NOTE
NUMBER NOTE TEXT
1 THE CONTRACTOR SHALL REMOVE IN ITS ENTIRETY THE
ABANDONED CONVEYOR SYSTEM IN THE SUB-BASEMENT TO IN THE
AREA OF SCOPE. THIS INCLUDES THE CONVEYOR, HANGERS, AND
ALL APPURTENANCES.
2 THE CONTRACTOR SHALL REMOVE IN ITS ENTIRETY THE STEAM AND
STEAM CONDENSATE AND ALL APPURTENANCES IN THE
SUB-BASEMENT TO IN THE AREA OF SCOPE. THIS INCLUDES
HANGERS AND ALL PIPE ACCESSORIES.
3 THE CONTRACTOR SHALL REMOVE IN ITS ENTIRETY THE PRESSURE
REDUCING STATIONS AND ALL APPURTENANCES. THIS INCLUDES
HANGERS AND ALL PIPE ACCESSORIES. (TYPICAL OF 2)
NOT TO SCALEMD401
2 DEMO - ABANDONED CONVEYOR SYSTEM
NOT TO SCALEMD401
3 DEMO - ABANDONED CONVEYOR SYSTEM
NOT TO SCALEMD401
5 DEMO - STEAM UP AT CONVEYOR
NOT TO SCALEMD401
4 DEMO - ABANDONED CONDENSATE
GENERAL NOTES
A. CONTRACTOR SHALL NOT REMOVE ANY STEAM PIPING UNTIL ALL OF THE
NEW PIPING IS INSTALLED AND READY FOR SHUTDOWN FOR
RECONNECTION.
11/25/2024 panderson Text Box
ISSUED FOR CONSTRUCTION
panderson
"X
B O
D =4
'-1
UP
34"∅ P.A.
16"∅
P.A
20"∅
20"∅ P.A. UP
26"∅
"X
B O
D =4
'-1 0"
"X
"X
D N
20"X10"
B O
D =6
'-0
B O
D =6
'-7
UP
UP
BOD=4'-5"B
O
D =1
'-6
S.A. UP
S.A. UP
UP
B O
D =1
'-8
D U
C T
S
IL
E N
C E
R
BOD=3'-6"
F.D. @ BSMT. FL. SLAB
"∅ BOD=1'-0"
MD-1
22"∅ S.A. UP
26"∅
BOD=2
'-9
BOD=1'-6"
DUCT
20"∅
20"∅
B .O
.D
4' -0
16"∅
18"∅
SILENCER
22"∅
22"∅
38"∅
42"∅
BOD=6'-4"
B O
D =1
6' -0
BOD=18'-0"BOD=18'-0"
BOD=18'-0"
B .O
.D
'-5
B .O
.D
'-6
B.O.D.=15'-6"
18"∅ B.O.D.=17'-7"
22"∅
UP
B O
D =1
4' -6
56"X17"
BOD=18'-0"
22"∅
BOD=18'-0"
BOD=5'-3"
16"X11" UP
"X
UP
UP
F A
N
LOUVER
20"X14" 18"X8"
18"X12" B O
D =3
'-5
96"X60"
LOUVER
EF-6
CU #4 CU #3 CU #2 CU #1
CU
CU
FRAME
C.P.
PIT #2
DS
(TYP.3)DS
CU
CU
DS
DS
CU
FRAME
DS
DS
DS
CU
DS
DS
CU
FRAME
DS
CU
D S
DS
DS
PIT #4
1-EF-1
CU
DS
DS
DS
DS
A/C UNIT
12,000 BTU
T
O N
C U
ROOM #165
FSD-1 FD-1FD-1 FSD-1
ROOM #167
AH-9
HTP-2
HTP-1
SF-1B
FD
HWH-1R HWH-2R
CHWP
HWSP
HM-1
XT-1
AS-1
TGM
INVERTER
12,000 BTU
CU
(TYP.3)
REFRIGERANT
COMPRESSOR
REFRIGERANT
CU
TGM INVERTER
18,000 BTU CU
FRAME (TYP.)
TGM-DC
INVERTER 12,000
BTU
18,000 BTU
A/C UNIT
SF-1A
(ON FLOOR)
SF-1C
(ON FLOOR)
A/C UNIT
36,000 BTU
A/C UNIT
12,000 BTU
CONTROL
PANELAHU-1
(NUCLEAR
MEDICINE)
A H
U -1
(P E
T /C
T
COMPRESS AIR TANK
REFRIGERANT COMPRESSOR
5 TON
CU
A/C UNIT TGM
INVERTER
18,000 BTU
A/C UNIT
12,000 BTU
A/C UNIT
12,000 BTU
A/C UNIT
A/C UNIT
A/C UNIT
12,000 BTU
A/C UNIT
18,000 BTU
AHU-1 (PET/CT)
BOOSTER PUMP
UP
2"∅ CHS
& CHR
2"∅ CHS & R
2"∅ CHS
& CHR
2"∅ CHS
& CHR
2"∅ CHS
& CHR
UP TO AHU-4
2"∅ CHS
& CHR 6"∅ UP TO AHU-24 & 26
3"∅ CHS
& CHR
3"∅ CHS
& CHR
3"∅ CHS
& CHR
2"∅ CHS
& CHR
2"∅ CHS
& CHR
3/8"∅ UP
(TYP.2)
1"∅ CHS
& CHR
1"∅ CHS
& CHR
3/4"∅ CHS
& CHR
3/4"∅ CHS & R
UP
3/4"∅ CHS
& CHR
UP
2"∅ CHS
& CHR
2"∅ CHS
& CHR
2"∅ CHS
& CHR
10"∅ UP
10"∅ CHS
& CHR
2"∅ CHS
& CHR
4"∅ CHS
& CHR
10"∅ CHS
& CHR
10"∅ CHS
& CHR
2"∅ CHS
& CHR
3"∅ CHS
& CHR
3"∅ CHS
& CHR
6"∅ CHS
& CHRCHS & R
10"∅ CHS
& CHR
4"∅ CHS
& CHR
UP
UP TO ROOF
6"∅ CHS
& CHR
10"∅ CHS
& CHR
C H
S
C H
R
C H
S
C H
R
2" ∅ CHS
& CHR
UP
UP TO ROOF
16"∅ CHS
& CHR
16"∅ CHS
& CHR
16"∅ CHS
& CHR
F R
O M
C H
IL
LE
D W
A T
E R
P
LA
N T
1" ∅ CHS
& CHR
BOP=5'-6"
1"∅ CHS
& CHR
3/4"∅ CHS
& CHR
UP
3/4"∅ CHS
& CHR
UP
UP
4"∅ CHS
& CHR
1"∅ CHS
& CHR
3/4"∅ CHS
& CHR
UP
UP
3/4"∅ CHS
& CHR
3/4"∅ CHS
& CHR
UP
3"∅ CHS
& CHR
16"∅ CHS
& CHR
UP TO AHU-25 & 27
FOR CONTINUATION
SEE BASEMENT LEVEL
UP FOR CONTINUATION
SEE BASEMENT LEVEL
UP FOR
CONTINUATION SEE
BASEMENT LEVEL
FOR CONTINUATION
SEE BASEMENT LEVEL
UP
TO
AHU-7
A H
U -1
(P E
T /C
T
F
G
H
I
J
K
L
M
N
P
Q
R
S
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 201.3 2.3 3.4 4.5 5.5 6.6 7.7 8.8 9.8 12.2 13.3 14.3 15.4 16.5 17.6 18.8 19.8
EL-03
DST-1
M401
M401
DST-1
DST-1
EL-02
PRV-05
DST-1
4" ø
S V
4" ø
S V
(E)PRV-07
(E )3
"ø H
P S
M101
(E)2"ø MPS
1/
2" ø
H P
R
1"ø HPR
(E)2"ø MPS
2 1/2"ø MPS
3"ø MPS (50#)
1" ø
H P
R
2"ø MPS
(E )2
"ø M
P S
1 1/2"ø HPR
3" ø
H P
S
1/
2" ø
H P
R
3"ø HPS
1 1/2"ø HPR
3" ø
H P
S
1/
2" ø
H P
R
M101
R/18
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
SUB-BASEMENT LEVEL - NEW WORK MECHANICAL PLAN
M101
1/16" = 1'-0"M101
1 SUB-BASEMENT LEVEL - NEW WORK MECHANICAL PLAN
# M101 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL FIELD ROUTE NEW STEAM AND CONDENSATE
PIPING THROUGH EXISTING SUB-BASEMENT. SLOPE PIPE
ACCORDING TO SPECIFICATIONS. WHERE ELEVATION CHANGES ARE
REQUIRED, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
PROVIDE FIELD APPLIED TRAPS AND DRIP LEGS. PROVIDE ALL NEW
HANGERS AND SUPPORTS.
2 CONTRACTOR SHALL FIELD ROUTE NEW STEAM VENT PIPING TO
EXISITING AREAWAY A MINIMUM 7 FT FROM FINISHED FLOOR. TURN
DOWN 12". PROVIDE PIPE SLEEVE THROUGH WALL.
3 CONTRACTOR SHALL UTILIZE EXISTING AREAWAY FOR VERTICAL
ROUTE TO BASEMENT LEVEL. PROVIDE TRAP AND DRIP LEG AT
LOWEST POINT. PROVIDE PIPE SLEEVE THROUGH WALL.
4 REFER TO REFERENCED SHEETS FOR ADDITIONAL COMPONENTS.
0 16' 32'8'
NOT TO SCALEM101
2 STEAM AND STEAM CONDENSATE ROUTING AT COLUMN P/18
A. CONTRACTOR SHALL NOT REMOVE ANY STEAM PIPING UNTIL ALL OF THE
NEW PIPING IS INSTALLED AND READY FOR SHUTDOWN FOR
RECONNECTION.
PIPE SUPPORT GENERAL NOTES
A. CONTRACTOR TO PROVIDE SHOP DRAWINGS AND CALCULATIONS PER
SPECIFICATION SECTION 232213 STEAM AND CONDENSATE HEATING PIPING.
PIPE SUPPORTS ARE INDICATED AND OR SPECIFIED ARE FOR THE PURPOSE
OF COORDINATION AND PRICING. REFER TO DETAILS SHEET M501 FOR
ADDITIONAL REQUIREMENTS.
GENERAL NOTES
NOT TO SCALEM101
3 STEAM AND STEAM CONDENSATE ROUTING AT COLUMN R/18
11/25/2024 panderson
T
18 19 2018.8 19.8
1 2 3 3.1 4
A
B
C
D
E
M102
M102
M102
M102
M102
1 1/2"ø HPR
3"ø HPS (110#)
CONNECTING
CORRIDOR
LAUNDRY
SOLDERING
SHOP &
STORAGE
J-1A
CONNECTING
CORRIDOR
3"ø HPS (110#)
OPERATORS
OFFICE
WATER
TREATMENT
LAB
R E
S T
R O
O M
ELECTRICAL
ROOM
SOILED ROOM
E-1D
STORAGE
E-1E
MALE
RESROOM
E-1F
FEMALE
RESTROOM
E-1G
BREAK ROOM
E-1H
ELECTRICAL
STORAGE
J-1B
CARPENTER
STORAGE
J-1C
CARPENTER
STORAGE
J-1D
DST-1
1 1/2"ø HPR
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
BASEMENT LEVEL - NEW WORK MECHANICAL PLAN
M102
1/8" = 1'-0"M102
1 BASEMENT LEVEL - NEW WORK MECHANICAL PLAN
M102 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 APPROXIMATE LOCATION OF NEW 3” DIA HIGH PRESSURE STEAM
PIPE TIE-IN LOCATION. FUTURE VA PROJECT TO INSTALL NEW
VALVE. CONTRACTOR TO VERIFY SIZE OF VALVE.
2 ROUTE NEW STEAM PIPING DOWN TO STEAM HEADER. FUTURE VA
PROJECT TO INSTALL NEW VALVE. CONTRACTOR TO VERIFY SIZE OF
VALVE.
3 UP TO BOILER PLANT ROOF LEVEL. SEE SHEET M103 FOR
CONTINUATION.
4 DOWN TO STEAM CONDENSATE HEADER.
5 UP TO BOILER PLANT ROOF LEVEL. SEE SHEET M103 FOR
CONTINUATION.
6 DOWN TO SUB-BASEMENT LEVEL. SEE SHEET M101 FOR
CONTINUATION.
7 REMOVE EXISTING ABANDONED PIPE BACK INTO CHASE AND OUT
THROUGH ROOF. REUSE SPACE FOR NEW STEAM AND STEAM
CONDENSATE PIPING.
8 CONTRACTOR SHALL COORDINATE WITH EXISTING BUILDING
OVERHANG.
8' 16'4'0
NOT TO SCALEM102
6 PHOTO - CEILING SOFFIT
NOT TO SCALEM102
5 PHOTO - PIPE ROUTE
NOT TO SCALEM102
4 PHOTO - CONDENSATE TANK
NOT TO SCALEM102
3 PHOTO - STEAM AND CONDENSATE INTERIOR ROOF PENETRATION
NOT TO SCALEM102
2 PHOTO - STEAM HEADER CONNECTION
GENERAL NOTES
A. CONTRACTOR SHALL NOT REMOVE ANY STEAM PIPING UNTIL ALL OF THE
NEW PIPING IS INSTALLED AND READY FOR SHUTDOWN FOR
RECONNECTION.
11/25/2024 panderson
T
18 19 2018.8 19.8
1 2 3 3.1 4
A
B
C
D
E
BOILER PLANT ROOFLAUNDRY ROOF
CONNECTING
CORRIDOR ROOF
3"ø HPS (110#) 1 1/2"ø HPR
3" ø
H P
S
0#
1/ 2" ø H
P R
1/
2" ø
H P
R
3" ø
H P
S
M103
M103
M103
M103
EL-01
DST-1
DST-1
3"ø HPS (110#) 1 1/2"ø HPR
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
BOILER PLANT ROOF LEVEL - NEW WORK MECHANICAL PLAN
M103
1/8" = 1'-0"M103
1 BOILER PLANT ROOF LEVEL - NEW WORK MECHANICAL PLAN
8' 16'4'0
# M103 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 DOWN TO BASEMENT LEVEL, CONNECTING CORRIDOR. SEE SHEET
M102 FOR CONTINUATION.
2 DOWN TO BASEMENT LEVEL, BOILER PLANT. SEE SHEET M102 FOR
CONTINUATION.
NOT TO SCALEM103
5 PHOTO - FIELD ROUTE - BOILER PLANT - BOILER PLANT ROOF PENETRATION
NOT TO SCALEM103
2 PHOTO - FIELD ROUTE - BOILER PLANT - LAUNDRY ROOF PENETRATION
NOT TO SCALEM103
4 PHOTO - FIELD ROUTE - BOILER PLANT - ROOF PIPING 2
NOT TO SCALEM103
3 PHOTO - FIELD ROUTE - BOILER PLANT - ROOF PIPING 1
GENERAL NOTES
A. CONTRACTOR SHALL NOT REMOVE ANY STEAM PIPING UNTIL ALL OF THE
NEW PIPING IS INSTALLED AND READY FOR SHUTDOWN FOR
RECONNECTION.
11/25/2024 panderson
34"∅ P.A.26"∅
"∅ BOD=1'-0"
MD-1
22"∅ S.A. UP
3"∅ CHS
& CHR
4"∅ CHS
& CHR
UP
10"∅ CHS
& CHR
UP
UP
3/4"∅ CHS
& CHR
3/4"∅ CHS
& CHR
UP
34"∅ P.A.26"∅
"∅ BOD=1'-0"
MD-1
22"∅ S.A. UP
3"∅ CHS
& CHR
4"∅ CHS
& CHR
UP
10"∅ CHS
& CHR
UP
UP
3/4"∅ CHS
& CHR
3/4"∅ CHS
& CHR
UP
J
K
L
M
N
P
9 10 11 12 13 149.8 12.2 13.3 14.3
1/
2" ø
H P
R
(E )2
"ø M
P S
(E)2 1/2"ø HPR
(E )3
"ø H
P S
(E)PRV-07(E)2"ø MPS
(E )2
"ø M
P S
(E)2"ø MPS
DST-1
DST-1
PRV-05
DST-3
DST-2
DST-4
DST-4
DST-4
DST-3
DST-2
DST-2
DST-1
DST-3
1 1/2"ø
1 1/2"ø
1/
2" ø
2 1/2"ø
(E )2
/2
"ø
ISO
ISO
ISO
ISO
ISO
ISO
ISO
4" ø
S V
4" ø
S V
(E)2"ø MPS
2 1/2"ø MPS
1 1/2"ø
1 1/2"ø
3"ø MPS (50#)
3" ø
H P
S
3"ø HPS
ISO
1"ø HPR
M401
1" ø
H P
R
1"ø HPR
2"ø
J
K
L
M
N
P
9 10 11 12 13 149.8 12.2 13.3 14.3
(E )3
"ø H
P S
(E)PRV-07(E)2"ø MPS
(E)1 1/2"ø MPS
(E)1 1/2"ø MPS
(E)1 1/2"ø MPS
(E )2
"ø M
P S
3"ø HPS (110#)
PRV-05
M401
M401
1 1/2"ø HPR
1 1/2"ø HPR
3"ø MPS (50#)
4" ø
S V
4" ø
S V
1"ø HPR
2 1/2"ø HPR
(E )2
/2
"ø H
P R
1/
2" ø
H P
R
2 1/2"ø MPS
2 1/2"ø MPS
2 1/2"ø MPS
2 1/2"ø MPS
1 1/2"ø HPR
(E)2"ø MPS
1 1/2"ø HPR
2"ø MPS
3"ø MPS (50#)
3"ø HPS
ISO
ISO
ISO
ISO
ISO
ISO
2" ø
2"ø
1/
2" ø
ISO
1 1/2"ø
(E)2 1/2"ø HPR
1" ø
H P
R
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
SUB-BASEMENT LEVEL - ENLARGED NEW WORK MECHANICAL
PLAN
M401
1/8" = 1'-0"M401
2 SUB-BASEMENT LEVEL - ENLARGED NEW WORK CONDENSATE PIPING PLAN
# M401 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 STATION COMPONENETS SUCH AS STEAM TRAPS AND SAFETY
VALVES ARE SHOWN ON DETAIL. REFER TO M502.
2 FIELD ROUTE PRV RELIEF VENT PIPING TO EXTERIOR.
3 REFER TO END OF STEAM LINE DETAIL FOR STEAM AND
CONDENSATE CONFIGURATION.
4 CONNECT NEW CONDENSATE LINE INTO EXISTING. PROVIDE
ISOLATION.
5 CONTRACTOR TO PROVIDE ELEVATION CHANGE. PROVIDE DRIP LEG
ON EACH SIDE OF OBSTACLE (TYP ALL).
6 PROVIDE NEW FULL SIZE STEAM FLOW METER FOR SPS SUPPLY.
7 PROVIDE TAP AND ISOLATION VALVE WITH BLIND FLANGE FOR
FUTURE SPS EXPANSION (390 LBS/HR).
8 CONTRACTOR SHALL CONNECT TO EXISTING STAINLESS STEEL
PIPING. APPROXIMATE LOCATION SHOWN, FIELD VERIFY.
9 PROVIDE NEW DRAIN PIPING AND COMPONENTS AND CONNECT INTO
NEW CONDENSATE PIPING. ROUTE PIPING FOR MAINTENANCE
ACCESS.
8' 16'4'0 1/8" = 1'-0"M401
1 SUB-BASEMENT LEVEL - ENLARGED NEW WORK STEAM PIPING PLAN
8' 16'4'0
NOT TO SCALEM401
3 STEAM CONNECTION 1 AND 2 AT COLUMN L/11
NOT TO SCALEM401
4 STEAM CONNECTION 3 AT COLUMN M/11
1" = 20'-0"M401
5 STEAM CONDENSATE CONNECTION 4 AT COLUMN K/11
GENERAL NOTES
A. CONTRACTOR SHALL NOT REMOVE ANY STEAM PIPING UNTIL ALL OF THE
NEW PIPING IS INSTALLED AND READY FOR SHUTDOWN FOR
RECONNECTION.
11/25/2024 panderson
VAPOR BARRIER AND
MOISTURE MIGRATION
SEAL
PIPE
INSULATION
APPLY INSULATION AND
VAPOR JACKET SEAL
AROUND ROD ON COLD
SERVICE INSTALLATION
TYPE 3
DOUBLE
BOLT PIPE
CLAMP
ADHESIVE (TYPICAL)
TAPE APPLIED AT
EACH BUTT JOINT
TYPE 17
WELDLESS
EYENUT
HANGER ROD ATTACHED TO
STRUCTURE ABOVE
NON-
INSULATED
PIPE
PIPE INSULATION
AS REQUIRED
TYPE 40 & 41 INSULATION
PROTECTION SHIELD (FIGURE
167)NOTES:
1. SIZE RODS, SPRING CUSHION, AND HORIZONTAL MEMBER
APPROVED TO SATISFY LOAD REQUIREMENT WITH SAFETY
FACTOR OF 5.
2. FIGURE NUMBERS ARE TYPICAL TO GRINNELL SUPPORT
NUMBERS.
EQUAL LEG ANGLE
ASSEMBLY (FIG. 50
CHANNEL ASSEMBLY
(FIG. 45), OR UNIVERSAL
TRAPEZE ASSEMBLY
(FIG. 46)
CUT ROD ABOVE
BOTTOM OF ANGLE.
MINIMUM 3"x3"x1/4"
TRAPEZE HANGER ANGLE.
DOUBLE HEX NUTS
PLATE WASHER
SPECIFIED INSULATION
12" SECTION OF CELLULAR
GLASS INSULATION, ALL FLUIDS,
ON PIPE SIZES 3" AND LARGER.
HANGER ROD SEE
SPECIFICATIONS.
PIPE
18 GAUGE, 180° ARC, 12"
LONG, GALVANIZED STEEL
BEARING PLATE.
INSULATION
PIPE
TYPE 39A, 39B, 40A & 40B
PIPE INSULATION
PROTECTION SADDLE.
(FIGURE 160-165)
TYPE 34
SIDE BEAM BRACKET
(FIGURE 202)
TYPE 31 - LIGHT
TYPE 32 - MEDIUM
TYPE 33 - HEAVY
WELD STEEL BRACKET
(FIGURE 193, 194, 195, 99)
NOTE:
FIGURE NUMBERS ARE TYPICAL
TO GRINNELL SUPPORT NUMBERS.
TYPE 41
SINGLE PIPE
ROLLER
(FIGURE 171)
TYPE 43
SINGLE PIPE
ROLLER
(FIGURE 181)
1"
M A
X
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN THRU 3/4
1 1/4
32FT
FT - - - - - -
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD
AT HANGER
INSULATION
SHIELD AT
HANGER
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
PROVIDE INSULATION
SHIELD & INSERT FOR
ALL PIPING (8" MIN.)
1 1/2 2 1/2
1/2" DIA. HANGER RODS
WITH 36" MAX. SPACING
ON EACH CHANNEL
1-5/8" 12 GAUGE
CHANNEL OR 2"X2"X1/4"
ANGLE
BAND
6" M
IN
M
IN
6" M
IN
M
IN
6"
M
IN
M
IN
STEAM TRAP ASSEMBLY - (F&T OR IB)
END OF STEAM LINE DRIP TRAP
STEAM LINE DRIP POCKET
CAP (TYPICAL)
NOTE:
DRIP POCKET PIPE SIZE SAME AS STEAM
MAIN UNLESS OTHERWISE NOTED.
3/4" MIN.
DRIP
RETURN
3/8" TEST CONNECTION
BYPASS - INSTALL IN HORIZONTAL PLANE LEVEL WITH
TRAP OR IN VERTICAL PLANE & BELOW TRAP. (PROVIDE
BYPASS PIPING FOR ALL TRAPS 1" AND LARGER.)
FLOAT AND INVERTED
BUCKET STEAM TRAP
TO DRAIN
PIPE T0 STEAM
TRAP (TYPICAL)
LAST
CONNECTION
MANUAL AIR
VENT
PIPE T0 STEAM TRAP
(TYPICAL)
3/4" DRAIN (ALTERNATE
LOCATIONS) (TYPICAL)
PIPE T0 STEAM TRAP
(TYPICAL)
DRIP LEG (TYP.)
FLOWFROM STEAM
SUPPLY
TO STEAM
RETURN
FLOW
3/4" DRAIN (ALTERNATE
LOCATIONS) (TYPICAL)
STEAM PIPE (TYPICAL)
ST-X
FIELD APPLIED STEAM TRAP
STEAM
PREFERRED
CONNECTION
LOCATION - BEST
ACCEPTABLE
CONNECTION
LOCATION
USE FOR BOILER
CONNECTION TO
HEADER ONLY
DO NOT USE THESE
CONNECTION
LOCATIONS
USE FOR BOILER
CONNECTION TO
HEADER ONLY
PREFERRED
CONNECTION
LOCATION - BEST
A SIZE, TRAP DISCHARGE LINE 1/2" 3/4"
1-1/4"1"SIZE, 45° WELDING NIPPLEB
C
LENGTH OF EXPANDED MAIN AHEAD OF
TRAP DISCHARGE PIPE
7" 7"
16-1/2"
2"
LENGTH OF EXPANDED MAIN FOLLOWING
PERFORATED PIPE
LENGTH OF PERFORATED PIPED
E
RETURN MAIN SIZE 1-1/2" 3" & OVER
SAME SIZE2-1/2"EXPANDED RETURN MAIN SIZE
WELD CAP
EXPANDED RETURN MAIN
CAP
REDUCERINCREASER
A
B
A
A
RETURN
MAIN
FLOW
SECTION-EXPANDED RETURN MAIN
PERFORATED
TUBE
16-1/2"
2"
2"
EXPANDED RETURN MAIN
PERFORATED TUBE 1"x1/8"
THICK GUIDE FINS WELDED TO
PERFORATED TUBE
SECTION A-A
EDC
NOTES:
1. 1/2" PERFORATED TUBE SHALL HAVE 40 - 1/8" DIAMETER HOLES SPACED 1-1/2" O.C. IN 4 ROWS.
2. 3/4" PERFORATED TUBE SHALL HAVE 78 - 1/8" DIAMETER HOLES SPACED 1-1/2" O.C. IN 6 ROWS.
3. HOLES IN TUBE SHALL BE SPACED EQUALLY AROUND PERIMETER.
NOTE:
MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY METER MANUFACTURERS
TT
PT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
FLOW METER
INTERFACE
WITH BACNET
SYSTEM
DIFFERENTIAL PRESSURE
(DP) CELL STEAM FLOW
MEASUREMENT
SHUTOFF VALVE
TO METERING SYSTEM
BUILDING INCOMING
MAIN STEAM
3"
1"
24" MAX
D
ELEVATION
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT BLOWN
OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN ANSI B31.1.
POWER PIPING CODE, APPENDIX II.
2. VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHICH
PERSONNEL MAY OCCUPY.
4. NO OTHER DRAIN SHALL BE CONNECTED TO THE DRIP PAN ELBOW DRAIN PIPE.
PROVIDE UNION UNLESS SAFETY
VALVE HAS FLANGED OUTLET
SAFETY VALVE
OPEN DRAIN
(NOTE 3)
CONNECTION TO
PRESSURE
VESSEL OR PIPE
3/4" DRAIN TO FLOOR DRAIN OR
OPEN SIGHT DRAIN (NOTE 4)
FLEXIBLE CONNECTOR
DRIP PAN ELBOW (SECTIONAL VIEW)
PIPE THREADED INTO ELBOW
(SAME SIZE AS ELBOW)
VENT PIPE THROUGH ROOF
SUPPORT AS INDICATED ON
DWGS. (NOTES 1, 2)
VORTEX FLOW METER
ECCENTRIC
EXPANSION,
DOWNSTREAM
PIPE RUN
PIPE RUN
ECCENTRIC REDUCER,
UPSTREAM
OPTIONAL FLOW STRAIGHTENER
ANSI CLASS
300 FLANGES
FLOW DIRECTION
50 DIAMETERS
UPSTREAM METER RUN 5 DIAMETERS
(VERIFY WITH FLOW METER MANUFACTURER)
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
MECHANICAL DETAILS
M501
NOT TO SCALEM501
1 PIPE HANGER, INSULATION AND VAPOR JACKET
NOT TO SCALEM501
9 TRAPEZE TYPE PIPE SUPPORT
NOT TO SCALEM501
2 PIPE BRACKETS AND ROLLERS
NOT TO SCALEM501
10 PIPE SUPPORT DETAIL
NOT TO SCALEM501
3 STEAM LINE DRIP POKECT - STEAM TRAP ASSEMBLY
NOT TO SCALEM501
4 PIPING DESIGN STEAM PIPING LOCATIONS
NOT TO SCALEM501
5 HIGH AND MEDIUM PRESSURE STEAM TRAP DISCHARGE INTO PUMPED CONDENSATE RETURN LINE
NOT TO SCALEM501
7 STEAM METER SCHEMATIC
NOT TO SCALEM501
8 STEAM SAFETY VALVE DETAIL
NOT TO SCALEM501
6 STEAM FLOW METER INSTALLATION
11/25/2024 panderson
ROUTE
TO FD
H P
S
P S
I )
FACTORY INSTALLED
BYPASSES ON VALVES
8" HPS MAIN
STEAM HEADER
H
W
2H 2H
ANCHOR TO ANCHOR EXPANSION
GUIDEGUIDE
NOTE:
WIDTH(W) AND HEIGHT(H)
DEMENTIONS CAN BE
FOUD ON EXPANSION
LOOP SCHEDULE
H P
R
MPR
MPS(50 PSI)
M P
S (5
P
S I)
V
MPS(50 PSI)
PRV-05A
N.C.
PRV-05B
0-100 PSIG
0-150 PSIG
FIELD ROUTE
TO EXTERIOR
HPS (110 PSI)
SST-1
SST-4
MPR
SST-3
MPS(50 PSI)
PRV-05C
MPR
SST-2
BYPASS
PSV-01
N.0.
MANUAL VALVE SHALL REMAIN
IN LOCKED OPEN POSITION
CONTINUOUSLY
WELDED TO I-BEAM
OR TOP CHORD OF
JOIST
B335-2 ROD SIZE
ADJUSTABLE HINGE
ROD STIFFENER
ALL THREADED ROD
B3100 SERIES
CLEVIS HANGER
1 (MIN)
MAX TRANSVERSE SPAN
DIA.
B22 CHANNEL
LONGITUDINAL OR
TRANSVERSE BRACE
(9'-4" MAX. LENGTH)
B335-2 5/8
ADJUSTABLE
HINGE
1. MAXIMUM SPAN FOR TRANSVERSE BRACING
FOR SEISMIC ZONE X.
2. MAXIMUM SPAN FOR LATERAL BRACING SHALL
NOT EXCEED TWICE THAT SHOWN
FORTRANSVERSE BRACING
1-1/2
2-1/2 3-1/2
B3080S-1/2
WELDING LUG
B22 CHANNEL
TRANSVERSE BRACE
(9'-4" MAX.LENGTH)
1. GAS PIPING LESS THAN 1 INCH INSIDE DIAMETER.
2. PIPING IN BOILER AND MECHANICAL ROOMS LESS THAN 1-1/4
INCH INSIDE DIAMETER.
3. ALL OTHER PIPING LESS THAN 2-1/2" INSIDE DIAMETER.
4. ALL PIPING SUSPENDED BY INDIVIDUAL HANGERS 12" OR LESS
IN LENGTH FROM THE TOPOF THE PIPE TO THE BOTTOM OF THE
SUPPORT FOR THE HANGER.
NOTE: SEISMIC ZONE X RESTRAINTS SHALL NOT BE
REQUIRED FOR THE FOLLOWING INSTALLATIONS.
STANDARD WEIGHT PIPE
10'-3" 12'-0" 13'-6"
14'-9" 16'-3" 17'-6"
18'-3" 20'-3" 22'-0"
24'-9"
29'-0" 27'-0"
PRESSURE GAGE WITH
DUAL (METRIC/ENGLISH)
DISPLAY
1/8” TUBING (SNUBBER
FOR STEAM/CONDENSATE
APPLICATIONS ONLY)
1/4” BALL VALVE
PIPE
1/4" AUXILIARY
GAGE COCK
REMOVABLE CAP
NOTES:
1. PROVIDE AUXILIARY GAGE COCK AT EACH PRESSURE GAGE
LOCATION.
2. INSTALL PRESSURE GAGES (AND SNUBBERS) IN VERTICAL
POSITION - ADD ELBOW FOR VERTICAL PIPING.
NOTE:
THIS INFORMATION MAY NOT CONTAIN ALL DETAILS REQUIRED FOR CONSTRUCTION. APPROPRIATE MODIFICATION MAY BE REQUIRED TO ENSURE SUITABILITY OF THESE DRAWINGS FOR THE SPECIFIC
APPLICATION. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE INSTALLATION OF THE
EQUIPMENT/SYSTEM IS IN ACCORDANCE WITH BUILDING/PROJECT SPECIFICATIONS, APPLICABLE CODES
AND STANDARDS.
1/2" MINIMUM
PACK WITH OAKUM
WALL
NON-SHRINK
OR EPOXY
GROUT
PACK BOTH ENDS OF SLEEVE
WITH 3M FIRE DAM 150 3 HOUR
RATED CAULK OR APPROVED
EQUAL, MINIMUM 1" DEEP
PIPE, CONDUIT, OR
DUCTWORK
CORE DRILL
HOLE AS
REQUIRED
STEEL PIPE SLEEVE
STEEL ANCHOR PLATE WELDED
TO SLEEVE, MINIMUM 3" LARGER
THAN SLEEVE OUTSIDE
DIAMETERPROVIDE LINTEL WHERE INDICATED
CONTRACTOR SHALL PATCH AND REPAIR
ADJACENT CONSTRUCTION WITH
MATCHING MATERIALS AND FINISHES
(INTERIOR AND EXTERIOR). WHERE
PAINTING, CONTRACTOR SHALL PAINT
ENTIRE WALL. BOTH SIDES.
CANT STRIP
COUNTER FLASHING
24 GA. GALV. STEEL
CAP FLASHING
ENCLOSED
CURB
ROOFING
PIPES
ROOF DECK
1/4" PER FT
SLOPE
4"
/4
METAL PIPE
PIPE SUPPORT
CONT 2 x 12 BLOCKING
ROOF MEMBRANE
CONT CANT STRIP
P.T. 2 x 4 WOOD NAILER
ANCHOR TO DECK
EXISTING DECK TO REMAIN
COVER BOARD ON
RIGID INSULATION
CONT EDGE SEALANT AT
ROOF TERMINATION POINTS
RIGID INSULATION ON
EXISTING DECKING
CONT. MEMBRANE
COATED METAL FLASHING
CONT. METAL CAP WITH
COUNTER FLASHING
NOTE:
REPAIR EXISTING ROOF SYSTEM AS REQUIRED TO INSTALL NEW PIPE SUPPORT WORK PER MANUFACTURE’S
INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARRANTED INSTALLATION.
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
MECHANICAL DETAILS
M502
NOT TO SCALEM502
5 EXPANSION LOOP PIPING DETAIL
NOT TO SCALEM502
7 CLEVIS HANGER TRANSVERSE BRACING DETAIL
NOT TO SCALEM502
1 PIPING PRESSURE GAGE
NOT TO SCALEM502
4 STEAM WARMUP VALVE
NOT TO SCALEM502
6 PRV STATION PIPING DETAIL (PRV-05)
NOT TO SCALEM502
2 PIPE SLEEVE THRU WALL DETAIL
NOT TO SCALEM502
3 PIPE PENETRATION DETAIL
NOT TO SCALEM502
8 PIPE SUPPORT DETAIL
11/25/2024 panderson
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
100% DESIGN
SUBMISSION
JK JP
PROVIDE DEDICATED STEAM SUPPLY
LINE TO SPS
672-23-108
VA CARIBBEAN HEALTHCARE SYSTEM
SAN JUAN, PR 00921 33201 USA
12-02-2024
MECHANICAL SCHEDULES
M601
4. CONFIGURATION INCLUDES 510 LBS/HR STEAM FOR SPS EXPANSION.
3. PROVIDE DOUBLE ISOLATION VALVE.
2. PROVIDE BY-PASS GLOBE VALVE SIZED FOR STEAM SERVICE OF COMBINED CAPACITY OF STATION. BYPASS SHALL NOT EXCEED THE CAPACITY OF THE RELIEF VALVE.
1. RELIEF VALVE SIZE AND VENT PIPE SIZE SHALL BE ADJUSTED BASED ON ACTUAL PRV USED. RELIEF VALVE SHALL BE SIZED FOR COMBINED CAPACITY OF STATION PRVS.
NOTES:
STEAM PRESSURE REGULATING VALVE SCHEDULE
MARK LOCATION SERVICE
BYPASS PRESSURE REDUCING VALVE 1/4 (PROVIDE 2@ 25% EA) PRESSURE REDUCING VALVE 1/2 (PROVIDE 1@ 50%)
NOTES
CAPACITY
INLET PIPE
DIA (D1)
OUTLET PIPE
DIA (D2)
CAPACITY
INLET PIPE
DIA (D1)
OUTLET PIPE
DIA (D2)
CAPACITY
INLET PIPE
DIA (D1)
OUTLET PIPE
DIA (D2)P INLET
(PSIG)
P OUTLET
(PSIG)
MAX LOAD
(LBS/HR)
P INLET
(PSIG)
P OUTLET
(PSIG)
MAX LOAD
(LBS/HR)
P INLET
(PSIG)
P OUTLET
(PSIG)
MAX LOAD
(LBS/HR)
PRV-05 PIPEBASEMENT SPS 110 50 1560 2" 2" 110 50 390 1-1/4" 1-1/2" 110 50 780 1-1/2" 2 1:2:3:
1) REFER TO EXPANSION LOOP PIPING DETAIL ON SHEET M502 FOR LAYOUT.
NOTES:
EXPANSION LOOP SCHEDULE
MARK SYSTEM SERVED H (FT) W (FT) NOTES
EL-01 SPS 11 5.5 1:
EL-02 SPS 11 5.5 1:
EL-03 SPS 11 5.5 1:
3. PROVIDE FT TYPE TRAP SIZED FOR 2.5 TIMES THE EQUIPMENT LOAD FOR ALL EQUIPMENT LOADS. SST=STATION STEAM TRAP
2. FIELD APPLIED DRIP STATIONS SIZED FOR 3 TIMES WARMING LOAD AND DIFF. PRESSURE AT 80% LINE PRESSURE. EST=EQUIPMENT STEAM TRAP FT - FLOAT AND THERMOSTATIC
1. PROVIDE 18" STATIC HEAD, 12" STATIC HEAD MINIMUM. DST=DRIP STEAM TRAP IB - INVERTED BUCKET
NOTES: MARK TYPE TYPE:
STEAM TRAP SCHEDULE
MARK AREA SERVED TYPE SIZE
MIN INLET PRESSURE
(PSIG)
CAPICITY (LBS/HR)
DIFFERENTIAL PRESSURE
(PSIG)
NOTES
DST-1 DRIP IB 3/4" 110 170 88 1:2:3:
DST-2 DRIP IB 3/4" 50 150 40 1:2:3:
DST-3 DRIP IB 3/4" 50 100 40 1:2:3:
DST-4 DRIP IB 3/4" 50 80 40 1:2:3:
SST-1 PRV-05 IB 3/4" 110 170 88 1:2:
SST-2 PRV-05 (1/4) IB 3/4" 50 390 40 1:2:
SST-3 PRV-05 (1/4) IB 3/4" 50 390 40 1:2:
SST-4 PRV-05 (1/2) IB 3/4" 50 780 40 1:2:
ST-X FIELD APPLIED IB 3/4 -- -- -- 1:2:
3. PROVIDE DRIP PAN ELBOW.
2. WHERE VENTS RUN IN FINISHED SPACE, THEY SHALL BE FURRED IN TO MATCH ADJACENT BUILDING CONSTRUCTION. IN UNFINISHED SPACE, PIPE TO BE COVERED ONLY.
1. VENT PIPE SHALL BE NO LESS THAN ONE PIPE SIZE LARGER THAN SAFETY VALVE DISCHARGE AND SHALL FURTHER BE SIZED SO THAT FRICTIONAL…