36C24825R0101 BB 672-23-108 Dedicated Steam Supply Line SPS.docx
DOCX document 296 KB Posted
- Attached to
- Z2DA--Provide Dedicated Steam Supply Line to SPS
- Solicitation number
- 36C24825R0101
About this file
This is a Request for Proposal (RFP) for construction services issued by the Department of Veterans Affairs (VA) for a dedicated steam supply line project at the VA Caribbean Healthcare System in San Juan, Puerto Rico. The solicitation (36C24825R0101) is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a project value between $500,000 and $1,000,000 under NAICS code 236220. The project involves constructing a new steam supply line from the Boiler Plant to the Sterile Processing Service (SPS), including stainless steel steam and condensate return piping.
Key details include a performance period of 540 calendar days, with an estimated contract period from September 30, 2025, to March 24, 2027. The solicitation requires offerors to be registered in SAM and certified in the Veteran Small Business Certification database. Proposals are due by July 24, 2025, at 2:30 PM AST, with an offer acceptance period of 120 calendar days. Contractors must comply with limitations on subcontracting, ensuring at least 15% of the contract cost is performed by their own employees. A mandatory site visit is scheduled for July 2, 2025, at 10:00 AM AST, and contractors must submit detailed technical and past performance documentation as part of their proposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24825R0101
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 OF
36C24825R0101 X 06-24-2025 672-23-108 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
VA
Caribbean HCS (Admin Bldg #10 Calle Casia Suite #4M440 San Juan PR 00921-3201
VIA EMAIL TO:
ivan.nieves-cruz@va.gov
Ivan Nieves-Cruz 787-452-1609 Project Title: Provide Dedicated Steam Supply Line to SPS
Project Location: VA Caribbean Healthcare System, #10 Calle Casia, San Juan, PR 00921-3201
Project Description: Construction services to provide a new dedicated steam supply line from Boiler Plant to Sterile Processing Service (SPS) along with its condensate return line. Steam piping shall be provided stainless steel at VA Caribbean Healthcare System at San Juan, PR.
NAICS Code: 236220 Commercial and Institutional Building Construction. Size Standard $45M.
Product Service Code: Z2DA - Repair or Alteration of Hospitals and Infirmaries.
The magnitude of construction is: Between $500,000 and $1,000,000, in accordance with Federal Acquisition Regulation 36.204 (e).
THIS ACQUISITION IS SET-ASIDE 100% FOR SERVICE-DISABLED VETERANS-OWNED SMALL BUSINESS (SDVOSB) ONLY, UNDER THE AUTHORITY OF 38 U.S.C. PART 74. ANY PERSON(S) OF BUSINESS ENTITY SUSPECTED OF MISREPRESENTATION FOR THE PURPOSE OF THIS SECURING A GOVERNMENT CONTRACT MAY BE CRIMINALLY INVESTIGATED AND PROSECUTED FOR FRAUD AGAINST THE UNITED STATES
GOVERNMENT.
Offerors must be registered in SAM ( www.sam.gov ) and VISIBLE/CERTIFIED in Veteran Small Business Certification database https://dsbs.sba.gov/search/dsp_dsbs.cfm ) at the time of offer submission and prior to award to be considered an eligible SDVOSB concern.
This solicitation will be evaluated on a tradeoff basis.
All Offerors must comply with all solicitation terms and conditions.
It shall be known that funds are not currently available. No contract award will be made until appropriated funds are made available.
Refer to solicitation instructions and due date for Request for Information (RFIs), or Questions (if any).
An organized site visit has been scheduled. Refer to FAR 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995) for location, date, time, and any other details.
X X 52.211-10 X
VIA EMAIL
2:30 PM (AST)
07-24-2025 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
SEE PRICE SCHEDULE
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
VA
Caribbean HCS (Admin Bldg #10 Calle Casia Suite #4M440 San Juan PR 00921-3201 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971 Ana G. Alvarado
NCO815L3-0313
TABLE OF CONTENTS
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE & ITEM INFORMATION | 5 |
| A.4 DELIVERY SCHEDULE | 5 |
| INSTRUCTIONS TO OFFERORS AND EVALUATION FACTORS | 6 |
| I. GENERAL PROPOSAL INFORMATION | 6 |
| II. PROPOSAL PREPARATION AND EVALUATION INFORMATION | 10 |
| PROPOSAL PREPARATION INSTRUCTION | 10 |
| PROPOSAL SUBMISSION | 10 |
| CONTRACT AWARD | 11 |
| PROPOSAL REQUIREMENTS AND FORMATTING | 11 |
| TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS | 12 |
| PRICE PROPOSAL PREPARATION INSTRUCTIONS | 13 |
| III. EVALUATION FACTORS FOR AWARD AND PRICE EVALUATION | 15 |
| STATEMENT OF WORK | 19 |
| SOLICITATION PROVISIONS | 26 |
| 2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) | 26 |
| 2.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 26 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 26 |
| 2.4 52.228-1 BID GUARANTEE (SEP 1996) | 27 |
| 2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 28 |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 28 |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 29 |
| 2.8 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 29 |
| 2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 29 |
| 2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 30 |
| REPRESENTATIONS AND CERTIFICATIONS | 31 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025) | 31 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 35 |
| 3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 37 |
| 3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 39 |
| 3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 40 |
| GENERAL CONDITIONS | 43 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 43 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023) | 43 |
| 4.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023) | 44 |
| 4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 49 |
| 4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 50 |
| 4.6 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) | 50 |
| 4.7 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 52 |
| 4.8 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 55 |
| 4.9 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 56 |
| 4.10 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 56 |
| 4.11 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (MAY 2024) | 58 |
| 4.12 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 58 |
| 4.13 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 59 |
| 4.14 SUPPLEMENTAL INSURANCE REQUIREMENTS | 64 |
| 4.15 IT CONTRACT SECURITY | 64 |
| 4.16 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 74 |
| 4.17 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 78 |
| 4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 80 |
| 4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 81 |
| 4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 82 |
| 4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 82 |
| 4.22 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 82 |
| 4.23 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 84 |
| 4.24 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 84 |
| 4.25 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 85 |
| ATTACHMENTS | 89 |
This solicitation 36C24825R0101 is for construction services for a dedicated steam supply line to SPS. Project Number 672-23-108.
A.3 PRICE/COST SCHEDULE & ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Provide construction services for project 672-23-108, Provide Dedicated Steam Supply Line to SPS located at the VA Caribbean Healthcare System (VACHS), San Juan, PR in accordance with construction drawings, specifications, and contract terms & conditions.
Period of Performance: 540 calendar days Contract Period: Base POP Begin: 09-30-2025 POP End: 03-24-2027
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries
Note: The POP Begin and POP End dates are estimated dates. Upon notice to proceed (NTP) issuance, dates will be updated through a modification.
| GRAND TOTAL |
| __________________ |
A.4 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| VA Caribbean Healthcare System (VACHS) |
10 Calle Casia San Juan, PR 00921 3201
USA
| 1.00 |
| See LIN 0001 |
| MARK FOR: |
| Sixto Ortiz-Diaz |
(787) 641-7582 X 110436 sixto.ortiz-diaz@va.gov
Page 1 of
INSTRUCTIONS TO OFFERORS AND EVALUATION FACTORS
I. GENERAL PROPOSAL INFORMATION
1. Solicitation, attachments, and any issued amendments will be posted at www.sam.gov. This is the only official location where these documents can be obtained and where updates are posted. No “hard copy” solicitation materials are available.
2. All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror”.
3. MAGNITUDE OF THIS PROJECT: Between $500,000 and $1,000,000 in accordance with (IAW) FAR 36.204(e).
4. PROPOSAL DUE DATE: Standard Form (SF) 1442, block 13a (or as amended on SF 30), refers to proposals due date.
5. SITE VISIT: An organized site visit has been scheduled. Refer to FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) Alternate I (FEB 1995) for location, date, and time details.
6. OFFER ACCEPTANCE PERIOD: Offers providing less than one-hundred and twenty (120) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
7. REQUESTS FOR INFORMATION/QUESTIONS: Requests for Information (RFIs) or questions shall be submitted via email to ivan.nieves-cruz@va.gov by the Prime Offeror. Prime offeror should consolidate RFIs/questions from its team members and submit as one submission to the maximum extent practicable.
7.1. Offerors may submit RFIs or questions via email to ivan.nieves-cruz@va.gov at any time; however, RFIs or questions received after 07/10/2025 @ 3:30 PM (AST) may not be answered.
7.2. To easily identify all RFIs or questions for this project, email subject line shall be titled using the following format: RFI – SOLICITATION NUMBER – OFFEROR COMPANY NAME.
7.3. No telephone RFIs/Questions will be accepted.
8. SPECIFICATIONS AND DRAWINGS: All applicable specifications and drawings will be provided electronically along with the solicitation. No hard copies will be made available to offerors.
9. Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project Manager”, Contracting Officer Technical Representative, or their abbreviations are to be replaced with “Contracting Officer Representative (COR)”
10. SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS VERIFICATION: This solicitation is 100% set asides for verified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The award of this requirement shall not be delayed due to loss of SDVOSB verification/certification. Proposals submitted by nonverified/certified SDVOSBs shall be excluded from award consideration.
11. SDVOSB Verification: The Government will review Veteran Small Business Certification at https://dsbs.sba.gov/search/dsp_dsbs.cfm and/or https://veterans.certify.sba.gov/ to confirm SDVOSB status verification for the submitted proposal. Evaluations will be performed on proposals submitted by verified/certified SDVOSBs only. Subsequent confirmation of SDVOSB verification status will be performed for the apparent awardee.
12. LIMITATIONS ON SUBCONTRACTING (LOS) (Reference Contract Clause FAR 52.219-14 for further information): By submission of an offer and execution of a contract, the Offeror agrees that in performance of the contract, the concern will perform at least fifteen (15) percent of the cost of the contract, not including the cost of materials, with its own employees.
12.1. Completed VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction shall be submitted along with your price proposal. The completed VAAR 852.219-75 Certification will be submitted in a separate PDF document (do not combine/save with other documents). The completed VAAR 852.219-75 Certification shall be named “LOS Mandatory Certification – SOLICITATION NUMBER – OFFEROR COMPANY NAME”.
13. FUNDS: Funds are not presently available for this acquisition. The Government does not compensate offerors for proposals’ development. Award is subject to availability of funds, in accordance with FAR 52.232-18 Availability of Funds.
14. BONDS: Performance Bonds (SF25) and Payment Bonds (SF25A) are required. Offeror must refer to SF1442 Block 12a for Payment and Performance Bond requirements. Refer to FAR 52.228-15 for additional information on applicability.
15. OFFER GUARANTEE (BID BOND) (SUBMIT WITH PRICE PROPOSAL): Offeror must refer to SF1442 Block 13b (Bid Bond) requirement. Per FAR Clause 52.228-1 Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less. NOTE: A legible electronic copy of the original is acceptable.
15.1. The bid bond (SF24) will be submitted with Price Proposal in a separate pdf document (do not combine/save with other documents) and shall be named “BID BOND – SOLICITATION NUMBER – OFFEROR COMPANY NAME”.
16. SAFETY AND ENVIRONMENTAL RECORD (SUBMIT WITH PRICE PROPOSAL): Offerors shall submit with their proposal a completed Attachment 03 - Safety or Environmental Violations and Experience Modification Rate (EMR) Form, which supplies the Government information pertaining to your firm’s past Safety and Environmental record. A submitted Attachment 03 represents a certification of your firm’s past Safety and Environmental record identifying serious, willful, or repeat violations from OSHA or any EPA violations within the last 3 years. Please attach explanation for any violations.
16.1. All Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the offeror’s insurance company and be furnished on the insurance carrier’s letterhead and included with the completed Attachment 03.
16.2. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (N1CCI) by completing/submitting ERM-6 Form and providing the rating on letterhead from NCCI. Include this letter with the completed Attachment 03. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau and include this letter with the completed Attachment 03.
16.3. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The information provided, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to make the Determination of Responsibility. Offerors with an EMR greater than 1.0 will be considered ineligible and will not be evaluated.
17. VETS-4212, Federal Contractor Veterans’ Employment Report (SUBMIT WITH PRICE PROPOSAL): Offerors are required to provide verification of their submission of the annual form VETS-4212 (https://www.dol.gov/agencies/vets/programs/vets4212). This verification shall be the emailed confirmation of receipt notification sent to the offeror after successful submission of their report.
17.1. The verification will be submitted with the Price Proposal in a separate pdf document (do not combine/save with other documents) and shall be named “VETS 4212 – SOLICITATION NUMBER – OFFEROR COMPANY NAME”.
18. PERFORMANCE PERIOD: Refer to SF1442, Block 11, for performance period. Performance period shall be commenced upon receipt of written Notice to Proceed (NTP) performed in concurrent or sequential phases as indicated or required.
19. WAGE DETERMINATION & CONSTRUCTION WAGE RATE REQUIREMENTS (DAVIS BACON ACT): The prevailing Wage Determination for Puerto Rico is not applicable for this contract. The Wage Rate Requirement (Davis-Bacon Act (DBA)) does not apply to federal construction contracts in Puerto Rico, and the U.S. Virgin Islands or other territories. However, some related Acts which provide federal assistance to local Government bodies in these territories do require the payment of prevailing wage rates.
20. VA CARIBBEAN HEALTHCARE SYSTEM (VACHS) SPECIAL CIRCUMSTANCES:
20.1. Daylight Savings Time: No Daylight-Saving time is observed in Puerto Rico.
20.2. Payment of Municipality Taxes in Puerto Rico: The Contractors shall be responsible for all Municipality Taxes also known as “Arbitrios Municipales” and patents for all construction projects, when a proposal is submitted to the Department of Veterans Affairs, VA Caribbean Healthcare System, Puerto Rico. Each Contractor shall make an assessment with the “Centro de Recaudaciones e Ingresos Municipales” known as “CRIM” from the Commonwealth of Puerto Rico. The Contractors shall be responsible to find out the applicable municipality construction taxes and patents where the construction project will be performed with each local Government offices (i.e., San Juan, Ponce, Mayaguez, etc.). If the Contractor fails to include the applicable municipality construction taxes and patents with their proposed cost/price proposal, the Contractor will be solely responsible for the omitted cost/price.
20.3. Puerto Rico Christmas Bonus Law: Puerto Rico Christmas Bonus Law No. 148 of June 30, 1969, as amended, is applicable to all businesses working in Puerto Rico.
21. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E-Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54).
22. Section 743(a)(3) of Division C of Public Law 111-117: Companies awarded a contract with the federal government shall comply with the annually reporting requirements of 52.204-14, Service Contract Reporting Requirements and 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts. Note that the contracting officer shall make the contractor’s failure to comply with the reporting requirements a part of the contractor’s performance information under FAR Subpart 42.15.
23. System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”
II. PROPOSAL PREPARATION AND EVALUATION INFORMATION
PROPOSAL PREPARATION INSTRUCTION
1. PROPOSAL PREPARATION INSTRUCTION:
1.1. The submission of the documentation specified below will constitute the Offeror’s acceptance of all the terms and conditions of the RFP, including attachments and any issued amendments.
1.2. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
1.3. In order for proposals to receive full consideration for award, offerors should ensure that the information furnished in support of the proposal is factual, accurate, and complete, and directly responds to the requirements of this solicitation.
1.4. These instructions prescribe the format for the proposal and describe the approach for the development of proposal data. Also, are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
PROPOSAL SUBMISSION
2. PROPOSAL SUBMISSION:
2.1. All proposals shall be submitted by the Prime Offeror no later than (NLT) closing date and time specified in SF1442, Block 13a. (or as amended on SF 30) via email at ivan.nieves-cruz@va.gov. NO OTHER FORMS OF SUBMISSION WILL BE ACCEPTED.
2.2. Your proposal shall be submitted as portable data files (pdf), and documents submitted shall be no larger than 8 Mega Bytes (MB) in size. Send document in separate files as deem necessary. The offeror is responsible to verify that the Government has received the proposals.
2.3. Undeliverable emails due to an offeror’s proposal size, using wrong email address, or else, is not the responsibility of the Government.
2.4. To be considered and accepted as timely the proposal must be received in its entirety prior to the deadline. Failure to provide a proposal in its entirety prior to the deadline will render the proposal noncompliant.
CONTRACT AWARD
3. CONTRACT AWARD:
3.1. It is the Government’s intent to award one (1) firm-fixed price contract resulting from this solicitation to the responsible offeror whose proposal, conforming to the solicitation, is fair and reasonable, and has been determined to be the most advantageous to the Government, non-price, price, and other factors considered. The proposals must conform to the solicitation requirements and judged to represent the best value to the Government. The source selection process will utilize FAR 36 and FAR 15 to evaluate proposals and award the contract.
3.2. Intent for No Discussions: Offerors are hereby advised that the Government intends to evaluate proposals and award a contract without conducting discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to contact offerors and/or hold discussions if the Contracting Officer determines them to be necessary. Offerors are cautioned that discussions may not be conducted, and Offerors should not assume that they will have an opportunity to revise their proposals after submission.
3.3. All evaluation factors other than price, when combined, are approximately equal to price. As differences in factor ratings and relative advantages and disadvantages become less distinct, difference in price may become the discriminating factor in determining the most advantageous offer. Conversely, as differences in price become less distinct, differences in ratings and relative advantages and disadvantages between offers are determinative.
PROPOSAL REQUIREMENTS AND FORMATTING
4. PROPOSAL REQUIREMENTS AND FORMATTING:
4.1. Proposals shall be typewritten, with fonts no smaller than 10 points, with page layout no smaller than ½” top, bottom and ½” side margins, single space, paginated, portrait mode or letter size paper; except charts may be displayed in landscape mode.
4.2. Solicitation forms requiring to be completed shall be typewritten with fonts no smaller than 9 points.
4.3. No hyperlinks or electronic media will be allowed or considered.
4.4. Any conceptual drawings, one-line diagrams, etc. included in your proposal, shall be submitted as portable data files (pdf).
4.5. Strongly recommend formatting your technical proposal factor by factor, as listed in the solicitation. Stick to the page limits.
4.6. Proposals which merely restate the requirement or state that the requirement will be met, without providing supporting rationale, are not sufficient and will not be considered an appropriate response. It is the offeror’s responsibility to insure the completeness of the proposal.
4.7. Offers that do not propose to perform all the work required by the solicitation will not be considered.
4.8. Proprietary Data: Each page of the offeror’s proposals must be reviewed and marked as to proprietary data content by the offeror in strict compliance with FAR 52.215-1. Also, see FAR 3.104-4. A single blanket statement at the front of the proposal is not acceptable. Failure to mark every page will subject the proposal to public release through Freedom of Information Act (FOIA) requests.
4.9. Proposals submitted in response to this solicitation shall be signed by the Prime Offeror owner or by a person with authority to bind company and dated.
TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS
5. TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s technical proposal:
TECHNICAL PROPOSAL:
(a) Cover Page with: Solicitation Number, Project Title and Project Number, Company Information (company name, principal point of contact, email, address, phone numbers (including area code), Unique Entity Identifier (UEI) number, Cage code, DUNs, etc.)
(b) Table of Contents
(c) Required Submittals for Factor 1 - Technical Approach and Technical Qualifications
(d) Required Submittals for Factor 2 - Specialized Experience
(e) Required Submittals for Factor 3 – Relevant Past Performance
*** TECHNICAL PROPOSAL SHALL NOT INCLUDE PRICING DATA ***
PRICE PROPOSAL PREPARATION INSTRUCTIONS
6. PRICE PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s Price Proposal:
(a) Cover Page with: Solicitation Number, Project Title and Project Number, Company Information (company name, principal points of contact, email, address, phone numbers (including area code), Unique Entity Identifier (UEI) number, Cage code, etc.)
(b) Table of Contents
(c) Signed SF 1442 by the SDVOSB Prime Offeror, with Blocks 14-20C completed including acknowledgement of any Amendments issued.
(d) Completed Price Schedule.
(e) Price Proposal Breakdown to support price proposed.
(f) Verification of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report. (Refer to General Information Section, paragraph 17 for details.)
(g) Copy of current SDVOSB certification.
(h) Completed Experience Modification Rate (EMR) Form shall be submitted in a separate PDF document (do not combine/save with other documents).
(i) Bid Bond-SF24 “legible scan copy in pdf format” The bid bond will be submitted in a separate PDF document (do not combine/save with other documents) and shall be named “BID BOND SOLICITATION NUMBER – OFFEROR COMPANY NAME”. (Refer to General Information Section, paragraph 15 for details).
(j) Completed VAAR 852.219-75 (LOS) Certification: Completed VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction shall be submitted in a separate PDF document (do not combine/save with other documents). (Refer to General Information Section, paragraph 12.1 for details).
7. The proposed prices will be analyzed for fairness and reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Include copy of the Pricing Schedule of the solicitation. Provide a detailed price breakdown for the purpose of evaluating price. The breakdown shall separately at a minimum but not limited to (this is not an all-inclusive breakdown list, DO NOT limit your breakdown to this list) include the following cost elements: Labor (Direct & Indirect), Materials, Material Markups, Material Overhead, Equipment, Subcontractor Cost, Other Direct Costs, Overhead Expenses, Indirect Cost, General & Administrative (G&A) expenses, and Profit. While developing your price proposal please make sure to include all applicable taxes, and government stamps cost.
8. NOTE: Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees. Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-73.
9. PRICE EVALUATION: The Government will initially review pricing independently from the factor evaluation. Price is not rated but will be analyzed for fairness and reasonableness.
III. EVALUATION FACTORS FOR AWARD AND PRICE EVALUATION
The evaluation factors consist of Factor 1 - Technical Approach and Technical Qualifications, Factor 2 - Specialized Experience, Factor 3 - Relevant Past Performance. Each factor shall have equal importance.
FACTOR 1: TECHNICAL APPROACH AND TECHNICAL QUALIFICATIONS
(Max. pages 20 excluding the cover page and table of contents)
1) Describe in detail how the offeror intends to meet or exceed all performance areas stated in the solicitation/statement of work/attachments that are related to this project. Provide technical methods and procedures that reflect a construction approach unique to the site and facility. NOTE: Vague, general narratives that include the restatement of the Statement of Work will be rated less favorably. Describe experience on steam generation systems.
2) Credentials of key personnel shall be submitted with bibliographical data (Attachment 04 – Key Personnel Resume Form - Sample). Offeror shall provide certifications from its technical staff regarding steam generation systems installation.
3) Briefly describe technical competence in new Construction involving an active healthcare facilities.
4) Briefly describe ability to obtain the necessary resources to perform this project.
5) Schedule and minimizing downtime are crucial. Describe a plan to complete the project in a timely manner without causing disruptions to facility operations, especially during normal business hours. Also, describe actions to be taken by the offeror if completion of work is anticipated to fall behind schedule. It is critical to the VA mission that services remain intact with minimal disruption.
6) Submit Quality Control (QC) monitoring procedures that will ensure a high level of construction quality that applies to the specific and general requirements of the project.
7) Submit copy of current, valid General Contractor License issued by any United States federal, state, or local government agency for Construction Contractor, who will be of record.
FACTOR 2 – SPECIALIZED EXPERIENCE
(30 pages maximum)
1) Offeror shall provide a total of four (4) work experience projects meeting the requirements of this solicitation in performance at any point during the previous five (5) years from the solicitation date or currently ongoing (at least 50% construction complete) that best represent the Offeror’s work experience required on this solicitation. The information provided will be used to evaluate the relevancy and depth of each Offeror’s experience. Offeror is responsible for providing project descriptions in sufficient detail to permit evaluation of project relevancy to this procurement. Information shall be provided by completing Specialized Experience Form (Attachment 05).
2) Projects provided for experience should demonstrate experience constructing and managing steam generation projects including steam and condensate piping works.
3) In this context, “Offeror or Offeror’s” refers to the proposed prime contractor, and all proposed major subcontractor(s).
4) Any teaming or proposed sub-contractor arrangement you are submitting as part of the proposal for evaluation must remain intact through contract completion. Completed letter of commitment for key Subcontractor is required (See Attachment 06).
5) If more than four (4) projects are submitted, only the first four (4) will be evaluated. If the project is older than five (5) years, it may be considered less relevant.
6) The Government may place greater importance on projects that most closely resemble the project identified in this solicitation, depending upon overall role and relevancy considerations.
7) The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations.
8) The Government may place greater importance on projects that were performed at an active VA hospital, depending upon overall role and relevancy considerations.
FACTOR 3 – RELEVANT PAST PERFORMANCE
(No page limits)
1) The offeror shall provide relevant past performance information for each project submitted on Factor 2 - Specialized Experience. If available, copies of a completed Contractor Performance Assessment Reports (CPARs) for projects performed for the U.S. Government shall be provided. If the project provided has a CPARS, it must be used by the offeror to demonstrate past performance. If CPARS submission is used to validate past performance, it will be the most recent evaluation in the system (i.e., for projects submitted as completed, the final 100% completed CPARS will be provided). The Government reserves right to verify the accuracy of the CPARS submitted.
2) Past Performance will be evaluated based on information provided and any other past performance information obtained by the Government such as but are not limited to past performance information retrieved through the Contractor Performance Assessment Reporting system (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS) and may contact customers other than those identified by the Offeror when evaluating past performance.
3) While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror and the government is under no obligation to check other sources and/or may not contact all the identified POCs.
4) In the absence of CPARS, the Offeror shall submit a completed PPQ form (See Attachment 07) from the client for a project(s). If Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).
5) Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact ivan.nieves-cruz@va.gov. Offerors shall specify which PPQ if any will be submitted by client with a valid and accurate email and telephone number information.
6) Subcontractor’s Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide, with proposal, Subcontractor Past Performance of Consent form referenced subcontractors authorizing release of their past performance information for this requirement (See sample included at Attachment 08).
7) In the case of an Offeror without a record of past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance.
8) The Government will assess the past performance on projects submitted under the Specialized Experience Factor and reserves the right to conduct telephone interviews with point of contacts identified in the proposal and/or to review other recent projects rated in CPARS or other agency performance databases, review and/or contact Offeror-furnished references, or to review personal knowledge. The Government will perform a performance confidence assessment of the Offeror’s probability of successfully meeting the contract requirements considering the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance.
PRICE EVALUATION
(No page limit)
PRICE EVALUATION: The Government will initially review pricing independently from the factor evaluation. Price is not rated but will be analyzed for fairness and reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination.
The proposed prices will be analyzed for fairness and reasonableness. Include copy of the Pricing Schedule of the solicitation. Provide a detailed price breakdown for the purpose of evaluating price. The breakdown shall separately at a minimum but not limited to (this is not an all-inclusive breakdown list) include the following cost elements: Labor (Direct & Indirect), Materials, Material Markups, Material Overhead, Equipment, Subcontractor Cost, Other Direct Costs, Overhead Expenses, Indirect Cost, General & Administrative (G&A) expenses, and Profit. While developing your price proposal please make sure to include all applicable taxes, and government stamps cost.
- - - END OF EVALUATION FACTORS AND PRICE EVALUATION - - -
STATEMENT OF WORK
Project Title: PROVIDE DEDICATED STEAM SUPPLY LINE TO SPS Project Number: 672-23-107 VA Caribbean Healthcare System, San Juan, Puerto Rico
I. FOREWORD
A. This document does not relieve the construction firms of their professional responsibility to produce a correct, complete and fully coordinated work.
II. PROJECT DESCRIPTION
A. This project shall provide a new dedicated steam supply line from Boiler Plant to the Sterile Processing Service (SPS) along with its condensate return line. Steam piping shall be provided stainless steel.
B. Complete construction specifics and requirements are provided on the construction specifications and drawings set prepared by Toland Mizell Molnar.
C. Construction Requirements:
1) Piping Tie-Ins shall be performed during weekends to minimize impact on the hospital operations.
2) New steam and condensate piping shall be completed and hydro-tested prior performing tie-ins on the existing lines.
3) Utility shutdowns shall be strictly coordinated with the facility 14 days in advance, to minimize impact to daily operations. Shutdowns shall be performed during nights and weekends.
4) Contractor shall be responsible to obtain all state and federal permits required for construction and waste disposal.
5) Contractor shall comply with the Federal Government policy on waste recycling, disposition and shall present a Waste Management Plan to be approved by the facility Environmental Department.
6) Contractor performance period is 540 calendar days from Notice to Proceed effective date.
7) The Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire job.
8) Training shall be provided to VA personnel of all new equipment installed.
9) Recommended spare parts by the manufacturer, for all new equipment provided, shall be provided by the contractor. A spare part list shall be submitted to VA.
D. Prior to any mobilization and construction, a project schedule shall be submitted and approved by COR and VA Chief Engineering. Contractor shall provide all necessary environmental documents and related EQB approved permits for construction.
E. Contractor shall completely prepare site, prior to the installation of the equipment, and furnish all labor, equipment and materials necessary to perform work for this specific project as required by this statement of work and the project specifications and drawings.
F. All construction or associated work, and temporary work shall conform to the latest VA specifications, VA Standards, energy conservation methods, EPA, OSHA, ADA, NFPA, NEC, ASHRAE, LIFE SAFETY CODE, IBC, local, Federal and industry requirements and regulations.
G. The Contractor shall comply with all applicable federal, state and local requirements for protecting the safety of the contractor’s employees, building occupants and the environment. In particular, all applicable standards of the Occupational Safety and Health Administration (OSHA) shall be followed when working in accordance with this project. No process or materials shall be employed in such a manner that they will introduce additional hazards into occupied space.
H. Contractor shall keep the VA Project Manager (COR) informed at all times of the status and progress of the project.
I. The Contractor shall be responsible for repair of any damage incurred to buildings or property as a result of negligence during construction activities or omission to report potential hazards to VA authorities.
J. Any related supporting system, apparatus, material or work not mentioned, or any incidental accessories necessary to make the work complete in all respects and ready for operation even if not particularly specified, shall be furnished, delivered, and installed by the contractor without additional cost to the government.
K. No separate staging, office, or workshop area outside of the project limits will be provided. Access to the job site is permitted to drop off materials and project personnel. No long term (more than necessary for drop-off/pick-up of personnel or materials). Contractor shall ensure that all subcontractors maintain their respective work areas and secure tools, materials, loose items, and other components to protect the condition of the workplace. Daily removal of debris, unused materials, and other refuse (trash) from the assigned work area is expected by the end of the workday.
L. Parking inside VA premises is not available to contractors nor its employees.
M. All vendor/contract personnel must report to the Police Service and identify themselves upon entering the VACHS facility. They shall all abide by Police Service rules and personal identification verification (PIV) regulations, process and to carry the identification card throughout the entire period while providing the service.
N. The Contractor shall prepare written minutes of each meeting with the Government concerning contractual, design and construction matters. Copies of the minutes shall be furnished to the Contracting Officer and within seven calendar days of the meetings. The Contractor shall prepare written records of phone conversations addressing major project issues and furnish a copy to the Contracting Officer within five calendar days of contract.
O. Project performance is to be developed in accordance with VA guides, standards and requirements; local and federal codes; and other engineering standards and best practices as per A/E design work (detailed demolition drawings, all necessary civil, electrical, and plumbing and mechanical engineering specialties as well as detailed phasing and construction coordination drawings). The constructor will develop a well-organized, practicable and complete construction phasing for the proposed project in order that the normal hospital operations will not be interrupted nor disturbed except by previous and timely coordination with VAMC Center Director through the Project Manager/Engineer/COR.
P. Construction General Sections' applicable requirements: the Contractor shall comply with the applicable construction project requirements (e.g. submission of final as-built drawings, shop drawings, tests, safety requirements, new material and equipment provision and installation requirements, Buy American Act, payment and performance bonds requirements; insurance requirements; progress payments and schedules, work inspection and supervision, daily logs requirements, material and workmanship, guaranty, cleaning up, accident prevention, and other requirements) included in the specifications.
Q. All vendor/contract personnel must report to the Police Service and identify themselves upon entering the VACHS facility. They shall all abide by Police Service rules and personal identification verification (PIV) regulations and to carry the identification card throughout the entire period while providing the service. This include but not limited to any other screening protocols the VA implement in response to any emergency at all VA facilities.
R. The offeror is responsible to present a proposal that fully incorporates all items on the Statement of Work. No omissions or assumptions will be permitted. All concerns / questions shall be responded through Requests for Information prior proposals submission. The offeror shall deliver according to the full extent of the Scope of Work, even if already awarded the contract.
III. GUARANTEE
A. The contractor guarantees the equipment against defective material, workmanship and performance for a period of one year, said guarantee to run from date of acceptance of the equipment by the Government. The contractor agrees to furnish, without cost to the Government, replacement of all parts and material that are found to be defective during the guarantee period. Replacement of material and parts will be furnished to the Government at the point of installation, if installation is within the continental United States, or f.o.b. the continental U.S. port to be designated by the contracting officer if installation is outside of the continental United States. Cost of installation of replacement material and parts shall be borne by the contractor.
IV. DEFINITIONS
A. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control and approval of the CO.
B. VA Project Manager (PM): The Contracting Officer’s Technical Representative (COR) responsible for administering contracts under the immediate direction of the CO and the PM/COR at the construction site. When more than one PM/COR is assigned to a construction project one is designated as being in-charge and is called the “Senior PM/COR”. The PM/COR is responsible for protecting the Government’s interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc.
C. Contractor: This term, as used herein, refers to the Contractor under this contract.
D. A/E: This term, as used…