S02 - Attachment 01 - Drawings Chapel_Mental Health 38 pages.pdf

PDF 47 MB Posted

Attached to
Z2DA--Renovate Second Floor Mental Health Outpatient Clinic and Chapel
Solicitation number
36C24825R0063
Issued by

About this file

These architectural and engineering drawings detail a renovation project for the second floor Mental Health Outpatient Clinic and Chapel at 10 Calle Casia in San Juan, Puerto Rico, with project number 672-23-100. The comprehensive set includes multiple drawing sheets covering architectural, mechanical, electrical, fire alarm, and telecommunications aspects of the renovation. The project involves renovating approximately 6,000 square feet across multiple rooms including the chapel, mental health waiting area, chaplain offices, corridors, and supporting spaces. Key renovation elements include new wall partitions, ceiling systems, lighting, mechanical equipment, electrical systems, and telecommunications infrastructure. The drawings specify using materials like gypsum board, stone panels, luxury vinyl tile flooring, and acoustic ceiling tiles, with a focus on creating functional and aesthetically cohesive spaces. The design incorporates seismic considerations, infection control protocols, and compliance with VA design standards and building codes.

The solicitation (36C24825R0063) is issued by the Department of Veterans Affairs Veterans Health Administration for construction services to renovate the second-floor mental health and chapel areas. The design documents provide detailed technical specifications for contractors, including demolition plans, new construction requirements, mechanical and electrical system modifications, and specific installation guidelines. The renovation aims to modernize and improve the facility's functional spaces while maintaining compliance with healthcare facility design standards. The project includes provisions for preserving existing infrastructure, implementing new technological systems, and ensuring patient and staff safety through careful design and construction planning.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION

SUBSYSTEM

BUILDING WALL

SECTION

ELEVATION

INTERIOR

ELEVATION

DOORS

ROOM NUMBER

PLAN & SECTION

DETAIL REFERENCE

REFERS TO A TYPICAL

ASSEMBLY

LOCATION ON DRAWING

SHEET

SHEET DETAIL IS

LOCATED

REFERS TO NUMBER ON DOOR

SCHEDULE, SEE SHEET A401

REFERS TO NUMBER ON

FLOOR PLAN

LOCATION ON

DRAWING SHEET

ARROW INDICATES DIRECTION OF

ELEVATION

SHEET LOCATION WHERE

ELEVATION IS LOCATED

Room name

A101

SIM

NUMBER INDICATES ELEVATION

ON SHEET

LOCATION ON

DRAWING SHEET

A101

A101

PARTITION

TYPES

REFERS TO INTERIOR PARTITIONS,

SEE SHEET A001

REVISION

REVISIONS ARE SHOWN WITHIN

"CLOUDED" AREA REVISION

NUMBER & DATE WILL APPEAR IN

TITLE BLOCK SPACE SO LABELED

SHEET LOCATION WHERE

ELEVATION IS LOCATED

A101

DEMOLITION NOTE

REFERS TO DEMOLITION

NOTES ON THAT SHEET

X

CONSTRUCTION NOTE REFERS TO CONSTRUCTION

NOTES ON THAT SHEET

X

REFERS TO EXISTING GRID

LINES IN PROJECT

REFERS TO NEW GRID LINES

EXISTING GRID LINE

NEW GRID LINE

DRAWING LIST

SITE MAP SYMBOLS

IMAGE: GOOGLE EARTH

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DEPARTMENT OF VETERANS AFFAIRS

A u to d e s k D o c s /2

V

A S a n

J u a n

C h a p e l a n d

M e n ta l H e a lt h

W a it in g /2

S

A N

J U

A N

C H

A P

E L A

N D

M E

N T

A L H

E A

L T

H .r v t

/2 /2

:5

:0

A

M

G001

COVER SHEET Renovate Second Floor Mental

Health Outpatient Clinic and Chapel

10 CALLE CASIA

SAN JUAN, PR 0921-3201

23010

11.11.2023 MC LK

PERMIT SET

Renovate Second Floor Mental Health

Outpatient Clinic and Chapel

10 CALLE CASIA

SAN JUAN, PR 0921-3201

Revision No.

SHEET

NUMBER SHEET TITLE

GENERAL

G001 COVER SHEET

G002 NOTES, ABBREVIATIONS & LIFE SAFETY

G003 INFECTION CONTROL RISK ASSESMENT

G004 3D VIEWS

HAZARDOUS ABATEMENT

HA101 SECOND FLOOR PLAN - ABATEMENT

ARCHITECTURAL

AD101 FLOOR & REFLECTED CEILING DEMOLITION PLAN

A001 PARTITION TYPES

A101 FLOOR AND REFLECTED CEILING PLAN

A201 SECTIONS & INTERIOR ELEVATION

A301 SEISMIC RCP DETAILS

A302 DETAILS

A401 DOOR LEGEND, SCHEDULE & DETAILS

A600 FINISH PLAN LEGEND, NOTES & DETAILS

A601 FINISH BOARD

FIRE PROTECTION

FA001 FIRE ALARM LEGENDS & SYMBOLS

FD101 SECOND FLOOR PLAN - FIRE ALARM - DEMO

FA101 SECOND FLOOR PLAN - FIRE ALARM - NEW WORK

FA501 FIRE ALARM DETAILS

MECHANICAL

M-001 MECHANICAL NOTES, LEGEND & SYMBOLS

MD101 SECOND FLOOR PLAN - MECHANICAL - DEMO

MH101 SECOND FLOOR PLAN - MECHANICAL - NEW WORK

M501 MECHANICAL DETAILS

M701 MECHANICAL CONTROLS

M801 MECHANICAL SCHEDULES

ELECTRICAL

E001 ELECTRICAL LEGENDS & SYMBOLS

E002 ELECTRICAL GENERAL NOTES

ED101 SECOND FLOOR PLAN - LIGHTING - DEMO

ED102 SECOND FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO

EL101 SECOND FLOOR PLAN - LIGHTING - NEW WORK

EP101 SECOND FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK

EP102 THIRD FLOOR ELECTRICAL ROOM LOCATION - NEW WORK

E501 ELECTRICAL DETAILS

E601 ELECTRICAL DIAGRAMS & PANEL SCHEDULES

TELECOM

T-001 TELECOM LEGEND, ABBREV, & GENERAL NOTES

TD101 SECOND FLOOR PLAN - TELECOM - DEMO

T101 SECOND FLOOR PLAN - TELECOM - NEW WORK

T102 SECOND FLOOR PLAN - TELECOM AREA PLAN - NEW WORK

T501 TELECOM DETAILS

1. DEDUCT NO.1: BASE BID TO INCLUDE RENOVATION TO CHAPEL AREA ONLY AS INDICATED ON

DRAWINGS. PROVIDE A DEDUCT ALTENATE FOR ALL THE WORK ASSOCIATED WITH THE

MENTAL HEALTH WAITING AREA.

DEDUCT ALTERNATES

Revisions: Date:

LaShaun Key Stamp

DN DN

ABBREVIATIONS:

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

ABV ABOVE

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADH ADHESIVE

ADJ ADJACENT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATE

ARCH ARCHITECT

ASB ASBESTOS

ASPH ASPHALT

ASSN ASSOCIATION

AUTO AUTOMATIC

AUX AUXILIARY

BAT BATTEN

BD BOARD

BEV BEVEL

BKG BACKING

BLDG BUILDING

BOT BOTTOM

BTWN BETWEEN

C TO C CENTER TO CENTER

CAB CABINET

CONC CONCRETE

CIR CIRCLE

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COL COLUMN

CONC FLR CONCRETE FLOOR

CONSTR CONSTRUCTION

CONT CONTINUE

COORD COORDINATE

CPT CARPET OR CARPET TILE

CSWK CASEWORK

CT CERAMIC TILE

CTRL CONTROL

DAT DATUM

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DTL DETAIL

DIFF DIFFERENCE

DIM DIMENSION

DIR DIRECTION

DR DOOR, OR DRAIN

DR OPNG DOOR OPENING

E.J. EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

ENGR ENGINEER

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ESP ESPECIALLY

EXIST EXISTING

FA FIRE ALARM

FAS FASCIA

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FLR FINISH FLOOR

FIXT FIXTURE

FLR FLOOR

FP FIRE PROTECTION OR FIREPROOF

FRT FIRE RETARDANT TREATED

FRZ FREEZER

FT FEET OR FOOT

FURN FURNISH OR FURNITURE

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERAL OR GENERATOR

GL GLASS

GLU LAM GLUED LAMINATED WOOD

GT GROUT

GYP GYPSUM

GYP BD GYPSUM BOARD

HB HOSE BIBB

HC HOLLOW CORE

HDWD HARDWOOD

HM HOLLOW METAL

HT HEIGHT

HVAC HEATING, VENTILATING,

AND AIR CONDITIONING

ID IDENTIFICATION

ILLUM ILLUMINATION

INCL INCLUDED

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

JAN JANITOR

J-BOX JUNCTION BOX

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LDR LEADER

LED LIGHT EMITTING DIODE

LT LIGHT

LVD LOUVERED

LVR LOUVER

LVT LUXURY VINYL TILE

LYR LAYER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMO MEMORANDUM

MEZZ MEZZANINE

MID MIDDLE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MO MASONRY OPENING

MTL METAL

MULL MULLION

NA NOT APPLICABLE

NAT NATURAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NUM NUMERAL

OC ON CENTER

OCC OCCUPY

OFF OFFICE

OPNG OPENING

OPP OPPOSITE

OSHA OCCUPATIONAL SAFETY

AND HEALTH ADMINSTRATION

OZ OUNCE

PART PARTIAL

PAT PATTERN

PEN PENETRATE

PERF PERFORATED

PERP PERPENDICULAR

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

PRB PROFILE BASE

PRCST PRECAST

PREFAB PREFABRICATE

PRELIM PRELIMINARY

PREP PREPARATION

PREV PREVIOUS

PROP PROPERTY

PTD PAINTED

PVC POLYVINYL CHLORIDE (PLASTIC)

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QT QUARRY TILE

QTB QUARRY TILE BASE

QTR QUARTER

QTY QUANTITY

R RADIUS OR RISER

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REINF REINFORCE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RESIL RESILIENT

RET RETURN

REV REVISION

RF RUBBER FLOORING

RM ROOM

RND ROUND

RO ROUGH OPENING

SALV SALVAGE

SBSTR SUBSTRATE

SC SOLID CORE

SCHED SCHEDULE

SCHEM SCHEMATIC

SECT SECTION

SEP SEPARATE

SF SQUARE FOOT (FEET)

SLNT SEALANT

SMK SMOKE

SPEC SPECIFICATION

SPKLR SPRINKLER

SPLY SUPPLY

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SURF SURFACE

SUSP SUSPEND

SVT SOLID VINYL FLOOR TILE

SYS SYSTEM

T&G TONGUE AND GROOVE

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

THK THICKNESS

THRU THROUGH

TMPD TEMPERED

TO TOP OF ___

TRANS TRANSOM

TRTD TREATED

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

UV ULTRAVIOLET

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VOL VOLUME

W/ WITH

W/O WITHOUT

WD WOOD

WSCT WAINSCOT

WSF WELDED SEAM SHEET FLOORING

WT WEIGHT

A. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION

THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE

FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE

MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE

CONSTRUCTION OF NEW STRUCTURE.

a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION

b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900)

c. NATIONAL ELECTRIC CODE (NEC)

d. INTERNATIONAL PLUMBING CODE (IPC)

e. ASME BOILER AND PRESSURE VESSEL CODE

f. ASME CODE FOR PRESSURE PIPING

g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

h. ENERGY POLICY ACT (EPAct)

i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL)

j. VA MENTAL HEALTH DESIGN GUIDE

k. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA

DESIGN DOCUMENTS

l. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

m. PHYSICAL SECURITY DESIGN MANUAL (PSDM)

2. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222). THE MINIMUM FIRE RATING FOR

ALL LOAD BEARING STRUCTURAL ELEMENTS IS 2 HOURS. IF DURING CONSTRUCTION, ANY

DAMAGE TO EXISTING FIREPROOFING IS OBSERVED OR IF DISCOVERED THAT ANY FIRE

PROTECTION IS MISSING, THE CONTRACTOR SHALL REPAIR TO MAINTAIN FULL PROTECTION.

3. RENOVATION TO EXISTING CHAPEL AND MENTAL HEALTH WAITING AREAS ONLY. NO

CHANGE TO THE CORRIDOR WALL CONFIGURATIONS, EGRESS OR EXISTING:

NFPA 101 REVIEW

B. CHAPTER 39 EXISTING BUSINESS OCCUPANCIES

1. (39.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS OR

PORTIONS THEREOF USED AS BUSINESS OCCUPANCIES.

C. MEANS OF EGRESS - CHAPTER 39 AND CHAPTER 7

1. THERE IS NO CHANGE TO THE EXISTING CORRIDOR PLAN CONFIGURATION AND EXISTING.

D. FIRE PROTECTION EQUIPMENT - CHAPTER 39 AND CHAPTER 9

1. THE EXISTING CORRIDORS ARE NOT FULLY PROTECTED WITH AN AUTOMATIC SPRINKLER

SYSTEM.

2. (39.3.5) EXTINGUISHMENT REQUIREMENTS. PORTABLE FIRE EXTINGUISHERS SHALL BE

PROVIDED IN EVERY BUSINESS OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.

A. (9.9) WHERE REQUIRED BY ANOTHER SECTION OF THIS CODE, PORTABLE FIRE

EXTINGUISHERS SHALL BE SELECTED, INSTALLED, INSPECTED, AND MAINTAINED IN

ACCORDANCE WITH NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS.

E. INTERIOR FINISHES - CHAPTER 39 AND SECTION 10.2

1. (39.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2

SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS.

2. (39.3.3.2.2) INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B, OR CLASS C

IN AREAS OTHER THAN THOSE SPECIFIED IN 39.3.3.2.1..

CODE NOTES:

EXIT SIGN

LIFESAFETY LEGEND:

2 HOUR RATED FIRE PARTITION

EXIT ACCESS TRAVEL DISTANCE

FIRE EXTINGUISHER IN CABINETFEC

EXIT ACCESS TRAVEL DISTANCE 145'-8"

CHAPEL

MENTAL HEALTH

WAITING

FEC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /2

V

A S a n

J u a n

C h a p e l a n d

M e n ta l H e a lt h

W a it in g /2

S

A N

J U

A N

C H

A P

E L A

N D

M E

N T

A L H

E A

L T

H .r v t

/2 /2

:5

:1

A M

G002

NOTES, ABBREVIATIONS & LIFE

SAFETY

Renovate Second Floor Mental

Health Outpatient Clinic and Chapel

10 CALLE CASIA

SAN JUAN, PR 0921-3201

23010

11.11.2023 MC LK

PERMIT SET

Revisions: Date:

1/8" = 1'-0"G002

FIRST FLOOR LIFE SAFETY PLANF3

Minimum Required Infection Control Precautions by Class | Before and During Work Activity

CLASS I

1. Perform noninvasive work activity as to not block or interrupt patient care.

2. Perform noninvasive work activities in areas that are not directly occupied with patients.

3. Perform noninvasive work activity in a manner that does not create dust.

4. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

1. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

2. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

3. This Class of Precautions must never be used for construction or renovation activities.

CLASS II

1. Provide active means to prevent airborne dust dispersion into the occupied areas.

2. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

3. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

4. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

5. If work area is contained, then it must be neutrally to negatively always pressurized.

6. Seal all doors with tape that will not leave residue.

7. Contain all trash and debris in the work area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.

Adhesive mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

CLASS III

1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling or, if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.

2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

3. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

4. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

5. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

7. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

8. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

9. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

10. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

11. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.

12. Contain all trash and debris in the work area.

13. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

14. Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suits is acceptable.

15. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

16. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.

Adhesive mats must be changed routinely and when visibly soiled.

17. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

CLASS IV

1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling, or if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.

2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

3. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

4. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

5. Personnel will be required to wear disposable coveralls at all times during Class V work activities.

Disposable coveralls must be removed before leaving the anteroom.

6. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

7. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

8. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

9. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows do not require HEPA-filtered air.

10. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

11. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

12. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.

13. Contain all trash and debris in the work area.

14. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

15. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

16. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

17. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.

Adhesive mats must be changed routinely and when visibly soiled.

18. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

CLASS V

Minimum Required Infection Control Precautions | Upon Completion of Work Activity

CLASSES

I, II, & III

Cleaning:

1. Perform Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

CLASSES

IV & V

Class III (Type C Activities only), IV, and V precautions require inspection and documentation for downgraded ICRA precautions.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. 1. Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.

2. 2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Clean Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may

NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

A. Carefully remove screws and painter tape.

B. If dust will be generated during screw removal, use hand-held HEPA vacuum.

C. Drywall cutting is prohibited during removal process.

D. Clean all stud tracks with HEPA vacuum before removing outer hard barrier E. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must always remain operational and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

Attachment A: Infection Control Construction Permit

Location of Construction:

Project Coordinator:

Constractor Performing Work:

Supervisor:

Permit Request Signature:

Permit Authorized Signature:

Project No:

Project Start Date:

Estimated Duration:

Permit Expiration Date:

Telephone:

Date:

Date:

YES NO CONSTRUCTION ACTIVITY INFECTION CONTROL RISK GROUPYES NO

GROUP 3: HIGH RISK

GROUP 2: MEDIUM RISK

GROUP 1: LOW RISKTYPE A: Inspection, non-invasive activity.

TYPE B: Small scale, short duration.

TYPE C: Activity generates moderate to high levels of dust.Requires consecutive work shifts.

GROUP 4: HIGHEST RISK

TYPE D: Major demolition and construction activities.

Requires concesecutive work shifts.

Assigned CLASS CLASS I *See below for mandatory CLASS requirements

CLASS II CLASS III CLASS IV CLASS V

CLASS I

2. Perform noninvasive work activities in areas that are not directly occupied with patients.

1. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activity in a manner that does not create dust.

4. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

5. Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.

6. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

7. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

8. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

2. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

3. This Class of Precautions must never be used for construction or renovation activities.

1. Provide active means to prevent airborne dust dispersion into the occupied areas.

CLASS II

**Implement all activities from CLASS I in addition to:

2. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

CLASS III

**Implement all activities from CLASS I & II in addition to:

3. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

4. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

5. If work area is contained, then it must be neutrally to negatively pressurized at all times.

6. Seal all doors with tape that will not leave residue.

7. Contain all trash and debris in the work area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy. Adhesive mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

11. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

12. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers: Carefully remove screws and painter tape, if dust will be generated during screw removal, use hand-held HEPA vacuum. Drywall cutting is prohibited during removal process. Clean all stud tracks with HEPA vacuum before removing outer hard barrier. Use a plastic barrier to enclose area if dust could be generated.

13. The use of negative air must be designed to remove contaminates from the work area.

14. Negative air devices must always remain operational and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling or, if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.

2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

3. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

4. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

5. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

6. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

7. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

8. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

9. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.

10. Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suits is acceptable.

11.Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

12. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

1. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

2. Personnel will be required to always wear disposable coveralls during Class V work activities. Disposable coveralls must be removed before leaving the anteroom.

STEP TWO: Using the following table, identify the Patient Risk Groups that will be affected. If more than one risk group will be affected, select the higher risk group.

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

Non-patient care areas:

• Outbuildings

• Office Areas, meeting Rooms

• Environmental Services

• Prosthetis

• Canteen Store

• Chapel

• Morgue

• Elevators

• Warehouse

• Police

• Boiler Plant

• Facilities Maintenance Shop

• Respiratory Therpy

• Outpatient Clinics

• CBOS's

• Adult Day Care

• Psychiatry

• Echocardiography

• Physical Therapy

• EEG

• EKG

• Occupational Health

• Animal Research

Laboratories

• Dental Excluding Dental

Operating Suites

• Canteen Food Areas

• Behavorial Health

• Emergency Room

• Phlebotomy

• Research Laboratories, Laboratories (Patient)

• Pharmacy

• Post Anesthesia Care Unit

• Endoscopy

• Surgical Unit

• Medical Unit

• Community Living Center

• Pulmonary, Renal and

Infectious Disease Clinic

• Sleep Lab

• Nuclear Mediciine (Building 27)

• Any Sterile Supply Room

• Radiology/MRI/CT

• Logistics Storage

• Laundry/Linen Areas

• Dialysis

• Cardiac Cath Lab

• Steril Processing and

Distribution

• Intensive Care Unit

• Oncology

• Radiation Therapy/Building 26

• Operating Rooms (including

Dental Operating Suite)

• VIR Suite

• Urology Procedure Room

• Ophthalmology Procedure

Room

• Women's Health Procedure

Room

• Stratton Inn Microbiology Lab

• Pharmacy (USP 797/800

Compounding Areas

STEP 2 - Patient Risk Group: MEDIUM RISK

Match the Patient Risk Group (Low, Medium, High, Highest) from Step Two with the planned Construction Activity Project Type (A, B, C, D) from Step one using the table to find the Class of Precautions (I, II, III, IV or V) or level of infection control activities required.

TYPE A TYPE B TYPE C TYPE D

I II II III

I

I

II

III

III

III

IV

VIV

IV

V

V

LOW Risk Group

MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

Patient Risk Group

Construction Project Type

Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.

Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.

*Type C [Medium Risk Groups] and Type D [Low Risk Groups] work areas [Class III precautions] that cannot be sealed and completely isolated from occupied patient care spaces should be elevated to include negative air exhaust requirements as listed in Class IV Precautions.

STEP 3 - Class of Precautions: CLASS IV

STEP FOUR: Assess potential risk to areas surrounding the project. Using Table 4, identify the surrounding areas that will be affected and the type of impact that will occur.

If more than one risk group will be affected, select the higher risk group using Table 2 - Patient Risk Group.

SURROUNDING AREA ASSESSMENT

Unit Below: Radiology Admin Unit Above: N/A Unit Lateral: Mental Health Unit Behind: Corridor Unit in Front: Staff Restrooms

Risk Group: Low

Contact:

Phone:

Risk Group:

Contact:

Phone:

Risk Group: Meduim

Contact:

Phone:

Risk Group: Low

Contact:

Phone:

Risk Group: Low

Contact:

Phone:

Additional Controls:

Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs

Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs

Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs

Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs

Noise Vibration Dust Control Ventilation Pressurization Vertical Shafts Elevator/Stairs

System Impacted:

Data Mechanical Med Gases Hot/Cold Water

System Impacted:

Data Mechanical Med Gases Hot/Cold Water

System Impacted:

Data Mechanical Med Gases Hot/Cold Water

System Impacted:

Data Mechanical Med Gases Hot/Cold Water

System Impacted:

Data Mechanical Med Gases Hot/Cold Water

Additional Controls: Additional Controls: Additional Controls: Additional Controls:

Noise & Vibration Mitigation Strategies

Use diamond drills instead of powder-actuated fastners.

Schedule noise-making periods with adjacent spaces.

Use beam clamps instead of shot.

Prefab where possible.

Use tim snips to cut metal studs instead of using a chop saw.

Install metal decking with vent tabs, then use cellar floor deck hangers.

Consider compression style fittings instead of soldering, brazing, or welding.

Wet core drill instead of dry core or percussion.

Instead of jackhammering concrete, use wet diamond saws.

Use HEPA vacuums instead of standard wet/dry vacuums.

Use mechanical joining system sprinkler fittings instead of threaded.

Where fumes are tolerated, use chemical adhesive remover (floor glue) instead of mechanical.

To remove flooring, consider abrasive blasting instead of using a floor scraper.

Use electronic sheers instead of reciprocating saw for ductwork cutting.

Install exterior man/material lifts.

Ventilation & Pressurization Mitigation Strategies

HEPA to exterior.

Install temporary ductwork.

Utilize temporary HVAC equipment.

Vacate the area.

Install temporary partitions.

Use carbon filtration odors.

Impact to Other Systems Mitigation Strategies

Schedule outages.

Provide temporary systems.

Back-feed electrical or medical gases.

INFECTION CONTROL RISK ASSESSMENT

STEP ONE: Using the following table, identify the Type of Construction Project Activity (Type A-D)

TYPE A

Inspection and Non-Invasive Activities Includes, but is not limited to:

• removal of ceiling tiles for visual inspection only e.g., limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Infection Control Risk Assessment

Matrix of Precautions for Construction & Renovation

TYPE B

Small scale, short duration activities that create minimal dust and debris.

Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet, or dry sanding) that produce minimal dust and debris.

TYPE C

Large-scale, longer duration activities that create a moderate amount of dust and debris.

Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework, or other building components.

• New drywall placement.

• Renovation work in a single room.

• Non-existing cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

TYPE D

Major demolition and construction activities Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

STEP 1 - Activity Type: TYPE D

STEP THREE:

THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER.

IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES, REFER TO PROJECT SPECIFICATIONS.

A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNERS' REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING.

B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE MANOMETER MONITORS

FOR ALL CONSTRUCTION BARRIERS.

C. CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00 AND OR AFTER 4:00 PM UNLESS ARRANGED WITH THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL HAVE TO BE SUBMITTED AND

PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED.

D. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS.

E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM

MULTIPLE TIMES A DAY.

F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDED NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING MANOMETER AT

ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.

INFECTION CONTROL NOTES:

X X X X X X X X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /2

V

A S a n

J u a n

C h a p e l a n d

M e n ta l H e a lt h

W a it in g /2

S

A N

J U

A N

C H

A P

E L A

N D

M E

N T

A L H

E A

L T

H .r v t

/2 /2

:5

:1

A M

G003

INFECTION CONTROL RISK

ASSESMENT

Renovate Second Floor Mental

Health Outpatient Clinic and Chapel

10 CALLE CASIA

SAN JUAN, PR 0921-3201

23010

11.11.2023 LK LK

PERMIT SET

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /2

V

A S a n

J u a n

C h a p e l a n d

M e n ta l H e a lt h

W a it in g /2

S

A N

J U

A N

C H

A P

E L A

N D

M E

N T

A L H

E A

L T

H .r v t

/2 /2

:5

:1

A M

G004

3D VIEWS Renovate Second Floor Mental

Health Outpatient Clinic and Chapel

10 CALLE CASIA

SAN JUAN, PR 0921-3201

23010

11.11.2023 MC LK

PERMIT SET

Revisions: Date:

G004

CHAPEL 3D VIEW 2B7

G004

CHAPEL 3D VIEW 5F4

G004

CHAPEL 3D VIEW 3D4

G004

CHAPEL 3D VIEW 4D7

G004

CHAPEL 3D VIEW 6F7

G004

MENTAL HEALTH 3D VIEW 2F1

G004

CHAPEL 3D VIEW 1B4

G004

MENTAL HEALTH 3D VIEW 1C1

PROJECT

AREA

KEY PLAN

SD

SD

TS

FS

FS

A B C D

MENTAL HEALTH WAITING

CORRIDOR

TOILET

TOILET

SACRAMENT ROOM

CHAPLAIN OFFICE

NURSE OFFICE

STORAGE

ELECT. CLOSET

CORRIDOR

SOCIAL WORK OFFICE

MECHANICAL ROOM

OFFICE

OFFICE

SACRISITY OFFICE

STORAGE

CHAPLAIN OFFICE

CHAPLAIN OFFICE

CHAPLAIN OFFICE

CHAPEL

SF-3

(ON ROOF

ABOVE)

AHU-8

1 2 3

1 2 4

LIMITS OF

SURVEY

LIMITS OF

SURVEY

PROGRESS PRINT

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Scientists I Engineers I Program Managers Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180 T. 781-275-6050 www.mabbett.com

Mabbett R

Au to de sk

D oc s:

//2

V A

Sa n

Ju an

C ha pe l a nd M en ta l H ea lth W ai tin g/

- S an J ua n

C ha pe l &

M en ta l H ea lth

R

_M

EP

FP

FA

T.

rv t

8/ 4/

:3

9:

P M

8/4/2023 1:39:39 PM

HA101

SECOND FLOOR PLAN -

ABATEMENT

Renovate Second Floor Mental Health Outpatient Clinic and Chapel

10 CALLE CASIA

SAN JUAN, PR 0921-3201

672-23-100

11.11.2023 MFD DJA

PERMIT SET

N

0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"1 SECOND FLOOR PLAN - ABATEMENT

Revisions: Date:

GENERAL ABATEMENT NOTES:

ABATEMENT KEYNOTES:

LIMIT OF SURVEY/LEGEND:

Rectangle

A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD

AND COORDINATE ALL REMOVAL ACTIVITIES WITH NEW CONSTRUCTION.

THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO THE OWNER'S

REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING REMOVALS.

B. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE DURING

REMOVAL OF ADJACENT CONSTRUCTION. REPAIR/REPLACE

CONSTRUCTION TO REMAIN THAT WAS DAMAGED DURING DEMOLITION TO

MATCH THE QUALITY OF THE NEW WORK. PROVIDE DUST CONTROL AND

CONTAINMENT MATS, FLOOR AND WALL PROTECTION.

C. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK

MAY ALSO BE NECESSARY IN AREAS NOT SHOWN ON THE

ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING EXISTING

ELECTRICAL, OR OTHER SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A

PART OF THE CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS

AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN ACCORDANCE

WITH THE CONTRACT REQUIREMENTS AND AT NO ADDITIONAL COST TO

THE OWNER.

D. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS, COLUMNS OR

OTHER STRUCTURAL ELEMENTS UNLESS SPECIFICALLY NOTED. MAKE

OPENINGS OF PROPER SIZE FOR CONDUITS AND PIPING AND OTHER

ITEMS PASSING THROUGH OPENINGS.

E. GC TO SCAN THE SLAB AT EACH LOCATION OF PROPOSED FLOOR/SLAB

PENETRATION PRIOR TO CUTTING TO ENSURE THAT AREA IS CLEAR OF

EMBEDDED CONDUITS AND/OR LIVE CONDUCTORS.

F. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO MATCH

ADJACENT EXISTING FINISHES DAMAGED OR NEWLY EXPOSED DURING

THE PERFORMANCE OF THE WORK OF THIS CONTRACT.

G. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF EXISTING

FINISHES IS REQUIRED TO PERFORM THE WORK UNDER THIS CONTRACT,

AND A NEW FINISH IS NOT INDICATED, FILL RESULTING OPENINGS AND

PATCH THE SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH

ADJACENT EXISTING SURFACES.

H. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL CONDUITS AND

PIPING IN EVERY CASE ABOVE THE CEILING. REMOVE EXISTING CEILING

AS NECESSARY. AFTER INSTALLATION OF CONCEALED WORK, REINSTALL

REMOVED CEILING AND PATCH AND REFINISH TO MATCH ADJACENT UN-

REMOVED CEILINGS.

I. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR OTHERWISE

INDICATED AS EXISTING.

J. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH NEW AND

EXISTING WALLS AND PARTITIONS.

K. WHERE "MATCH EXISTING" IS INDICATED, NEW CONSTRUCTION OR

FINISHES, AS APPROPRIATE TO THE NOTE, SHALL MATCH THE EXISTING IN

THE PARTICULAR.

L. DEFINITIONS

M. M1. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT

THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR EXISTING.

M2. SALVAGE: ITEMS INDICATED TO BE SALVAGED SHALL REMAIN THE

OWNER'S PROPERTY. REMOVE, CLEAN AND PACK OR CRATE ITEMS TO

PROTECT AGAINST DAMAGE. IDENTIFY CONTENTS OF CONTAINERS AND

DELIVER TO OWNER'S DESIGNATED STORAGE AREA.

M3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN SERVICE AND

OTHERWISE PREPARE THEM FOR REUSE. STORE AND PROTECT AGAINST

DAMAGE. REINSTALL ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS

INDICATED.

M4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT CONSTRUCTION

INDICATED AS EXISTING AGAINST DAMAGE AND SOILING DURING

SELECTIVE DEMOLITION.

M5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT BACK TO THEIR

ORIGINAL CONDITION. ORIGINAL CONDITION IS THE CONDITION THAT THE

REFERENCED ITEM WAS IN WHEN THE BUILDING WAS FIRST

CONSTRUCTED.

M6. REPLACE: EXISTING ITEM TO BE REMOVED. PROVIDE NEW ITEM TO

MATCH EXISTING.

N. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION CONTROL

REGULATIONS.

O. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES AND

COORDINATE TRASH REMOVAL WITH THE VA.

P. TEMPORARY CONTINUOUS CONSTRUCTION BARRIER MUST BE IN PLACE

PRIOR TO ANY DEMOLITION. G.C. TO DETERMINE LOCATION FOR

TEMPORARY CONSTRUCTION BARRIER DOOR ACCESS. CONSTRUCTION

BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE STICKY MATS ON

ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED

AT CONSTRUCTION ENTRY. PAINT PUBLIC FACE OF TEMP BARRIER WHITE.

Q. PROVIDE NANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS.

R. PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO

EXTERIOR OF THE BUILDING.

S. CONTRACTOR TO REVIEW & FOLLOW ALL ABATEMENT REQUIREMENTS

PRIOR TO THE START OF GENERAL DEMOLITION.

T. GC TO COORDINATE WITH VA WHEN MAJOR SHUTDOWNS ARE TO OCCUR.

SHUTDOWNS WILL NEED TO OCCUR AFTER REGULAR BUSINESS HOURS,

OVERNIGHT AND WEEKENDS AS NEEDED TO MINIMIZE IMPACT TO

PATIENTS AND STAFF.

GENERAL DEMOLITION NOTES:

EXISTING CONSTRUCTION TO REMAIN

WALL OR ELEMENTS TO BE REMOVED

EXTENT OF FLOOR SLAB TO BE REMOVED.

COORDINATE DIMENSIONS AND LOCATIONS

WITH STRUCTURAL AND UTILITIES

DEMOLITION TAG10

DEMOLITION LEGEND:

NOT IN SCOPE

DCB

4 4

10 11

PROJECT

AREA

KEY PLAN

DCB

5 6

A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD

AND COORDINATE ALL REMOVAL ACTIVITIES WITH NEW CONSTRUCTION.

THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO THE OWNER'S

REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING REMOVALS.

B. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE DURING

REMOVAL OF ADJACENT CONSTRUCTION. REPAIR/REPLACE

CONSTRUCTION TO REMAIN THAT WAS DAMAGED DURING DEMOLITION TO

MATCH THE QUALITY OF THE NEW WORK. PROVIDE DUST CONTROL AND

CONTAINMENT MATS, FLOOR AND WALL PROTECTION.

C. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK

MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK

MAY ALSO BE NECESSARY IN AREAS NOT SHOWN ON THE

ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING EXISTING

ELECTRICAL, OR OTHER SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A

PART OF THE CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS

AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN ACCORDANCE

WITH THE CONTRACT REQUIREMENTS AND AT NO ADDITIONAL COST TO

THE OWNER.

D. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS, COLUMNS OR

OTHER STRUCTURAL ELEMENTS UNLESS SPECIFICALLY NOTED. MAKE

OPENINGS OF PROPER SIZE FOR CONDUITS AND PIPING AND OTHER

ITEMS PASSING THROUGH OPENINGS.

E. GC TO SCAN THE SLAB AT EA LOCATION OF PROPOSED FLOOR/SLAB

PENETRATION PRIOR TO CUTTING TO ENSURE THAT AREA IS CLEAR OF

EMBEDDED CONDUITS AND/OR LIVE CONDUCTORS.

F. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO MATCH

ADJACENT EXISTING FINISHES DAMAGED OR NEWLY EXPOSED DURING

THE PERFORMANCE OF THE WORK OF THIS CONTRACT.

G. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF EXISTING

FINISHES IS REQUIRED TO PERFORM THE WORK UNDER THIS CONTRACT,

AND A NEW FINISH IS NOT INDICATED, FILL RESULTING OPENINGS AND

PATCH THE SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH

ADJACENT EXISTING SURFACES.

H. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL CONDUITS AND

PIPING IN EVERY CASE ABOVE THE CEILING. REMOVE EXISTING CEILING

AS NECESSARY. AFTER INSTALLATION OF CONCEALED WORK, REINSTALL

REMOVED CEILING AND PATCH AND REFINISH TO MATCH ADJACENT UN-

REMOVED CEILINGS.

I. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR OTHERWISE

INDICATED AS EXISTING.

J. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH NEW AND

EXISTING WALLS AND PARTITIONS.

K. WHERE "MATCH EXISTING" IS INDICATED, NEW CONSTRUCTION OR

FINISHES, AS APPROPRIATE TO THE NOTE, SHALL MATCH THE EXISTING IN

THE PARTICULAR.

L. DEFINITIONS

M. M1. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT

THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR EXISTING.

M2. SALVAGE: ITEMS INDICATED TO BE SALVAGED SHALL REMAIN THE

OWNER'S PROPERTY. REMOVE, CLEAN AND PACK OR CRATE ITEMS TO

PROTECT AGAINST DAMAGE. IDENTIFY CONTENTS OF CONTAINERS AND

DELIVER TO OWNER'S DESIGNATED STORAGE AREA.

M3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN SERVICE AND

OTHERWISE PREPARE THEM FOR REUSE. STORE AND PROTECT AGAINST

DAMAGE. REINSTALL ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS

INDICATED.

M4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT CONSTRUCTION

INDICATED AS EXISTING AGAINST DAMAGE AND SOILING DURING

SELECTIVE DEMOLITION.

M5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT BACK TO THEIR

ORIGINAL CONDITION. ORIGINAL CONDITION IS THE CONDITION THAT THE

REFERENCED ITEM WAS IN WHEN THE BUILDING WAS FIRST

CONSTRUCTED.

M6. REPLACE: EXISTING ITEM TO BE REMOVED. PROVIDE NEW ITEM TO

MATCH EXISTING.

N. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION CONTROL

REGULATIONS.

O. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES AND

COORDINATE TRASH REMOVAL WITH THE VA.

P. TEMPORARY CONTINUOUS CONSTRUCTION BARRIER MUST BE IN PLACE

PRIOR TO ANY DEMOLITION. G.C. TO DETERMINE LOCATION FOR

TEMPORARY CONSTRUCTION BARRIER DOOR ACCESS. CONSTRUCTION

BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE STICKY MATS ON

ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED

AT CONSTRUCTION ENTRY. PAINT PUBLIC FACE OF TEMP BARRIER WHITE.

Q. PROVIDE NANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS.

R. PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO

EXTERIOR OF THE BUILDING.

S. CONTRACTOR TO REVIEW & FOLLOW ALL ABATEMENT REQUIREMENTS

PRIOR TO THE START OF GENERAL DEMOLITION.

T. GC TO COORDINATE WITH VA WHEN MAJOR SHUTDOWNS ARE TO OCCUR.