S02 - Attachment 01 - AHU 2 Drawings Final (86 pages).pdf
PDF 46 MB Posted
- Attached to
- Y1NB--Replace Air Handling Unit No. 2 and 3 Federal contract opportunity
- Solicitation number
- 36C24822R0103
About this file
This document outlines the scope of work for a federal construction contract solicitation to replace two air handling units at the Malcom Randall VA Medical Center in Gainesville, Florida. The solicitation number is 36C24822R0103 to replace AHU 2 and AHU 3, with a period of performance of 1095 calendar days for AHU 2 and 730 calendar days for AHU 3. The scope of work includes demolishing existing structures and ductwork, installing new air handling units, fans, ductwork, VAV boxes, controls, and associated mechanical, electrical and automation systems. Construction must be phased to minimize disruption to occupied areas of the hospital. The document provides extensive details on requirements for submittals, construction phasing, swing space, and compliance with VA standards and codes.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASPHALT PAVEMENT
O
O
O
O
O
O
7"
6"
SIGN
SI
G
N
DN
DN
DN
VICINITY MAP
DEPARTMENT OF VETERANS AFFAIRS
NORTH FLORIDA/SOUTH GEORGIA
VETERANS HEALTH SYSTEM
1601 SW ARCHER ROAD
GAINESVILLE, FL 32608
3603 NW 98TH STREET, SUITE B
GAINESVILLE, FLORIDA 32606
PH: (352) 474-6124
FAX. (352) 553-4437
COA: FL #29758
DESIGNED FOR:
Veterans Affairs Department of
DESIGNED BY:
PROJECT
LOCATION
PROJECT LOCATION MAP
PROJECT
LOCATION
G001 3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 10
REPLACE AIR HANDLING UNIT
(AHU) 2
GAINESVILLE, FLORIDA
573-18-602
JANUARY 21, 2022Revisions: Date:
Office of Construction and Facilities Management
ARCHITECT / ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
STATE OF
No. 89060
Digitally signed by Jonathan H Ko Date: 2022.01.21 17:06:13 -05'00'
FEC
FEC
FE
C
FE
C
FEC
DN
DN
FEC
FEC
FE
C
FE
C
FEC
D
E
F
G
H
J
K
A
B
C
AHU-61
48X48 SLAB OPENING
FOR 42x42 SA DUCT
54x54 SLAB OPENING FOR 48x48 RA DUCT
50X50 SLAB OPENING
FOR 44x44 EA DUCT
HXS-61
PHASE 3:
PROVIDE AHU-61 AND HXS-61
86X26 SLAB OPENING
FOR 80x20 SA DUCT 76X26 SLAB OPENING
FOR 70x20 RA DUCT 36x36 SLAB OPENING
FOR DCW, CHS, CHR,
HWS, HWR, LPS, AND PC
PIPE PENETRATION
PHASE 2:
RENOVATE SWING SPACE
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
PHASE 1: DEMOLISH AHU-14 AND AHU-44
DEMOLISH EXISTING
AHU-44
DEMOLISH AHU-14
RELOCATE
PROCESSING WATER
COOLER FOR CT
SCAN EQUIPMENT
INSTALL TEMPORARY
AIR HANDLING UNIT
AHU-14T and AHU-44T
ON GROUND LEVEL
3/64" = 1'-0" 3 2nd Floor Phasing Plan - Phase 3
Project Overview Narrative:
The intent of this project is replace AHU-5 with new AHU-61 and AHU-62 to modernize the HVAC system and improve the system effectiveness. Existing AHU-5 and radiant ceiling panels are deteriorated, outdated, and inefficient, and they are demolished in this project. New AHU-61 and AHU-62 that are capable of operating as variable air volume with return air system are installed on Level 2. Horizontal and vertical distribution of airflow is reconfigured with new supply, return, and exhaust ducts. Heat exchanger station is installed on Level 2 to provide hot water to preheat coil in AHU-61 and AHU-62 and reheat coil in air terminal units.
General Notes for All Phasing Plans:
• The old name of AHU-5 is AC-2, and the project title refers this unit as AHU-2. The unit has been renamed to AHU-5, and is successor to AHU-2 and AC-2.
• Phase numbers indicate the sequence of construction work. Zone numbers indicate the smoke compartment zones.
• Perform testing and balancing of new HVAC system after completion of construction work in each phase.
• Coordinate with VA prior to moving back occupants from swing space to building space
• Refer to architectural documents in regards to planning for relocating occupants to swing space
• Duct dimensions shown on phasing plans are inside clear dimensions of sheet metal. Refer to structural and architectural drawings for slab penetration dimensions.
Interim Life Safety Measures (ILSM) requirements:
• Follow ILSM requirements during construction.
• Drain fire sprinklers and shut down the fire protection system temporarily in construction zone.
• Replace existing smoke detectors with temporary heat detectors for fire detection in construction zone.
• Remaining occupied area requires two fire drills quarterly.
Deduct Alternate Scope:
• Deduct Alternate No.1 - No HVAC upgrade work in Zone B-A (Auditorium, Canteen Service, Retail Store, and Rehab Medicine) in Phase 5. No work in Phase 6. Keep existing AHU-5 and associated duct, piping and controls.
3/64" = 1'-0" 2 1st Floor Phasing Plan - Phase 2
STATE OF
P R
O
FES S IO NA L ENGIN
E E
R
JO
NA T HA N H. KO
No. 89060
L IC E NS E
F L O R I D A
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER - OF - RECORD FL. P.E. NO.
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
-0 1-
7:
:0
JHK JHK
JONATHAN H. KO 89060
JANUARY 21, 2022
G002
Construction Phasing Plan
Phasing Note:
Phase 1: Demolish AHU-14 and AHU-44
1. Inpatient Pharmacy (Zone 1-B) and Nuclear Medicine (Zone B-B) remain operational during construction.
2. Record airflow and pressure through existing duct penetration at AHU-14 and AHU-44.
3. Provide temporary air handling units, AHU-14T and AHU-44T at designated location. Use flexible duct to refeed the existing HVAC distribution duct from
Level 2. Provide spot coolers in Inpatient Pharmacy and Nuclear Medicine to maintain temperature and humidity during switchover.
4. Demolish AHU-14 (Pharmacy) and AHU-44 (Nuclear Medicine). Relocate CT-ACCU-1, air cooled condensing unit for CT scan equipment. Coordinate equipment shutdown with VA.
Phase 2: Swing space preparation
1. Prepare swing space on 1st floor ACA. Renovate interior space for temporary occupancy of departments that are affected by HVAC upgrade work.
Phase 3 on Level 2: Provide AHU-61 and HXS-61
1. Replace existing 3-way control valve with 2-way control valve at chilled water piping for AHU-5
2. Provide AHU-61 and HXS-61 on Level 2.
3. Provide new chilled water and hot water pipes to AHU-61 cooling coil and preheat coil.
4. Provide new steam pipes to HXS-61.
5. Provide exhaust fan associated with AHU-61 on Level 2.
6. Perform testing, balancing, and commissioning
3/64" = 1'-0" 1 2nd Floor Phasing Plan - Phase 1
Revisions: Date:
Digitally signed by Jonathan H Ko Date: 2022.01.21 17:20:45
RECEPTION /
SCHEDULING
PREP/RECOVERY #1
CORRIDOR
PREP/RECOVERY #2
READING RM.
PREP/RECOVERY #3
ADA TOILET
SOILED
STAFF TLT.
CLEAN STORAGE
110 CORRIDOR
P-5 P-6
LOBBY CORRIDOR
P-3
ANGIO RM. #2
EQUIP.
107 ANGIO RM. #1
P-4
DUCT CHASE
EQUIP.
S-2
SHARED
CONTROL
EQUIP.
S-1
FEC
FEC
FE
C
FE
C
FEC
PHASE # SMOKE ZONE NEW AHU DEPT. TO RELOCATE TO SWING SPACE DEPT. TO REMAIN
1-B AHU-61
PHARMACY ADMINISTRATION,
CARDIOLOGY,
HEALTHCARE ADMIN SERVICE,
VOLUNTARY
SERVICE
INPATIENT PHARMACY
1-C AHU-61 DIRECTOR'S SUITE
1-D AHU-61 ORTHOPEDICS SPECIALITY CLINIC MUSCULOSKELETAL READING ROOM, PATHOLOGY LAB
1-E AHU-61 RADIOLOGY
1-A AHU-62 REHAB MEDICINE AND CHAPEL
1-B AHU-62 SURGICAL OFFICE
B-B AHU-61 SCHEDULING UNIT NUCLEAR MEDICINE,
CYTOLOGY LAB
B-A AHU-62 REHAB MEDICINE
AUDITORIUM,
CANTEEN SERVICE,
RETAIL STORE
B-D AHU-61 - STAFF FACILITY,
NUTRITION/FOOD
345610
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
Smoke Zone 1C
Smoke Zone 1B
Smoke Zone 1D
Smoke Zone 1E
Smoke Zone 1B
Smoke Zone 1A
PHASE 4
HVAC SYSTEM UPGRADES IN
SMOKE ZONE 1A & 1B
R.3
RR.1
S
7891112
40X40 SLAB OPENING FOR 34x34 EA DUCT
36x36 SLAB OPENING FOR DCW, CHS, CHR, HWS, HWR, LPS, AND PC
PIPE IN CHASE
86X26 SLAB OPENING
FOR 80x20 SA DUCT
76X26 SLAB OPENING
FOR 70x20 RA DUCT
26X78 SLAB OPENING
FOR 20x72 SA DUCT
62X43 SLAB OPENING FOR 30x32 RA
DUCT AND CHS & CHR PIPE RISER
345610
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
Smoke Zone 1C
Smoke Zone 1B
Smoke Zone 1D
Smoke Zone 1E
Smoke Zone 1B
Smoke Zone 1APHASE 3:
HVAC SYSTEM UPGRADES IN
SMOKE ZONE 1B, 1C, 1D, & 1E
40X40 SLAB OPENING FOR 34x34 EA DUCT
36x36 SLAB OPENING FOR DCW, CHS, CHR, HWS, HWR, LPS, AND PC
PIPE IN CHASE
62X43 SLAB OPENING FOR 30x32 RA
DUCT AND CHS & CHR PIPE RISER
789111213
86X26 SLAB OPENING
FOR 80x20 SA DUCT
76X26 SLAB OPENING
FOR 70x20 RA DUCT
26X78 SLAB OPENING
FOR 20x72 SA DUCT
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
AHU-62
AHU-61
50X78 SLAB OPENING
FOR 44x72 SA DUCT
18X18 SLAB
OPENING FOR
12x12 EA DUCT
HXS-61
PHASE 4
PROVIDE AHU-62
72X52 SLAB OPENING FOR 46x46 RA
DUCT AND CHS & CHR PIPE
PENETRATION
48X48 SLAB OPENING
FOR 42x42 SA DUCT
50X50 SLAB OPENING
FOR 44x44 EA DUCT86X26 SLAB OPENING
FOR 80x20 SA DUCT
76X26 SLAB OPENING
FOR 70x20 RA DUCT
36x36 SLAB OPENING
FOR DCW, CHS, CHR,
HWS, HWR, LPS, AND PC
PIPE PENETRATION
54X54 SLAB OPENING
FOR 48x48 RA DUCT
3/64" = 1'-0" 3 1st Floor Phasing Plan - Phase 4
Phasing Note:
Phase 4 on Level 2: Provide AHU-62
1. Replace existing 3-way control valve with 2-way control valve at chilled water piping for AHU-5
2. Provide AHU-62 on Level 2.
3. Provide new chilled water and hot water pipes to AHU-62 cooling coil and preheat coil.
4. Provide exhaust fan associated with AHU-62 on Level 2.
5. Perform testing, balancing, and commissioning
Phase 4 on Level 1: AHU-62, 1st floor HVAC system upgrade
1. HVAC system upgrades in Zone 1-A and 1-B
A. Department in this phase
a. Zone 1-A: Rehab Medicine and Chapel
b. Zone 1-B: Surgical Office
2. Relocate Rehab Medicine (Zone 1-A), Chapel (Zone 1-A) and Surgical Office (Zone 1-B) to swing space.
3. Perform 1st floor AHU-62 HVAC system upgrade
A. Demolish existing duct distribution, air terminal units, radiant panel system and its associated piping, controls and appurtenances.
Remove all unused duct and pipe.
B. Demolish hot & cold deck from AHU-5, supply duct from AHU-6, and exhaust ducts from rooftop exhaust fans on Level 6 C. Provide slab penetration for vertical duct down, horizontal duct distribution, and VAV boxes with HW reheat piping.
D. Perform testing, balancing, and commissioning
4. Relocate occupants back to 1-A and 1-B.
STATE OF
P R
O
FES S IO NA L ENGIN
E E
R
JO
NA T HA N H. KO
No. 89060
L IC E NS E
F L O R I D A
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER - OF - RECORD FL. P.E. NO.
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
-0 1-
7:
:1
JHK JHK
JONATHAN H. KO 89060
JANUARY 21, 2022
G003
Construction Phasing Plan
3/64" = 1'-0" 1 1st Floor Phasing Plan - Phase 3
Phasing Note:
Phase 3 on Level 1: AHU-61, 1st floor HVAC system upgrades
1. HVAC system upgrades in Zone 1-B, 1-C, 1-D, and 1-E.
A. Departments in this phase:
a. Zone 1-C, Director’s Office Suite
b. Zone 1-B, Inpatient Pharmacy, Pharmacy Administration, Cardiology, Healthcare Admin Service, Voluntary Service
c. Zone 1-D, Pathology Lab and Orthopedic Clinic, Musculoskeletal Reading Room
d. Zone 1-E, Radiology
2. Inpatient Pharmacy (Zone 1-B), Pathology Labs (Zone 1-D), Musculoskeletal Reading Room (Zone 1-D), and Radiology (Zone 1-E) remain operational during weekdays. Construction work is allowed during weekends only. Coordinate with VA and prepare detailed procedure for sub-phasing of work in this area.
3. Relocate occupants in Director's Office Suite (1-C), Pharmacy Administration (1-B), Cardiology (1-B), Healthcare Admin Service (1-B), Voluntary Service (1-B) and Orthopedic Specialty Clinic (1-D) to swing space.
4. Perform 1st floor AHU-61 HVAC system upgrade A. Demolish existing duct distribution, air terminal units, radiant panel system and its associated piping, controls and appurtenances. Remove all unused duct and pipe.
B. Demolish hot & cold deck from AHU-5, supply duct from AHU-6, and exhaust ducts from rooftop exhaust fans on Level 6 C. Provide new vertical duct penetration, horizontal duct distribution, and VAV boxes with HW reheat piping.
D. Perform testing, balancing, and commissioning
5. Relocate occupants back to 1-B, 1-C, 1-D, and 1-E
3/64" = 1'-0" 2 2nd Floor Phasing Plan - Phase 4
Revisions: Date:
Digitally signed by Jonathan H Ko Date: 2022.01.21 17:21:50
UP
DN
DN
UP
UP
345610
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
Smoke Zone BB
Smoke Zone BD
Smoke Zone BA
(DEDUCT ALTERNATE SCOPE)
PHASE 5:
HVAC SYSTEM UPGRADES IN SMOKE ZONE BA, BB & BD
R.3
RR.1
18X32 SLAB OPENING FOR CHS
AND CHR PIPE RISER
78911
36X52 SLAB OPENING FOR DCW, CHS,
CHR, LPS, PC PIPE
D
E
F
G
H
J
K
C
12789
PHASE 6: DEMOLISH AHU-5 AND ASSOCIATED
HVAC SYSTEM IN PIPE BASEMENT
AH
U
-5
STATE OF
P R
O
FES S IO NA L ENGIN
E E
R
JO
NA T HA N H. KO
No. 89060
L IC E NS E
F L O R I D A
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
ENGINEER - OF - RECORD FL. P.E. NO.
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
-0 1-
7:
:1
JHK JHK
JONATHAN H. KO 89060
JANUARY 21, 2022
G004
Construction Phasing Plan
3/64" = 1'-0" 1 Basement Phasing Plan - Phase 5
Base Bid Scope Phasing Note:
Phase 5 - Base Bid Scope: Basement AHU-61 and AHU-62 HVAC system upgrade
1. HVAC system upgrades in Zone B-A, B-B and B-D
A. Smoke zones:
a. AHU-61 B-B, Nuclear Medicine, Cytology Lab, and Scheduling Unit
b. AHU-62 B-A, Auditorium, Canteen Service, Retail Store, and Rehab Medicine
c. AHU-61 B-D, Staff Facility, Nutrition/Food
2. Nuclear Medicine Suite and Cytology Lab in Zone B-B remain operational during weekdays. Construction work is allowed during weekends only. Coordinate with VA and prepare detailed procedure for subphasing of work in this area.
3. Relocate Scheduling Unit in Zone B-B and Rehab Medicine in Zone B-A to swing space.
4. Perform basement AHU-61 and AHU-62 HVAC system upgrade
A. Demolish existing duct distribution, air terminal units, controls and appurtenances. Remove all unused duct and pipe.
B. Demolish hot & cold deck from AHU-5 and exhaust ducts from rooftop exhaust fans on Level 6 C. Provide new vertical duct penetration, horizontal duct distribution, and VAV boxes with HW reheat piping.
D. Perform testing, balancing, and commissioning
5. Relocate occupants back to B-A, B-B, and B-D
Phase 6 - Base Bid Scope: Demolition of AHU-5
1. Demolish AHU-5, associated duct, piping and controls.
Phase 5 - Deduct Alternate Scope:
No HVAC upgrade work in Zone B-A (Auditorium, Canteen Service, Retail Store, and Rehab Medicine) in Phase 7.
Zone B-A continues to be served by AHU-5.
Phase 6 - Deduct Alternate Scope:
No work in Phase 6.
Keep AHU-5 and associated duct, piping, and controls in MECH A/C 1-B
Deduct Alternate Scope Phasing Note:
Phase 5 - Deduct Alternate Scope (Phase 5 in PART): Basement AHU-61 HVAC system upgrade
1. HVAC system upgrades in Zone B-B and B-D
A. Smoke zones:
a. AHU-61 B-B, Nuclear Medicine, Cytology Lab, and Scheduling Unit
b. AHU-61 B-D, Staff Facility, Nutrition/Food
2. Nuclear Medicine Suite and Cytology Lab in Zone B-B remain operational during weekdays. Construction work is allowed during weekends only. Coordinate with VA and prepare detailed procedure for subphasing of work in this area.
3. Relocate Scheduling Unit in Zone B-B to swing space.
4. Perform basement AHU-61 HVAC system upgrade
A. Demolish existing duct distribution, air terminal units, controls and appurtenances. Remove all unused duct and pipe.
B. Demolish hot & cold deck from AHU-5 and exhaust ducts from rooftop exhaust fans on Level 6 C. Provide new vertical duct penetration, horizontal duct distribution, and VAV boxes with HW reheat piping.
D. Perform testing, balancing, and commissioning
5. Relocate occupants back to B-B, and B-D
Phase 6 - Deduct Alternate Scope (Phase 6 in TOTAL): Keep AHU-5, associated duct, piping and controls.
3/64" = 1'-0" 3 Pipe Basement Phasing Plan - Phase 6
Revisions: Date:
Digitally signed by Jonathan H Ko Date: 2022.01.21 17:23:10 -05'00'
DN
DN
PHASE # SMOKE ZONE NEW AHU DEPT. TO RELOCATE TO SWING SPACE DEPT. TO REMAIN
1-B AHU-61
PHARMACY ADMINISTRATION,
CARDIOLOGY,
HEALTHCARE ADMIN SERVICE,
VOLUNTARY
SERVICE
INPATIENT PHARMACY
1-C AHU-61 DIRECTOR'S SUITE
1-D AHU-61 ORTHOPEDICS SPECIALITY CLINIC MUSCULOSKELETAL READING ROOM, PATHOLOGY LAB
1-E AHU-61 RADIOLOGY
1-A AHU-62 REHAB MEDICINE AND CHAPEL
1-B AHU-62 SURGICAL OFFICE
B-B AHU-61 SCHEDULING UNIT NUCLEAR MEDICINE,
CYTOLOGY LAB
B-A AHU-62 REHAB MEDICINE
AUDITORIUM,
CANTEEN SERVICE,
RETAIL STORE
B-D AHU-61 - STAFF FACILITY,
NUTRITION/FOOD
RE
HA
B
ME
DI
CI
NE
SM
OK
E
ZO
NE
1- A
SURGICAL OFFICES = 20-24 OCCUPANTS
SMOKE ZONE 1-B
CARDIOLOGY OFFICES = 6 OCCUPANTS
SMOKE ZONE 1-B
CHAPEL
CH
AP
EL
SM
OK
E
ZO
NE
1- A
DIRECTOR'S OFFICES =40 OCCUPANTS
SMOKE ZONE 1-C
PHARMACY ADMINISTRATION
= 7-12 OCCUPANTS
SMOKE ZONE 1-B
ORTHOPEDIC SPECIALITY CLINIC
= 19-24 OCCUPANTS
SMOKE ZONE 1-D
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
1/
/2
4:
:0
PM
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
G006
1ST FLOOR SWING SPACE -
PHASES 3 & 4
1/16" = 1'-0"2
ACA 1ST FLOOR PLAN - PHASE# 4
SWING SPACE RELOCATION SCHEME
1/16" = 1'-0"4
ACA 1ST FLOOR PLAN - PHASE# 3
SWING SPACE RELOCATION SCHEME
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:09:41-05'00'
PHASE # SMOKE ZONE NEW AHU DEPT. TO RELOCATE TO SWING SPACE DEPT. TO REMAIN
1-B AHU-61
PHARMACY ADMINISTRATION,
CARDIOLOGY,
HEALTHCARE ADMIN SERVICE,
VOLUNTARY
SERVICE
INPATIENT PHARMACY
1-C AHU-61 DIRECTOR'S SUITE
1-D AHU-61 ORTHOPEDICS SPECIALITY CLINIC MUSCULOSKELETAL READING ROOM, PATHOLOGY LAB
1-E AHU-61 RADIOLOGY
1-A AHU-62 REHAB MEDICINE AND CHAPEL
1-B AHU-62 SURGICAL OFFICE
B-B AHU-61 SCHEDULING UNIT NUCLEAR MEDICINE,
CYTOLOGY LAB
B-A AHU-62 REHAB MEDICINE
AUDITORIUM,
CANTEEN SERVICE,
RETAIL STORE
B-D AHU-61 - STAFF FACILITY,
NUTRITION/FOOD
SCHEDULING UNIT AND MEDICINE
OFFICES = 14-18 OCCUPANTS
SMOKE ZONE B-B
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
-0 1-
0:
:4
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
G007
1ST FLOOR SWING SPACE -
PHASE 5
1/16" = 1'-0"2
ACA 1ST FLOOR PLAN - PHASE #5
SWING SPACE RELOCATION SCHEME
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:10:21-05'00'
FLOOR PLAN NOTES
FLOOR PLAN LEGEND
AREA OUTSIDE ARCHITECTURAL
CONTRACT LIMITS
EXITING WALL CONSTRUCTION TO REMAIN
PARTITION TAG SEE SHEET , REFER
TO WALL TYPES SHEET#A402
1i
NEW TWO-HOUR FIRE RATED WALL,
REFER TO WALL TYPES
1.
2.
3.
4.
5.
6.
7.
8.
DIMENSIONS ARE TO THE FACE OF
PARTITION/EQUIPMENT/EXISTING ELEMENT, CENTERLINE OR
CLEAR JAMB OPENING OF DOORS, OR STRUCTURAL GRID. DO
NOT SCALE DRAWINGS
CLEAN & PREP SLAB FOR NEW FLOORING - FILL ANY
DEPRESSIONS AND LEVEL ALL SLOPED AREAS PRIOR TO
STARTING NEW WORK.
PATCH ALL FINISHES & MATERIALS DISTURBED IN
DEMOLITION IN EXECUTION OF NEW WORK TO MATCH
ADJACENT SURFACES & AS REQUIRED TO ACCEPT NEW
WORK.
REFER TO SHEET #A502 FOR THE SHAFT WALL SECTIONS.
PATCH EXISTING SURFACES WITH SIMILAR MATERIAL AND
COLORS TO MATCH ADJACENT. REPAIR FLOOR FINISHES
SUFFICIENTLY TO AVOID TRIPING HAZARD. PATCH AND
REPAIR WALLS TO RECEIVE NEW DEMOUNTABLE PARTITIONS,
REPLACE CEILING TILES AS NECESSARY TO MATCH
ADJACENT.
DEMOUNTABLE PARTITIONS TO MATCH ADJACENT AS
POSSIBLE AND MEET VISUAL AND SOUND PRIVACY
NECESSARY FOR OFFICE AND EXAM ROOM FUNCTION. SEE
SPECIFICATIONS 102219.
FIELD VERIFY ALL DIMENSIONS PRIOR TO MANUFACTURING.
EXISTING LIFE SAFETY EXIT ROUTES TO REMAIN
UNDISTURBED.
2526272829303132
B.2
C.2
D.2
E.2
333435
E.7
F.5
G.7
J
K.3
M
M.6
N
E.8
LIMITS OF
CONSTRUCTION WORK
PROPOSED
DEMOUNTABLE
WALLS, TYP.
Room
A260-2
PROPOSED
DEMOUNTABL
E WALLS, TYP.
PROPOSED
DEMOUNTABLE
WALLS, TYP.
PROPOSED PHYSICAL
THERAPY = 935 SF
PROPOSED
CHAPEL= 930 SF
A3F
A3F
A3F
A3F
A3F
A3F
DEMOUNTABLE
WALL
COVID-19 TEST AND
VACCINATION BAY
A3F
PROPOSED PHYSICAL
THERAPY = 860 SF
DEMOUNTABLE
WALL
COVID-19 TEST AND
VACCINATION BAY
(2) EXISTING THERMOSTATS
FOR AIR TERMINAL UNIT
TU-4-3 AND TU-4-4 TO REMAIN
RELOCATE (2)
THERMOSTATS FOR
AIR TERMINAL UNITS &
TU-4-1 TU-4-2 TO THIS
LOCATION
T
T
T
T
T
T
A3F
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
1/
/2
4:
:0
PM
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
G008
1ST FLOOR PLAN SWING SPACE -
PROPOSED DEMOUNTABLE WALLS
3/32" = 1'-0"2 ACA 1ST FLOOR PLAN
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:10:57-05'00'
345678910111213
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
D1D1 D2
D3 D4
D6
D1D1 D2 D3
D4
D6
D1D1 D2
D3 D4
D6
D1D1 D2 D3
D4
D6
D1D1 D2
D3
D4 D6
D1D1
D2 D3
D4
D6
D2 D3
D1 D4 D6
D1
D2 D3
D1 D4 D6
D1
D2 D3
D1 D4
D6
D1
SWITCHGEAR ROOM
C126A-1
AIR CONDITIONING
EQUIPMENT CONTROL
ROOM
C078-1
GAS
STOR.
C077A-1
GAS
STOR.
C077-1
ELECT.
CLOSET
C073A-1
ELEC.
CLOSET
A026-1
H.A.C.
A025-1
HOT LAB
A020-1SPECT/CT CT
SCAN
A018-1
STORAGE
A015-1
CAMERA IMAGING
A016-1
X-RAY
READING
A02-1
SCHEDULING
A03-1
EXAM
A04-1
TOILET
A07-1
INJECTION
ROOM
A010-1
BREAK ROOM
A05-1
NUCLEAR MEDICINE
A011-1
STORAGE
A060B-1
CYTOLOGY LAB
A060-1
SPD. STORAGE
A059-1
DATA
A027-1
CREDIT
UNION
A031B-1
OFFICE
A031-1
OFFICE
A032-1
WOMEN
LOUNGE
B033-1
STAFF WOMEN
LOCKER
B055-1
STAFF WOMENS
TOILET
A056-1
STAFF MENS TOILET
A057-1
FOOD STORAGE
A030-1
STORAGE
A036B-1
VISITOR FEMALE
TOILET
B035-1
VISITOR MALE TOILET
B034-1
RESEARCH OFFICE
A024B-1
VEST
A024-1
VOLUNTEER STORAGE
A024A-1
STORAGE
A029-1
AUDITORIUM
A036-1
OFFICE
B038-1
RECREATION
THERAPIST OFFICE
B037-1
RECREATION
THERAPIST OFFICE
B039-1
AMP
B039A-1
VESTI.
CB-6A
STORAGE
B040-1
HOUSEKEEPING
B041-1
RETAIL STORE
B046-1
VENDING
B065-1
SERVICE ELEVATOR
LOBBY
C067-1TRASH
C069-1
T/C
C070-1
LINEN STORAGE
C071-1CLEAN LINEN
DISTRIBUTION
C080B-1
COMPRESSOR ROOM
C073-1
SEAMSTRESS ROOM
C081-1
BUILDING
MANAGEMENT
EQUIPMENT
C083-1
EMS TRAININF ROOM
C079-1
DIETICIAN OFFICE
C068F-1
FREEZER
C059-1
STAIR
#3-1
REFRIG
C058-1
MEAT FREEZER
C056-1
H.A.C.
C068B-1
FOREMAN
C068D-1
OFFICE
C064-1
FOOD STOCK ROOM
B049H-1
VEGETABLE
PREPARATION
C068A-1
ELEC CLOSET
B054G-1
STORAGE
B054A-1
OFFICE
C068E-1
FREEZER
C061-1
LOBBY
CB-9
SOILED LINEN
D072-1
OFFICES
D100A-1
ELECTRIC SHOP
C086A-1
MACHINE
ROOM
C080C-1
CORRIDOR
C080F-1
HAC
D100U-1
RECEIVING
DECONTAMINATION
D100E-1
HAC
D100K-1
STERILIZATION ROOM
D100L-1
HAC
D100R-1
TOILET
D100Q-1
TOILET
D100P-1
OFFICE
D099-1
CHIEF
D099A-1
OFFICE
D099B-1
CLEAN RECEIVING
AREA
D100M-1
PREPARATION AREA
D100N-1
SUPPLY PROCESSING
AND DISTRIBUTION
D100-1
SHOWER
D100G-1
TOILET
D100H-1
PASSAGE
D100F-1
STAIR
#1-1
STAIR
#2-1
FILM
STGE.
C080D-1
GRAPHICS CONTROL
C078E-1
OFFICE
A060A-1
STORAGE
A026C-1
STORAGE
A036C-1
VENDING
B065A-1
OFFICE
B050C-1
OFFICE
B0508-1
NUTRITION & FOOD
SERVICE
B050-1
CHIEF
DIETETICS
OFFICE
B050A-1
OFFICE
B032A-1
VACANT
OFFICE
A030C-1
COPY RM
B054E-1
DIETICIAN
OFFICE
B054B-1
DIETETIC CLASS RM
B054F-1
COFFEE SHOP
B049J-1
NUTRIENT & FOOD
SERVICES
C068C-1
DAIRY REFRIG
C057-1
VEG FREEZER
C055-1
STORAGE
B054D-1
OFFICE
B046D-1
STOCKROOM
B047-1
STORAGE
D100O-1
EQUIP RM
D100B-1
EQUIPMENT
SPD
D100C-1
PET/CT SCAN ROOM
A019-1
PET/CT CONTROL
ROOM
A017-1
SPECT/CT
CONTROL RM
A014-1
CLOSET
EB52A-1
STAFF MENS LOCKERS
A058-1
TOILET
A017A-1
WAITING
A012-1
CANTEEN
B049-1
FEC
B-4-1
F.A.C.
B-7-1
E/C
C068H-1
FEC
B-9-1
DISH
WASHING
C480-1
T/C
C068G-1
PATIENTS DINING
ROOM
B054-1
F.A.C.
B-6-1
FEC
B-11-1
STORAGE
B0482-1
STAGE
A036A-1
FEC
B-5-1
CLOSET
A024C-1
CLOSET
A024D-1
DATA
A026B-1
DATA
A026A-1
MECH.
A059A-1
TRAYV.
D1001-1
LAUNDRY
SHOOT
D072A-1
CLEAN ROOM
D1005-1
T/C
D098-1
STG.
D098A-1
STAIRS
#4-1
CLOSET
A019A-1
EXAM
A08-1
F.A.C.
B-2-1
MECHANICAL ROOM
A/C 1-B
TOILET
A021
VEST
A06-1
CORRIDOR
A156-205
MECH
B049K
LACTATION ROOM
B055A-1
OFFICE
C080A-1
OFFICE
C080-1
OFFICE
C080E-1
SPS NURSE
D092A-1
ELEV
P-11
CORRIDOR
A156-206
FREEZER 1
DB103A1-3
FREEZER 2
DB103A1-4
OFFICE
A023A-13
OFFICE
B046E-1
FOOD PREPARATION
AREA
A023A-12
OFFICE
B0491-1
RETAIL RECEIVING
SECURE STORAGE
B0498-1
INCUBATION
A022B
CONTROL ROOM
A022
INCUBATION
A022C
INCUBATION
A022D
SYMBIA II SPECT/CT
CT SCAN ROOM
A023-1
NUCLEAR MEDICINE
SCAN ROOM
A023A-5
BREAK ROOM
A023A-6
CART WASH
A023A-8
READING ROOM
A06B-1
CHIEF TECHNOLOGIST
A06A-1
OFFICE
A06C-1
MEDICATION
A09-1
MAIN KITCHEN
C068-1
ELEC
A023A-19
ELEC
A023A-18
STORAGE
C076-1
ELEC.
A023A-1
CEILING PLAN DEMO LEGEND
GEN. DEMOLITION NOTES:
1. PROVIDE TEMPORARY DUSTPROOF PARTITIONS AS
REQUIRED TO PROTECT ALL EXISTING AREAS FROM
DAMAGE DUE TO DEMOLITION OR NEW
CONSTRUCTION.
2. CONTRACTOR TO PATCH, REPAIR AND PAINT
(REFINISH) SURFACES AND BUILDING ELEMENTS
DAMAGED BY ADDITION OR REMOVAL OF MECHANICAL
AND ELECTRICAL ITEMS.
3. PATCH AND REPAIR ALL SURFACES TO MATCH
EXISTING SURFACES WHERE ITEMS ARE REMOVED OR
ALTERED. FIELD VERIFY EXTENT OF REQUIRED
REPAIRS.
4. COORDINATE ITEMS TO BE SALVAGED TO OWNER
WITH THE SPECIFICATIONS AND OWNER'S
REPRESENTATIVE.
5. PROTECT ALL ITEMS NOT NOTED TO BE REMOVED
(FIELD VERIFY ALL CONDITIONS) AND COORDINATE ALL
WORK WITH OWNER TO MINIMIZE DISRUPTION TO
EXISTING FACILITIES OPERATIONS.
6. CONTRACTOR TO VERIFY LOCATION OF EXISTING
UTILITIES PRIOR TO START OF DEMOLITION. PROTECT
UTILITIES TO REMAIN IN SERVICE.
7. EXISTING LIFE SAFETY EXIT ROUTES TO REMAIN
UNDISTURBED.
GYP. BD CEILING TO BE
REMOVED
2'x2' ACOUSTIC CEILING PANELS
TO BE REMOVED
RADIANT CEILING PANELS
TO BE REMOVED
2'x4' ACOUSTIC CEILING PANELS
TO BE REMOVED
INDICATES AREA OF
MINIMAL OR NO CHANGES
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
1/
/2
4:
:2
PM
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
AD101
BASEMENT DEMO REFLECTED
CEILING PLAN
1/16" = 1'-0"1
BASEMENT FLOOR DEMOLITION
REFLECTED CEILING PLAN
11 T-4
T-6
T-
T- 1A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T- 1B
T-11
T-
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
DEMOLITION NOTES
1. REMOVE EXISTING ACOUSTICAL CEILING TILE.
2. REMOVE EXISTING T-BAR CEILING GRID, TYPICAL.
3. REMOVE EXISTING HVAC GRILLES. SEE MECHANICAL
DRAWINGS.
4. REMOVE EXPOSED CONDUIT AND ELECTRICAL
DEVICES AT EXISTING CEILINGS. SEE ELECTRICAL
DRAWINGS.
5. REMOVE EXISTING GYPSUM BOARD CEILING AS
NEEDED ONLY. COORDINATE WITH DEMOLITION OF
EXISTING DUCTWORK AND GRILLES. SEE MECHANICAL
DRAWINGS.
6. REMOVE EXISTING LIGHT AND OTHER CEILING
FIXTURES & APPURTANUCES. SALVAGE FOR
REINSTALLATION AT EXISTING LOCATION. COORDINATE
DEMOLITION WITH ELECTRICAL DRAWINGS.
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:11:32-05'00'
PREP/RECOVERY #1
CORRIDOR
PREP/RECOVERY #2
READING RM.
PREP/RECOVERY #3
ADA TOILET
SOILED
STAFF TLT.
CLEAN STORAGE
110 CORRIDOR
P-5 P-6
LOBBY CORRIDOR
P-3
ANGIO RM. #2
EQUIP.
107 ANGIO RM. #1
P-4
DUCT CHASE
EQUIP.
S-2
SHARED
CONTROL
EQUIP.
S-1
345678910111213
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
D1D1 D2 D3
D4
D1D1 D3 D4
D6
D6 D1
D2 D3
D4
D6
D1D1
D2 D3
D4
D6
D1D1
D2 D3
D4
D6
D1
D1D1 D2
D3
D4
D6
D1D1
D2 D3
D4 D6
D1D1
D2 D3
D4
D6
OFFICE
D326A-1
OFFICE
D326B-1
OFFICE
D326C-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164L-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164I-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164G-1
CONTROLLED
SUBSTANCE VAULT
A165-1
H.A.C.
C284-1
OFFICE
C280-1
OFFICE
C273-1
ELEC CLOS
C283B-1
MEN LOCKERS
C283-1
MENS TOILET
C283A-1
TOIL. AND LOCKERS
C281-1
OFFICE
C285-1
OFFICE
C268-1
LAB
C267-1
OFFICE
C258-1
OFFICE
C257-1
SUPERVISOR
C269-1
SECY.
C270-1
OFFICE
C251-1
BREAK RM
C250-1
OFFICE
C271-1
CATH LAB.
C254-1STAFF
TOILET
C252-1
CONTROL
ROOM
C254A-1
ELEC
CLOS
A261A-1
STORAGE
C256-1 STORAGE
C255-1
OFFICE
C260-1
OFFICE
C259A-1
OFFICE
C259-1
VIEWING
C295-1
OFFICE
D337B-1
FILM STORAGE
D337-1
STORAGE
D306-1
CENTRAL HAC
B183-1
DOCTOR
B202-1
OFFICE
B206-1
HOUSEKEEPING
B207-1
CHIEF,
NURSE SURGERY
B181-1
CARDIOLOGY
B206A-1
OFFICE
B205-1
OFFICE
B204-1
OFFICE
B203-1
OFFICE
B200-1
OFFICE
B199-1
STORAGE
B222B-1
STORAGE
B222A-1
PMRS
B216-1
OFFICE
B220-1
P.T.
TREATMENT
ROOM
B222-1
PHYSICAL
THERAPY
B221-1
PHYSICAL
TREATMENT
B235-1
OFFICE
B235A-1
ELEC CLO
B229A-1
CHAPLAN
SERVICE
B229-1
EUCHARISTIC
B228-1
ADMIN
OFFICER
B217-1
EMG. LAB.
B223-1
HAC
B224-1
STORAGE
B226-1
MALE T.
B234-1
FEMALE T.
B233-1
SECY
B232-1
CHAPEL
B231-1
CHAPEL
B230-1
OFFICE
WORK STATIONS
B219-1
PMRS
TBI TEAM
B218-1
STAFF
PSYCHIATRIST
B214-1
MEN
B212-1
WOMEN
B211-1
PHYSICAL
THERAPY CLINIC
B136-1
PROJ. BOOTH
A125A-1
OFFICE
B139B-1
GENERAL
SURGERY
B139-1
OFFICE
B138A-1
OFFICE
B140B-1
CONFERENCE ROOM
B209-1
SICU WAITING ROOM
B208-1
QUIT SICU
WAITING ROOM
B144-1
OFFICE
B143-1
NEUROSURGERY
B142-1
SERVICE LOBBY
C261-1
TRASH
C262-1
SURGICAL
PATHOLOGY
C264-1
WHEEL CHAIRS
C385A-1
CYSTO 2
C265A-1
CYSTO 1
D366D-1
OFFICE
D335A-1
SOILED
UTILITY
D171-1
F TOILET
A144-1
M TOILET
A145-1
SUPPLY
A147-1
OFFICE
A141-1
OFFICE
A140-1
F. TOILET
A127-1
M. TOILET
A126-1
OFFICE
A129-1
CARDIOLOGY
A130-1
OFFICE
A133-1
NA+
A134A-1
MANAGEMENT
INFORMATION CENTER
A125-1
HAC
A123-1
DEPUTY CHIEF
OF STAFF
A117-1
SECRETARY,
CHIEF OF STAFF
A116A-1
OFFICE OF QUALITY,
SAFETY & VALUE
A115-1
OFFICE
A119-1
OFFICE
A120-1
OFFICE
A122-1
DEPUTY DIRECTOR
A112-1SECRETARY TO
THE DEPUTY
DIRECTOR
A113-1COPY FILES
A114-1
CHIEF, OFFICE OF
COMMUNICATIONS
AND OUTREACH
A107A-1
TLT
A112C-1
HOSPITAL DIRECTOR
A111-1
OFFICE
A109-1
OFFICE
A108-1
OFFICE
A106-1
OFFICE
A107-1
OFFICE
A104-1
OFFICE
A102-1
PATIENT RECEPTION
A101-1
MALE TOILET
A160-1
FEMALE TOILET
A159-1
SWITCHBOARD
ROOM
A158-1
ORTHOPEDICS
D371-1
FDVA OFFICE
D162-1
FDVA OFFICE
D163-1
ELEC CLO
D166-1
ORTHOPEDICS
D370-1
ORTHOPEDICS
D361-1
EXAM 8
D361A-1
FLAM. STORAGE
D328-1
TOILET
D352-1
OFFICE
D353-1
OFFICE
D355A-1
ORTHOPEDICS
D350-1
ORTHOPEDICS
D347-1
ORTHOPEDICS
D346-1
ORTHOPEDICS
D355B-1
ORTHOPEDICS
D358-1
EXAM ROOM
D357-1
OFFICE
D355C-1
OFFICE
D355-1
OFFICE
D356-1
WAITING
D336-1
CLO
A111A-1
CLO
A112A-1
ELEC CLO
A116B-1
OFFICE
A121-1
CHIEF
REHAB MED
B215-1
TLT
A158A-1
DAV DRIVERS
OFFICE
A165A-1B
OFFICE
A165-1A
MANAGEMENT
INFORMATION CENTER
A128-1
OFFICE
A151-1
CHIEF PHARMACY
A152-1
OFFICE
A153-1
OFFICE
A155-1
STORAGE/SUPPLY
A154A-1
STERILE PREP.
A164B-1
OFFICE
D330-1
TLT
D351-1
HISTOLOGY
AND CYTOLOGY
D341-1
HISTOLOGY
D341A-1
CYTOLOGY
D341B-1
SURGICAL
PATHOLOGY LAB.
D340-1
SURGICAL
PATHOLOGY LAB
D339-1
HISTOLOGY
D341C-1
HISTOLOGY
D341D-1
ORTHOPEDICS
D344-1
ANATOMICAL AND
CLINICAL
PATHOLOGICAL
D375-1
AGENT CASHIER
D376-1
WHEELCHAIR
STORAGE
D161B-1
ORTHOPEDICS
D374-1
OFFICE
D373-1
PARALYZED
VET. OF AMERICA
D161A-1
FDVA OFFICE
D161-1
ORTHOPEDICS
D372-1
TREATMENT
D366F-1
OFFICE
D343-1
FILE ROOM
D337A-1
A156-12
ISOLATION
C286B-1
SOILED
HOLDING
C286A-1
CLEAN
D167-1
SPD STORAGE
C263-1
IT
C263A-1
CATH LAB
C246-1
DARK ROOM
C246A-1
STORAGE
C246C-1
CONTROL
ROOM
C246B-1
SPD
STORAGE
B189-1
CTICU
B188-1
EQUIP.
STRG.
B188A-1
SOILED
HOLDING
B190-1
BED 5
ISOLATION
B193-1
BED 6
ISOLATION
B192-1
STORAGE
B195-1
OFFICE
B194-1
LOCKERS
B184-1
LOUNGE
B185B-1
CHARTING
B188C-1
OFFICE
B187-1
LINEN
B186-1
TOILET
B185A-1
LOCKER
B185C-1
TOILET
B187A-1
CCU & SICU
STORAGE.
B383-1
OFFICE
B182C-1
OFFICE
B198-1
OFFICE
B201-1
SURGICAL ADMIN
B182A-1
OFFICE
B181B-1
SURGICAL QUALITY
NURSE VASQIP
B181D-1
OFFICE
B235B-1
OFFICE
B141A-1
GYN SURGERY
B141-1
OFFICE
B138B-1
OFFICE
B139A-1
CHIEF OF SURGERY
B137C-1
VASCULAR
SURGERY
B137-1
OFFICE
B137A-1
OFFICE
B138-1
OFFICE
A132A-1
OI & T
A132-1
CARDIOLOGY
A134-1
INPATIENT
PHARMACY
A164-1
DETAILS OFFICE
A164A-1
DAV BENEFIT OFFICE
A164C-1
IDS
A164-E
OFFICE
A164-D
OFFICE
A164-B
OFFICE
A103B-1
BREAK
ROOM
A114B-1
EXECUTIVE
ASSISTANT OFFICE
A114A-1
OFFICE OF
CHIEF OF STAFF
A116-1
SECRETARY TO THE
CHIEF OF STAFF
A118-1
LOBBY
A100-1
OFFICE
C272-1
OFFICE
B196-1
PHARMACY
ADMINISTRATION
A150-1
STORAGE
B137B-1
HALL WAY
D338B-1
OFFICE & CONTROL
D338B-2
CT SCAN
D422-1
OFFICE
A103-1
STORAGE
B226A-1
GENERAL CLINIC
WAITING AREA
D349-1
- 1-1
TOILET
D370A-1
TCIC
C447-1
TCIC
C448-1
T/C
TC1B-1
HARD CLEAN
B1180-1
NURSE STATION
B188B-1
OFFICE
B225A-1
OFFICE
B217A-1
EXAM
B227-1
F.A.C.
DRESSING
ROOM
B212A-1
DRESSING
ROOM
B211A-1
EXAM ROOM
PMRS
B136A-1
OFFICE
B137D-1
F.A.C.
DIRECTORS' OFFICES
A110-1F.A.C.
XXX
BREAK ROOM
A164-F
X-RAY DIAGNOSTIC II
D338-1
LOUNGE
C265B-1
OFFICE OF QUALITY,
SAFETY & VALUE
A114D-1
OFFICE OF QUALITY,
SAFETY & VALUE
A114-C1
STORAGE
A164M-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164J-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164H-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164K-1
RADIOLOGY
STORAGE
B140A-1
ANTE ROOM
A164A-1
Room
A164-N
STORAGE
A164O-3
STORAGE/SUPPLY
A154-1
OFFICE
B140C-1
OFFICE
D332-1
RECEPTION
D353-1
OFFICE
D341E-1
CHIEF OF STAFF
A124-1
OCCUPTAIONAL
THERAPY
B215-1
STORAGE
B222-1
SURGERY OFFICE
B140-1
OFFICE
A103A-1
OFFICE
D330-1
CEILING PLAN DEMO LEGEND
GEN. DEMOLITION NOTES:
1. PROVIDE TEMPORARY DUSTPROOF PARTITIONS AS
REQUIRED TO PROTECT ALL EXISTING AREAS FROM
DAMAGE DUE TO DEMOLITION OR NEW
CONSTRUCTION.
2. CONTRACTOR TO PATCH, REPAIR AND PAINT
(REFINISH) SURFACES AND BUILDING ELEMENTS
DAMAGED BY ADDITION OR REMOVAL OF MECHANICAL
AND ELECTRICAL ITEMS.
3. PATCH AND REPAIR ALL SURFACES TO MATCH
EXISTING SURFACES WHERE ITEMS ARE REMOVED OR
ALTERED. FIELD VERIFY EXTENT OF REQUIRED
REPAIRS.
4. COORDINATE ITEMS TO BE SALVAGED TO OWNER
WITH THE SPECIFICATIONS AND OWNER'S
REPRESENTATIVE.
5. PROTECT ALL ITEMS NOT NOTED TO BE REMOVED
(FIELD VERIFY ALL CONDITIONS) AND COORDINATE ALL
WORK WITH OWNER TO MINIMIZE DISRUPTION TO
EXISTING FACILITIES OPERATIONS.
6. CONTRACTOR TO VERIFY LOCATION OF EXISTING
UTILITIES PRIOR TO START OF DEMOLITION. PROTECT
UTILITIES TO REMAIN IN SERVICE.
7. EXISTING LIFE SAFETY EXIT ROUTES TO REMAIN
UNDISTURBED.
GYP. BD CEILING TO BE
REMOVED
2'x2' ACOUSTIC CEILING PANELS
TO BE REMOVED
RADIANT CEILING PANELS
TO BE REMOVED
2'x4' ACOUSTIC CEILING PANELS
TO BE REMOVED
INDICATES AREA OF
MINIMAL OR NO CHANGES
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
1/
/2
4:
:4
PM
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
AD102
1ST FLOOR DEMOLITION
REFLECTED CEILING PLAN
1/16" = 1'-0"1
PARTIAL 1ST FLOOR DEMOLITION
REFLECTED CEILING PLAN
11 T-4
T-6
T-
T- 1A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T- 1B
T-11
T-
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
DEMOLITION NOTES
1. REMOVE EXISTING ACOUSTICAL CEILING TILE.
2. REMOVE EXISTING T-BAR CEILING GRID, TYPICAL.
3. REMOVE EXISTING HVAC GRILLES. SEE MECHANICAL
DRAWINGS.
4. REMOVE EXPOSED CONDUIT AND ELECTRICAL
DEVICES AT EXISTING CEILINGS. SEE ELECTRICAL
DRAWINGS.
5. REMOVE EXISTING GYPSUM BOARD CEILING AS
NEEDED ONLY. COORDINATE WITH DEMOLITION OF
EXISTING DUCTWORK AND GRILLES. SEE MECHANICAL
DRAWINGS.
6. REMOVE EXISTING LIGHT AND OTHER CEILING
FIXTURES & APPURTANUCES. SALVAGE FOR
REINSTALLATION AT EXISTING LOCATION. COORDINATE
DEMOLITION WITH ELECTRICAL DRAWINGS.
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:12:05-05'00'
UP
DN
345678910111213
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
A502
A401
A401
A502
Sim
X-RAY
READING
A02-1
READING ROOM
A06B-1
CHIEF TECHNOLOGIST
A06A-1
OFFICE
A06C-1
MEDICATION
A09-1
EXAM
A08-1
CAMERA IMAGING
A016-1
PET/CT CONTROL
ROOM
A017-1
SPECT/CT CT
SCAN
A018-1
INJECTION
ROOM
A010-1
TOILET
A07-1
BREAK ROOM
A05-1
EXAM
A04-1SCHEDULING
A03-1
CYTOLOGY LAB
A060-1
OFFICE
A060A-1
WAITING
A012-1
DATA
A027-1
MECH.
A059A-1
SPD. STORAGE
A059-1
STAFF MENS LOCKERS
A058-1
STAFF MENS TOILET
A057-1
CREDIT
UNION
A031B-1
STAFF WOMENS
TOILET
A056-1
OFFICE
A031-1
OFFICE
A032-1
STORAGE
A036C-1
FOOD STORAGE
A030-1
STORAGE
A036B-1
VACANT
OFFICE
A030C-1
OFFICE
B032A-1
WOMEN
LOUNGE
B033-1
STAFF WOMEN
LOCKER
B055-1
OFFICE
B050C-1
OFFICE
B0508-1
NUTRITION & FOOD
SERVICE
B050-1
CHIEF
DIETETICS
OFFICE
B050A-1
VENDING
B065-1
VENDING
B065A-1
LOBBY
CB-9
SERVICE ELEVATOR
LOBBY
C067-1TRASH
C069-1
T/C
C070-1
LINEN STORAGE
C071-1
CANTEEN
B049-1
CANTEEN
B049-1
FOOD STOCK ROOM
B049H-1
MECH
B049K
POT WASH AREA
DB103A1-2
CORRIDOR
A156-205
FREEZER 2
DB103A1-4
FREEZER 1
DB103A1-3
STOCKROOM
B047-1OFFICE
B046D-1
RETAIL STORE
B046-1
RECREATION
THERAPIST OFFICE
B037-1
OFFICE
B038-1
RECREATION
THERAPIST OFFICE
B039-1
VESTI.
CB-6A
AMP
B039A-1
STORAGE
B040-1
HOUSEKEEPING
B041-1
STORAGE
B0482-1
AUDITORIUM
A036-1
STAGE
A036A-1
RESEARCH OFFICE
A024B-1
STORAGE
A029-1
STORAGE
A026C-1
H.A.C.
A025-1
ELEC.
CLOSET
A026-1
DATA
A026A-1
HOT LAB
A020-1
TOILET
A021
VOLUNTEER STORAGE
A024A-1
PET/CT SCAN ROOM
A019-1
CLOSET
A019A-1
TOILET
A017A-1
STORAGE
A015-1
SPECT/CT
CONTROL RM
A014-1
NUCLEAR MEDICINE
A011-1
CLOSET
EB52A-1
STORAGE
A060B-1
OFFICES
D100A-1
EQUIPMENT
SPD
D100C-1
SUPPLY PROCESSING
AND DISTRIBUTION
D100-1
STORAGE
D100O-1
OFFICE
D099-1
STERILIZATION ROOM
D100L-1
CLEAN ROOM
D1005-1
PREPARATION AREA
D100N-1
CLEAN RECEIVING
AREA
D100M-1
SPS NURSE
D092A-1
STAIRS
#4-1
CHIEF
D099A-1
OFFICE
D099B-1
RECEIVING
DECONTAMINATION
D100E-1
HAC
D100K-1
CART WASH
D100D-1
EQUIP RM
D100B-1
PASSAGE
D100F-1
SHOWER
D100G-1
TOILET
D100H-1
SOILED LINEN
D072-1
CLEAN LINEN
DISTRIBUTION
C080B-1
D100T-1
HAC
D100U-1
OFFICE
C080A-1
FILM
STGE.
C080D-1
ELEV
P-11
CORRIDOR
C080F-1
MACHINE
ROOM
C080C-1
OFFICE
C080-1
OFFICE
C080E-1
SEAMSTRESS ROOM
C081-1
EMS TRAININF ROOM
C079-1
COMPRESSOR ROOM
C073-1
ELECT.
CLOSET
C073A-1
DIETICIAN OFFICE
C068F-1
FOREMAN
C068D-1
OFFICE
C064-1
OFFICE
C068E-1
AIR CONDITIONING
EQUIPMENT CONTROL
ROOM
C078-1
GAS
STOR.
C077A-1
GAS
STOR.
C077-1
FREEZER
C061-1
FREEZER
C059-1
NUTRIENT & FOOD
SERVICES
C068C-1
VEGETABLE
PREPARATION
C068A-1
REFRIG
C058-1
STAIR
#3-1
H.A.C.
C068B-1
DAIRY REFRIG
C057-1
VEG FREEZER
C055-1
STORAGE
B054D-1
MEAT FREEZER
C056-1
STORAGE
B054A-1
PATIENTS DINING
ROOM
B054-1
OFFICE
B054C-1
DIETICIAN
OFFICE
B054B-1
COPY RM
B054E-1DIETETIC CLASS RM
B054F-1
DISH
WASHING
C480-1
ELEC CLOSET
B054G-1
STAIR
#2-1
FEC
B-9-1
E/C
C068H-1
INCUBATION
A022C
INCUBATION
A022B
INCUBATION
A022D
CONTROL ROOM
A022
INCUBATION
A022A
SYMBIA II SPECT/CT
CT SCAN ROOM
A023-1
ELEC.
A023A-1
NUCLEAR MEDICINE
SCAN ROOM
A023A-5
FOOD PREPARATION
AREA
A023A-12
OFFICE
A023A-13
OFFICE
B046E-1
OFFICE
B0491-1
RETAIL RECEIVING
SECURE STORAGE
B0498-1
FLOOR PLAN NOTES
FLOOR PLAN LEGEND
AREA OUTSIDE ARCHITECTURAL
CONTRACT LIMITS
EXITING WALL CONSTRUCTION TO REMAIN
PARTITION TAG SEE SHEET , REFER
TO WALL TYPES SHEET#A402
1i
NEW TWO-HOUR FIRE RATED WALL,
REFER TO WALL TYPES
1.
2.
3.
4.
5.
6.
7.
8.
DIMENSIONS ARE TO THE FACE OF
PARTITION/EQUIPMENT/EXISTING ELEMENT, CENTERLINE OR
CLEAR JAMB OPENING OF DOORS, OR STRUCTURAL GRID. DO
NOT SCALE DRAWINGS
CLEAN & PREP SLAB FOR NEW FLOORING - FILL ANY
DEPRESSIONS AND LEVEL ALL SLOPED AREAS PRIOR TO
STARTING NEW WORK.
PATCH ALL FINISHES & MATERIALS DISTURBED IN
DEMOLITION IN EXECUTION OF NEW WORK TO MATCH
ADJACENT SURFACES & AS REQUIRED TO ACCEPT NEW
WORK.
REFER TO SHEET #A502 FOR THE SHAFT WALL SECTIONS.
PATCH EXISTING SURFACES WITH SIMILAR MATERIAL AND
COLORS TO MATCH ADJACENT. REPAIR FLOOR FINISHES
SUFFICIENTLY TO AVOID TRIPING HAZARD. PATCH AND
REPAIR WALLS TO RECEIVE NEW DEMOUNTABLE PARTITIONS,
REPLACE CEILING TILES AS NECESSARY TO MATCH
ADJACENT.
DEMOUNTABLE PARTITIONS TO MATCH ADJACENT AS
POSSIBLE AND MEET VISUAL AND SOUND PRIVACY
NECESSARY FOR OFFICE AND EXAM ROOM FUNCTION. SEE
SPECIFICATIONS 102219.
FIELD VERIFY ALL DIMENSIONS PRIOR TO MANUFACTURING.
EXISTING LIFE SAFETY EXIT ROUTES TO REMAIN
UNDISTURBED.
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
1/
/2
4:
:4
PM
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
AE101
BASEMENT LEVEL
HVAC SHAFT WALLS
1/16" = 1'-0"1
BASEMENT LEVEL
HVAC SHAFT WALLS
11 T-4
T-6
T-
T- 1A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T- 1B
T-11
T-
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:12:39-05'00'
PREP/RECOVERY #1
CORRIDOR
PREP/RECOVERY #2
READING RM.
PREP/RECOVERY #3
ADA TOILET
SOILED
STAFF TLT.
CLEAN STORAGE
110 CORRIDOR
P-5 P-6
LOBBY CORRIDOR
P-3
ANGIO RM. #2
EQUIP.
107 ANGIO RM. #1
P-4
DUCT CHASE
EQUIP.
S-2
SHARED
CONTROL
EQUIP.
S-1
345678910111213
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
A502
A502
OFFICE
D326A-1
OFFICE
D326B-1
OFFICE
D326C-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164L-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164I-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164G-1
CONTROLLED
SUBSTANCE VAULT
A165-1
H.A.C.
C284-1
OFFICE
C280-1
OFFICE
C273-1
ELEC CLOS
C283B-1
MEN LOCKERS
C283-1
MENS TOILET
C283A-1
TOIL. AND LOCKERS
C281-1
OFFICE
C285-1
OFFICE
C268-1
LAB
C267-1
OFFICE
C258-1
OFFICE
C257-1
SUPERVISOR
C269-1
SECY.
C270-1
OFFICE
C251-1
BREAK RM
C250-1
OFFICE
C271-1
CATH LAB.
C254-1STAFF
TOILET
C252-1
CONTROL
ROOM
C254A-1
ELEC
CLOS
A261A-1
STORAGE
C256-1 STORAGE
C255-1
OFFICE
C260-1
OFFICE
C259A-1
OFFICE
C259-1
VIEWING
C295-1
OFFICE
D337B-1
FILM STORAGE
D337-1
STORAGE
D306-1
CENTRAL HAC
B183-1
DOCTOR
B202-1
OFFICE
B206-1
HOUSEKEEPING
B207-1
CHIEF,
NURSE SURGERY
B181-1
CARDIOLOGY
B206A-1
OFFICE
B205-1
OFFICE
B204-1
OFFICE
B203-1
OFFICE
B200-1
OFFICE
B199-1
STORAGE
B222B-1
STORAGE
B222A-1
PMRS
B216-1
OFFICE
B220-1
P.T.
TREATMENT
ROOM
B222-1
PHYSICAL
THERAPY
B221-1
PHYSICAL
TREATMENT
B235-1
OFFICE
B235A-1
ELEC CLO
B229A-1
CHAPLAN
SERVICE
B229-1
EUCHARISTIC
B228-1
ADMIN
OFFICER
B217-1
EMG. LAB.
B223-1
HAC
B224-1
STORAGE
B226-1
MALE T.
B234-1
FEMALE T.
B233-1
SECY
B232-1
CHAPEL
B231-1
CHAPEL
B230-1
OFFICE
WORK STATIONS
B219-1
PMRS
TBI TEAM
B218-1
STAFF
PSYCHIATRIST
B214-1
MEN
B212-1
WOMEN
B211-1
PHYSICAL
THERAPY CLINIC
B136-1
PROJ. BOOTH
A125A-1
OFFICE
B139B-1
GENERAL
SURGERY
B139-1
OFFICE
B138A-1
OFFICE
B140B-1
CONFERENCE ROOM
B209-1
SICU WAITING ROOM
B208-1
QUIT SICU
WAITING ROOM
B144-1
OFFICE
B143-1
NEUROSURGERY
B142-1
SERVICE LOBBY
C261-1
TRASH
C262-1
SURGICAL
PATHOLOGY
C264-1
WHEEL CHAIRS
C385A-1
CYSTO 2
C265A-1
CYSTO 1
D366D-1
OFFICE
D335A-1
SOILED
UTILITY
D171-1
F TOILET
A144-1
M TOILET
A145-1
SUPPLY
A147-1
OFFICE
A141-1
OFFICE
A140-1
F. TOILET
A127-1
M. TOILET
A126-1
OFFICE
A129-1
CARDIOLOGY
A130-1
OFFICE
A133-1
NA+
A134A-1
MANAGEMENT
INFORMATION CENTER
A125-1
HAC
A123-1
DEPUTY CHIEF
OF STAFF
A117-1
SECRETARY,
CHIEF OF STAFF
A116A-1
OFFICE OF QUALITY,
SAFETY & VALUE
A115-1
OFFICE
A119-1
OFFICE
A120-1
OFFICE
A122-1
DEPUTY DIRECTOR
A112-1SECRETARY TO
THE DEPUTY
DIRECTOR
A113-1COPY FILES
A114-1
CHIEF, OFFICE OF
COMMUNICATIONS
AND OUTREACH
A107A-1
TLT
A112C-1
HOSPITAL DIRECTOR
A111-1
OFFICE
A109-1
OFFICE
A108-1
OFFICE
A106-1
OFFICE
A105-1
OFFICE
A107-1
OFFICE
A104-1
OFFICE
A102-1
PATIENT RECEPTION
A101-1
MALE TOILET
A160-1
FEMALE TOILET
A159-1
SWITCHBOARD
ROOM
A158-1
ORTHOPEDICS
D371-1
FDVA OFFICE
D162-1
FDVA OFFICE
D163-1
ELEC CLO
D166-1
ORTHOPEDICS
D370-1
ORTHOPEDICS
D361-1
EXAM 8
D361A-1
FLAM. STORAGE
D328-1
TOILET
D352-1
OFFICE
D353-1
OFFICE
D355A-1
ORTHOPEDICS
D350-1
ORTHOPEDICS
D347-1
ORTHOPEDICS
D346-1
ORTHOPEDICS
D355B-1
ORTHOPEDICS
D358-1
EXAM ROOM
D357-1
OFFICE
D355C-1
OFFICE
D355-1
OFFICE
D356-1
WAITING
D336-1
CLO
A111A-1
CLO
A112A-1
ELEC CLO
A116B-1
OFFICE
A121-1
CHIEF
REHAB MED
B215-1
TLT
A158A-1
DAV DRIVERS
OFFICE
A165A-1B
OFFICE
A165-1A
MANAGEMENT
INFORMATION CENTER
A128-1
OFFICE
A151-1
CHIEF PHARMACY
A152-1
OFFICE
A153-1
OFFICE
A155-1
STORAGE/SUPPLY
A154A-1
STERILE PREP.
A164B-1
OFFICE
D330-1
TLT
D351-1
HISTOLOGY
AND CYTOLOGY
D341-1
HISTOLOGY
D341A-1
CYTOLOGY
D341B-1
SURGICAL
PATHOLOGY LAB.
D340-1
SURGICAL
PATHOLOGY LAB
D339-1
HISTOLOGY
D341C-1
HISTOLOGY
D341D-1
ORTHOPEDICS
D344-1
ANATOMICAL AND
CLINICAL
PATHOLOGICAL
D375-1
AGENT CASHIER
D376-1
WHEELCHAIR
STORAGE
D161B-1
ORTHOPEDICS
D374-1
OFFICE
D373-1
PARALYZED
VET. OF AMERICA
D161A-1
FDVA OFFICE
D161-1
ORTHOPEDICS
D372-1
TREATMENT
D366F-1
OFFICE
D343-1
? READING RM
B362-1
FILE ROOM
D337A-1
A156-12
ISOLATION
C286B-1
SOILED
HOLDING
C286A-1
EXAM 2
D170-1
CLEAN
D167-1
SPD STORAGE
C263-1
IT
C263A-1
CATH LAB
C246-1
DARK ROOM
C246A-1
STORAGE
C246C-1
CONTROL
ROOM
C246B-1
SPD
STORAGE
B189-1
CTICU
B188-1
EQUIP.
STRG.
B188A-1
SOILED
HOLDING
B190-1
BED 5
ISOLATION
B193-1
BED 6
ISOLATION
B192-1
STORAGE
B195-1
OFFICE
B194-1
LOCKERS
B184-1
LOUNGE
B185B-1
CHARTING
B188C-1
OFFICE
B187-1
LINEN
B186-1
TOILET
B185A-1
LOCKER
B185C-1
TOILET
B187A-1
CCU & SICU
STORAGE.
B383-1
OFFICE
B182C-1
OFFICE
B198-1
OFFICE
B201-1
SURGICAL ADMIN
B182A-1
OFFICE
B181B-1
SURGICAL QUALITY
NURSE VASQIP
B181D-1
OFFICE
B235B-1
OFFICE
B141A-1
GYN SURGERY
B141-1
OFFICE
B138B-1
OFFICE
B139A-1
CHIEF OF SURGERY
B137C-1
VASCULAR
SURGERY
B137-1
OFFICE
B137A-1
OFFICE
B138-1
OFFICE
A132A-1
OI & T
A132-1
CARDIOLOGY
A134-1
INPATIENT
PHARMACY
A164-1
DETAILS OFFICE
A164A-1
DAV BENEFIT OFFICE
A164C-1
IDS
A164-E
OFFICE
A164-D
OFFICE
A164-B
OFFICE
A103B-1
BREAK
ROOM
A114B-1
EXECUTIVE
ASSISTANT OFFICE
A114A-1
OFFICE OF
CHIEF OF STAFF
A116-1
SECRETARY TO THE
CHIEF OF STAFF
A118-1
LOBBY
A100-1
OFFICE
C272-1
OFFICE
B196-1
PHARMACY
ADMINISTRATION
A150-1
STORAGE
B137B-1
HALL WAY
D338B-1
OFFICE & CONTROL
D338B-2
CT SCAN
D422-1
OFFICE
A103-1
STORAGE
B226A-1
GENERAL CLINIC
WAITING AREA
D349-1
- 1-1
TOILET
D370A-1
TCIC
C447-1
TCIC
C448-1
T/C
TC1B-1 ?
HARD CLEAN
B1180-1
NURSE STATION
B188B-1
OFFICE
B225A-1
OFFICE
B217A-1
EXAM
B227-1
F.A.C.
DRESSING
ROOM
B212A-1
DRESSING
ROOM
B211A-1
EXAM ROOM
PMRS
B136A-1
OFFICE
B137D-1
F.A.C.
DIRECTORS' OFFICES
A110-1F.A.C.
XXX
BREAK ROOM
A164-F
X-RAY DIAGNOSTIC II
D338-1
LOUNGE
C265B-1
OFFICE OF QUALITY,
SAFETY & VALUE
A114D-1
OFFICE OF QUALITY,
SAFETY & VALUE
A114-C1
STORAGE
A164M-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164J-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164H-1
OFFICE OF QUALITY,
SAFETY & VALUE
A164K-1
RADIOLOGY
STORAGE
B140A-1
ANTE ROOM
A164A-1
Room
A164-N
STORAGE
A164O-3
STORAGE/SUPPLY
A154-1
OFFICE
B140C-1
OFFICE
D332-1
RECEPTION
D353-1
OFFICE
D341E-1
CHIEF OF STAFF
A124-1
A401
A401
A502
Sim
A502
Sim
OFFICE
A103A-1
OCCUPTAIONAL
THERAPY
B215-1
FLOOR PLAN NOTES
FLOOR PLAN LEGEND
AREA OUTSIDE ARCHITECTURAL
CONTRACT LIMITS
EXITING WALL CONSTRUCTION TO REMAIN
PARTITION TAG SEE SHEET , REFER
TO WALL TYPES SHEET#A402
1i
NEW TWO-HOUR FIRE RATED WALL,
REFER TO WALL TYPES
1.
2.
3.
4.
5.
6.
7.
8.
DIMENSIONS ARE TO THE FACE OF
PARTITION/EQUIPMENT/EXISTING ELEMENT, CENTERLINE OR
CLEAR JAMB OPENING OF DOORS, OR STRUCTURAL GRID. DO
NOT SCALE DRAWINGS
CLEAN & PREP SLAB FOR NEW FLOORING - FILL ANY
DEPRESSIONS AND LEVEL ALL SLOPED AREAS PRIOR TO
STARTING NEW WORK.
PATCH ALL FINISHES & MATERIALS DISTURBED IN
DEMOLITION IN EXECUTION OF NEW WORK TO MATCH
ADJACENT SURFACES & AS REQUIRED TO ACCEPT NEW
WORK.
REFER TO SHEET #A502 FOR THE SHAFT WALL SECTIONS.
PATCH EXISTING SURFACES WITH SIMILAR MATERIAL AND
COLORS TO MATCH ADJACENT. REPAIR FLOOR FINISHES
SUFFICIENTLY TO AVOID TRIPING HAZARD. PATCH AND
REPAIR WALLS TO RECEIVE NEW DEMOUNTABLE PARTITIONS,
REPLACE CEILING TILES AS NECESSARY TO MATCH
ADJACENT.
DEMOUNTABLE PARTITIONS TO MATCH ADJACENT AS
POSSIBLE AND MEET VISUAL AND SOUND PRIVACY
NECESSARY FOR OFFICE AND EXAM ROOM FUNCTION. SEE
SPECIFICATIONS 102219.
FIELD VERIFY ALL DIMENSIONS PRIOR TO MANUFACTURING.
EXISTING LIFE SAFETY EXIT ROUTES TO REMAIN
UNDISTURBED.
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
COA: FL #29758
AKEA Project No. AD182-19
Design, Inc.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REPLACE AIR HANDLING UNIT
(AHU) 2
573-18-602
GAINESVILLE, FLORIDA
ARCHITECT - OF - RECORD FL. REG. NO.
FINAL DESIGN SUBMITTAL
APPROVED FOR CONSTRUCTION
This item has been electronically signed and sealed by the individual named at right.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
1/
/2
4:
:5
PM
JF RA
JENNIFER FONG AR97191
JANUARY 21, 2022
AE102
1ST FLOOR PLAN
HVAC SHAFT WALLS
1/16" = 1'-0"1
1ST FLOOR LEVEL
HVAC SHAFT WALLS
11 T-4
T-6
T-
T- 1A
NEW BED TOWER
T-2
T-5
E-WING
ROOF TOP
1st FLOOR
T- 1B
T-11
T-
T-3
MECH. BLDG.
MAIN
HOSPITAL
T-9
T-10
AMBULATORY
CARE
Revisions: Date:
Digitally signed by Jennifer R Fong Date: 2022.01.20 18:13:15-05'00'
345678910111213
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
SWITCHGEAR ROOM
C126A-1
AIR CONDITIONING
EQUIPMENT CONTROL
ROOM
C078-1
GAS
STOR.
C077A-1
GAS
STOR.
C077-1
ELECT.
CLOSET
C073A-1
ELEC.
CLOSET
A026-1
H.A.C.
A025-1
HOT LAB
A020-1SPECT/CT CT
SCAN
A018-1
STORAGE
A015-1
CAMERA IMAGING
A016-1
X-RAY
READING
A02-1
SCHEDULING
A03-1
EXAM
A04-1
TOILET
A07-1
INJECTION
ROOM
A010-1
BREAK ROOM
A05-1
NUCLEAR MEDICINE
A011-1
STORAGE
A060B-1
CYTOLOGY LAB
A060-1
SPD. STORAGE
A059-1
DATA
A027-1
CREDIT
UNION
A031B-1
OFFICE
A031-1
OFFICE
A032-1
WOMEN
LOUNGE
B033-1
STAFF WOMEN
LOCKER
B055-1
STAFF WOMENS
TOILET
A056-1
STAFF MENS TOILET
A057-1
FOOD STORAGE
A030-1
STORAGE
A036B-1
VISITOR FEMALE
TOILET
B035-1
VISITOR MALE TOILET
B034-1
RESEARCH OFFICE
A024B-1
VEST
A024-1
VOLUNTEER STORAGE
A024A-1
STORAGE
A029-1
AUDITORIUM
A036-1
OFFICE
B038-1
RECREATION
THERAPIST OFFICE
B037…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .