This document is a specification for ceiling mounted patient lift systems to be installed at a Veterans Affairs medical facility. It requires eight Guldmann ceiling mounted patient lift systems and accessories to be furnished and installed by a single contractor. The standard lift system specified is the Guldmann GH3+ model with a minimum capacity of 825 pounds including one basic sling. Transitions and track configurations are defined for patient rooms and toilet areas. Submittals, delivery requirements, warranties, testing and training are also outlined. Installation must be supervised by the manufacturer and inspected utilizing manufacturer and VA checklists prior to patient use.

View the file

Other files

File Type Posted
36C25222B0032 0005.docx DOCX document
S02_Att13 Abatement Survey 2065101 N. Chicago VAMC report_Optimized.pdf PDF
36C25222B0032 0004.docx DOCX document
36C25222B0032 0003.docx DOCX document
S04_2nd Site Visit Sign-In-Sheet (08182022) 556-17-001 Hemodialysis Renovation.pdf PDF
S04_1st Site Visit Sign-In-Sheet (08112022) 556-17-001 Hemodialysis Renovation.pdf PDF
36C25222B0032 0002.docx DOCX document
36C25222B0032 0001.docx DOCX document
S02_Att09 Quality Requirements 01 40 00 19MAY20.pdf PDF
S02_Att02 Revised 100_ SPECS Vol 2_556-17-001 (Hemodialysis Renovation) 06222022.pdf PDF
S02_Att04 Wage Rates SAM IL (current as of 07132022).pdf PDF
S02_Att08 Infection Control Requirements 01 35 33 27AUG21.pdf PDF
36C25222B0032_1.docx DOCX document
S02_Att01 Final SOW 556-17-001.pdf PDF
S02_Att03 DWGS 556-17-001_Hemodialysis Renovation r22MAR22.pdf PDF
S02_Att02 Revised 100_ SPECS Vol 1_556-17-001 (Hemodialysis Renovation) 06222022.pdf PDF
S02_Att06 Safer Federal Workforce Task Force guidance.pdf PDF
S02_Att07 Safety Requirements 01 35 26 27AUG21.pdf PDF
S02_Att10 Regulatory Requirements 01 41 00 24JAN22.pdf PDF
S02_Att05 VHA Directive 1192_01_D_2020-08-10 Seasonal Flu Shot.pdf PDF
S02_Att11 36C25222B0032 556-17-001 VAAR 852.219-77 Certification.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

556-17-001 Corrected Specification 07/22/2022

CEILING MOUNTED PATIENT LIFT SYSTEM

11 73 00 - 1

SECTION 11 73 00

CEILING MOUNTED PATIENT LIFT SYSTEM

PART 1 - GENERAL

This corrected specification replaces the specification of the same name and number included in the project manual.

Drawing QH100 does not include the eight Guldmann ceiling mounted patient lift systems to be furnished and installed in their entirety by the General Contractor. Refer to drawings

GUL101 through GUL113, in coordination with all other documents.

All reference to model “GH3” shall be replaced with “GH3+ 825 lb. capacity with scale”.

All occurrences of lift capacity which are not 825 lbs. shall be 825 lbs. (min.).

All reference to “the Facility” regarding assignment of activities not to be performed directly by Guldmann shall be replaced with “the General Contractor” as the General Contractor (not

VA) is responsible for contracting with Guldmann, and fulfilling all parts of the work not performed directly by Guldmann.

Guldmann drawings included in this set will require revision for prevention of special conflicts above ceilings, and completion for submittal as described in this Specification. The submitted and accepted pre-installation drawings shall be accurately revised at completion of installation to become the as-built submission for record.

1.1 DESCRIPTION

Ceiling Mounted Patient Lift Systems for the transfer of physically challenged patients are specified in this section.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS: Requirements for pre-test of equipment.

B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-

STRUCTURAL COMPONENTS: Seismic requirements for non-structural equipment

(https://www.cfm.va.gov/TIL/spec/130541.docx)

Note: To be completed by the vendor’s Structural Engineer in collaboration with the AE

Structural Engineer of-Record for this project.

C. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General

Electrical Requirements and items, which are common to sections of Division 26.

11 73 00 - 2

1.3 QUALITY ASSURANCE

A. Certification for compliance is required for Ceiling Mounted Patient Lift Systems.

Certifications shall be provided by the manufacturer who will conduct testing to ensure that the ceiling lift and charging system are safe and in compliance with ISO 10535 & UL

60601-1.

B. Inspection of equipment after installation is required prior to use for patient movement.

Inspection shall be in accordance with manufacturer’s installation checklist and the VA

Installation or Relocation Checklist for Ceiling Mounted Patient Lifts

(https://www.publichealth.va.gov/docs/employeehealth/InstallationRelocation.pdf).

C. Certification of compliance with VA requirements shall be provided by the vendor’s

Structural Engineer (Inspector of-Record; IOR), who will observe installation and manufacturer’s testing to ensure that the ceiling structure, ceiling lift, and charging system is safe and in compliance with shop drawings, structural calculations, specifications, ISO 10535 requirements, and code requirements. IOR shall be a registered structural engineer in the state of installation.

1.4 SUBMITTALS

A. Within seven days of Notice to Proceed, submit the name, contact information, and credentials of the manufacturer’s Structural Engineer.

B. Submit in accordance with specification Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1. Shop drawings shall show structural supports to the underside of structure. Structural calculations for the support of the track and its attachment to ceiling structure shall be submitted. Shop drawings used in the quoting phase shall be submitted as both PDF, and 3D BIM (electronic) files showing structural support to underside of structure.

Shop drawings shall also provide general room layout with bed position and all obstructions to ceiling lift.

2. Once the general contractor’s purchase order (or other agreed-to instrument) is accepted by the manufacturer, a set of stamped drawings shall be provided by the manufacturer. Shop drawings and structural calculations shall be signed and stamped by a registered structural engineer, and shall meet all applicable Code requirements.

The manufacturer’s Structural Engineer shall ensure ceiling minimum structure

11 73 00 - 3 capacity shall support the loads specified in the shop and installation drawings and be in compliance with VA structural and seismic requirements and Code.

3. Shop drawings shall show obstructions such as curtains, lights and sprinklers, and coordinate their (re)location.

4. Manufacturer shall provide BIM (Building Information Model) for clash detection to the GC for review and attestation of compliance prior to transmission to VA COR.

C. Certificates of Compliance from Manufacturer

D. Manufacturer's Literature and Data:

1. Lifting Capacity

2. Lifting Speed

3. Vertical Axis Motor

4. Emergency Brake

5. Emergency Lowering Device

6. Emergency Stopping Device

7. Electronic Soft-Start and Soft-Stop Motor Control

8. Current limiter for Circuit Protection

9. Strap and sling technical data

10. All equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity of the structural support, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed.

E. Individual room layouts showing location of lift system installation shall be approved before proceeding with installation of lifts.

F. Manufacturer’s checklist for post-installation inspection.

G. Manufacturer’s operation and maintenance manual.

H. Manufacturer’s warranty – written to Dept. of Veterans Affairs.

1.5 DELIVERY, STORAGE AND HANDLING:

A. Deliver, store and handle to prevent damage and deterioration until final acceptance of project.

11 73 00 - 4

B. Deliver and store materials in manufacturer’s original labeled containers immediately prior to installation.

C. Store materials in a secure, locked area.

D. Repair or replace damaged items due to storage or handling.

1.6 WARRANTY:

A. Construction Warranty: Comply with FAR clause 52.246-21 “Warranty of Construction”.

B. Manufacturer Warranty:

1. Manufacturers standard warranty covering lifts shall warranty their products and installation for three (3) years from date of final acceptance of the project (not installation) by the Government. Submit manufacturer warranty.

2. Manufacturers standard warranty covering rail systems, including their structural supporting, shall warranty their products and installation for twenty-five (25) years from date of final acceptance of the project (not installation) by the Government.

Submit manufacturer warranty.

3. Manufacturer shall write their warranty directly to Dept. of Veterans Affairs.

1.7 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced.

The publications are listed in the text by the basic designation only. Always apply the most recent edition.

B. International Organization for Standardization (ISO):

10535......................................Hoist for the Transfer of Disabled Persons-Requirements and Test Methods

C. Underwriters Laboratories (UL):

60601-1 ..................................Medical Electrical Equipment: General Requirements for

Safety

94............................................UL Standards for Safety Test for Flammability of Plastic

Materials for Parts in Devices and Appliances-Sixth

Edition, April 1, 2022.

D. International Electromagnetic Commission (IEC):

60601-1-2 ...............................Medical electrical equipment – Part 1-2: General requirements for basic safety and essential performance –

11 73 00 - 5

Collateral Standard: Electromagnetic disturbances –

Requirements and tests.

E. VA Office of Construction and Facilities Management, Safe Patient Handling and

Mobility Design Criteria, August 1, 2021 (https://www.cfm.va.gov/til/etc/dcSPHM.pdf).

F. VHA Directive 1611 Safe Patient Handling, Amended July 16, 2020

(https://www.va.gov/VHAPUBLICATIONS/ViewPublication.asp?pub_ID=6338)

G. VA Installation or Relocation Checklist for Ceiling Mounted Patient Lifts

(https://www.publichealth.va.gov/docs/employeehealth/InstallationRelocation.pdf)

H. VA Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts

(https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf)

PART 2 - PRODUCTS

2.0 SOLE SOURCE PROCUREMENT

A. All ceiling mounted patient lift systems and accessories are required to be manufactured and installed by a single source. The standard of this facility is:

Guldmann, Inc.

101 Station Landing, Suite 130

Medford, MA 02155

800-664-8834 www.guldmann.com

B. The standard lift system for common use is the Guldmann GH3+ with 825 lb. capacity

(minimum) hoist and hanger bar, scale, including one basic sling, non-recessed continuous charge ‘H’ track (X-Y axis) rail system.

C. For patient rooms with adjoining toilet/shower rooms, include Combilock transition from

“H” into single switch “J” track terminating over toilet.

D. For toilet room not adjoining patient room, “J” track terminating over toilet is required in lieu of “H” track.

2.1 CEILING TRACK SYSTEM

A. The ceiling track shall be made from high strength extruded aluminum or VA approved equal.

11 73 00 - 6

B. Installed rail shall be security tested to 1.5 times greater than the motor’s weight capacity as well as for lateral deflection of a horizontal rail - never to exceed 1mm (1/16th inch) per 200mm (7.87 inch) of track length (per ISO 10535).

2.2 LIFT UNIT

A. The lift unit shall be constructed of a steel frame system driven by a gear reduced high torque motor or VA approved equal.

B. The lift system shall have the following features.

1. Lifting capacity (minimum): 5 825 lbs.

2. Electronic soft-start and soft-stop motor control

3. Emergency lowering device

4. Emergency stopping device

5. Current limiter for circuit protection in case of overload.

6. Safety device that stops the motor to lift when batteries are low.

7. Horizontal axis motor

8. Emergency brake (in case of mechanical failure)

9. Cab: VO plastic–fire retardant, UL 94

2.3 MOTORS

Vertical Movement-DC Motor

2.4 BATTERIES

A. The life cycle (number of charging cycles) for batteries shall fully comply with IEC

6100-1-2.

B. Provide rechargeable batteries with up to 35 transfers with a load of 200lbs (74kg) (for repositioning) and a minimum of 17 transfers with its maximum load.

2.5 CHARGER

Charger compatible with system supplied and installed by manufacturer.

2.6 STRAPS AND SLINGS

A. The straps shall meet ISO 10535. The straps shall ensure the patient’s safety by preventing the patient from falling out of the sling.

B. The sling shall meet ISO 10535. The sling shall cradle the body of the patient. Bariatric slings shall be rated to a minimum of 825 lbs. (matching unit capacity).

11 73 00 - 7

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install ceiling mounted patient lift system per manufacturer's instruction and under the supervision of the manufacturer’s Structural Engineer and technical field representative

(resource for subsequent inspections, warranty response, etc.) (See 1.4 Submittals).

B. If the distance in between the suspended ceiling and anchors is more than 12” consult with manufacturer to determine if lateral braces will be required.

C. Do not plan vertically embedded anchorage into concrete deck above. Plan horizontal anchorage of horizontal supplemental steel support system.

D. Do not plan to support any part of the lift system using support systems of other building systems such as conduits, piping, ducts, etc.

3.2 INSTRUCTION AND PERSONNEL TRAINING

A. Training shall be provided by the manufacturer for VA personnel to educate them on proper operation and maintenance for the lift system equipment. Plan no less than three events, one per shift.

B. Document the training provided, including hand-outs and other supplemental resources along with a legible sign-in sheet recording all present for each event. Submit all event documentation to the VA COR immediately following each event.

3.3 TEST

Conduct performance tests for each system in the presence of the VA COR and the manufacturer’s Structural Engineer and technical field representative (resource for subsequent inspections, warranty response, etc.), to show that the patient lift system equipment and control devices operate properly and in accordance with this contract, VA and manufacturer’s requirements, and Code.

3.4 INSPECTION

A. Inspection of installed ceiling mounted patient lift systems shall be conducted in accordance with the manufacturer’s installation checklist and the VA Installation or

Relocation Checklist for Ceiling Mounted Patient Lifts

(https://www.publichealth.va.gov/docs/employeehealth/InstallationRelocation.pdf) prior to use for patient movement. Coordinate scheduling with the VA COR.

11 73 00 - 8

B. Periodic Inspection shall be provided by the manufacturer on a yearly basis throughout the manufacturer’s warranty term in compliance with ISO 10535 and VA Corrective and

Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts

(https://www.publichealth.va.gov/docs/employeehealth/PreventitiveMaintenance.pdf)

- - - E N D - - -

File details come from the government source that posted it. Updated .