S02_Att03 DWGS 556-17-001_Hemodialysis Renovation r22MAR22.pdf
PDF 21 MB Posted
- Solicitation number
- 36C25222B0032
About this file
This document outlines a federal contract opportunity for hemodialysis renovation services. The solicitation number is 36C25222B0032 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity is for renovating the hemodialysis unit in building 134 at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. Services required include renovating areas 3A through 3C to update the hemodialysis unit. The response due date is not provided, nor are any other details included regarding pricing, award timing, or set-asides.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
PROJECT SITE,
BUILDING 133
AREA MAP
VICINITY MAP
G R
E E
N B
A Y
R D
BUCKLEY RD
N
N
KEY PLAN
N
PROJECT LOCATION:
THIRD FLOOR
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLAN
GC101 INFECTION CONTROL/PHASING PLAN
HA101 HAZARDOUS MATERIAL REMOVAL PLAN
ARCHITECTURAL
AD100 THIRD FLOOR DEMOLITION PLANS
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE002 WALL TYPES
AE100 THIRD FLOOR ARCHITECTURAL PLAN
AE101 THIRD FLOOR DIMENSION PLAN
AE110 THIRD FLOOR REFLECTED CEILING PLAN
AE401 ENLARGED PLANS & INTERIOR ELEVATIONS
AE402 ENLARGED PLANS & INTERIOR ELEVATIONS
AE601 DOOR & WINDOW SCHEDULE
AE602 DOOR & WINDOW DETAILS
AI101 FINISH WALL TREATMENT PLAN
AI102 FINISH FLOOR TREATMENT PLAN
AI103 SIGNAGE PLAN
AI502 CASEWORK DETAILS
QH100 EQUIPMENT FLOOR PLAN
FIRE PROTECTION
F001 ABBREVIATIONS, LEGEND AND DRAWING INDEX
FX103 PARTIAL THIRD FLOOR - NEW WORK PLAN
PLUMBING
P001 ABBREVIATIONS, LEGEND & DRAWING INDEX
PD103 PARTIAL SECOND & THIRD FLOOR REMOVAL PLANS
PL103 PARTIAL SECOND & THIRD FLOOR NEW WORK PLANS
PP103 PARTIAL THIRD FLOOR - NEW WORK PLANS
P601 SCHEDULES & DETAILS
P901 SOIL, WASTE & VENT DIAGRAM
P902 DOMESTIC WATER DIAGRAM
MECHANICAL
M001 ABBREVIATIONS, LEGEND & DRAWING INDEX
MD103 PARTIAL THIRD FLOOR - REMOVALS PLAN
MD105 PARTIAL FIFTH FLOOR - REMOVALS PLAN
MH100 PARTIAL BASEMENT FLOOR - DUCTWORK
MH103 PARTIAL THIRD FLOOR - DUCTWORK & PIPING PLANS
MH105 PARTIAL FIFTH FLOOR (PENTHOUSE) - DUCTWORK PLAN
MH106 PARTIAL ROOF - NEW WORK PLAN
M501 DETAILS
M502 DETAILS
M503 DETAILS
M601 SCHEDULES & DIAGRAMS
M701 CONTROL SCHEMATICS
M702 CONTROL SCHEMATICS
ELECTRICAL
E001 ABBREVIATIONS, LEGENDS & DRAWING INDEX
ED103 PARTIAL THIRD & FIFTH FLOOR - FIRE ALARM NEW WORK & REMOVALS
EL103 PARTIAL THIRD FLOOR & ROOF - POWER & LIGHTING PLANS
EL104 PARTIAL FIFTH FLOOR & ROOF - POWER PLANS
E501 DETAILS
E601 SCHEDULES AND SINGLE LINE
TECHNOLOGY
T001 ABBREVIATIONS, LEGENDS & DRAWING INDEX
TD103 PARTIAL THIRD FLOOR - TECHNOLOGY REMOVALS
TA103 PARTIAL THIRD FLOOR - TECHNOLOGY PLANS
T501 DETAILS
T601 SCHEDULES & DIAGRAMS
PATIENT LIFT SYSTEMS
GUL101 COVER
GUL102 GENERAL INFO
GUL103 ATTACHMENT
GUL104 PROJECT DETAILS
GUL105 BAY 3A-112A
GUL106 BAY 3A-112B
GUL107 BAY 3A-112C
GUL108 BAY 3A-112D
GUL109 BAY 3A-112E
GUL110 BAY 3A-112F
GUL111 ISO-3A-109
GUL112 TLT 3A-110
GUL113 OVERALL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
25% SCHEMATIC DESIGN 07/27/2021
50% DESIGN DEVELOPMENT 09/17/2021
75% DESIGN DEVELOPMENT 10/25/2021
95% DESIGN DEVELOPMENT 1/7/2022
100% CONSTRUCTION DOCUMENTS 2/15/2022
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.0
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/2
/2
:2
:1
A
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
937.224.0861
HEMODIALYSIS RENOVATION
DESIGN
3001 Green Bay Road. North Chicago, IL 60064
556-17-001
3/22/2022 JF DV
556-17-001
HEMODIALYSIS RENOVATION DESIGN
CAPTAIN JAMES A. LOVELL FHCC
3001 Green Bay Road. North Chicago, IL 60064
100% CONSTRUCTION DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Contact:Contact: Contact:
HEAPY
Matt Graham
Project Manager
MECHANICAL, ELECTRICAL &
PLUMBING
CAPTAIN JAMES A. LOVELL FHCC
Sean Brewner
COR
2450 Buckley Road North Chicago, IL 60064 p: 224.610.3945 e: sean.brewner@va.gov
OWNER
GUIDON DESIGN INC.
David Vallandingham
Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com
ARCHITECT
1400 W Dorthy Lane Dayton, OH 45409 p: 937.224.0861 x 1050 e: msgraham@heapy.com
***RENDERINGS DO NOT NECESSARILY ALIGN WITH DESIGN INTENT
Revisions: Date:
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
KEY PLAN
N
PROJECT LOCATION:
THIRD FLOOR
12141618
J
K
L
M
N
P
Q
H
I
O
R
S
T
UV WXYZ AA
3A-117
SOILED UTILITY
USCL1
3A-116
EQUIP STOR
SRSE1
3A-115
CLEAN SUPPLY
UCCL13A-114
EQUIP STOR
USCL1
3A-113
OFFICE
OFA01
3A-112
CORRIDOR
RDC01
3A-112F
BAY
RDC0F
3A-112E
BAY
RDC0E
3A-112D
BAY
RDC0D
3A-112A
BAY
RDC0A
3A-112B
BAY
RDC0B
3A-112C
BAY
RDC0C
3A-111
MED
MEDP1
3A-110
TLT
TLT1
3A-109A
TLT
TPG01
3A-106
WAITING
WRC01
3A-109
ISOLATION
RDC02
2799 SF
10028
I
D
IA
G O
N A
L D
IS
T A
N C
E
4'
0"
E X
IT
S
E P
A R
A T
IO
N
T R
A V
E L
D
IS
T A
N C
E
FEC
FEC
E X
IT
EXIT
C3-135
CORRIDOR
C3-129
CORRIDOR
3A-100
ELEC.
3A-107C
LOCKER
3A-107B
LOCKER
3A-107
RECEPTION
3A-108
ANTEROOM
3A-108
ANTEROOM
RDC02
3A-107
RECEPTION
RECP1
C3-130
SERVICE LOBBY
3A-108A
JAN
ST-X1
STAIR
3A-110
TLT
3A-111
MED
3A-114
EQUIP STOR
3A-116
EQUIP STOR
3A-115
CLEAN UTILITY
3A-117
SOILED UTILITY
3A-118
OFFICE
ST-X2
STAIR
3A-103
STORAGE
3A-102
STORAGE
3A-101
STORAGE
EL-3
ELEVATOR
EL-2
ELEVATOR
EL-1
ELEVATOR
T R
A V
E L
D
IS
T A
N C
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
25% SCHEMATIC DESIGN 07/27/2021
50% DESIGN DEVELOPMENT 09/17/2021
75% DESIGN DEVELOPMENT 10/25/2021
95% DESIGN DEVELOPMENT 1/7/2022
100% CONSTRUCTION DOCUMENTS 2/15/2022
C U s e rs
\d b a jo r\ D o c u m e n ts
\1
.1
.0
A v d b a jo r.
rv t
/1
/2
:2
:2
A
M
GI101
LIFE SAFETY PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
937.224.0861
HEMODIALYSIS RENOVATION
DESIGN
3001 Green Bay Road. North Chicago, IL 60064
556-17-001
2/15/2022 JF DV
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
LIFE SAFETY OCCUPANCY COUNT
AREA SF OCC OCC FACTOR # OF OCC
3RD FLOOR
Area 2799 SF I 100 28
2799 SF 28
2799 SF 28
SCALE: 1/8" = 1'-0"GI101
4 LIFE SAFETY PLAN - 3RD FLOOR PLAN
Revisions: Date: 3/22/2022
T
T
T
T
CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C
PATIENT RISK GROUP: HIGH
CLASS OF PRECAUTION MATRIX: III
1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 1/GC101.
2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
KEYED ACCESS. REFER TO ELEVATION 2/GC101. CONTRACTOR SHALL
PROVIDE COR WITH COPY OF KEY.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
4. LOCATION OF CONSTRUCTION ANTEROOM.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN TWO PHASES.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. ABOVE CEILING PNEUMATIC TUBE WORK IN THE EXISTING CORRIDOR SHALL
BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM. COORDINATE
WITH COR. ALL WORK TO BE COMPLETED AND OPEN FOR PUBLIC USE AT
THE END OF EACH NIGHT'S WORK.
PHASING GENERAL NOTES
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
KEY PLAN
N
PROJECT LOCATION:
THIRD FLOOR
12141618
J
K
L
M
N
P
I
UV
CLEAR
5' - 0"
CLEAR
5' - 0"
PATH OF NEGATIVE AIR THROUGH EXTERIOR WINDOWS
2 1
6'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
25% SCHEMATIC DESIGN 07/27/2021
50% DESIGN DEVELOPMENT 09/17/2021
75% DESIGN DEVELOPMENT 10/25/2021
95% DESIGN DEVELOPMENT 1/7/2022
100% CONSTRUCTION DOCUMENTS 2/15/2022
C U s e rs
\d b a jo r\ D o c u m e n ts
\1
.1
.0
A v d b a jo r.
rv t
/1
/2
:2
:2
A
M
GC101
INFECTION CONTROL/PHASING
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
937.224.0861
HEMODIALYSIS RENOVATION
DESIGN
3001 Green Bay Road. North Chicago, IL 60064
556-17-001
2/15/2022 JF DV
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"GC101
1 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"GC101
2 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 3/16" = 1'-0"GC101
4 INFECTION CONTROL / PHASING PLAN
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY
AREA FOR REMOVAL OF ASBESTOS-CONTAINING FLOORING
AND ASSOCIATED MASTIC
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 11.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. PROVIDE ABATEMENT OF VCT AND FLOORING MASTIC WITHIN HATCHED
AREA.
E. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD
FITTINGS ON FIBERGLASS INSULATED DOMESTIC WATER LINES FOR 10
FITTINGS.
F. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING BLACK MASTIC
AND 12" NON-ASBESTOS FLOOR TILE OF APPROXIMATELY 300 SQ.FT.
G. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
H. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED
LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE
EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED
PLASTER WALLS AND PAINTED SURFACES. REFER TO SPECIFICATION
SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL, DISPOSAL AND FOR
ADDITIONAL INFORMATION.
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
12141618
J
K
L
M
N
P
I
UV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
25% SCHEMATIC DESIGN 07/27/2021
50% DESIGN DEVELOPMENT 09/17/2021
75% DESIGN DEVELOPMENT 10/25/2021
95% DESIGN DEVELOPMENT 1/7/2022
100% CONSTRUCTION DOCUMENTS 2/15/2022
C U s e rs
\d b a jo r\ D o c u m e n ts
\1
.1
.0
A v d b a jo r.
rv t
/1
/2
:2
:2
A
M
HA101
HAZARDOUS MATERIAL REMOVAL
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
937.224.0861
HEMODIALYSIS RENOVATION
DESIGN
3001 Green Bay Road. North Chicago, IL 60064
556-17-001
2/15/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/16" = 1'-0"HA101
1 HAZARDOUS MATERIALS ABATEMENT PLAN
D
D
DD
T
T
T
T
12141618
J
K
L
M
N
H
I
O
UV WXYZ AA
V
IF
7'
1/ 4"
6 6
LOCKER
3A-107B
RECEPTION
3A-107
STAIR
ST-X1
TLT
3A-110
MED
3A-111
EQUIP STOR
3A-114
CLEAN UTILITY
3A-115
CORRIDOR
C3-135
EQUIP STOR
3A-116
SOILED UTILITY
3A-117
OFFICE
3A-118
CORRIDOR
C3-129
STORAGE
3A-102
STORAGE
3A-103
SERVICE LOBBY
C3-130
STORAGE
3A-101
ELEVATOR
EL-3
ELEVATOR
EL-2
STAIR
ST-X2
ELEC.
3A-100
KEY PLAN
N
PROJECT LOCATION:
THIRD FLOOR
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL
QUANTITIES AND ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL FLOOR PLAN AE100 AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
K. WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE
SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL
BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING
MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.
L. COORDINATE SCOPE OF FLOORING REMOVAL WITH HAZMAT PLAN SHEET
HA101.
M. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS
OTHERWISE INDICATED.
N. COLUMN WRAPS SHALL BE REMOVED FROM EXISTING COLUMNS
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.
O. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE INDICATED.
P. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.
Q. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO
PLUMBING PLAN FOR ADDITIONAL INFORMATION.
R. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
S. REMOVE EXISTING WALL PROTECTION, CORNER GUARDS, HANDRAILS AND/
OR GUARDRAILS THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE
NOTED.
T. REMOVE INTERIOR FINISHES OF EXISTING EXTERIOR WALLS AND INTERIOR
FINISHES ON PROJECT SIDE OF PROJECT BOUNDARY WALLS.
U. PATCH, REPAIR AND REFINISH ANY SELECTIVE DEMOLITION REQUIRED ON
OTHER FLOORS TO COMPLETE THE SCOPE OF WORK IN THESE
DOCUMENTS.
DEMOLITION GENERAL NOTES
1. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY.
2. EXISTING EXTERIOR WINDOWS TO REMAIN. PATCH, REPAIR AND CLEAN AS
REQUIRED FOR NEW CONSTRUCTION.
3. REMOVE EXISTING WALL COMPLETE AS NOTED. COORDINATE EXTENT OF
REMOVAL WITH NEW CONSTRUCTION.
4. REMOVE ALL EXISTING TILE FLOORING AND BASE IN ITS ENTIRETY. PATCH
AND REPAIR CONCRETE SUBSTRATE TO RECEIVE NEW FINISHES.
5. REMOVE EXISTING SUSPENDED CEILING SYS. IN ITS ENTIRETY. PATCH AND
REPAIR STRUCTURE ABOVE AND ADJACENT WALLS TO RECEIVE NEW
FINISHES.
6. REMOVE EXISTING WALL IN ITS ENTIRETY.
7. RENOVE EXISTING WALL TILE IN ITS ENTIRETY. PATCH AND REPAIR
EXISTING SUBSTRATE TO RECEIVE NEW FINISHES/CONSTRUCTION.
8. PROTECT ALL EXISTING SURFACES, EQUIPMENT, FINISHES, ETC. FROM
DAMAGE DURING CONSTRUCTION. COORDINATE EXTENTS OF EXISTING
AREAS TO BE PROTECTED WITH SCOPE OF NEW CONSTRUCTION.
9. REMOVE EXISTING WALL AND TILE FINISHES SURROUNDING STRUCTURAL
COLUMN IN ITS ENTIRETY.
#DEMOLITION PLAN NOTES
12141618
J
K
L
M
N
H
I
O
UV WXYZ AA
5 5
LOCKER
3A-107B
RECEPTION
3A-107
STAIR
ST-X1
CORRIDOR
C3-135
TLT
3A-110
MED
3A-111
EQUIP STOR
3A-114
CLEAN UTILITY
3A-115
EQUIP STOR
3A-116
SOILED UTILITY
3A-117
OFFICE
3A-118
STORAGE
3A-103
STORAGE
3A-102
SERVICE LOBBY
C3-130
ELEC.
3A-100
STAIR
ST-X2
ELEVATOR
EL-3
STORAGE
3A-101
ELEVATOR
EL-2
1. REMOVE, SALVAGE AND REPLACE EXISTING CEILING SYSTEM AS REQUIRED
FOR THE INSTALLATION OF A NEW PNEUMATIC TUBE SYSTEM. COODRINATE
EXTENT OF REMOVAL WITH NEW CONSTRUCTION.
2. REMOVE EXISTING SUSPENDED CEILING SYSTEM IN ITS ENTIRETY. PATCH
AND REPAIR EXISTING STRUCTURE TO RECEIVE NEW FINISHES.
#DEMOLITION REFLECTED CEILING PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
25% SCHEMATIC DESIGN 07/27/2021
50% DESIGN DEVELOPMENT 09/17/2021
75% DESIGN DEVELOPMENT 10/25/2021
95% DESIGN DEVELOPMENT 1/7/2022
100% CONSTRUCTION DOCUMENTS 2/15/2022
C U s e rs
\d b a jo r\ D o c u m e n ts
\1
.1
.0
A v d b a jo r.
rv t
/1
/2
:2
:1
A
M
AD100
THIRD FLOOR DEMOLITION PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
937.224.0861
HEMODIALYSIS RENOVATION
DESIGN
3001 Green Bay Road. North Chicago, IL 60064
556-17-001
2/15/2022 JF DV
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/16" = 1'-0"AD100
1 DEMO - 3RD FLOOR PLAN
SCALE: 3/16" = 1'-0"AD100
2 DEMO - 3RD FLOOR RCP
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
LED WALL MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED RECESSED LIGHT FIXTURE
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
LED RECESSED LIGHT FIXTURE
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR
HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR
SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIP FILLER PANEL
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER OR HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LEFT HAND REVERSE LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM OR MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
NEW WALL
WALL TO BE
REMOVED
S3A.G
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND FINISH HEIGHTS
INDICATES QUALIFER
EXISTING WALL TO
REMAIN
TEMPORARY IC
BARRIER WALL
CONSTRUCTION
ROOM
ROOM TAG
NEW DOOR
EXISTING DOOR
DEMOLISHED DOOR
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP
DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
S SOUTH
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL LNTL STEEL LINTEL
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TA TOILET ACCESSORY
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL OR TEMPERATURE
CONTROL PANEL OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
REVISION TO PLAN CALLOUT
WALLS
DOOR TAG
KEY NOTE TAGS
WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION
DOORS
PT-1
A
T
101 EQUIPMENT/FURNITURE TAG
FINISH INDICATION
FRAME / WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
ALTERNATE/BID DEDUCT ITEM
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS
REFLECTED CEILING PLAN SYMBOLS
ARCHITECTURAL ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
25% SCHEMATIC DESIGN 07/27/2021
50% DESIGN DEVELOPMENT 09/17/2021
75% DESIGN DEVELOPMENT 10/25/2021
95% DESIGN DEVELOPMENT 1/7/2022
100% CONSTRUCTION DOCUMENTS 2/15/2022
C U s e rs
\d b a jo r\ D o c u m e n ts
\1
.1
.0
A v d b a jo r.
rv t
/1
/2
:2
:1
A
M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HEAPY
4000 W. DORTHY LANE
DAYTON, OH 45409
937.224.0861
HEMODIALYSIS RENOVATION
DESIGN
3001 Green Bay Road. North Chicago, IL 60064
556-17-001
2/15/2022 JF DV
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
A. ALL WALLS WILL BE WALL TYPS S3C.G UNLESS OTHERWISE NOTED.
B. ALL WALL TYPE INDICATORS REFER TO THIS SHEET UNLESS OTHERWISE
NOTED.
C. REFER TO DIMENSION PLANS FOR PARTITION TYPE LOCATIONS.
PARTITIONS ARE DISTINGUSHED ON PLANS BY SYMBOL DESIGNATION
GRAPHIC DESIGNATION, OR A COMBINATION OF BOTH. NOT ALL
PARTITIONS ON THIS SHEET MAY BE USED. REFER TO PARTITION TYPE
SCHEDULE ON THIS SHEET FOR PARTITIONS USED ON THIS PROJECT.
D. ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD, OR TO FACE
OF BLOCK. REFER TO PARTITION S3C.G FOR PARTITION WIDTH
DIMENSIONS.
E. ALL WALLS STUDS TO BE 16" O.C. UNLESS OTHERWISE NOTED.
F. REFER TO SPECIFICATIONS AND TO TABLE ON THIS SHEET FOR MINIMUM
STUD GAUGE, MAXIMUM SPACING AND ALLOWABLE LIMITING HEIGHT
DEFLECTION CRITERIA FOR GYPSUM BOARD ASSEMBLIES AND REQUIRED
FINISHES. FOR WALLS WHERE STUDS ARE ATTACHED TO STRUCTURE
ABOVE, PROVIDE CROSS BRACING AS NECESSARY MEETING THE CRITERIA
INDICATED TO ACCOMMODATE THE SPECIFIED DEFLECTION CRITERIA OF
THE WALL.
G. ALL INTERIOR NON-BEARING STUDS TO BE DESIGNED FOR A DEFLECTION
EQUAL TO BUT NOT GREATER THAN L/240, UNLESS FULL HEIGHT FINISH IS
DETERMINED TO BE FRAGILE OR BRITTLE, THEN DEFLECTION TO BE L/360.
EXAMPLES OF FRAGILE FINISHES WOULD INCLUDE BUT NOT LIMITED TO
ANY TYPE OF WALL TILE, PLASTER OR PLASTER SKIM COAT.
H. ALTHOUGH WALL STUD SIZES ARE LISTED ON PLANS AND WALL TYPE S3C.G
IN AREAS WHERE STUDS ARE TO STRUCTURE ABOVE OR HIGH AREAS,
CONTRACTOR TO VERIFY SIZED INDICATED IS ADEQUATE FOR HEIGHT
LISTED. PROVIDE ADEQUATE SIZE STELL STUD FRAMING AND NOTIFY
ARCHITECT OF ANY DISCREPANCY PRIOR TO FABRICATION OR
INSTALLATION.
I. KING STUDS AT DOOR FRAMES TO BE 18 GA. UNLESS OTHERWISE NOTED.
J. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD FOR ALL OTHER WALL
CONSTRUCTION, UNLESS OTHERWISE NOTED.
K. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD IN BULKHEAD CONSTRUCTION.
L. REFER TO LIFE SAFETY PLANS FOR LOCATIONS AND RATINGS OF SMOKE
AND FIRE RATED PARTITIONS. REFERENCE TEST NUMBERS APPLY ONLY TO
PARTITIONS INDICATED TO BE RATED.
M. FIRE RATING TEST NUMBERS ARE FOR UNDERWRITER'S LABORATORIES
(UL) ASSEMBLIES UNLESS OTHERWISE NOTED.
N. FIRE RESISTANT RATED PARTITIONS SHALL EXTEND TO THE INSIDE FACE
OF EXTERIOR SHEATHING, INCLUDING EXTENSIONS THROUGH SOFFITS.
O. SEAL ALL OPENINGS, GAPS, PENETRATIONS, AND JOINTS IN PARTITIONS
TYPES AS FOLLOWS:
a. FIRE RATED PARTITIONS: SEAL IN ACCORDANCE WITH THE
REQUIREMENTS SPECIFIED FOR THROUGH PENETRATION
FIRESTOP SYSTEMS AND FIRE RESISTIVE JOINT SYSTEMS.
b. SMOKE TIGHT PARTITIONS: SEAL COMPLETELY WITH
ELASTOMERIC SEALANT. FOR THE LOCATION AND EXTENT OF
PARTITIONS, DESIGNATED AS "SMOKE TIGHT", REFER TO THE LIFE
SAFETY DRAWINGS.
c. ALL OTHER LOCATIONS: SEAL AS INDICATED AND REQUIRED
ELSEWHERE BY THE CONTRACT DOCUMENTS.
P. INSULATION HEAD CONDITIONS AT FLOOR / ROOF DECK:
a. FIRE RESISTANT RATED PARTITIONS SHALL USE MINERAL WOOL
INSULATION AND APPROPRIATE FIRE RATED SEALANT.
b. NON-RATED PARTITIONS REQUIRING SOUND ATTENUATION SHALL
USE SOUND ATTENUATION BATTS (SAB).
Q. PROVIDE STENCILED IDENTIFICATION FOR RATED PARTITIONS.
R. STC RATING APPLIES WHERE PARTION TAG QUALIFIER INDICATES WITH AN
"i". PROVIDE SOUND ATTENUATION BATTS OF THICKNESS INDICATED ON
SCHEDULE WHERE INDICATED BY QUALIFIER.
S. FOR PARTITIONS WITH STC RATINGS INDICATED SOUND ATTENUATION
BATTS TO EXTEND FULL HEIGHT OF PARTITION UNLESS OTHERWISE
NOTED. FLOOR TRACK TO BE SET IN A CONTINUOUS BED OF SEALANT.
T. WHERE PARTITION TYPE INDICATES SOUND ACOUSTICAL BAT, WITH FINISH
BOARD GOING TO DECK ON ONE SIDE ONLY, PROVIDE VAPOR BARRIER TO
SECURE INSULATION IN PLACE.
U. REFER TO DIMENSIONED PLANS FOR REFERNECE SYMBOLS INDICATING
THE EXTENT OF RADIATION PROTECTION.
V. PROVIDE 5/8" MOISTURE/MOLD RESISTANT GYPSUM BOARD IN SOILED
ROOMS, BATHROOMS, TOILET ROOMS, ON WALLS BEHIND PLUMBING
FIXTURES, AND IN ALL WET LOCATIONS EXCEPT IN SHOWER AREA.
W. PROVIDE 5/8" CEMENTITIOUS BACKER BOARD BEHIND CERAMIC WALL TILE &
SHOWER AREA. COORDINATE LOCATIONS WITH FINISH WALL PLANS.
X. PROVIDE CORNER AND END WALL FRAMING AS DETAILED ON 3/AE002.
WALL TYPES LEGEND AND GENERAL NOTES
X#X.#
INDICATES STRUCTURAL MATERIAL
CH = SHAFT WALL
F = FURRING
S = STEEL
M = MASONRY
W = WOOD
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND
FINISH HEIGHTS
QUALIFIER'S (X-X-X)
G GYPSUM BOARD FINISH
1SB 1 HR RATED SMOKE BARRIER
2SB 2 HR RATED SMOKE BARRIER
1F 1 HR FIRE RATED
2F 2 HR FIRE RATED
i SOUND INSULATION t THERMAL INSULATION
B BULLET RESISTANT
L LEAD LINED
M MESH (STEEL SECURITY MESH)
MR MOIST/MOLD RESISTANT GYPSUM
SP SMOKE PARTITION
TB TILE BACKER CEMENT BOARD
A = STRUCTURE TO DECK, FINISH TO DECK
B = STRUCTURE TO DECK, FINISH ONE SIDE TO DECK
C = STRUCTURE TO DECK, FINISH TO ABOVE CEILING
D = STRUCTURE TO ABOVE CEILING, FINISH TO ABOVE CEILING
P = PARTIAL HEIGHT WALL
U = STRUCTURE TO UNDERSIDE OF CELING, FINISH TO UNDERSIDE OF CEILING
*SEE WALL TYPES FOR PROJECT SPECIFIC CONSTRUCTION
CH
2 1/2" 4" 6"
F 7/8
1 1/2" 2 1/2" 3 5/8"
4" 6" 8" 12"
S
2 1/2" 3 5/8"
4" 6" 8" 12"
M
2 5/8" 3 5/8" 5 5/8" 7 5/8" 11 5/8"
W
3/4"
3 1/2"
5 1/2" 7 1/4" 11 1/4"
" 1 HR FIRE/SMOKE
10'-0" MAX 10'-0" MAX
A. LETTERED STENCILS SHALL BE APPLIED TO EACH SIDE OF RATED PARTITIONS
AT 10'-0" INTERVALS; BUT NO LESS THAN ONCE PER PARTITION LENGTH.
B. USE THE FOLLOWING LANGUAGE FOR STENCILS:
"1 HR FIRE/SMOKE" "1 HR FIRE"
"2 HR FIRE/SMOKE" "2 HR FIRE"
"LIMIT TRANSFER OF SMOKE"
PERMANENT RED PAINT
LETTERING, TYP.
CEILING LINE
STENCILING NOTES
WALL TAG LEGEND
S2A.G 2 1/2"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
3 3/4" NA NA NA
COMMENTS
S3A.G 3 5/8" 4 7/8"
NA
NANANANA
S6A.G 6" 7 1/4" NANANANA
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
3/4"
STRUCTURAL SIZE
3/4"
FINISH DIMENSION
5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
CEILING
DEEP LEG SLIP TRACK AT DECK
HOLD GYPSUM BACK FROM DECK FOR
DEFLECTION
S2C.G 2 1/2"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
3 3/4" NA NA NA
COMMENTS
S3C.G 3 5/8" 4 7/8"
NA
NANANANA
S6C.G 6" 7 1/4" NANANANA
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
3/4"
STRUCTURAL SIZE
3/4"
FINISH DIMENSION
STEEL STUD BRACING @ 4'-0" O.C.
CEILING
6"
INSULATION PRESENT
5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
INSULATION PRESENT WITH QUALIFER (i OR t)
F2D.G 2 1/2"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
3 1/8" NA NA NA
COMMENTS
F3D.G 3 5/8" 4 1/4"
NA
NANANANA
F6D.G 6" 6 5/8" NANANANA
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
STRUCTURAL DIMENSION
3/4"
FINISH DIMENSION
CEILING
5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
INSULATION PRESENT
EXISTING WALL / COLUMN, VIF.
F0D.G 7/8" 1 1/2" NA NA NA
F1D.G 1 1/2" 2 1/8"
HAT CHANNEL @ 24" O.C.
NANANA HAT CHANNEL @ 24" O.C.
WALL TYPES
BEAD OF CONT. SEALANT
NOTE:
• TYPICAL LIMITING HEIGHTS-INTERIOR PARTITIONS, L/240 (5 PSF), WITH 5/8"GYPSUM BOARD EACH SIDE.
• PROVIDE DIAGONAL STUD BRACING AT ALL NON FULL HEIGHT INTERIOR PARTITIONS STAGGERED AT 48" O.C. TO DECK ABOVE. PROVIDE STUD
ATTACHMENT TO DECK W/ MIN. SPAN OF 2 DECK FLUTES. BRACING TO BE THE SAME SIZE AND GAUGE AS VERTICAL STUDS.
25 GA. STUDS (NON-COMPOSITE)
STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT
16" L/240 6'-11"1-5/8"
24" L/240 6'-0"162S125-18
16" L/240 9'-6"2-1/2"
24" L/240 8'-4"250S125-18
16" L/240 12'-5"3-5/8"
24" L/240 10'-10"362S125-18
16" L/240 13'-9"4"
24" L/240 12'-0"400S125-18
22 GA. STUDS (NON-COMPOSITE)
STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT
16" L/240 8'-1"1-5/8"
24"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .