This document outlines a federal contract opportunity for hemodialysis renovation services. The solicitation number is 36C25222B0032 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity is for renovating the hemodialysis unit in building 134 at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. Services required include renovating areas 3A through 3C to update the hemodialysis unit. The response due date is not provided, nor are any other details included regarding pricing, award timing, or set-asides.

View the file

Other files

File Type Posted
36C25222B0032 0005.docx DOCX document
S02_Att13 Abatement Survey 2065101 N. Chicago VAMC report_Optimized.pdf PDF
36C25222B0032 0004.docx DOCX document
36C25222B0032 0003.docx DOCX document
S04_2nd Site Visit Sign-In-Sheet (08182022) 556-17-001 Hemodialysis Renovation.pdf PDF
S04_1st Site Visit Sign-In-Sheet (08112022) 556-17-001 Hemodialysis Renovation.pdf PDF
36C25222B0032 0002.docx DOCX document
36C25222B0032 0001.docx DOCX document
S02_Att09 Quality Requirements 01 40 00 19MAY20.pdf PDF
S02_Att02 Revised 100_ SPECS Vol 2_556-17-001 (Hemodialysis Renovation) 06222022.pdf PDF
S02_Att04 Wage Rates SAM IL (current as of 07132022).pdf PDF
S02_Att08 Infection Control Requirements 01 35 33 27AUG21.pdf PDF
36C25222B0032_1.docx DOCX document
S02_Att12 Corrected Spec 11 73 00 Ceiling Mounted Pt Lift 556-17-001 Hemodialysis 22JUL22.pdf PDF
S02_Att01 Final SOW 556-17-001.pdf PDF
S02_Att02 Revised 100_ SPECS Vol 1_556-17-001 (Hemodialysis Renovation) 06222022.pdf PDF
S02_Att06 Safer Federal Workforce Task Force guidance.pdf PDF
S02_Att07 Safety Requirements 01 35 26 27AUG21.pdf PDF
S02_Att10 Regulatory Requirements 01 41 00 24JAN22.pdf PDF
S02_Att05 VHA Directive 1192_01_D_2020-08-10 Seasonal Flu Shot.pdf PDF
S02_Att11 36C25222B0032 556-17-001 VAAR 852.219-77 Certification.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT OFFICER REPRESENTATIVE DATE

CHIEF OF ENGINEERING DATE

INTERIOR DESIGNER DATE

DEPARTMENT HEAD DATE

CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE

PROJECT SITE,

BUILDING 133

AREA MAP

VICINITY MAP

G R

E E

N B

A Y

R D

BUCKLEY RD

N

N

KEY PLAN

N

PROJECT LOCATION:

THIRD FLOOR

SHEET INDEX

SHEET NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 LIFE SAFETY PLAN

GC101 INFECTION CONTROL/PHASING PLAN

HA101 HAZARDOUS MATERIAL REMOVAL PLAN

ARCHITECTURAL

AD100 THIRD FLOOR DEMOLITION PLANS

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AE100 THIRD FLOOR ARCHITECTURAL PLAN

AE101 THIRD FLOOR DIMENSION PLAN

AE110 THIRD FLOOR REFLECTED CEILING PLAN

AE401 ENLARGED PLANS & INTERIOR ELEVATIONS

AE402 ENLARGED PLANS & INTERIOR ELEVATIONS

AE601 DOOR & WINDOW SCHEDULE

AE602 DOOR & WINDOW DETAILS

AI101 FINISH WALL TREATMENT PLAN

AI102 FINISH FLOOR TREATMENT PLAN

AI103 SIGNAGE PLAN

AI502 CASEWORK DETAILS

QH100 EQUIPMENT FLOOR PLAN

FIRE PROTECTION

F001 ABBREVIATIONS, LEGEND AND DRAWING INDEX

FX103 PARTIAL THIRD FLOOR - NEW WORK PLAN

PLUMBING

P001 ABBREVIATIONS, LEGEND & DRAWING INDEX

PD103 PARTIAL SECOND & THIRD FLOOR REMOVAL PLANS

PL103 PARTIAL SECOND & THIRD FLOOR NEW WORK PLANS

PP103 PARTIAL THIRD FLOOR - NEW WORK PLANS

P601 SCHEDULES & DETAILS

P901 SOIL, WASTE & VENT DIAGRAM

P902 DOMESTIC WATER DIAGRAM

MECHANICAL

M001 ABBREVIATIONS, LEGEND & DRAWING INDEX

MD103 PARTIAL THIRD FLOOR - REMOVALS PLAN

MD105 PARTIAL FIFTH FLOOR - REMOVALS PLAN

MH100 PARTIAL BASEMENT FLOOR - DUCTWORK

MH103 PARTIAL THIRD FLOOR - DUCTWORK & PIPING PLANS

MH105 PARTIAL FIFTH FLOOR (PENTHOUSE) - DUCTWORK PLAN

MH106 PARTIAL ROOF - NEW WORK PLAN

M501 DETAILS

M502 DETAILS

M503 DETAILS

M601 SCHEDULES & DIAGRAMS

M701 CONTROL SCHEMATICS

M702 CONTROL SCHEMATICS

ELECTRICAL

E001 ABBREVIATIONS, LEGENDS & DRAWING INDEX

ED103 PARTIAL THIRD & FIFTH FLOOR - FIRE ALARM NEW WORK & REMOVALS

EL103 PARTIAL THIRD FLOOR & ROOF - POWER & LIGHTING PLANS

EL104 PARTIAL FIFTH FLOOR & ROOF - POWER PLANS

E501 DETAILS

E601 SCHEDULES AND SINGLE LINE

TECHNOLOGY

T001 ABBREVIATIONS, LEGENDS & DRAWING INDEX

TD103 PARTIAL THIRD FLOOR - TECHNOLOGY REMOVALS

TA103 PARTIAL THIRD FLOOR - TECHNOLOGY PLANS

T501 DETAILS

T601 SCHEDULES & DIAGRAMS

PATIENT LIFT SYSTEMS

GUL101 COVER

GUL102 GENERAL INFO

GUL103 ATTACHMENT

GUL104 PROJECT DETAILS

GUL105 BAY 3A-112A

GUL106 BAY 3A-112B

GUL107 BAY 3A-112C

GUL108 BAY 3A-112D

GUL109 BAY 3A-112E

GUL110 BAY 3A-112F

GUL111 ISO-3A-109

GUL112 TLT 3A-110

GUL113 OVERALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

25% SCHEMATIC DESIGN 07/27/2021

50% DESIGN DEVELOPMENT 09/17/2021

75% DESIGN DEVELOPMENT 10/25/2021

95% DESIGN DEVELOPMENT 1/7/2022

100% CONSTRUCTION DOCUMENTS 2/15/2022

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.0

A v d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/2

/2

:2

:1

A

M

GI000

COVER SHEET

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

937.224.0861

HEMODIALYSIS RENOVATION

DESIGN

3001 Green Bay Road. North Chicago, IL 60064

556-17-001

3/22/2022 JF DV

556-17-001

HEMODIALYSIS RENOVATION DESIGN

CAPTAIN JAMES A. LOVELL FHCC

3001 Green Bay Road. North Chicago, IL 60064

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Contact:Contact: Contact:

HEAPY

Matt Graham

Project Manager

MECHANICAL, ELECTRICAL &

PLUMBING

CAPTAIN JAMES A. LOVELL FHCC

Sean Brewner

COR

2450 Buckley Road North Chicago, IL 60064 p: 224.610.3945 e: sean.brewner@va.gov

OWNER

GUIDON DESIGN INC.

David Vallandingham

Project Manager

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com

ARCHITECT

1400 W Dorthy Lane Dayton, OH 45409 p: 937.224.0861 x 1050 e: msgraham@heapy.com

***RENDERINGS DO NOT NECESSARILY ALIGN WITH DESIGN INTENT

Revisions: Date:

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

CODE ANALYSIS LEGEND

KEY PLAN

N

PROJECT LOCATION:

THIRD FLOOR

12141618

J

K

L

M

N

P

Q

H

I

O

R

S

T

UV WXYZ AA

3A-117

SOILED UTILITY

USCL1

3A-116

EQUIP STOR

SRSE1

3A-115

CLEAN SUPPLY

UCCL13A-114

EQUIP STOR

USCL1

3A-113

OFFICE

OFA01

3A-112

CORRIDOR

RDC01

3A-112F

BAY

RDC0F

3A-112E

BAY

RDC0E

3A-112D

BAY

RDC0D

3A-112A

BAY

RDC0A

3A-112B

BAY

RDC0B

3A-112C

BAY

RDC0C

3A-111

MED

MEDP1

3A-110

TLT

TLT1

3A-109A

TLT

TPG01

3A-106

WAITING

WRC01

3A-109

ISOLATION

RDC02

2799 SF

10028

I

D

IA

G O

N A

L D

IS

T A

N C

E

4'

0"

E X

IT

S

E P

A R

A T

IO

N

T R

A V

E L

D

IS

T A

N C

E

FEC

FEC

E X

IT

EXIT

C3-135

CORRIDOR

C3-129

CORRIDOR

3A-100

ELEC.

3A-107C

LOCKER

3A-107B

LOCKER

3A-107

RECEPTION

3A-108

ANTEROOM

3A-108

ANTEROOM

RDC02

3A-107

RECEPTION

RECP1

C3-130

SERVICE LOBBY

3A-108A

JAN

ST-X1

STAIR

3A-110

TLT

3A-111

MED

3A-114

EQUIP STOR

3A-116

EQUIP STOR

3A-115

CLEAN UTILITY

3A-117

SOILED UTILITY

3A-118

OFFICE

ST-X2

STAIR

3A-103

STORAGE

3A-102

STORAGE

3A-101

STORAGE

EL-3

ELEVATOR

EL-2

ELEVATOR

EL-1

ELEVATOR

T R

A V

E L

D

IS

T A

N C

E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

25% SCHEMATIC DESIGN 07/27/2021

50% DESIGN DEVELOPMENT 09/17/2021

75% DESIGN DEVELOPMENT 10/25/2021

95% DESIGN DEVELOPMENT 1/7/2022

100% CONSTRUCTION DOCUMENTS 2/15/2022

C U s e rs

\d b a jo r\ D o c u m e n ts

\1

.1

.0

A v d b a jo r.

rv t

/1

/2

:2

:2

A

M

GI101

LIFE SAFETY PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

937.224.0861

HEMODIALYSIS RENOVATION

DESIGN

3001 Green Bay Road. North Chicago, IL 60064

556-17-001

2/15/2022 JF DV

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

LIFE SAFETY OCCUPANCY COUNT

AREA SF OCC OCC FACTOR # OF OCC

3RD FLOOR

Area 2799 SF I 100 28

2799 SF 28

2799 SF 28

SCALE: 1/8" = 1'-0"GI101

4 LIFE SAFETY PLAN - 3RD FLOOR PLAN

Revisions: Date: 3/22/2022

T

T

T

T

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: III

1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 1/GC101.

2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

KEYED ACCESS. REFER TO ELEVATION 2/GC101. CONTRACTOR SHALL

PROVIDE COR WITH COPY OF KEY.

3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

4. LOCATION OF CONSTRUCTION ANTEROOM.

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN TWO PHASES.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

I. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A. ABOVE CEILING PNEUMATIC TUBE WORK IN THE EXISTING CORRIDOR SHALL

BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM. COORDINATE

WITH COR. ALL WORK TO BE COMPLETED AND OPEN FOR PUBLIC USE AT

THE END OF EACH NIGHT'S WORK.

PHASING GENERAL NOTES

INFECTION CONTROL PLAN NOTES

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

TEMPORARY WALLS. SEE PLAN AND PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS DOORS

REFERENCE AREA FOR ABOVE CEILING

WORK ON FLOOR BELOW.

RE: ENGINEERING DRAWINGS FOR FULL

SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

IC / PHASING LEGEND

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH SIDES

3 5/8" METAL STUD @ 16" O.C. WITH

RUNNER CHANNELS ALONG TOP

AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY ADHERE

TO THE STRUCTURAL DECK ABOVE AND

TO THE FLOOR BELOW WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING CEILING

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

KEY PLAN

N

PROJECT LOCATION:

THIRD FLOOR

12141618

J

K

L

M

N

P

I

UV

CLEAR

5' - 0"

CLEAR

5' - 0"

PATH OF NEGATIVE AIR THROUGH EXTERIOR WINDOWS

2 1

6'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

25% SCHEMATIC DESIGN 07/27/2021

50% DESIGN DEVELOPMENT 09/17/2021

75% DESIGN DEVELOPMENT 10/25/2021

95% DESIGN DEVELOPMENT 1/7/2022

100% CONSTRUCTION DOCUMENTS 2/15/2022

C U s e rs

\d b a jo r\ D o c u m e n ts

\1

.1

.0

A v d b a jo r.

rv t

/1

/2

:2

:2

A

M

GC101

INFECTION CONTROL/PHASING

PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

937.224.0861

HEMODIALYSIS RENOVATION

DESIGN

3001 Green Bay Road. North Chicago, IL 60064

556-17-001

2/15/2022 JF DV

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"GC101

1 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241

SCALE: 1/4" = 1'-0"GC101

2 TEMPORARY WALL CONSTRUCTION ELEVATION

SCALE: 3/16" = 1'-0"GC101

4 INFECTION CONTROL / PHASING PLAN

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY

AREA FOR REMOVAL OF ASBESTOS-CONTAINING FLOORING

AND ASSOCIATED MASTIC

A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL

IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND

REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION

02 82 11.

B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH

APPLICABLE CODES AND LAWS.

C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL

OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS

TO COMPLETE THE CONSTRUCTION WORK.

D. PROVIDE ABATEMENT OF VCT AND FLOORING MASTIC WITHIN HATCHED

AREA.

E. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD

FITTINGS ON FIBERGLASS INSULATED DOMESTIC WATER LINES FOR 10

FITTINGS.

F. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING BLACK MASTIC

AND 12" NON-ASBESTOS FLOOR TILE OF APPROXIMATELY 300 SQ.FT.

G. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL

INFORMATION.

H. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED

LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE

EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED

PLASTER WALLS AND PAINTED SURFACES. REFER TO SPECIFICATION

SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL, DISPOSAL AND FOR

ADDITIONAL INFORMATION.

HAZARDOUS MATERIAL REMOVAL GENERAL NOTES

HAZARDOUS MATERIAL REMOVAL LEGEND

12141618

J

K

L

M

N

P

I

UV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

25% SCHEMATIC DESIGN 07/27/2021

50% DESIGN DEVELOPMENT 09/17/2021

75% DESIGN DEVELOPMENT 10/25/2021

95% DESIGN DEVELOPMENT 1/7/2022

100% CONSTRUCTION DOCUMENTS 2/15/2022

C U s e rs

\d b a jo r\ D o c u m e n ts

\1

.1

.0

A v d b a jo r.

rv t

/1

/2

:2

:2

A

M

HA101

HAZARDOUS MATERIAL REMOVAL

PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

937.224.0861

HEMODIALYSIS RENOVATION

DESIGN

3001 Green Bay Road. North Chicago, IL 60064

556-17-001

2/15/2022

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/16" = 1'-0"HA101

1 HAZARDOUS MATERIALS ABATEMENT PLAN

D

D

DD

T

T

T

T

12141618

J

K

L

M

N

H

I

O

UV WXYZ AA

V

IF

7'

1/ 4"

6 6

LOCKER

3A-107B

RECEPTION

3A-107

STAIR

ST-X1

TLT

3A-110

MED

3A-111

EQUIP STOR

3A-114

CLEAN UTILITY

3A-115

CORRIDOR

C3-135

EQUIP STOR

3A-116

SOILED UTILITY

3A-117

OFFICE

3A-118

CORRIDOR

C3-129

STORAGE

3A-102

STORAGE

3A-103

SERVICE LOBBY

C3-130

STORAGE

3A-101

ELEVATOR

EL-3

ELEVATOR

EL-2

STAIR

ST-X2

ELEC.

3A-100

KEY PLAN

N

PROJECT LOCATION:

THIRD FLOOR

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL

QUANTITIES AND ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLAN AE100 AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

K. WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURES RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

L. COORDINATE SCOPE OF FLOORING REMOVAL WITH HAZMAT PLAN SHEET

HA101.

M. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

N. COLUMN WRAPS SHALL BE REMOVED FROM EXISTING COLUMNS

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.

O. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE INDICATED.

P. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

Q. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO

PLUMBING PLAN FOR ADDITIONAL INFORMATION.

R. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

S. REMOVE EXISTING WALL PROTECTION, CORNER GUARDS, HANDRAILS AND/

OR GUARDRAILS THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE

NOTED.

T. REMOVE INTERIOR FINISHES OF EXISTING EXTERIOR WALLS AND INTERIOR

FINISHES ON PROJECT SIDE OF PROJECT BOUNDARY WALLS.

U. PATCH, REPAIR AND REFINISH ANY SELECTIVE DEMOLITION REQUIRED ON

OTHER FLOORS TO COMPLETE THE SCOPE OF WORK IN THESE

DOCUMENTS.

DEMOLITION GENERAL NOTES

1. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY.

2. EXISTING EXTERIOR WINDOWS TO REMAIN. PATCH, REPAIR AND CLEAN AS

REQUIRED FOR NEW CONSTRUCTION.

3. REMOVE EXISTING WALL COMPLETE AS NOTED. COORDINATE EXTENT OF

REMOVAL WITH NEW CONSTRUCTION.

4. REMOVE ALL EXISTING TILE FLOORING AND BASE IN ITS ENTIRETY. PATCH

AND REPAIR CONCRETE SUBSTRATE TO RECEIVE NEW FINISHES.

5. REMOVE EXISTING SUSPENDED CEILING SYS. IN ITS ENTIRETY. PATCH AND

REPAIR STRUCTURE ABOVE AND ADJACENT WALLS TO RECEIVE NEW

FINISHES.

6. REMOVE EXISTING WALL IN ITS ENTIRETY.

7. RENOVE EXISTING WALL TILE IN ITS ENTIRETY. PATCH AND REPAIR

EXISTING SUBSTRATE TO RECEIVE NEW FINISHES/CONSTRUCTION.

8. PROTECT ALL EXISTING SURFACES, EQUIPMENT, FINISHES, ETC. FROM

DAMAGE DURING CONSTRUCTION. COORDINATE EXTENTS OF EXISTING

AREAS TO BE PROTECTED WITH SCOPE OF NEW CONSTRUCTION.

9. REMOVE EXISTING WALL AND TILE FINISHES SURROUNDING STRUCTURAL

COLUMN IN ITS ENTIRETY.

#DEMOLITION PLAN NOTES

12141618

J

K

L

M

N

H

I

O

UV WXYZ AA

5 5

LOCKER

3A-107B

RECEPTION

3A-107

STAIR

ST-X1

CORRIDOR

C3-135

TLT

3A-110

MED

3A-111

EQUIP STOR

3A-114

CLEAN UTILITY

3A-115

EQUIP STOR

3A-116

SOILED UTILITY

3A-117

OFFICE

3A-118

STORAGE

3A-103

STORAGE

3A-102

SERVICE LOBBY

C3-130

ELEC.

3A-100

STAIR

ST-X2

ELEVATOR

EL-3

STORAGE

3A-101

ELEVATOR

EL-2

1. REMOVE, SALVAGE AND REPLACE EXISTING CEILING SYSTEM AS REQUIRED

FOR THE INSTALLATION OF A NEW PNEUMATIC TUBE SYSTEM. COODRINATE

EXTENT OF REMOVAL WITH NEW CONSTRUCTION.

2. REMOVE EXISTING SUSPENDED CEILING SYSTEM IN ITS ENTIRETY. PATCH

AND REPAIR EXISTING STRUCTURE TO RECEIVE NEW FINISHES.

#DEMOLITION REFLECTED CEILING PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

25% SCHEMATIC DESIGN 07/27/2021

50% DESIGN DEVELOPMENT 09/17/2021

75% DESIGN DEVELOPMENT 10/25/2021

95% DESIGN DEVELOPMENT 1/7/2022

100% CONSTRUCTION DOCUMENTS 2/15/2022

C U s e rs

\d b a jo r\ D o c u m e n ts

\1

.1

.0

A v d b a jo r.

rv t

/1

/2

:2

:1

A

M

AD100

THIRD FLOOR DEMOLITION PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

937.224.0861

HEMODIALYSIS RENOVATION

DESIGN

3001 Green Bay Road. North Chicago, IL 60064

556-17-001

2/15/2022 JF DV

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/16" = 1'-0"AD100

1 DEMO - 3RD FLOOR PLAN

SCALE: 3/16" = 1'-0"AD100

2 DEMO - 3RD FLOOR RCP

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

N

NORTH ARROW

LED WALL MOUNTED LIGHT FIXTURE

LED SURFACE MOUNTED LIGHT FIXTURE

LED SURFACE MOUNTED LIGHT FIXTURE

LED RECESSED LIGHT FIXTURE

HVAC RETURN AIR GRILLE

HVAC SUPPLY DIFFUSER

PENDANT LIGHT

ACCESS PANEL

EXIT LIGHTING

S

D

SPEAKER

SMOKE DETECTOR

LED RECESSED LIGHT FIXTURE

A 9'-0"

CEILING TAG CEILING TYPE

FINISHED CEILING HEIGHT

REFER TO CEILING LEGEND FOR MORE

INFORMATION

EXTENT OF REVISION

REVISION SET

MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APPD APPROVED

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ATCH ATTACHMENT

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BEV BEVEL

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKG BLOCKING

BLKT BLANKET

BM BEAM OR BENCHMARK

BOT BOTTOM

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL OR CHANNEL CELSIUS

C CONC CAST CONCRETE

C TO C CENTER TO CENTER

CAB CABINET

CB CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CLEANOUT

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CS CAST CONCRETE STONE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

N NORTH

NA NOT APPLICABLE

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEG NEGATIVE

NEUT NEUTRAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND CEMENT

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PLATE, PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION OR REFRIGERATION

REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

YD YARD

YR YEAR

1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®

SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION

MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL

DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,

SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES

MANAGEMENT.

2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE

NATIONAL CAD STANDARD AS GUIDES.

3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT

TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.

CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER

QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY

THE BID DUE DATE.

4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH

OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED

WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,

ACCESS CONTROL, ETC.

5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING

BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC

MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR

VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH

THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS

AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,

ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF

WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE

FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK

THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF

WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY

CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.

8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR

UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,

GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.

9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING

AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING

CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING

PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED

METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.

10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW

INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL

CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING

AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND

STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.

11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT

IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW

CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION

BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED

CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY

ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR

MISSING DIMENSIONS.

12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF

CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.

14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW

STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN

GRID LINES UNLESS NOTED OTHERWISE.

15. FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING

SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.

16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.

17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.

19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS

AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL

DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND

EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF

DELIVERY AND ROUGH-IN.

21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY

CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE

FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND

HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.

23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL

UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO

UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE

OWNER.

24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING

REQUIRED DURING CONSTRUCTION.

25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT

CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE

CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE

CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO

COST TO THE OWNER.

26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.

27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,

ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE

AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR

HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR

SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOZ DOZEN

DN DOWN

DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

ETS EXPOSE TO STRUCTURE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIP FILLER PANEL

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR FIBERGLASS

REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER OR HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE OR LEFT HAND REVERSE LATENT

HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM OR MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE OR MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

NEW WALL

WALL TO BE

REMOVED

S3A.G

INDICATES STRUCTURAL MATERIAL

INDICATES NOMINAL SIZE

INDICATES STRUCTURE AND FINISH HEIGHTS

INDICATES QUALIFER

EXISTING WALL TO

REMAIN

TEMPORARY IC

BARRIER WALL

CONSTRUCTION

ROOM

ROOM TAG

NEW DOOR

EXISTING DOOR

DEMOLISHED DOOR

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP

DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

S SOUTH

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL STEEL

STL LNTL STEEL LINTEL

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

TA TOILET ACCESSORY

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL OR TEMPERATURE

CONTROL PANEL OR TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

REVISION TO PLAN CALLOUT

WALLS

DOOR TAG

KEY NOTE TAGS

WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION

DOORS

PT-1

A

T

101 EQUIPMENT/FURNITURE TAG

FINISH INDICATION

FRAME / WINDOW

GLAZING1

1 PLAN NOTE

1 DEMOLITION NOTE

ALTERNATE/BID DEDUCT ITEM

KEY NOTE SYMBOLS

CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS

REFLECTED CEILING PLAN SYMBOLS

ARCHITECTURAL ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

25% SCHEMATIC DESIGN 07/27/2021

50% DESIGN DEVELOPMENT 09/17/2021

75% DESIGN DEVELOPMENT 10/25/2021

95% DESIGN DEVELOPMENT 1/7/2022

100% CONSTRUCTION DOCUMENTS 2/15/2022

C U s e rs

\d b a jo r\ D o c u m e n ts

\1

.1

.0

A v d b a jo r.

rv t

/1

/2

:2

:1

A

M

AE001

ARCHITECTURAL SYMBOLS AND

ABBREVIATIONSGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HEAPY

4000 W. DORTHY LANE

DAYTON, OH 45409

937.224.0861

HEMODIALYSIS RENOVATION

DESIGN

3001 Green Bay Road. North Chicago, IL 60064

556-17-001

2/15/2022 JF DV

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

A. ALL WALLS WILL BE WALL TYPS S3C.G UNLESS OTHERWISE NOTED.

B. ALL WALL TYPE INDICATORS REFER TO THIS SHEET UNLESS OTHERWISE

NOTED.

C. REFER TO DIMENSION PLANS FOR PARTITION TYPE LOCATIONS.

PARTITIONS ARE DISTINGUSHED ON PLANS BY SYMBOL DESIGNATION

GRAPHIC DESIGNATION, OR A COMBINATION OF BOTH. NOT ALL

PARTITIONS ON THIS SHEET MAY BE USED. REFER TO PARTITION TYPE

SCHEDULE ON THIS SHEET FOR PARTITIONS USED ON THIS PROJECT.

D. ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD, OR TO FACE

OF BLOCK. REFER TO PARTITION S3C.G FOR PARTITION WIDTH

DIMENSIONS.

E. ALL WALLS STUDS TO BE 16" O.C. UNLESS OTHERWISE NOTED.

F. REFER TO SPECIFICATIONS AND TO TABLE ON THIS SHEET FOR MINIMUM

STUD GAUGE, MAXIMUM SPACING AND ALLOWABLE LIMITING HEIGHT

DEFLECTION CRITERIA FOR GYPSUM BOARD ASSEMBLIES AND REQUIRED

FINISHES. FOR WALLS WHERE STUDS ARE ATTACHED TO STRUCTURE

ABOVE, PROVIDE CROSS BRACING AS NECESSARY MEETING THE CRITERIA

INDICATED TO ACCOMMODATE THE SPECIFIED DEFLECTION CRITERIA OF

THE WALL.

G. ALL INTERIOR NON-BEARING STUDS TO BE DESIGNED FOR A DEFLECTION

EQUAL TO BUT NOT GREATER THAN L/240, UNLESS FULL HEIGHT FINISH IS

DETERMINED TO BE FRAGILE OR BRITTLE, THEN DEFLECTION TO BE L/360.

EXAMPLES OF FRAGILE FINISHES WOULD INCLUDE BUT NOT LIMITED TO

ANY TYPE OF WALL TILE, PLASTER OR PLASTER SKIM COAT.

H. ALTHOUGH WALL STUD SIZES ARE LISTED ON PLANS AND WALL TYPE S3C.G

IN AREAS WHERE STUDS ARE TO STRUCTURE ABOVE OR HIGH AREAS,

CONTRACTOR TO VERIFY SIZED INDICATED IS ADEQUATE FOR HEIGHT

LISTED. PROVIDE ADEQUATE SIZE STELL STUD FRAMING AND NOTIFY

ARCHITECT OF ANY DISCREPANCY PRIOR TO FABRICATION OR

INSTALLATION.

I. KING STUDS AT DOOR FRAMES TO BE 18 GA. UNLESS OTHERWISE NOTED.

J. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD FOR ALL OTHER WALL

CONSTRUCTION, UNLESS OTHERWISE NOTED.

K. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD IN BULKHEAD CONSTRUCTION.

L. REFER TO LIFE SAFETY PLANS FOR LOCATIONS AND RATINGS OF SMOKE

AND FIRE RATED PARTITIONS. REFERENCE TEST NUMBERS APPLY ONLY TO

PARTITIONS INDICATED TO BE RATED.

M. FIRE RATING TEST NUMBERS ARE FOR UNDERWRITER'S LABORATORIES

(UL) ASSEMBLIES UNLESS OTHERWISE NOTED.

N. FIRE RESISTANT RATED PARTITIONS SHALL EXTEND TO THE INSIDE FACE

OF EXTERIOR SHEATHING, INCLUDING EXTENSIONS THROUGH SOFFITS.

O. SEAL ALL OPENINGS, GAPS, PENETRATIONS, AND JOINTS IN PARTITIONS

TYPES AS FOLLOWS:

a. FIRE RATED PARTITIONS: SEAL IN ACCORDANCE WITH THE

REQUIREMENTS SPECIFIED FOR THROUGH PENETRATION

FIRESTOP SYSTEMS AND FIRE RESISTIVE JOINT SYSTEMS.

b. SMOKE TIGHT PARTITIONS: SEAL COMPLETELY WITH

ELASTOMERIC SEALANT. FOR THE LOCATION AND EXTENT OF

PARTITIONS, DESIGNATED AS "SMOKE TIGHT", REFER TO THE LIFE

SAFETY DRAWINGS.

c. ALL OTHER LOCATIONS: SEAL AS INDICATED AND REQUIRED

ELSEWHERE BY THE CONTRACT DOCUMENTS.

P. INSULATION HEAD CONDITIONS AT FLOOR / ROOF DECK:

a. FIRE RESISTANT RATED PARTITIONS SHALL USE MINERAL WOOL

INSULATION AND APPROPRIATE FIRE RATED SEALANT.

b. NON-RATED PARTITIONS REQUIRING SOUND ATTENUATION SHALL

USE SOUND ATTENUATION BATTS (SAB).

Q. PROVIDE STENCILED IDENTIFICATION FOR RATED PARTITIONS.

R. STC RATING APPLIES WHERE PARTION TAG QUALIFIER INDICATES WITH AN

"i". PROVIDE SOUND ATTENUATION BATTS OF THICKNESS INDICATED ON

SCHEDULE WHERE INDICATED BY QUALIFIER.

S. FOR PARTITIONS WITH STC RATINGS INDICATED SOUND ATTENUATION

BATTS TO EXTEND FULL HEIGHT OF PARTITION UNLESS OTHERWISE

NOTED. FLOOR TRACK TO BE SET IN A CONTINUOUS BED OF SEALANT.

T. WHERE PARTITION TYPE INDICATES SOUND ACOUSTICAL BAT, WITH FINISH

BOARD GOING TO DECK ON ONE SIDE ONLY, PROVIDE VAPOR BARRIER TO

SECURE INSULATION IN PLACE.

U. REFER TO DIMENSIONED PLANS FOR REFERNECE SYMBOLS INDICATING

THE EXTENT OF RADIATION PROTECTION.

V. PROVIDE 5/8" MOISTURE/MOLD RESISTANT GYPSUM BOARD IN SOILED

ROOMS, BATHROOMS, TOILET ROOMS, ON WALLS BEHIND PLUMBING

FIXTURES, AND IN ALL WET LOCATIONS EXCEPT IN SHOWER AREA.

W. PROVIDE 5/8" CEMENTITIOUS BACKER BOARD BEHIND CERAMIC WALL TILE &

SHOWER AREA. COORDINATE LOCATIONS WITH FINISH WALL PLANS.

X. PROVIDE CORNER AND END WALL FRAMING AS DETAILED ON 3/AE002.

WALL TYPES LEGEND AND GENERAL NOTES

X#X.#

INDICATES STRUCTURAL MATERIAL

CH = SHAFT WALL

F = FURRING

S = STEEL

M = MASONRY

W = WOOD

INDICATES NOMINAL SIZE

INDICATES STRUCTURE AND

FINISH HEIGHTS

QUALIFIER'S (X-X-X)

G GYPSUM BOARD FINISH

1SB 1 HR RATED SMOKE BARRIER

2SB 2 HR RATED SMOKE BARRIER

1F 1 HR FIRE RATED

2F 2 HR FIRE RATED

i SOUND INSULATION t THERMAL INSULATION

B BULLET RESISTANT

L LEAD LINED

M MESH (STEEL SECURITY MESH)

MR MOIST/MOLD RESISTANT GYPSUM

SP SMOKE PARTITION

TB TILE BACKER CEMENT BOARD

A = STRUCTURE TO DECK, FINISH TO DECK

B = STRUCTURE TO DECK, FINISH ONE SIDE TO DECK

C = STRUCTURE TO DECK, FINISH TO ABOVE CEILING

D = STRUCTURE TO ABOVE CEILING, FINISH TO ABOVE CEILING

P = PARTIAL HEIGHT WALL

U = STRUCTURE TO UNDERSIDE OF CELING, FINISH TO UNDERSIDE OF CEILING

*SEE WALL TYPES FOR PROJECT SPECIFIC CONSTRUCTION

CH

2 1/2" 4" 6"

F 7/8

1 1/2" 2 1/2" 3 5/8"

4" 6" 8" 12"

S

2 1/2" 3 5/8"

4" 6" 8" 12"

M

2 5/8" 3 5/8" 5 5/8" 7 5/8" 11 5/8"

W

3/4"

3 1/2"

5 1/2" 7 1/4" 11 1/4"

" 1 HR FIRE/SMOKE

10'-0" MAX 10'-0" MAX

A. LETTERED STENCILS SHALL BE APPLIED TO EACH SIDE OF RATED PARTITIONS

AT 10'-0" INTERVALS; BUT NO LESS THAN ONCE PER PARTITION LENGTH.

B. USE THE FOLLOWING LANGUAGE FOR STENCILS:

"1 HR FIRE/SMOKE" "1 HR FIRE"

"2 HR FIRE/SMOKE" "2 HR FIRE"

"LIMIT TRANSFER OF SMOKE"

PERMANENT RED PAINT

LETTERING, TYP.

CEILING LINE

STENCILING NOTES

WALL TAG LEGEND

S2A.G 2 1/2"

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

3 3/4" NA NA NA

COMMENTS

S3A.G 3 5/8" 4 7/8"

NA

NANANANA

S6A.G 6" 7 1/4" NANANANA

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

3/4"

STRUCTURAL SIZE

3/4"

FINISH DIMENSION

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

CEILING

DEEP LEG SLIP TRACK AT DECK

HOLD GYPSUM BACK FROM DECK FOR

DEFLECTION

S2C.G 2 1/2"

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

3 3/4" NA NA NA

COMMENTS

S3C.G 3 5/8" 4 7/8"

NA

NANANANA

S6C.G 6" 7 1/4" NANANANA

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

3/4"

STRUCTURAL SIZE

3/4"

FINISH DIMENSION

STEEL STUD BRACING @ 4'-0" O.C.

CEILING

6"

INSULATION PRESENT

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

INSULATION PRESENT WITH QUALIFER (i OR t)

F2D.G 2 1/2"

WALL TAG

STRUCTURAL

SIZE

FINISH DIM FIRE RATING UL DESIGN

MIN STC

RATING

3 1/8" NA NA NA

COMMENTS

F3D.G 3 5/8" 4 1/4"

NA

NANANANA

F6D.G 6" 6 5/8" NANANANA

LINE OF STRUCTURE ABOVE

LINE OF CEILING

LINE OF STRUCTURE BELOW

PLAN

STRUCTURAL DIMENSION

3/4"

FINISH DIMENSION

CEILING

5/8" TYPE X GYP BD

BEAD OF CONT. SEALANT

STEEL STUDS @ 16" O.C.

INSULATION PRESENT

EXISTING WALL / COLUMN, VIF.

F0D.G 7/8" 1 1/2" NA NA NA

F1D.G 1 1/2" 2 1/8"

HAT CHANNEL @ 24" O.C.

NANANA HAT CHANNEL @ 24" O.C.

WALL TYPES

BEAD OF CONT. SEALANT

NOTE:

• TYPICAL LIMITING HEIGHTS-INTERIOR PARTITIONS, L/240 (5 PSF), WITH 5/8"GYPSUM BOARD EACH SIDE.

• PROVIDE DIAGONAL STUD BRACING AT ALL NON FULL HEIGHT INTERIOR PARTITIONS STAGGERED AT 48" O.C. TO DECK ABOVE. PROVIDE STUD

ATTACHMENT TO DECK W/ MIN. SPAN OF 2 DECK FLUTES. BRACING TO BE THE SAME SIZE AND GAUGE AS VERTICAL STUDS.

25 GA. STUDS (NON-COMPOSITE)

STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT

16" L/240 6'-11"1-5/8"

24" L/240 6'-0"162S125-18

16" L/240 9'-6"2-1/2"

24" L/240 8'-4"250S125-18

16" L/240 12'-5"3-5/8"

24" L/240 10'-10"362S125-18

16" L/240 13'-9"4"

24" L/240 12'-0"400S125-18

22 GA. STUDS (NON-COMPOSITE)

STUD WIDTH STUD SPACING ALLOW. DEFLECTION HEIGHT

16" L/240 8'-1"1-5/8"

24"…