This document is a set of 100% construction documents for an electrical design project at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves an oil transformer and switch enclosure upgrade under VA Contract #36C25223D0061, Task Order #36C25224N0376.
The scope includes replacing and upgrading electrical infrastructure across multiple buildings at the facility, specifically addressing transformer and switch equipment. The work involves removing existing transformers (including 150KVA and 750KVA units) and installing replacements with updated enclosures at designated building locations (Buildings 1, 3, 9, 11, 66, 137, 138, 139, and 187). The construction documents include electrical plans for each building, one-line diagrams showing power distribution, transformer pad specifications with grounding requirements, and equipment schedules. The documents detail conduit routing, panel configurations, circuit breaker specifications, transformer sizing (ranging from 150KVA to 750KVA at 4160V primary to 208Y/120V secondary), and coordination requirements between buildings. Key technical specifications include concrete pad construction standards (SG-6 with 3,000 PSI minimum strength), grounding electrode conductor installation, anti-ram bollard protection details, and electrical symbol conventions. The design is dated 03/07/2025 with construction documents finalized 04/10/2025, prepared by Specialized Engineering Solutions as the consultant and designer of record, with approval from the VA Office of Construction and Facilities Management.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/1
/2
:5
:3
A M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
Captain James A. Lovell Federal Health Care Center (FHCC)
OIL TRANSFORMER AND SWITCH ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO,
IL 60064
G000
COVER SHEET OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
SHEET INDEX - ELECTRICAL
Sheet Number Sheet Name
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ES100 OVERALL SITE PLAN - ELECTRICAL PLAN
EP100 BUILDING - 01 - FIRST FLOOR - ELECTRICAL PLAN
EP101 BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN - DEMOLITION
EP102 BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN
EP103 BUILDING - 03 - BASEMENT FLOOR - ELECTRICAL PLAN
EP104 BUILDING - 03 - BASEMENT FLOOR - ENLARGED - ELECTRICAL PLANS
EP105 BUILDING - 09 - FIRST FLOOR - ELECTRICAL PLAN
EP106 BUILDING - 11 - FIRST FLOOR - ELECTRICAL PLAN
EP107 BUILDING - 66 - FIRST FLOOR - ELECTRICAL PLAN
EP108 BUILDING - 137 - FIRST FLOOR - ENLARGED - ELECTRICAL PLANS
EP109 BUILDING -138 - FIRST FLOOR - ELECTRICAL PLAN
EP110 BUILDING -139 - FIRST FLOOR - ELECTRICAL PLAN
EP111 BUILDING -187 - FIRST FLOOR - ELECTRICAL PLAN
E500 ONE-LINE DIAGRAMS
E600 ELECTRICAL DETAILS
E700 ELECTRICAL SCHEDULES
Grand total: 17
SHEET INDEX - GENERAL
Sheet Number Sheet Name
G000 COVER SHEET
Grand total: 1
VA CONTRACT #: 36C25223D0061
TASK ORDER #: 36C25224N0376
BASE BID: Work includes Replacing Oil Filled transformers and switch enclosures at the following buildings at the James A.
Lovell Federal Healthcare Center: 1, 3, 9, 11, 66, 137, 187. Work also includeds distribution equipment replacements at buildings 3 and 137.
N
Revisions: Date:
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CEILING
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WALL PHONE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
W
WR
XFMR
ZSI
A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.
RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG
CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. NEW ROOF MOUNTED EQUIPMENT SHALL BE BONDED TO EXISTING BUILDING LIGHTNING PROTECTION SYSTEM IF ONE EXISTS. PROVIDE AIR TERMINALS ON TOP OF EQUIPMENT AND BOND TO EXISTING SYSTEM PER NFPA 780 AND UL 96A REQUIREMENTS. PROVIDE UL INSPECTION AND/OR LPI SYSTEM INSPECTION AS REQUIRED TO OBTAIN UL MASTER LABEL RECERTIFICATION, UL MASTER LABEL AND/OR LPI SYSTEM
CERTIFICATE.
D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES.
F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
G. ALL CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, INCLUDING LIGHTING AND WALL RECEPTACLES, SHALL BE MECHANICALLY PROTECTED PER NEC 517.31(C)(3). NON-FLEXIBLE RACEWAY SHALL BE USED FOR CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, EXCEPT THAT THE FINAL CONNECTION TO VIBRATING EQUIPMENT OR LIGHT FIXTURES IF THE TOTAL LENGTH OF FLEXIBLE RACEWAY IS 6' OR LESS ACROSS THE
ENTIRE CIRCUIT LENGTH.
H. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
I. FOR TEMPORARY FEEDERS, CONTRACTOR HAS CHOICE OF DIRECT BURIED CABLING OR CONDUIT AND RAN ACROSS FENCED OFF AREA. REFER TO SPECS FOR CABLE TYPES. TEMPORARY CONNECTIONS ARE NOT
SHOWN ON THE DRAWINGS. COORDINATE LOCATION OF TEMPORARY TRANSFORMERS, TEMPORARY
CABLING, AND TEMPORARY FENCING WITH THE VA. ALTERNATE TEMPORARY LOCATIONS OF EQUIPMENT TO ACCOMMODATE CONTINUITY OF SERVICES AT THE VA AS REQUIRED BY THE VA STAFF SHALL NOT BE
GROUNDS FOR ADDITIONAL COMPENSATION.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
DISTRIBUTION PANEL
ENCLOSED DISCONNECT
SWITCH - FUSED
PANELBOARD - RECESSED
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
TRANSFORMER - OIL FILLED
UTILITY PAD MOUNT SWITCH OR
SECTIONALIZING CABINET
ONE LINE SYMBOL
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
CONTINUATION
DIGITAL METER
GROUND BAR
GROUNDING ELECTRODE
MOTOR STARTER
NON-FUSED DISCONNECT
PANEL BOARD
SURGE PROTECTIVE DEVICE
SWITCHBOARD/SWITCHGEAR -
DOUBLE TUB
TRANSFORMER
FHCC CONDUIT COLOR SCHEME
Red- Fire Alarm Blue- Controls, HVAC, BAS Orange- Fiber optic, communications Green- Normal power Yellow- Emergency Power, Critical Power Black- Security Purple- Medical Systems, Nurse Call
REPLACE TRANSFORMERS THROUGHOUT CAMPUS. REUTILIZE EXISTING TRANSFORMERS REMOVED FOR
TEMPORARY POWER FOR OTHER TRANSFORMERS WITH LONGER DURATION OUTAGES.
A. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. OUTAGE DURATION
TOLERANCES VARY BY BUILDING SERVED. SPECIAL CONSIDERATION IS REQUIRED FOR BUILDING 137 OUTAGE IN COORDINATION WITH NAVFAC. REFER TO BUILDING 137 PHASING NOTES FOR FURTHER DETAILS.
B. RETAIN EXISTING TRANSFORMER FOR TEMPORARY POWER USE FOR OTHER BUILDINGS CONSTRUCTION
PHASING PRIOR TO DISPOSAL.
a. REMOVE 150KVA, 4160∆ /208Y EXTERIOR TRANSFORMER FROM BUILDING 11 TO UTILIZED FOR OTHER
BUILDINGS WITH 150KVA TRANSFORMERS.
b. REMOVE 750KVA, 4160∆ /208Y EXTERIOR TRANSFORMER FROM BUILDING 1 TO UTILIZED FOR OTHER
BUILDINGS WITH 300KVA TRANSFORMERS.
c. RETAIN OTHER 150KVA TRANSFORMERS FOR USE IF DESIRED TO DO MULTIPLE TRANSFORMER
REPLACEMENTS SIMULTANEOUSLY.
C. SEQUENCE OF TRANSFORMER REPLACEMENT (SEQUENCE REQUIRED FOR EXISTING TRANSFORMERS THAT
WILL BE REMOVED TO BE UTILIZED FOR TEMPORARY FEED TO ANOTHER BUILDING SERVICE):
a. BUILDING 1 AND 3.
b. BUILDING 187.
c. ALL OTHER BUILDINGS REQUIRING TEMPORARY TRANSFORMER FEEDS.
OVERALL PROJECT PHASING NOTES:
MANHOLE
BOLLARD
137-TLF-001-EXT
36-TLF-001-EXT
5-TLF-001-EXT
7-TLF-001-EXT
131-TLF-001-016
133EF-SG-002-BE403
133-EF-TDT-001SG2-BE403
PURPLE
GOLD
133EF-SG-001-BE403
133-EF-TDT-001SG1-BE403
133-SG-001-BA133 (USS-1)
133-TLF-002-BA133
133-SG-002-BA133 (USS-2)
133-TLF-001-BA133
46-TDT-001-01
195-TLF-001-EXT
(T-302)
PS-302
133CA-SG-001-1D223 (USS1)
133CA-TLF-003-1D223
133CA-SG-002-1D223 (USS2)
133CA-TLF-002-1D223
133CA-SG-003-1D223 (USS3)
133CA-TLF-001-1D223
SC-185A
188 XFMR 51
206-TDT-001-EXT
XFMR 65
MH#QQ
PMH1PMH2
PMH3
SC-301
PMH203
GENERATOR FEEDS 480V
MH
#UUA
PMH
MH#UUB
MH#VV
134-TDT-001-EXT
EMH#10
EMH#9B
SC-165
MH#11
MH#WW
196-TLF-001-EXT
T-304
PS-304
XFMR
XFMR
SC-166
MH#ZZ
SC-167
MH#A1
MH#A2
XFMRS
SC-168
MH#B
MH#C
MH#55
MH#66
MH#FF
MH#GG
MH#66A
SC-157
48-TLF-001-EXT
MH#DD
SC-172
T305PS-305
SC-173
SC-171
SC-170
PMH20
MH#2D
MH#2C
MH#CE-2
MH#HH
MH#11
MH#JJ
MH#QQB
MH#QQA
MH4
MH#UI
PMH202
MH#2B
MH
#2A
MH#2
MH#CE-1
MH#KK
3A (x2) 3B (x2)
PURPLE
GOLD
MH#102
MH#AC
SC-303
SC-163
MH#VV
MH#YY
MH#4
MH#44
MH#3A
MH#3SC-169 MH#2 MH#1
202 201
SC-175131
SC-176
SC-159
133CA
133EF
MH#77
MH#100
SC-180
SC-181
MH#EE
MH#103
MH#CC
MH#BB
MH#AA
MH#A SC-177XFMR 51
32-TDT-001-10
SC-183
SC-184
SC-179
SC-178
201-TDT-001-EXT
MH#9
MH#6A
SC-182A
MH#6B
MH#7
MH#8
MH#6
MH#5
MH#4
MH#3
7A
1A 2A
6A 5A
4A
6B7B
1B 2B
5B
4B
3A
P
3B
3A
3B
GL
--1B----1AGLP
2A 3A --
4A3A--
7A6A5A
3B 2B
4B 3B
6B5B 7B
3A
P
3B
3A 3B
GL
3A
P
3B
3A 3B
GL
3A
P
3B
3A 3B
GL
3A
3B
3A
3B
P
GL
--P
GL
BL O
S Y
G
R
--BL
OY
S
WW
Y
Y
O
O
BL
O
Y S
Y
O
Y
O
Y
O
O
Y
O Y
O Y
Y
OBL
S
MH#D
OY
O/Y FROM
SC-171 SWITCH
OY--
Y
O
Y Y
O
--P
G L
R O
G Y
GL--
R G
P
GL
R G P
GL--
P
-- O G
R
R/G FROM
SC-157 SWITCH
Y
RG
G
L P Y
O
SC-305
R R
G G
R G
SC-177A
-- BLS
-- BLS
B L
S
-- BLS
BL
BL
SS
-- BL
S
MH#100
MH#NN
BL/S FROM
SC-184 SWITCH
BL
S--
-- BL
S
BL
S
-- BL
S
BL
S
BLBL
SS
BL/S FROM
SC-183 SWITCH
4B4A
7A-- 1A
2A6A
5A 4A
6B
7B 1B
2B
5B 4B
7A-- 1A
2A6A
5A 4A
6B
7B 1B
2B
5B 4B
7A
1A
2A 6A
5A 4A
-- 6B 7B
1B
2B5B 4B
7A
1A 2A
6A 5A
6B
7B 1B 2B5B
7A-- 1A 2A6A
5A
6B
7B 1B 2B
5B
7A-- 1A
2A6A
5A
6B 7B 1B
2B
5B
7A
1A 2A
6A 5A--
6B7B
1B 2B
5B
1A
2A
1B
2B
7A
6A
5A
6B
7B
5B
BLBL
SS
BL
MH#MM
SC-185
BL
MH#MA
BL
MH#LL
151-TDT-001-01
Y O
Y O
O
Y
O/Y FROM
SC-176 SWITCH
G
R
G R
G R
G R
O/Y FROM
SC-175 SWITCH
SC-174
MH#OO
O/Y FROM
SC-174 SWITCH
O/Y FROM
SC-174 SWITCH
R G
GL
P
Y O
RG
G L
P
Y O--
R
G G
R
R G P GL
SC-160
R/G FROM
SC-160 SWITCH
MH#QQ1
GL
P
GR
SC-1
GLP
--GR
--R
R G
G
SC-300
PS-N1
PS-N2
-- P
GL
PGL
GL
P
GL
PR
G
SC-2
R
G
R
G
R
G
R
G
R G
R
G
R
G
--R G
G--
R
RG
R
G
R/G FROM
PS-302 SWITCH
R G
R G
1A
1A
1A
1A
1A
1A
1A
1B
1B
1B
1B
1B
1B
1B
SC-162
SC-162A
SC-162B
SC-162C
1A/1B FROM SC-162
SWITCHES TO
USS1, USS2, USS3
G R
R
G
G
G
SC-164
R G--
2A 2B
2A 2B
2A
2B
SC-165A
135-TDT-001-EXT
SC-164
G
G
G
G
G G
2A 2B
1A
2A
1B
2B
-- R G
R G --
4A4B
6-TDT-002SG1-007C
6-TDT-001SG1-007C
188-TLF-001-101
188-TLF-002-101
188-SG-001-101
188-SG-002-101
188-MCB-002-101
188-MCB-001-101
188-MCB-003-101
O/Y FROM
SC-172A SWITCH
3-TLF-001-EXT
SC-172A
11-TLF-001-EXT
9-TLF-001-EXT
66-TLF-001-EXT
/S
/S /S
R/
R/
R/
R/
R/ R/
1-TLF-001-EXT
187-TLF-001-EXT
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/1
/2
:5
:3
A M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
ES100
OVERALL SITE PLAN - ELECTRICAL
PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
SITE
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
N
NOTES:
1. NAMING CONVENTION FOR EQUIPMENT
A. MH: MANHOLE
B. SC: SWITCH AND/OR SECTIONALIZING CABINET
C. PS: PADMOUNT SWITCH
2. NAMING CONVENTION FOR TRANSFORMERS
A. [BUILDING NUMBER]-[TLF (LIQUID FILLED) OR TDT (DRY TYPE)]-[EQUIPMENT NUMBER WITHIN ROOM]-
[LOCATION, ROOM NUMBER OR EXTERIOR].
100 100 200
1" = 100'-0"
FEETSCALE
• G: GREEN - (3) 500 KCMIL (5KV)
• R: RED - (3) 500 KCMIL (5KV)
• O: ORANGE - (3) 500 KCMIL (5KV)
• Y: YELLOW - (3) 500 KCMIL (5KV)
• S: SILVER - (3) 500 KCMIL (5KV)
• BL: BLUE - (3) 500 KCMIL (5KV)
• P: PURPLE - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND
• GL: GOLD - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND
• 1A: F1A - (3) 500 KCMIL (5KV)
• 2A: F2A - (3) 500 KCMIL (5KV)
• 3A: F3A - 2 SETS (3) 500 KCMIL (5KV)
• 4A: F4A - (3) 500 KCMIL (5KV)
• 5A: F5A - (3) 750 KCMIL (5KV)
• 6A: F6A - (3) 750 KCMIL (5KV)
• 7A: F7A - (3) 750 KCMIL (5KV)
• 1B: F1B - (3) 500 KCMIL (5KV)
• 2B: F2B - (3) 500 KCMIL (5KV)
• 3B: F3B - (3) 500 KCMIL (5KV)
• 4B: F4B - 2 SETS (3) 500 KCMIL (5KV)
• 5B: F5B - (3) 750 KCMIL (5KV)
• 6B: F6B - (3) 750 KCMIL (5KV)
• 7B: F7B - (3) 750 KCMIL (5KV)
• --: SPARE CONDUIT
MEDIUM VOLTAGE CIRCUITS:
GR
DRAWING IS FOR REFERENCE ONLY. NO PROJECT SCOPE IS SHOWN ON THIS DRAWING.
1" = 100'-0"
OVERALL SITE PLAN - ELECTRICAL PLAN - UPDATED
• R: RED - (3) 500 KCMIL (5KV)
• O: ORANGE - (3) 500 KCMIL (5KV)
• Y: YELLOW - (3) 500 KCMIL (5KV)
• S: SILVER - (3) 500 KCMIL (5KV)
• G: GREEN - (3) 500 KCMIL (5KV)
• P: PURPLE - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND
• GL: GOLD - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND
• BL: BLUE - (3) 500 KCMIL (5KV)
1-MDP-001-151
E
E600
1-TLF-001-EXT
E600
(TYP)
COVERED WALKWAY
(TRAMWAY)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP100
BUILDING - 01 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 01 - FIRST FLOOR - ELECTRICAL PLAN
N 5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. ANTICIPATE OUTAGE DURING WEEKEND OR AFTER WORK HOURS. THE BUILDING IS CURRENTLY
UNDER CONSTRUCTION FOR EXTERIOR IMPROVEMENTS AND IS APPROXIMATELY 50 % OCCUPIED.
A. DE-ENERGIZE THE EXISTING TRANSFORMER.
B. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.
C. PROTECT EXISTING CONCRETE PAD, CONDUITS, AND CONDUCTORS.
D. REMOVE EXISTING TRANSFORMER.
E. INSTALL NEW TRANSFORMER.
F. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.
G. RETAIN EXISTING TRANSFORMER FOR TEMPORARY POWER USE FOR OTHER BUILDINGS CONSTRUCTION
PHASING PRIOR TO DISPOSAL.
SHEET NOTES:
1. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS
AND RECONNECT TO NEW.
2. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING
CLEARANCE AROUND THE TRANSFORMER.
PHASING NOTES:
SC-172
E
EP104
187-TLF-001-EXT
D
E
E E
E
3-PNL-002-CO-1-03
3-PNL-003-CO-1-03
3-PNL-001-CO14
3-PNL-001-CO-1-03
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP101
BUILDING - 03 - FIRST FLOOR -
ELECTRICAL PLAN - DEMOLITION
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN - DEMOLITION
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
1. REFER TO SHEET EP111 FOR FURTHER DETAILS ON TRANSFORMER REPLACEMENT FOR BUILDING 187.
2. INTERCEPT EXISTING CONDUITS AND REMOVE SECTIONS REQUIRED FOR THE NEW SCOPE OF WORK. REFER
TO EP102 AND E500 FOR FURTHER DETAILS.
SC-172
E
3-TLF-001-EXT
OIL SWITCH
187-TLF-001-EXT
4" 4"
TEMP TO BLDG 3
4"1
E600
3-PNL-001-CO14
3-PNL-003-CO-1-03
3-PNL-002-CO-1-03
3-PNL-001-CO-1-03
E
E E
E
E
187-DP-0001-05
(MDP 187)
E600
(TYP)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP102
BUILDING - 03 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
REPLACE EXISTING LOAD INTERRUPTER SWITCHES AND UNIT SUBSTATION WITH EXTERIOR SWITCH AND TRANSFORMER. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS.
ANTICIPATE OUTAGE DURING WEEKEND OR AFTER WORK HOURS.
A. PROVIDE TEMPORARY FENCING AROUND WORK AREA.
B. LOCATE TEMPORARY EXISTING 150KVA TRANSFORMER REMOVED FROM BUILDING 11 FOR TEMPORARY
POWER. PROVIDE FIBERGLASS PAD AND OTHER TEMPORARY PROVISIONS FOR TEMPORARY TRANSFORMER.
C. TIE INTO PRIMARY SIDE OF TRANSFORMER 187. SPLICE CONDUCTORS (OR CONNECT TO LOOP FEED
TERMINALS) WITH TEMPORARY CABLING FROM TRANSFORMER 187 TO TEMPORARY TRANSFORMER.
D. INSTALL NEW 'MDP 3' 400A SERVICE ENTRANCE RATED DISTRIBUTION PANELBOARD.
E. PROVIDE TEMPORARY 400A FEEDER TO BASEMENT ELECTRICAL ROOM TO SERVE NEW 'MDP 3' AND
ENERGIZE NEW 'MDP 3'.
F. RELOCATE EXISTING LOADS FROM OLD 'MDP 3' TO NEW 'MDP 3' ONE-BY-ONE TO MINIMIZE OUTAGES.
G. DISCONNECT MEDIUM VOLTAGE CIRCUITS TO ELECTRICAL ROOM TO DENERGIZE OLD ELECTRICAL GEAR.
H. REMOVE THE EXISTING TRANSFORMER, PANELBOARD, AND LOAD INTERRUPTER SWITCHES. REMOVE
EXISTING INCOMING CONDUITS FOR DUAL PRIMARY FEEDS WITHIN THE BASEMENT ELECTRICAL ROOM.
I. INTERCEPT INCOMING DUAL FEEDS IN BETWEEN THE SECTIONALIZER CABINET AND THE CURRENT
TRANSFORMER LOCATION. RETAIN EXISTING 4" CONDUITS. INSTALL A NEW EXTERIOR SWITCH WITH TWO INCOMING FEEDS AND FUSED OUTGOING SINGLE FEED. REMOVE EXISTING MEDIUM VOLTAGE CONDUCTORS BACK TO NEW SWITCH LOCATION. PROVIDE TWO NEW 4” CONDUITS FROM NEW SWITCH TO NEW EXTERIOR
MOUNTED TRANSFORMER. EXTEND EXISTING CONDUITS TO NEW SWITCH AND TRANSFORMER PAD
LOCATIONS.
J. PROVIDE NEW 150KVA, 4160∆ /208Y EXTERIOR TRANSFORMER ON CONCRETE PAD OUTSIDE BUILDING 3.
PROVIDE FEED FROM THE TRANSFORMER INTO THE BASEMENT ELECTRICAL ROOM. REUSE EXISTING 4"
CONDUIT FROM ENTRY TO THE ROOM TO INTERCEPTED LOCATION UNDERGROUND BETWEEN THE
ELECTRICAL ROOM AND THE NEW TRANSFORMER LOCATION.
K. DENERGIZE FEED FROM TEMPORARY TRANSFORMER AND ENERGIZE NEW TRANSFORMER.
L. REUSE EXISTING TEMPORARY TRANSFORMER FOR FEED FOR BUILDING 187 TEMPORARY FEED.
M. REMOVE TEMPORARY FENCING AROUND WORK AREA AFTER COMPLETION OF BUILDING 187 SCOPE OF
WORK.
PHASING NOTES:
SHEET NOTES:
1. PROVIDE 4" CONDUIT STUB OUT FOR USE FOR TEMPORARY CONNECTION FOR BUILDING 187 TRANSFORMER
REPLACEMENT.
2. ROOM WITH EXISTING FIRE ALARM PANEL FOR REFERENCE OF RE-FEEDING CIRCUIT.
3. REFER TO SHEET EP111 FOR SCOPE OF WORK ASSOCIATED WITH THE REPLACEMENT OF THIS
TRANSFORMER.
4. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS
TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING
CLEARANCE AROUND THE TRANSFORMER.
EP104
3-PNL-001-BO1-3
3-PNL-002-BO1-3
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP103
BUILDING - 03 - BASEMENT FLOOR
- ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
B03 - BASEMENT FLOOR - ELECTRICAL PLAN
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
MDP 3
3-TLF-001-EXT
J-BOX
INT SWITCH
INT SWITCH
D D
D
D
E
3- M
D P
-0
-E X
T
4"
MDP 3
J-BOX
3-MDP-001-EXT
MDP 3
E
4"
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP104
BUILDING - 03 - BASEMENT FLOOR
- ENLARGED - ELECTRICAL PLANS
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
B03 - BASEMENT FLOOR - ENLARGED - ELECTRICAL PLAN - DEMO
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
1/4" = 1'-0"
B03 - BASEMENT FLOOR - ENLARGED - ELECTRICAL PLAN
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
SHEET NOTES:
1. SPLICE AND EXTEND EXISTING FEEDERS FROM OLD LOCATION OF MDP 3 TO NEW LOCATION OF MDP 3: (1)
30/3, (2) 125/3, (2) 150/3, AND (1) 20/3.
2. RELOCATE THE SITE LIGHTING TIMECLOCK TO A WALL. INTERCEPT 20/1 CIRCUIT FEED TO FIRE ALARM AND FEED FROM PANEL '3-PNL-003-CO-1-03' ON FIRST FLOOR. PROVIDE NEW 20/1 CIRCUIT BREAKER.
3. '3-MDP-001-EXT' SHALL BE INSTALLED BEFORE THE REMOVAL OF THE EXISTING UNIT SUBSTATION. REFER TO PHASING NOTES ON SHEET EP102 AND ONE-LINE DIAGRAMS ON SHEET E500 FOR FURTHER DETAILS.
9-DP-001-133
(LEVEL ABOVE)
E
E600
E600
9-TLF-001-EXT
E600
(TYP)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP105
BUILDING - 09 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 09 - FIRST FLOOR - ELECTRICAL PLAN
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
1. REMOVE EXISTING CONCRETE EQUIPMENT PAD. PROVIDE NEW PAD IN SAME LOCATION.
2. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS
AND RECONNECT TO NEW.
3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS
TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING
CLEARANCE AROUND THE TRANSFORMER.
REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. BUILDING 9 DOES NOT PROVIDE HEALTH CARE SERVICES AND HAS NO OCCUPANCY DURING NIGHTS AND WEEKENDS. OUTAGES SHALL BE KEPT TO A MINIMUM DURATION UNLESS ON NIGHTS OR
WEEKENDS.
A. LOCATE TEMPORARY EXISTING 750KVA TRANSFORMER REMOVED FROM BUILDING 1 FOR TEMPORARY
POWER. PROVIDE FIBERGLASS PAD AND OTHER TEMPORARY PROVISIONS FOR TEMPORARY TRANSFORMER.
B. DE-ENERGIZE THE EXISTING TRANSFORMER.
C. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.
D. REMOVE EXISTING TRANSFORMER.
E. TIE INTO PRIMARY FEEDERS PREVIOUSLY CONNECTED TO TRANSFORMER. SPLICE CONDUCTORS WITH
TEMPORARY CABLING FROM OLD TRANSFORMER 9 REMOVED TO TEMPORARY TRANSFORMER. PROVIDE
TEMPORARY WEATHER PROTECTION OF TEMPORARY FEEDER CONDITIONS.
F. REMOVE OLD CONCRETE EQUIPMENT PAD. PROTECT EXISTING CONDUITS AND CONDUCTORS.
G. INSTALL NEW CONCRETE EQUIPMENT PAD. WAIT FOR CONCRETE TO CURE.
H. DISCONNECT TEMPORARY CABLING FROM EXISTING CONDUCTORS TO TEMPORARY TRANSFORMER.
I. INSTALL NEW TRANSFORMER ON NEW CONCRETE EQUIPMENT PAD.
J. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.
K. REMOVE TEMPORARY TRANSFORMER AND TEMPORARY PROVISIONS.
11-TLF-001-EXT
E600
E600
(TYP)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP106
BUILDING - 11 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 11 - FIRST FLOOR - ELECTRICAL PLAN
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS
AND RECONNECT TO NEW.
2. CUT EXISTING CONDUIT STUB OUT TO BE LEVEL WITH CONCRETE PAD SURFACE. FILL IN HOLE WHERE THE
CONDUIT EXISTS BELOW THE PAD SURFACE WITH CONCRETE.
3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING
CLEARANCE AROUND THE TRANSFORMER.
REPLACE TRANSFORMER IN-PLACE. THE CONTRACTOR SHALL COORDINATE ALL OUTAGES DATES AND DURATIONS WITH VA. STAFF AND PATIENTS WILL NEED TO BE RELOCATED TO ANOTHER BUILDING FOR THE OUTAGE, SO OUTAGES WILL NEED TO BE COORDINATED WELL IN ADVANCE. ANTICIPATE OUTAGES TO BE DURING THE DAYTIME WHEN STAFF IS PRESENT. BUILDING 11 PROVIDES RESIDENTIAL CARE SERVICES AND OUTAGES
SHALL BE KEPT TO A MINIMUM DURATION.
A. DE-ENERGIZE THE EXISTING TRANSFORMER.
B. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.
C. PROTECT EXISTING CONCRETE PAD, CONDUITS, AND CONDUCTORS.
D. REMOVE EXISTING TRANSFORMER.
E. INSTALL NEW TRANSFORMER.
F. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.
G. RETAIN EXISTING TRANSFORMER FOR TEMPORARY POWER USE FOR OTHER BUILDINGS CONSTRUCTION
PHASING PRIOR TO DISPOSAL.
66-MDP-001-4A
(MDP-66)
E
(LEVEL BELOW)
E
E600
E600
SC-184
66-TLF-001-EXT
E600
(TYP)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP107
BUILDING - 66 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 66 - FIRST FLOOR - ELECTRICAL PLAN
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. REMOVE EXISTING CONCRETE EQUIPMENT PAD. PROVIDE NEW PAD IN SAME LOCATION.
2. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS
AND RECONNECT TO NEW.
3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS
TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING
CLEARANCE AROUND THE TRANSFORMER.
REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. STAFF AND PATIENTS WILL NEED TO BE RELOCATED TO ANOTHER BUILDING FOR THE OUTAGE, SO OUTAGES WILL NEED TO BE COORDINATED WELL IN ADVANCE. ANTICIPATE OUTAGES TO BE DURING THE DAYTIME WHEN STAFF IS PRESENT. BUILDING 66 PROVIDES RESIDENTIAL SERVICES AND OUTAGES SHALL BE
KEPT TO A MINIMUM DURATION.
A. LOCATE TEMPORARY EXISTING 750KVA TRANSFORMER REMOVED FROM BUILDING 1 FOR TEMPORARY
POWER. PROVIDE FIBERGLASS PAD AND OTHER TEMPORARY PROVISIONS FOR TEMPORARY TRANSFORMER.
B. DE-ENERGIZE THE EXISTING TRANSFORMER.
C. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.
D. REMOVE EXISTING TRANSFORMER.
E. TIE INTO PRIMARY FEEDERS PREVIOUSLY CONNECTED TO TRANSFORMER. SPLICE CONDUCTORS WITH
TEMPORARY CABLING FROM OLD TRANSFORMER 66 REMOVED TO TEMPORARY TRANSFORMER. PROVIDE
TEMPORARY WEATHER PROTECTION OF TEMPORARY FEEDER CONDITIONS.
F. REMOVE OLD CONCRETE EQUIPMENT PAD. PROTECT EXISTING CONDUITS AND CONDUCTORS.
G. INSTALL NEW CONCRETE EQUIPMENT PAD. WAIT FOR CONCRETE TO CURE.
H. DISCONNECT TEMPORARY CABLING FROM EXISTING CONDUCTORS TO TEMPORARY TRANSFORMER.
I. INSTALL NEW TRANSFORMER ON NEW CONCRETE EQUIPMENT PAD.
J. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.
K. REMOVE TEMPORARY TRANSFORMER AND TEMPORARY PROVISIONS.
MDP 137
D
D
137-TLF-001-EXT
137-PNL-001-01
E
PUMP
50 HP
PUMP
25 HP
PUMP
25 HP
E
E E
137-TLF-001-EXT
137-MDP-001-EXT
137-PNL-001-01
E
PUMP
50 HP
PUMP
25 HP
PUMP
25 HP
E
E E
E600
E600
(TYP)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP108
BUILDING - 137 - FIRST FLOOR -
ENLARGED - ELECTRICAL PLANS
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"
BUILDING - 137 - FIRST FLOOR - ELECTRICAL PLAN - DEMO
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
1/4" = 1'-0"
BUILDING - 137 - FIRST FLOOR - ELECTRICAL PLAN
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS
AND RECONNECT TO NEW.
2. REPLACE EXISTING SWITCHBOARD MDP 137 IN-PLACE. DISCONNECT EXISTING LINE AND LOAD FEEDERS AND
RECONNECT TO NEW.
3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 6' GAP IN BETWEEN BOLLARDS ON THE FRONT SIDE OR 5' ON THE
SIDES WHILE MAINTAINING WORKING CLEARANCE AROUND THE FENCE.
REPLACE EXISTING TRANSFORMER AND SWITCHBOARD IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH BOTH THE VA AND NAVFAC UTILITIES PRIOR TO SHUTDOWNS. OUTAGES TO BE EVENINGS AND WEEKENDS. BUILDING 137 PROVIDES PUMPING TO BOTH THE VA CAMPUS WATER DISTRIBUTION AND NAVAL CAMPUS WATER DISTRIBUTION AND ELECTRICAL SERVICE TO BUILDINGS 137 (PUMP HOUSE), 138 (WAREHOUSE), AND BUILDING 139 (GARAGE AND 4160V SWITCHGEAR). OUTAGES SHALL BE KEPT TO A MINIMUM. OUTAGES SHALL BE COORDINATED WITH THE VA AND NAVFAC AT LEAST TEN (10) BUSINESS DAYS PRIOR TO PLANNED OUTAGE.
• BUILDING 137 CAN SUSTAIN A MULTIDAY POWER OUTAGE TO FACILITATE REPLACING THE SWITCHGEAR
THAT FEEDS B137, B138 AND B139.
• THE WAREHOUSE (B138) SHALL BE RESTRICTED TO A WEEKEND OUTAGE.
A. OVER A WEEKEND, REMOVE EXISTING 'MDP 137' AND REPLACE IN-PLACE.
B. DE-ENERGIZE THE EXISTING EQUIPMENT.
C. DISCONNECT EXISTING FEEDERS TO BUILDINGS 137, 138, 139, AND PUMPS WITHIN 137.
D. REMOVE EXISTING 'MDP 137'.
E. INSTALL NEW 'MDP 137'.
F. RECONNECT EXISTING FEEDERS TO BUILDINGS 137, 138, 139, AND PUMPS WITHIN 137.
G. AFTER COMPLETION OF MDP REPLACEMENT, REPLACE TRANSFORMER IN-PLACE A FUTURE WEEKEND.
H. DE-ENERGIZE THE EXISTING TRANSFORMER.
I. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.
J. PROTECT EXISTING CONCRETE PAD, CONDUITS, AND CONDUCTORS.
K. REMOVE EXISTING TRANSFORMER.
L. INSTALL NEW TRANSFORMER.
M. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.
138-PNL-001-C 1
Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP109
BUILDING -138 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 138 - FIRST FLOOR - ELECTRICAL PLAN
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. EXISTING ELECTRICAL SERVICE FOR BUILDING 138 FED FROM SWITCHBOARD MDP 137. LOCATION PROVIDED
TO AID IN ELECTRICAL OUTAGE COORDINATION.
139-PNL-001-100
139-SG-001-102
139-DS-001-103 1
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP110
BUILDING -139 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 139 - FIRST FLOOR - ELECTRICAL PLAN
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. EXISTING ELECTRICAL SERVICE FOR BUILDING 139 FED FROM SWITCHBOARD MDP 137. LOCATION PROVIDED
TO AID IN ELECTRICAL OUTAGE COORDINATION.
2. EXISTING 4160V SWITCHGEAR FEEDING MDP 137. LOCATION PROVIDED TO AID IN ELECTRICAL OUTAGE
COORDINATION.
E600
E600
187-DP-0001-05
(MDP 187)
187-TLF-001-EXT
E
3-TLF-001-EXT
OIL SWITCH
4" 4"
4"
TEMP TO BLDG 187
E600
(TYP)
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
EP111
BUILDING -187 - FIRST FLOOR -
ELECTRICAL PLAN
OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
BUILDING - 187 - FIRST FLOOR - ELECTRICAL PLAN
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. REMOVE EXISTING CONCRETE EQUIPMENT PAD. PROVIDE NEW PAD IN SAME LOCATION.
2. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS
AND RECONNECT TO NEW.
3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS
TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING
CLEARANCE AROUND THE TRANSFORMER.
REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO
SHUTDOWNS. ANTICIPATE OUTAGE DURING WEEKEND OR AFTER WORK HOURS.
A. UTILIZE TEMPORARY FENCING AROUND WORK AREA FROM BUILDING 3 WORK.
B. UTILIZE TEMPORARY EXISTING 150KVA TRANSFORMER PREVIOUSLY USED FOR BUILDING 3 TRANSFORMER
REPLACEMENT FOR TEMPORARY POWER. PROVIDE OTHER TEMPORARY PROVISIONS FOR TEMPORARY
TRANSFORMER.
C. DE-ENERGIZE THE EXISTING TRANSFORMER.
D. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.
E. REMOVE EXISTING TRANSFORMER.
F. TIE INTO PRIMARY FEEDERS PREVIOUSLY CONNECTED TO TRANSFORMER. UTILIZE 4" CONDUIT STUB UP
PROVIDED FOR TEMPORARY CONNECTION. UTILIZE SECONDARY CABLE TERMINALS TO FEED THROUGH PRIMARY SIDE WITH TEMPORARY CABLING INSTALLED FROM NEW TRANSFORMER 3 TO TEMPORARY TRANSFORMER. PROVIDE TEMPORARY CABLING FROM TEMPORARY TRANSFORMER TO 'MDP 187'. PROVIDE
TEMPORARY WEATHER PROTECTION OF TEMPORARY FEEDER CONDITIONS.
G. ENERGIZE EXISTING MDP 187 FOR TEMPORARY TRANSFORMER.
H. REMOVE OLD CONCRETE EQUIPMENT PAD. PROTECT EXISTING CONDUITS AND CONDUCTORS.
I. INSTALL NEW CONCRETE EQUIPMENT PAD. WAIT FOR CONCRETE TO CURE.
J. DISCONNECT TEMPORARY CABLING FROM EXISTING CONDUCTORS TO TEMPORARY TRANSFORMER.
K. INSTALL NEW TRANSFORMER ON NEW CONCRETE EQUIPMENT PAD.
L. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.
M. REMOVE TEMPORARY TRANSFORMER, CABLING, AND TEMPORARY PROVISIONS.
N. CAP 4" CONDUIT STUB UP FROM UNDERNEATH NEW TRANSFORMER 3 AND BURY.
O. REMOVE TEMPORARY FENCING FROM AROUND WORK AREA.
BUILDING NUMBER:
1-206 = BUILDINGS 1, 2, 3, ETC.
EQUIPMENT TYPE:
TLF = TRANSFORMER LIQUID FILLED MDP = MAIN DISTRIBUTION PANEL
PNL = PANELBOARD
PANEL NUMBER # WITHIN ROOM: 001, 002, 003 ETC.
ROOM NUMBER/LOCATION (FLOOR INDICATED BY FIRST DIGIT):
001 = ROOM 001 BASEMENT
101 = ROOM 101 FIRST FLOOR EXT = EXTERIOR
TYPICAL ELECTRICAL EQUIPMENT NAMING CONVENTION
(INDEX NUMBER):
137-MDP-001-EXT
200/3 AT
250/3 AF
LSI
TO BUILDING 137
137-PNL-001-01
200/3 AT
250/3 AF
LSI
TO BUILDING 138
138-PNL-001-C
250/3 AF
SPACE
300/3 AT
400/3 AF
LSI
200/3 AT
250/3 AF
LSI
200/3 AT
250/3 AF
LSI
200/3 AT
250/3 AF
LSI
250/3 AF
SPACE
TO BUILDING 139
139-PNL-001-100
TO BUILDING 137
PUMP 1
25HP
TO BUILDING 137
PUMP 2
25HP
TO BUILDING 137
PUMP 3
50HP
MDP 137
137-MDP-001-EXT
600A
208Y/120V, 3PH, 4W
NEMA 3R
400/3 AT
600/3 AF
LSI
40N
MDP 3
3-MDP-001-EXT
600A
208Y/120V, 3PH, 4W
400/3 AT
600/3 AF
137-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
150KVA
400A LSI CB
TO BUILDING 139
40N
3-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
150KVA
400A LSI CB
TO
STEAM PIT
BLDG 48
30/3
TO
STREET
LIGHTS
20/3
TO
3-PNL-001-CO104
150/3
LSI
TO
3-PNL-002-B01-3
125/3
LSI
TO
3-PNL-002-CO103
125/3
LSI
TO
3-PNL-001-CO103
150/3
LSI
250/3 AF
SPACE
250/3 AF
SPACE
TO
SECTIONALIZER
CABINET 172
YELLOW LOOP
TO
SECTIONALIZER
CABINET 172
ORANGE LOOP
OIL SWITCH
200A, 15KV
SC-172A
17MV
EXISTING: (1) SET 3-#1/0
EXISTING: (1) SET 3-#350
187-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
150KVA
400A LSI CB
TO SC-172
YELLOW LOOP
BUILDING 187
EXISTING: (1) SET 4-#500
KCMIL IN 4-1/4" C.
EXISTING: (1) SET 3-#1/0
MDP 187
450A MCB
ADD 1-#1/0 AWG
EGC IN EXISTING
CONDUIT.
66-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
300KVA
800A LSI CB
TO SC-184
BUILDING 66
EXISTING: (2) SETS
4-#500 KCMIL, #2/0
GND IN 4" C.
EXISTING: (1) SET 3-#4/0
MDP 66
800A MLO
9-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
300KVA
800A LSI CB
TO SC-186
BUILDING 9
EXISTING: (3) SETS
4-#250 KCMIL IN 4" C.
EXISTING: (1) SET 3-#1/0
MDP 9
800A MCB
ADD (3) SETS 1-#2/0
AWG EGC IN
EXISTING CONDUIT.
1-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
750KVA
2000A LSI CB
TO SC-174
BUILDING 1
EXISTING: (6) SETS
4-#500 KCMIL IN 4" C.
EXISTING: (1) SET 3-#1/0
MDP 1
2000A MCB
11-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
150KVA
400A LSI CB
TO SC-174
BUILDING 11
EXISTING: (1) SET
4-#500 KCMIL, #1/0
GND IN 4" C.
EXISTING: (1) SET 3-#350
MDP 11
400A MCB
11-MDP-001-BSMT1-MDP-001-151 9-DP-001-133 66-DP-001-4A 187-MDP-001-05
44 4
MDP 3
3-MDP-001-EXT
400A
208Y/120V, 3PH, 4W
TO
STEAM PIT
BLDG 48
30/3
TO
STREET
LIGHTS
20/3
TO
3-PNL-001-CO104
150/3
LSI
TO
3-PNL-002-B01-3
125/3
LSI
TO
3-PNL-002-CO103
125/3
LSI
TO
3-PNL-001-CO103
150/3
LSI
250/3 AF
SPACE
250/3 AF
SPACE
TO
SECTIONALIZER
CABINET 172
YELLOW LOOP
TO
SECTIONALIZER
CABINET 172
ORANGE LOOP
EXISTING: (1) SET 3-#1/0
BUILDING 3
LOAD INTERRUPTER
SWITCHES
D
D
EEEEE
200/3 AT
250/3 AF
TO BUILDING 137
137-PNL-001-01
200/3 AT
250/3 AF
TO BUILDING 138
138-PNL-001-C
250/3 AF
SPACE
300/3 AT
400/3 AF
200/3 AT
250/3 AF
200/3 AT
250/3 AF
200/3 AT
250/3 AF 250/3 AF
SPACE
TO BUILDING 139
139-PNL-001-100
TO BUILDING 137
PUMP 1
25HP
TO BUILDING 137
PUMP 2
25HP
TO BUILDING 137
PUMP 3
50HP
MDP 137
137-MDP-001-EXT
600A
208Y/120V, 3PH, 4W
NEMA 3R
137-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
150KVA
TO BUILDING 139
BUILDING 137
EXISTING: (1) SET 3-#350
D
JUNCTION BOX IN
ELECTRICAL ROOM
D
3-TLF-001-EXT
TRANSFORMER
4160Δ-208Y/120V
150KVA
5 555
6 6
7777 7
7 7
MAINTAIN EXISTING CONDUITS, REFER TO SHEET EP102
A. REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION NOT SHOWN ON ONE-LINES.
(GENERAL NOTES SHALL APPLY TO ALL ONE-LINE SHEETS)
ONE-LINE GENERAL NOTES:
REMARKS: (TRANSFORMER SCHEDULE)
1. PROVIDE WITH EXTERNAL MOUNTED ACCESSIBLE OIL GAUGES AND SAMPLING PORT. GUAGE AND SAMPLING PORT SHALL BE
ENCLOSED IN A NEMA 3R ENCLOSURE.
GENERAL NOTES: (TRANSFORMER SCHEDULE)
A. REFER TO DEFINITIONS BELOW FOR CLARIFICATIONS OF REQUIREMENTS.
B. "VOLTAGE" - PRIMARY AND SECONDARY VOLTAGE CONFIGURATIONS.
C. "EXISTING IMPEDANCE" - APPROXIMATE IMPEDANCE VALUE (%Z) IN PERCENTAGE OF THE EXISTING TRANSFORMER THAT WILL BE
REPLACED. NEW TRANSFORMER SHALL BE RATED AS NOTED BELOW OR WITHIN RANGE LISTED BELOW TO LIMIT CHANGES
DOWNSTREAM OF THE SYSTEM IN FAULT CURRENT AND ARC FLASH HAZARD.
a. ACCEPTABLE IMPEDANCE RANGES (%Z):
• 1-TLF-001-EXT: 5.75
• 3-TLF-001-EXT: 4.5-5.75
• 9-TLF-001-EXT: 4.5-5.75
• 11-TLF-001-EXT: 4.5-5.75
• 66-TLF-001-EXT: 4.5-5.75
• 137-TLF-001-EXT: 4.5-5.75
• 187-TLF-001-EXT: 4.5-5.75
D. "CIRCUIT BREAKER OPTIONS" - SECONDARY CABINET SECTION INTEGRAL MOUNTED CIRCUIT BREAKER. PROVIDE ADDITIONAL CIRCUIT BREAKER OPTIONS AS NOTED. CIRCUIT BREAKER OPTIONS SUFFIX: 'LSI' - PROVIDE ELECTRONIC TRIP ADJUSTABLE LONG, SHORT, AND INSTANTEOUS TRIP SETTINGS / 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE
SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
03/07/2025
04/10/2025100% CONSTRUCTION DOCUMENTS
/9
/2
:4
:3
A
M
A u to d e s k D o c s
/2
.0
V A
L o v e ll O il T ra n s fo rm e r a n d S w it c h
/2
V
A L o v e ll
C a m p u s B u ild in g
.r v t
E500
ONE-LINE DIAGRAMS OIL TRANSFORMER AND SWITCH
ENCLOSURE UPGRADE
3001 GREEN BAY RD, NORTH CHICAGO, IL 60064
556-24-113
04/10/2025 ACR MOJ
23022.014
100% CONSTRUCTION
DOCUMENTS
NO SCALEE500
ELECTRICAL ONE-LINES1
FEEDER SCHEDULE - COPPER
FEEDER NOMINAL SIZE WIRE AND CONDUIT
17MV 175 A 3-#1/0 CU, #2 CU GND - 4" C. 133% EPR, 5KV
40N 400 A 4-#4/0 CU, #1/0 CU GND - 2-1/2" C. (2 SETS)
SHEET NOTES:
1. REUSE EXISTING (2) 4" CONDUITS.
2. DO NOT BOND NEUTRAL AND GROUND BARS WITHIN MDP.
3. REMOVE ANY "SERVICE DISCONNECT" LABEL FROM PANELBOARD MCB. PROVIDE LABEL TO INDICATE THE
LOCATION OF THE SERVICE DISCONNECT WITHIN THE TRANSFORMER ENCLOSURE.
4. IF EXISTING CONDUCTORS ARE TOO SHORT TO TERMINATE ONTO NEW CIRCUIT BREAKER OUTPUT LUGS, EXTEND CONDUCTORS WITH COMPRESSION SPLICE. ENSURE EXTENSION CONDUCTORS IS AT LEAST 1' IN LENGTH TO HAVE SOLID TERMINATIONS IN THE CIRCUIT BREAKER OUTPUT LUGS. CONTRACTOR SHALL FIELD VERIFY LENGTHS OF CONDUCTORS PRIOR TO ORDERING TRANSFORMERS TO ELIMINATE SPLICES IF
POSSIBLE.
5. ENSURE NEUTRAL-GROUND BOND DOES NOT EXIST OR REMOVE BOND IF IT DOES EXIST.
6. CONTRACTOR SHALL PROVIDE INSULATION TESTING OF CABLES AFTER ADDITIONAL CABLE IS PULLED TO
ENSURE CABLES ARE IN GOOD CONDITION.
7. CONTRACTOR SHALL PROVIDE LABEL ON MDP WHERE INDICATING THE LOCATION OF THE NEUTRAL-GROUND
BOND OF THAT PARTICULAR ELECTRICAL SERVICE. PROVIDE LABEL INDICATING THE LOCATION OF MAIN
BUILDING SERVICE DISCONNECT.
8. RETAIN EXISTING NEUTRAL-GROUND BOND WITHIN SWITCHBOARD.
OIL FILLED TRANSFORMER SCHEDULE
NAME
KVA
RATING VOLTAGE
EXISTING
IMPEDANCE
CIRCUIT BREAKER
OPTIONS GROUND REMARKS
1-TLF-001-EXT 750 4160Δ-208Y 5.8 2000A, LSI #2/0 CU 1
3-TLF-001-EXT 150 4160Δ-208Y 4.32 400A, LSI #1/0 CU 1
9-TLF-001-EXT 300 4160Δ-208Y 5.0 800A, LSI #2/0 CU 1
11-TLF-001-EXT 150 4160Δ-208Y 4.3 400A, LSI #1/0 CU 1
66-TLF-001-EXT 300 4160Δ-208Y 5.66 800A, LSI #2/0 CU 1
137-TLF-001-EXT 150 4160Δ-208Y 5.08 400A, LSI #1/0 CU 1
187-TLF-001-EXT 150 4160Δ-208Y 4.4 400A, LSI #1/0 CU 1
PHASE
PHASE PHASE
PHASE
PHASE PHASE
NEUTRAL
GROUND
XO TERMINAL
PROVIDE NEW GROUNDING
ELECTRODE CONDUCTOR
TO GROUND ROD
RECONNECT EXISTING
GROUNDING CONDUCTOR
PHASE
PHASE PHASE
PHASE
PHASE PHASE
NEUTRAL
GROUND
XO TERMINAL
PROVIDE NEW GROUNDING
ELECTRODE CONDUCTOR
TO GROUND ROD
PROVIDE NEW GROUNDING CONDUCTOR.
DISCONNECT NEUTRAL/GROUND BOND
AT MAIN DISTRIBUTION PANEL
PHASE
PHASE PHASE
PHASE
PHASE PHASE
NEUTRAL
XO TERMINAL
PROVIDE NEW GROUNDING
ELECTRODE CONDUCTOR
TO GROUND ROD
EDGE OF BUILDING
M A
T E
R
IA
L O
F U
N D
IS
T
U R
B E
D T
O C
LE
A
N S
U R
F A
C E
S H
A
LL
B E
E X
C A
V A
T E
D B
O T
T O
M O
F H
O
LE
#4 R
E B
A R
S E
.W
F
IN
IS
H
E D
G R
A D
E
A
LL
A R
O U
N D
3/ 4"
C H
A M
F E
R
4"
1' -0
1'
-0
3"
3" T
Y P
IC
A
L
#8 x
S
T E
E L
M E
S H
5'-0" MIN8"
INSTALL PIERS TO
UNDISTURBED EARTH
5'-3" 5'-3"
ANTI-RAM BOLLARD. REFER TO
DETAIL FOR FURTHER INFORMATION
AREA WITHIN PROTECTION
PIPES MUST BE CLEAR FOR
OPENING OF TRANSFORMER
DOORS AND MAINTENANCE
4' -0
T
Y P
IC
A
L 6' -0
M
IN
7'
-6
4-#4 x 2'-3"
REBARS
1' -6
1' -1
2'
-3
1' -7
PIERSCL
PIERSCL
1'-6"
#4 x 7'-0"
REBAR (TYP)
MINIMUM4'-0"
PIERS
1'-6"
CL
4'-6"1'-6"
PIERSCL
M
IN
IM
U
M 4'
-0
#4 x 4'-6"
REBAR (TYP)
ONE LAYER NUMBER
8-6" x…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .