This document is a set of 100% construction documents for an electrical design project at Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves an oil transformer and switch enclosure upgrade under VA Contract #36C25223D0061, Task Order #36C25224N0376.

The scope includes replacing and upgrading electrical infrastructure across multiple buildings at the facility, specifically addressing transformer and switch equipment. The work involves removing existing transformers (including 150KVA and 750KVA units) and installing replacements with updated enclosures at designated building locations (Buildings 1, 3, 9, 11, 66, 137, 138, 139, and 187). The construction documents include electrical plans for each building, one-line diagrams showing power distribution, transformer pad specifications with grounding requirements, and equipment schedules. The documents detail conduit routing, panel configurations, circuit breaker specifications, transformer sizing (ranging from 150KVA to 750KVA at 4160V primary to 208Y/120V secondary), and coordination requirements between buildings. Key technical specifications include concrete pad construction standards (SG-6 with 3,000 PSI minimum strength), grounding electrode conductor installation, anti-ram bollard protection details, and electrical symbol conventions. The design is dated 03/07/2025 with construction documents finalized 04/10/2025, prepared by Specialized Engineering Solutions as the consultant and designer of record, with approval from the VA Office of Construction and Facilities Management.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/1

/2

:5

:3

A M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

Captain James A. Lovell Federal Health Care Center (FHCC)

OIL TRANSFORMER AND SWITCH ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO,

IL 60064

G000

COVER SHEET OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

SHEET INDEX - ELECTRICAL

Sheet Number Sheet Name

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ES100 OVERALL SITE PLAN - ELECTRICAL PLAN

EP100 BUILDING - 01 - FIRST FLOOR - ELECTRICAL PLAN

EP101 BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN - DEMOLITION

EP102 BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN

EP103 BUILDING - 03 - BASEMENT FLOOR - ELECTRICAL PLAN

EP104 BUILDING - 03 - BASEMENT FLOOR - ENLARGED - ELECTRICAL PLANS

EP105 BUILDING - 09 - FIRST FLOOR - ELECTRICAL PLAN

EP106 BUILDING - 11 - FIRST FLOOR - ELECTRICAL PLAN

EP107 BUILDING - 66 - FIRST FLOOR - ELECTRICAL PLAN

EP108 BUILDING - 137 - FIRST FLOOR - ENLARGED - ELECTRICAL PLANS

EP109 BUILDING -138 - FIRST FLOOR - ELECTRICAL PLAN

EP110 BUILDING -139 - FIRST FLOOR - ELECTRICAL PLAN

EP111 BUILDING -187 - FIRST FLOOR - ELECTRICAL PLAN

E500 ONE-LINE DIAGRAMS

E600 ELECTRICAL DETAILS

E700 ELECTRICAL SCHEDULES

Grand total: 17

SHEET INDEX - GENERAL

Sheet Number Sheet Name

G000 COVER SHEET

Grand total: 1

VA CONTRACT #: 36C25223D0061

TASK ORDER #: 36C25224N0376

BASE BID: Work includes Replacing Oil Filled transformers and switch enclosures at the following buildings at the James A.

Lovell Federal Healthcare Center: 1, 3, 9, 11, 66, 137, 187. Work also includeds distribution equipment replacements at buildings 3 and 137.

N

Revisions: Date:

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPERE

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

CEILING

CIRCUIT BREAKER

CORRELATED COLOR TEMPERATURE

COPPER

DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WALL PHONE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

C

CB

CCT

CU

D

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

W

WR

XFMR

ZSI

A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.

RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG

CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. NEW ROOF MOUNTED EQUIPMENT SHALL BE BONDED TO EXISTING BUILDING LIGHTNING PROTECTION SYSTEM IF ONE EXISTS. PROVIDE AIR TERMINALS ON TOP OF EQUIPMENT AND BOND TO EXISTING SYSTEM PER NFPA 780 AND UL 96A REQUIREMENTS. PROVIDE UL INSPECTION AND/OR LPI SYSTEM INSPECTION AS REQUIRED TO OBTAIN UL MASTER LABEL RECERTIFICATION, UL MASTER LABEL AND/OR LPI SYSTEM

CERTIFICATE.

D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES.

F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

G. ALL CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, INCLUDING LIGHTING AND WALL RECEPTACLES, SHALL BE MECHANICALLY PROTECTED PER NEC 517.31(C)(3). NON-FLEXIBLE RACEWAY SHALL BE USED FOR CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, EXCEPT THAT THE FINAL CONNECTION TO VIBRATING EQUIPMENT OR LIGHT FIXTURES IF THE TOTAL LENGTH OF FLEXIBLE RACEWAY IS 6' OR LESS ACROSS THE

ENTIRE CIRCUIT LENGTH.

H. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING.

I. FOR TEMPORARY FEEDERS, CONTRACTOR HAS CHOICE OF DIRECT BURIED CABLING OR CONDUIT AND RAN ACROSS FENCED OFF AREA. REFER TO SPECS FOR CABLE TYPES. TEMPORARY CONNECTIONS ARE NOT

SHOWN ON THE DRAWINGS. COORDINATE LOCATION OF TEMPORARY TRANSFORMERS, TEMPORARY

CABLING, AND TEMPORARY FENCING WITH THE VA. ALTERNATE TEMPORARY LOCATIONS OF EQUIPMENT TO ACCOMMODATE CONTINUITY OF SERVICES AT THE VA AS REQUIRED BY THE VA STAFF SHALL NOT BE

GROUNDS FOR ADDITIONAL COMPENSATION.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

E000

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

ELECTRICAL EQUIPMENT

SYMBOLS

PLAN SYMBOL NAME

DISTRIBUTION PANEL

ENCLOSED DISCONNECT

SWITCH - FUSED

PANELBOARD - RECESSED

PANELBOARD - SURFACE

SWITCHBOARD

TRANSFORMER - DRY TYPE

TRANSFORMER - OIL FILLED

UTILITY PAD MOUNT SWITCH OR

SECTIONALIZING CABINET

ONE LINE SYMBOL

PLAN SYMBOL NAME

AUTOMATIC TRANSFER SWITCH

CONTINUATION

DIGITAL METER

GROUND BAR

GROUNDING ELECTRODE

MOTOR STARTER

NON-FUSED DISCONNECT

PANEL BOARD

SURGE PROTECTIVE DEVICE

SWITCHBOARD/SWITCHGEAR -

DOUBLE TUB

TRANSFORMER

FHCC CONDUIT COLOR SCHEME

Red- Fire Alarm Blue- Controls, HVAC, BAS Orange- Fiber optic, communications Green- Normal power Yellow- Emergency Power, Critical Power Black- Security Purple- Medical Systems, Nurse Call

REPLACE TRANSFORMERS THROUGHOUT CAMPUS. REUTILIZE EXISTING TRANSFORMERS REMOVED FOR

TEMPORARY POWER FOR OTHER TRANSFORMERS WITH LONGER DURATION OUTAGES.

A. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. OUTAGE DURATION

TOLERANCES VARY BY BUILDING SERVED. SPECIAL CONSIDERATION IS REQUIRED FOR BUILDING 137 OUTAGE IN COORDINATION WITH NAVFAC. REFER TO BUILDING 137 PHASING NOTES FOR FURTHER DETAILS.

B. RETAIN EXISTING TRANSFORMER FOR TEMPORARY POWER USE FOR OTHER BUILDINGS CONSTRUCTION

PHASING PRIOR TO DISPOSAL.

a. REMOVE 150KVA, 4160∆ /208Y EXTERIOR TRANSFORMER FROM BUILDING 11 TO UTILIZED FOR OTHER

BUILDINGS WITH 150KVA TRANSFORMERS.

b. REMOVE 750KVA, 4160∆ /208Y EXTERIOR TRANSFORMER FROM BUILDING 1 TO UTILIZED FOR OTHER

BUILDINGS WITH 300KVA TRANSFORMERS.

c. RETAIN OTHER 150KVA TRANSFORMERS FOR USE IF DESIRED TO DO MULTIPLE TRANSFORMER

REPLACEMENTS SIMULTANEOUSLY.

C. SEQUENCE OF TRANSFORMER REPLACEMENT (SEQUENCE REQUIRED FOR EXISTING TRANSFORMERS THAT

WILL BE REMOVED TO BE UTILIZED FOR TEMPORARY FEED TO ANOTHER BUILDING SERVICE):

a. BUILDING 1 AND 3.

b. BUILDING 187.

c. ALL OTHER BUILDINGS REQUIRING TEMPORARY TRANSFORMER FEEDS.

OVERALL PROJECT PHASING NOTES:

MANHOLE

BOLLARD

137-TLF-001-EXT

36-TLF-001-EXT

5-TLF-001-EXT

7-TLF-001-EXT

131-TLF-001-016

133EF-SG-002-BE403

133-EF-TDT-001SG2-BE403

PURPLE

GOLD

133EF-SG-001-BE403

133-EF-TDT-001SG1-BE403

133-SG-001-BA133 (USS-1)

133-TLF-002-BA133

133-SG-002-BA133 (USS-2)

133-TLF-001-BA133

46-TDT-001-01

195-TLF-001-EXT

(T-302)

PS-302

133CA-SG-001-1D223 (USS1)

133CA-TLF-003-1D223

133CA-SG-002-1D223 (USS2)

133CA-TLF-002-1D223

133CA-SG-003-1D223 (USS3)

133CA-TLF-001-1D223

SC-185A

188 XFMR 51

206-TDT-001-EXT

XFMR 65

MH#QQ

PMH1PMH2

PMH3

SC-301

PMH203

GENERATOR FEEDS 480V

MH

#UUA

PMH

MH#UUB

MH#VV

134-TDT-001-EXT

EMH#10

EMH#9B

SC-165

MH#11

MH#WW

196-TLF-001-EXT

T-304

PS-304

XFMR

XFMR

SC-166

MH#ZZ

SC-167

MH#A1

MH#A2

XFMRS

SC-168

MH#B

MH#C

MH#55

MH#66

MH#FF

MH#GG

MH#66A

SC-157

48-TLF-001-EXT

MH#DD

SC-172

T305PS-305

SC-173

SC-171

SC-170

PMH20

MH#2D

MH#2C

MH#CE-2

MH#HH

MH#11

MH#JJ

MH#QQB

MH#QQA

MH4

MH#UI

PMH202

MH#2B

MH

#2A

MH#2

MH#CE-1

MH#KK

3A (x2) 3B (x2)

PURPLE

GOLD

MH#102

MH#AC

SC-303

SC-163

MH#VV

MH#YY

MH#4

MH#44

MH#3A

MH#3SC-169 MH#2 MH#1

202 201

SC-175131

SC-176

SC-159

133CA

133EF

MH#77

MH#100

SC-180

SC-181

MH#EE

MH#103

MH#CC

MH#BB

MH#AA

MH#A SC-177XFMR 51

32-TDT-001-10

SC-183

SC-184

SC-179

SC-178

201-TDT-001-EXT

MH#9

MH#6A

SC-182A

MH#6B

MH#7

MH#8

MH#6

MH#5

MH#4

MH#3

7A

1A 2A

6A 5A

4A

6B7B

1B 2B

5B

4B

3A

P

3B

3A

3B

GL

--1B----1AGLP

2A 3A --

4A3A--

7A6A5A

3B 2B

4B 3B

6B5B 7B

3A

P

3B

3A 3B

GL

3A

P

3B

3A 3B

GL

3A

P

3B

3A 3B

GL

3A

3B

3A

3B

P

GL

--P

GL

BL O

S Y

G

R

--BL

OY

S

WW

Y

Y

O

O

BL

O

Y S

Y

O

Y

O

Y

O

O

Y

O Y

O Y

Y

OBL

S

MH#D

OY

O/Y FROM

SC-171 SWITCH

OY--

Y

O

Y Y

O

--P

G L

R O

G Y

GL--

R G

P

GL

R G P

GL--

P

-- O G

R

R/G FROM

SC-157 SWITCH

Y

RG

G

L P Y

O

SC-305

R R

G G

R G

SC-177A

-- BLS

-- BLS

B L

S

-- BLS

BL

BL

SS

-- BL

S

MH#100

MH#NN

BL/S FROM

SC-184 SWITCH

BL

S--

-- BL

S

BL

S

-- BL

S

BL

S

BLBL

SS

BL/S FROM

SC-183 SWITCH

4B4A

7A-- 1A

2A6A

5A 4A

6B

7B 1B

2B

5B 4B

7A-- 1A

2A6A

5A 4A

6B

7B 1B

2B

5B 4B

7A

1A

2A 6A

5A 4A

-- 6B 7B

1B

2B5B 4B

7A

1A 2A

6A 5A

6B

7B 1B 2B5B

7A-- 1A 2A6A

5A

6B

7B 1B 2B

5B

7A-- 1A

2A6A

5A

6B 7B 1B

2B

5B

7A

1A 2A

6A 5A--

6B7B

1B 2B

5B

1A

2A

1B

2B

7A

6A

5A

6B

7B

5B

BLBL

SS

BL

MH#MM

SC-185

BL

MH#MA

BL

MH#LL

151-TDT-001-01

Y O

Y O

O

Y

O/Y FROM

SC-176 SWITCH

G

R

G R

G R

G R

O/Y FROM

SC-175 SWITCH

SC-174

MH#OO

O/Y FROM

SC-174 SWITCH

O/Y FROM

SC-174 SWITCH

R G

GL

P

Y O

RG

G L

P

Y O--

R

G G

R

R G P GL

SC-160

R/G FROM

SC-160 SWITCH

MH#QQ1

GL

P

GR

SC-1

GLP

--GR

--R

R G

G

SC-300

PS-N1

PS-N2

-- P

GL

PGL

GL

P

GL

PR

G

SC-2

R

G

R

G

R

G

R

G

R G

R

G

R

G

--R G

G--

R

RG

R

G

R/G FROM

PS-302 SWITCH

R G

R G

1A

1A

1A

1A

1A

1A

1A

1B

1B

1B

1B

1B

1B

1B

SC-162

SC-162A

SC-162B

SC-162C

1A/1B FROM SC-162

SWITCHES TO

USS1, USS2, USS3

G R

R

G

G

G

SC-164

R G--

2A 2B

2A 2B

2A

2B

SC-165A

135-TDT-001-EXT

SC-164

G

G

G

G

G G

2A 2B

1A

2A

1B

2B

-- R G

R G --

4A4B

6-TDT-002SG1-007C

6-TDT-001SG1-007C

188-TLF-001-101

188-TLF-002-101

188-SG-001-101

188-SG-002-101

188-MCB-002-101

188-MCB-001-101

188-MCB-003-101

O/Y FROM

SC-172A SWITCH

3-TLF-001-EXT

SC-172A

11-TLF-001-EXT

9-TLF-001-EXT

66-TLF-001-EXT

/S

/S /S

R/

R/

R/

R/

R/ R/

1-TLF-001-EXT

187-TLF-001-EXT

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/1

/2

:5

:3

A M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

ES100

OVERALL SITE PLAN - ELECTRICAL

PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

SITE

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

N

NOTES:

1. NAMING CONVENTION FOR EQUIPMENT

A. MH: MANHOLE

B. SC: SWITCH AND/OR SECTIONALIZING CABINET

C. PS: PADMOUNT SWITCH

2. NAMING CONVENTION FOR TRANSFORMERS

A. [BUILDING NUMBER]-[TLF (LIQUID FILLED) OR TDT (DRY TYPE)]-[EQUIPMENT NUMBER WITHIN ROOM]-

[LOCATION, ROOM NUMBER OR EXTERIOR].

100 100 200

1" = 100'-0"

FEETSCALE

• G: GREEN - (3) 500 KCMIL (5KV)

• R: RED - (3) 500 KCMIL (5KV)

• O: ORANGE - (3) 500 KCMIL (5KV)

• Y: YELLOW - (3) 500 KCMIL (5KV)

• S: SILVER - (3) 500 KCMIL (5KV)

• BL: BLUE - (3) 500 KCMIL (5KV)

• P: PURPLE - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND

• GL: GOLD - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND

• 1A: F1A - (3) 500 KCMIL (5KV)

• 2A: F2A - (3) 500 KCMIL (5KV)

• 3A: F3A - 2 SETS (3) 500 KCMIL (5KV)

• 4A: F4A - (3) 500 KCMIL (5KV)

• 5A: F5A - (3) 750 KCMIL (5KV)

• 6A: F6A - (3) 750 KCMIL (5KV)

• 7A: F7A - (3) 750 KCMIL (5KV)

• 1B: F1B - (3) 500 KCMIL (5KV)

• 2B: F2B - (3) 500 KCMIL (5KV)

• 3B: F3B - (3) 500 KCMIL (5KV)

• 4B: F4B - 2 SETS (3) 500 KCMIL (5KV)

• 5B: F5B - (3) 750 KCMIL (5KV)

• 6B: F6B - (3) 750 KCMIL (5KV)

• 7B: F7B - (3) 750 KCMIL (5KV)

• --: SPARE CONDUIT

MEDIUM VOLTAGE CIRCUITS:

GR

DRAWING IS FOR REFERENCE ONLY. NO PROJECT SCOPE IS SHOWN ON THIS DRAWING.

1" = 100'-0"

OVERALL SITE PLAN - ELECTRICAL PLAN - UPDATED

• R: RED - (3) 500 KCMIL (5KV)

• O: ORANGE - (3) 500 KCMIL (5KV)

• Y: YELLOW - (3) 500 KCMIL (5KV)

• S: SILVER - (3) 500 KCMIL (5KV)

• G: GREEN - (3) 500 KCMIL (5KV)

• P: PURPLE - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND

• GL: GOLD - (3) 500 KCMIL (5KV, ERP), (1) #3/0 (XHHW) GND

• BL: BLUE - (3) 500 KCMIL (5KV)

1-MDP-001-151

E

E600

1-TLF-001-EXT

E600

(TYP)

COVERED WALKWAY

(TRAMWAY)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP100

BUILDING - 01 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 01 - FIRST FLOOR - ELECTRICAL PLAN

N 5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. ANTICIPATE OUTAGE DURING WEEKEND OR AFTER WORK HOURS. THE BUILDING IS CURRENTLY

UNDER CONSTRUCTION FOR EXTERIOR IMPROVEMENTS AND IS APPROXIMATELY 50 % OCCUPIED.

A. DE-ENERGIZE THE EXISTING TRANSFORMER.

B. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.

C. PROTECT EXISTING CONCRETE PAD, CONDUITS, AND CONDUCTORS.

D. REMOVE EXISTING TRANSFORMER.

E. INSTALL NEW TRANSFORMER.

F. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.

G. RETAIN EXISTING TRANSFORMER FOR TEMPORARY POWER USE FOR OTHER BUILDINGS CONSTRUCTION

PHASING PRIOR TO DISPOSAL.

SHEET NOTES:

1. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS

AND RECONNECT TO NEW.

2. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING

CLEARANCE AROUND THE TRANSFORMER.

PHASING NOTES:

SC-172

E

EP104

187-TLF-001-EXT

D

E

E E

E

3-PNL-002-CO-1-03

3-PNL-003-CO-1-03

3-PNL-001-CO14

3-PNL-001-CO-1-03

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP101

BUILDING - 03 - FIRST FLOOR -

ELECTRICAL PLAN - DEMOLITION

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN - DEMOLITION

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

1. REFER TO SHEET EP111 FOR FURTHER DETAILS ON TRANSFORMER REPLACEMENT FOR BUILDING 187.

2. INTERCEPT EXISTING CONDUITS AND REMOVE SECTIONS REQUIRED FOR THE NEW SCOPE OF WORK. REFER

TO EP102 AND E500 FOR FURTHER DETAILS.

SC-172

E

3-TLF-001-EXT

OIL SWITCH

187-TLF-001-EXT

4" 4"

TEMP TO BLDG 3

4"1

E600

3-PNL-001-CO14

3-PNL-003-CO-1-03

3-PNL-002-CO-1-03

3-PNL-001-CO-1-03

E

E E

E

E

187-DP-0001-05

(MDP 187)

E600

(TYP)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP102

BUILDING - 03 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 03 - FIRST FLOOR - ELECTRICAL PLAN

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

REPLACE EXISTING LOAD INTERRUPTER SWITCHES AND UNIT SUBSTATION WITH EXTERIOR SWITCH AND TRANSFORMER. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS.

ANTICIPATE OUTAGE DURING WEEKEND OR AFTER WORK HOURS.

A. PROVIDE TEMPORARY FENCING AROUND WORK AREA.

B. LOCATE TEMPORARY EXISTING 150KVA TRANSFORMER REMOVED FROM BUILDING 11 FOR TEMPORARY

POWER. PROVIDE FIBERGLASS PAD AND OTHER TEMPORARY PROVISIONS FOR TEMPORARY TRANSFORMER.

C. TIE INTO PRIMARY SIDE OF TRANSFORMER 187. SPLICE CONDUCTORS (OR CONNECT TO LOOP FEED

TERMINALS) WITH TEMPORARY CABLING FROM TRANSFORMER 187 TO TEMPORARY TRANSFORMER.

D. INSTALL NEW 'MDP 3' 400A SERVICE ENTRANCE RATED DISTRIBUTION PANELBOARD.

E. PROVIDE TEMPORARY 400A FEEDER TO BASEMENT ELECTRICAL ROOM TO SERVE NEW 'MDP 3' AND

ENERGIZE NEW 'MDP 3'.

F. RELOCATE EXISTING LOADS FROM OLD 'MDP 3' TO NEW 'MDP 3' ONE-BY-ONE TO MINIMIZE OUTAGES.

G. DISCONNECT MEDIUM VOLTAGE CIRCUITS TO ELECTRICAL ROOM TO DENERGIZE OLD ELECTRICAL GEAR.

H. REMOVE THE EXISTING TRANSFORMER, PANELBOARD, AND LOAD INTERRUPTER SWITCHES. REMOVE

EXISTING INCOMING CONDUITS FOR DUAL PRIMARY FEEDS WITHIN THE BASEMENT ELECTRICAL ROOM.

I. INTERCEPT INCOMING DUAL FEEDS IN BETWEEN THE SECTIONALIZER CABINET AND THE CURRENT

TRANSFORMER LOCATION. RETAIN EXISTING 4" CONDUITS. INSTALL A NEW EXTERIOR SWITCH WITH TWO INCOMING FEEDS AND FUSED OUTGOING SINGLE FEED. REMOVE EXISTING MEDIUM VOLTAGE CONDUCTORS BACK TO NEW SWITCH LOCATION. PROVIDE TWO NEW 4” CONDUITS FROM NEW SWITCH TO NEW EXTERIOR

MOUNTED TRANSFORMER. EXTEND EXISTING CONDUITS TO NEW SWITCH AND TRANSFORMER PAD

LOCATIONS.

J. PROVIDE NEW 150KVA, 4160∆ /208Y EXTERIOR TRANSFORMER ON CONCRETE PAD OUTSIDE BUILDING 3.

PROVIDE FEED FROM THE TRANSFORMER INTO THE BASEMENT ELECTRICAL ROOM. REUSE EXISTING 4"

CONDUIT FROM ENTRY TO THE ROOM TO INTERCEPTED LOCATION UNDERGROUND BETWEEN THE

ELECTRICAL ROOM AND THE NEW TRANSFORMER LOCATION.

K. DENERGIZE FEED FROM TEMPORARY TRANSFORMER AND ENERGIZE NEW TRANSFORMER.

L. REUSE EXISTING TEMPORARY TRANSFORMER FOR FEED FOR BUILDING 187 TEMPORARY FEED.

M. REMOVE TEMPORARY FENCING AROUND WORK AREA AFTER COMPLETION OF BUILDING 187 SCOPE OF

WORK.

PHASING NOTES:

SHEET NOTES:

1. PROVIDE 4" CONDUIT STUB OUT FOR USE FOR TEMPORARY CONNECTION FOR BUILDING 187 TRANSFORMER

REPLACEMENT.

2. ROOM WITH EXISTING FIRE ALARM PANEL FOR REFERENCE OF RE-FEEDING CIRCUIT.

3. REFER TO SHEET EP111 FOR SCOPE OF WORK ASSOCIATED WITH THE REPLACEMENT OF THIS

TRANSFORMER.

4. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS

TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING

CLEARANCE AROUND THE TRANSFORMER.

EP104

3-PNL-001-BO1-3

3-PNL-002-BO1-3

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP103

BUILDING - 03 - BASEMENT FLOOR

- ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

B03 - BASEMENT FLOOR - ELECTRICAL PLAN

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

MDP 3

3-TLF-001-EXT

J-BOX

INT SWITCH

INT SWITCH

D D

D

D

E

3- M

D P

-0

-E X

T

4"

MDP 3

J-BOX

3-MDP-001-EXT

MDP 3

E

4"

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP104

BUILDING - 03 - BASEMENT FLOOR

- ENLARGED - ELECTRICAL PLANS

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"

B03 - BASEMENT FLOOR - ENLARGED - ELECTRICAL PLAN - DEMO

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

N

1/4" = 1'-0"

B03 - BASEMENT FLOOR - ENLARGED - ELECTRICAL PLAN

N

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

SHEET NOTES:

1. SPLICE AND EXTEND EXISTING FEEDERS FROM OLD LOCATION OF MDP 3 TO NEW LOCATION OF MDP 3: (1)

30/3, (2) 125/3, (2) 150/3, AND (1) 20/3.

2. RELOCATE THE SITE LIGHTING TIMECLOCK TO A WALL. INTERCEPT 20/1 CIRCUIT FEED TO FIRE ALARM AND FEED FROM PANEL '3-PNL-003-CO-1-03' ON FIRST FLOOR. PROVIDE NEW 20/1 CIRCUIT BREAKER.

3. '3-MDP-001-EXT' SHALL BE INSTALLED BEFORE THE REMOVAL OF THE EXISTING UNIT SUBSTATION. REFER TO PHASING NOTES ON SHEET EP102 AND ONE-LINE DIAGRAMS ON SHEET E500 FOR FURTHER DETAILS.

9-DP-001-133

(LEVEL ABOVE)

E

E600

E600

9-TLF-001-EXT

E600

(TYP)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP105

BUILDING - 09 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 09 - FIRST FLOOR - ELECTRICAL PLAN

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

1. REMOVE EXISTING CONCRETE EQUIPMENT PAD. PROVIDE NEW PAD IN SAME LOCATION.

2. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS

AND RECONNECT TO NEW.

3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS

TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING

CLEARANCE AROUND THE TRANSFORMER.

REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. BUILDING 9 DOES NOT PROVIDE HEALTH CARE SERVICES AND HAS NO OCCUPANCY DURING NIGHTS AND WEEKENDS. OUTAGES SHALL BE KEPT TO A MINIMUM DURATION UNLESS ON NIGHTS OR

WEEKENDS.

A. LOCATE TEMPORARY EXISTING 750KVA TRANSFORMER REMOVED FROM BUILDING 1 FOR TEMPORARY

POWER. PROVIDE FIBERGLASS PAD AND OTHER TEMPORARY PROVISIONS FOR TEMPORARY TRANSFORMER.

B. DE-ENERGIZE THE EXISTING TRANSFORMER.

C. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.

D. REMOVE EXISTING TRANSFORMER.

E. TIE INTO PRIMARY FEEDERS PREVIOUSLY CONNECTED TO TRANSFORMER. SPLICE CONDUCTORS WITH

TEMPORARY CABLING FROM OLD TRANSFORMER 9 REMOVED TO TEMPORARY TRANSFORMER. PROVIDE

TEMPORARY WEATHER PROTECTION OF TEMPORARY FEEDER CONDITIONS.

F. REMOVE OLD CONCRETE EQUIPMENT PAD. PROTECT EXISTING CONDUITS AND CONDUCTORS.

G. INSTALL NEW CONCRETE EQUIPMENT PAD. WAIT FOR CONCRETE TO CURE.

H. DISCONNECT TEMPORARY CABLING FROM EXISTING CONDUCTORS TO TEMPORARY TRANSFORMER.

I. INSTALL NEW TRANSFORMER ON NEW CONCRETE EQUIPMENT PAD.

J. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.

K. REMOVE TEMPORARY TRANSFORMER AND TEMPORARY PROVISIONS.

11-TLF-001-EXT

E600

E600

(TYP)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP106

BUILDING - 11 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 11 - FIRST FLOOR - ELECTRICAL PLAN

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS

AND RECONNECT TO NEW.

2. CUT EXISTING CONDUIT STUB OUT TO BE LEVEL WITH CONCRETE PAD SURFACE. FILL IN HOLE WHERE THE

CONDUIT EXISTS BELOW THE PAD SURFACE WITH CONCRETE.

3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING

CLEARANCE AROUND THE TRANSFORMER.

REPLACE TRANSFORMER IN-PLACE. THE CONTRACTOR SHALL COORDINATE ALL OUTAGES DATES AND DURATIONS WITH VA. STAFF AND PATIENTS WILL NEED TO BE RELOCATED TO ANOTHER BUILDING FOR THE OUTAGE, SO OUTAGES WILL NEED TO BE COORDINATED WELL IN ADVANCE. ANTICIPATE OUTAGES TO BE DURING THE DAYTIME WHEN STAFF IS PRESENT. BUILDING 11 PROVIDES RESIDENTIAL CARE SERVICES AND OUTAGES

SHALL BE KEPT TO A MINIMUM DURATION.

A. DE-ENERGIZE THE EXISTING TRANSFORMER.

B. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.

C. PROTECT EXISTING CONCRETE PAD, CONDUITS, AND CONDUCTORS.

D. REMOVE EXISTING TRANSFORMER.

E. INSTALL NEW TRANSFORMER.

F. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.

G. RETAIN EXISTING TRANSFORMER FOR TEMPORARY POWER USE FOR OTHER BUILDINGS CONSTRUCTION

PHASING PRIOR TO DISPOSAL.

66-MDP-001-4A

(MDP-66)

E

(LEVEL BELOW)

E

E600

E600

SC-184

66-TLF-001-EXT

E600

(TYP)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP107

BUILDING - 66 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 66 - FIRST FLOOR - ELECTRICAL PLAN

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. REMOVE EXISTING CONCRETE EQUIPMENT PAD. PROVIDE NEW PAD IN SAME LOCATION.

2. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS

AND RECONNECT TO NEW.

3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS

TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING

CLEARANCE AROUND THE TRANSFORMER.

REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO SHUTDOWNS. STAFF AND PATIENTS WILL NEED TO BE RELOCATED TO ANOTHER BUILDING FOR THE OUTAGE, SO OUTAGES WILL NEED TO BE COORDINATED WELL IN ADVANCE. ANTICIPATE OUTAGES TO BE DURING THE DAYTIME WHEN STAFF IS PRESENT. BUILDING 66 PROVIDES RESIDENTIAL SERVICES AND OUTAGES SHALL BE

KEPT TO A MINIMUM DURATION.

A. LOCATE TEMPORARY EXISTING 750KVA TRANSFORMER REMOVED FROM BUILDING 1 FOR TEMPORARY

POWER. PROVIDE FIBERGLASS PAD AND OTHER TEMPORARY PROVISIONS FOR TEMPORARY TRANSFORMER.

B. DE-ENERGIZE THE EXISTING TRANSFORMER.

C. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.

D. REMOVE EXISTING TRANSFORMER.

E. TIE INTO PRIMARY FEEDERS PREVIOUSLY CONNECTED TO TRANSFORMER. SPLICE CONDUCTORS WITH

TEMPORARY CABLING FROM OLD TRANSFORMER 66 REMOVED TO TEMPORARY TRANSFORMER. PROVIDE

TEMPORARY WEATHER PROTECTION OF TEMPORARY FEEDER CONDITIONS.

F. REMOVE OLD CONCRETE EQUIPMENT PAD. PROTECT EXISTING CONDUITS AND CONDUCTORS.

G. INSTALL NEW CONCRETE EQUIPMENT PAD. WAIT FOR CONCRETE TO CURE.

H. DISCONNECT TEMPORARY CABLING FROM EXISTING CONDUCTORS TO TEMPORARY TRANSFORMER.

I. INSTALL NEW TRANSFORMER ON NEW CONCRETE EQUIPMENT PAD.

J. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.

K. REMOVE TEMPORARY TRANSFORMER AND TEMPORARY PROVISIONS.

MDP 137

D

D

137-TLF-001-EXT

137-PNL-001-01

E

PUMP

50 HP

PUMP

25 HP

PUMP

25 HP

E

E E

137-TLF-001-EXT

137-MDP-001-EXT

137-PNL-001-01

E

PUMP

50 HP

PUMP

25 HP

PUMP

25 HP

E

E E

E600

E600

(TYP)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP108

BUILDING - 137 - FIRST FLOOR -

ENLARGED - ELECTRICAL PLANS

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"

BUILDING - 137 - FIRST FLOOR - ELECTRICAL PLAN - DEMO

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

N

1/4" = 1'-0"

BUILDING - 137 - FIRST FLOOR - ELECTRICAL PLAN

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS

AND RECONNECT TO NEW.

2. REPLACE EXISTING SWITCHBOARD MDP 137 IN-PLACE. DISCONNECT EXISTING LINE AND LOAD FEEDERS AND

RECONNECT TO NEW.

3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 6' GAP IN BETWEEN BOLLARDS ON THE FRONT SIDE OR 5' ON THE

SIDES WHILE MAINTAINING WORKING CLEARANCE AROUND THE FENCE.

REPLACE EXISTING TRANSFORMER AND SWITCHBOARD IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH BOTH THE VA AND NAVFAC UTILITIES PRIOR TO SHUTDOWNS. OUTAGES TO BE EVENINGS AND WEEKENDS. BUILDING 137 PROVIDES PUMPING TO BOTH THE VA CAMPUS WATER DISTRIBUTION AND NAVAL CAMPUS WATER DISTRIBUTION AND ELECTRICAL SERVICE TO BUILDINGS 137 (PUMP HOUSE), 138 (WAREHOUSE), AND BUILDING 139 (GARAGE AND 4160V SWITCHGEAR). OUTAGES SHALL BE KEPT TO A MINIMUM. OUTAGES SHALL BE COORDINATED WITH THE VA AND NAVFAC AT LEAST TEN (10) BUSINESS DAYS PRIOR TO PLANNED OUTAGE.

• BUILDING 137 CAN SUSTAIN A MULTIDAY POWER OUTAGE TO FACILITATE REPLACING THE SWITCHGEAR

THAT FEEDS B137, B138 AND B139.

• THE WAREHOUSE (B138) SHALL BE RESTRICTED TO A WEEKEND OUTAGE.

A. OVER A WEEKEND, REMOVE EXISTING 'MDP 137' AND REPLACE IN-PLACE.

B. DE-ENERGIZE THE EXISTING EQUIPMENT.

C. DISCONNECT EXISTING FEEDERS TO BUILDINGS 137, 138, 139, AND PUMPS WITHIN 137.

D. REMOVE EXISTING 'MDP 137'.

E. INSTALL NEW 'MDP 137'.

F. RECONNECT EXISTING FEEDERS TO BUILDINGS 137, 138, 139, AND PUMPS WITHIN 137.

G. AFTER COMPLETION OF MDP REPLACEMENT, REPLACE TRANSFORMER IN-PLACE A FUTURE WEEKEND.

H. DE-ENERGIZE THE EXISTING TRANSFORMER.

I. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.

J. PROTECT EXISTING CONCRETE PAD, CONDUITS, AND CONDUCTORS.

K. REMOVE EXISTING TRANSFORMER.

L. INSTALL NEW TRANSFORMER.

M. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.

138-PNL-001-C 1

Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP109

BUILDING -138 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 138 - FIRST FLOOR - ELECTRICAL PLAN

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. EXISTING ELECTRICAL SERVICE FOR BUILDING 138 FED FROM SWITCHBOARD MDP 137. LOCATION PROVIDED

TO AID IN ELECTRICAL OUTAGE COORDINATION.

139-PNL-001-100

139-SG-001-102

139-DS-001-103 1

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP110

BUILDING -139 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 139 - FIRST FLOOR - ELECTRICAL PLAN

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. EXISTING ELECTRICAL SERVICE FOR BUILDING 139 FED FROM SWITCHBOARD MDP 137. LOCATION PROVIDED

TO AID IN ELECTRICAL OUTAGE COORDINATION.

2. EXISTING 4160V SWITCHGEAR FEEDING MDP 137. LOCATION PROVIDED TO AID IN ELECTRICAL OUTAGE

COORDINATION.

E600

E600

187-DP-0001-05

(MDP 187)

187-TLF-001-EXT

E

3-TLF-001-EXT

OIL SWITCH

4" 4"

4"

TEMP TO BLDG 187

E600

(TYP)

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

EP111

BUILDING -187 - FIRST FLOOR -

ELECTRICAL PLAN

OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

BUILDING - 187 - FIRST FLOOR - ELECTRICAL PLAN

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. REMOVE EXISTING CONCRETE EQUIPMENT PAD. PROVIDE NEW PAD IN SAME LOCATION.

2. REPLACE EXISTING TRANSFORMER IN-PLACE. DISCONNECT EXISTING PRIMARY AND SECONDARY FEEDERS

AND RECONNECT TO NEW.

3. CONTRACTOR TO LOCATE AND MARK EXISTING UNDERGROUND UTILITIES AROUND LOCATION OF BOLLARDS

TO BE ADDED. IF UTILITY LINES INTERFERE WITH BOLLARD LOCATION, COORDINATE MODIFIED LOCATION WITH COR AND ENSURE NO GREATER THAN 5' GAP IN BETWEEN BOLLARDS WHILE MAINTAINING WORKING

CLEARANCE AROUND THE TRANSFORMER.

REPLACE TRANSFORMER IN-PLACE. COORDINATE OUTAGE DATE, TIMING, AND DURATION WITH VA PRIOR TO

SHUTDOWNS. ANTICIPATE OUTAGE DURING WEEKEND OR AFTER WORK HOURS.

A. UTILIZE TEMPORARY FENCING AROUND WORK AREA FROM BUILDING 3 WORK.

B. UTILIZE TEMPORARY EXISTING 150KVA TRANSFORMER PREVIOUSLY USED FOR BUILDING 3 TRANSFORMER

REPLACEMENT FOR TEMPORARY POWER. PROVIDE OTHER TEMPORARY PROVISIONS FOR TEMPORARY

TRANSFORMER.

C. DE-ENERGIZE THE EXISTING TRANSFORMER.

D. DISCONNECT EXISTING PRIMARY AND SECONDARY CONDUCTORS.

E. REMOVE EXISTING TRANSFORMER.

F. TIE INTO PRIMARY FEEDERS PREVIOUSLY CONNECTED TO TRANSFORMER. UTILIZE 4" CONDUIT STUB UP

PROVIDED FOR TEMPORARY CONNECTION. UTILIZE SECONDARY CABLE TERMINALS TO FEED THROUGH PRIMARY SIDE WITH TEMPORARY CABLING INSTALLED FROM NEW TRANSFORMER 3 TO TEMPORARY TRANSFORMER. PROVIDE TEMPORARY CABLING FROM TEMPORARY TRANSFORMER TO 'MDP 187'. PROVIDE

TEMPORARY WEATHER PROTECTION OF TEMPORARY FEEDER CONDITIONS.

G. ENERGIZE EXISTING MDP 187 FOR TEMPORARY TRANSFORMER.

H. REMOVE OLD CONCRETE EQUIPMENT PAD. PROTECT EXISTING CONDUITS AND CONDUCTORS.

I. INSTALL NEW CONCRETE EQUIPMENT PAD. WAIT FOR CONCRETE TO CURE.

J. DISCONNECT TEMPORARY CABLING FROM EXISTING CONDUCTORS TO TEMPORARY TRANSFORMER.

K. INSTALL NEW TRANSFORMER ON NEW CONCRETE EQUIPMENT PAD.

L. RE-TERMINATE EXISTING CONDUCTORS ONTO THE NEW TRANSFORMER.

M. REMOVE TEMPORARY TRANSFORMER, CABLING, AND TEMPORARY PROVISIONS.

N. CAP 4" CONDUIT STUB UP FROM UNDERNEATH NEW TRANSFORMER 3 AND BURY.

O. REMOVE TEMPORARY FENCING FROM AROUND WORK AREA.

BUILDING NUMBER:

1-206 = BUILDINGS 1, 2, 3, ETC.

EQUIPMENT TYPE:

TLF = TRANSFORMER LIQUID FILLED MDP = MAIN DISTRIBUTION PANEL

PNL = PANELBOARD

PANEL NUMBER # WITHIN ROOM: 001, 002, 003 ETC.

ROOM NUMBER/LOCATION (FLOOR INDICATED BY FIRST DIGIT):

001 = ROOM 001 BASEMENT

101 = ROOM 101 FIRST FLOOR EXT = EXTERIOR

TYPICAL ELECTRICAL EQUIPMENT NAMING CONVENTION

(INDEX NUMBER):

137-MDP-001-EXT

200/3 AT

250/3 AF

LSI

TO BUILDING 137

137-PNL-001-01

200/3 AT

250/3 AF

LSI

TO BUILDING 138

138-PNL-001-C

250/3 AF

SPACE

300/3 AT

400/3 AF

LSI

200/3 AT

250/3 AF

LSI

200/3 AT

250/3 AF

LSI

200/3 AT

250/3 AF

LSI

250/3 AF

SPACE

TO BUILDING 139

139-PNL-001-100

TO BUILDING 137

PUMP 1

25HP

TO BUILDING 137

PUMP 2

25HP

TO BUILDING 137

PUMP 3

50HP

MDP 137

137-MDP-001-EXT

600A

208Y/120V, 3PH, 4W

NEMA 3R

400/3 AT

600/3 AF

LSI

40N

MDP 3

3-MDP-001-EXT

600A

208Y/120V, 3PH, 4W

400/3 AT

600/3 AF

137-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

150KVA

400A LSI CB

TO BUILDING 139

40N

3-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

150KVA

400A LSI CB

TO

STEAM PIT

BLDG 48

30/3

TO

STREET

LIGHTS

20/3

TO

3-PNL-001-CO104

150/3

LSI

TO

3-PNL-002-B01-3

125/3

LSI

TO

3-PNL-002-CO103

125/3

LSI

TO

3-PNL-001-CO103

150/3

LSI

250/3 AF

SPACE

250/3 AF

SPACE

TO

SECTIONALIZER

CABINET 172

YELLOW LOOP

TO

SECTIONALIZER

CABINET 172

ORANGE LOOP

OIL SWITCH

200A, 15KV

SC-172A

17MV

EXISTING: (1) SET 3-#1/0

EXISTING: (1) SET 3-#350

187-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

150KVA

400A LSI CB

TO SC-172

YELLOW LOOP

BUILDING 187

EXISTING: (1) SET 4-#500

KCMIL IN 4-1/4" C.

EXISTING: (1) SET 3-#1/0

MDP 187

450A MCB

ADD 1-#1/0 AWG

EGC IN EXISTING

CONDUIT.

66-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

300KVA

800A LSI CB

TO SC-184

BUILDING 66

EXISTING: (2) SETS

4-#500 KCMIL, #2/0

GND IN 4" C.

EXISTING: (1) SET 3-#4/0

MDP 66

800A MLO

9-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

300KVA

800A LSI CB

TO SC-186

BUILDING 9

EXISTING: (3) SETS

4-#250 KCMIL IN 4" C.

EXISTING: (1) SET 3-#1/0

MDP 9

800A MCB

ADD (3) SETS 1-#2/0

AWG EGC IN

EXISTING CONDUIT.

1-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

750KVA

2000A LSI CB

TO SC-174

BUILDING 1

EXISTING: (6) SETS

4-#500 KCMIL IN 4" C.

EXISTING: (1) SET 3-#1/0

MDP 1

2000A MCB

11-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

150KVA

400A LSI CB

TO SC-174

BUILDING 11

EXISTING: (1) SET

4-#500 KCMIL, #1/0

GND IN 4" C.

EXISTING: (1) SET 3-#350

MDP 11

400A MCB

11-MDP-001-BSMT1-MDP-001-151 9-DP-001-133 66-DP-001-4A 187-MDP-001-05

44 4

MDP 3

3-MDP-001-EXT

400A

208Y/120V, 3PH, 4W

TO

STEAM PIT

BLDG 48

30/3

TO

STREET

LIGHTS

20/3

TO

3-PNL-001-CO104

150/3

LSI

TO

3-PNL-002-B01-3

125/3

LSI

TO

3-PNL-002-CO103

125/3

LSI

TO

3-PNL-001-CO103

150/3

LSI

250/3 AF

SPACE

250/3 AF

SPACE

TO

SECTIONALIZER

CABINET 172

YELLOW LOOP

TO

SECTIONALIZER

CABINET 172

ORANGE LOOP

EXISTING: (1) SET 3-#1/0

BUILDING 3

LOAD INTERRUPTER

SWITCHES

D

D

EEEEE

200/3 AT

250/3 AF

TO BUILDING 137

137-PNL-001-01

200/3 AT

250/3 AF

TO BUILDING 138

138-PNL-001-C

250/3 AF

SPACE

300/3 AT

400/3 AF

200/3 AT

250/3 AF

200/3 AT

250/3 AF

200/3 AT

250/3 AF 250/3 AF

SPACE

TO BUILDING 139

139-PNL-001-100

TO BUILDING 137

PUMP 1

25HP

TO BUILDING 137

PUMP 2

25HP

TO BUILDING 137

PUMP 3

50HP

MDP 137

137-MDP-001-EXT

600A

208Y/120V, 3PH, 4W

NEMA 3R

137-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

150KVA

TO BUILDING 139

BUILDING 137

EXISTING: (1) SET 3-#350

D

JUNCTION BOX IN

ELECTRICAL ROOM

D

3-TLF-001-EXT

TRANSFORMER

4160Δ-208Y/120V

150KVA

5 555

6 6

7777 7

7 7

MAINTAIN EXISTING CONDUITS, REFER TO SHEET EP102

A. REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION NOT SHOWN ON ONE-LINES.

(GENERAL NOTES SHALL APPLY TO ALL ONE-LINE SHEETS)

ONE-LINE GENERAL NOTES:

REMARKS: (TRANSFORMER SCHEDULE)

1. PROVIDE WITH EXTERNAL MOUNTED ACCESSIBLE OIL GAUGES AND SAMPLING PORT. GUAGE AND SAMPLING PORT SHALL BE

ENCLOSED IN A NEMA 3R ENCLOSURE.

GENERAL NOTES: (TRANSFORMER SCHEDULE)

A. REFER TO DEFINITIONS BELOW FOR CLARIFICATIONS OF REQUIREMENTS.

B. "VOLTAGE" - PRIMARY AND SECONDARY VOLTAGE CONFIGURATIONS.

C. "EXISTING IMPEDANCE" - APPROXIMATE IMPEDANCE VALUE (%Z) IN PERCENTAGE OF THE EXISTING TRANSFORMER THAT WILL BE

REPLACED. NEW TRANSFORMER SHALL BE RATED AS NOTED BELOW OR WITHIN RANGE LISTED BELOW TO LIMIT CHANGES

DOWNSTREAM OF THE SYSTEM IN FAULT CURRENT AND ARC FLASH HAZARD.

a. ACCEPTABLE IMPEDANCE RANGES (%Z):

• 1-TLF-001-EXT: 5.75

• 3-TLF-001-EXT: 4.5-5.75

• 9-TLF-001-EXT: 4.5-5.75

• 11-TLF-001-EXT: 4.5-5.75

• 66-TLF-001-EXT: 4.5-5.75

• 137-TLF-001-EXT: 4.5-5.75

• 187-TLF-001-EXT: 4.5-5.75

D. "CIRCUIT BREAKER OPTIONS" - SECONDARY CABINET SECTION INTEGRAL MOUNTED CIRCUIT BREAKER. PROVIDE ADDITIONAL CIRCUIT BREAKER OPTIONS AS NOTED. CIRCUIT BREAKER OPTIONS SUFFIX: 'LSI' - PROVIDE ELECTRONIC TRIP ADJUSTABLE LONG, SHORT, AND INSTANTEOUS TRIP SETTINGS / 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE

SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

03/07/2025

04/10/2025100% CONSTRUCTION DOCUMENTS

/9

/2

:4

:3

A

M

A u to d e s k D o c s

/2

.0

V A

L o v e ll O il T ra n s fo rm e r a n d S w it c h

/2

V

A L o v e ll

C a m p u s B u ild in g

.r v t

E500

ONE-LINE DIAGRAMS OIL TRANSFORMER AND SWITCH

ENCLOSURE UPGRADE

3001 GREEN BAY RD, NORTH CHICAGO, IL 60064

556-24-113

04/10/2025 ACR MOJ

23022.014

100% CONSTRUCTION

DOCUMENTS

NO SCALEE500

ELECTRICAL ONE-LINES1

FEEDER SCHEDULE - COPPER

FEEDER NOMINAL SIZE WIRE AND CONDUIT

17MV 175 A 3-#1/0 CU, #2 CU GND - 4" C. 133% EPR, 5KV

40N 400 A 4-#4/0 CU, #1/0 CU GND - 2-1/2" C. (2 SETS)

SHEET NOTES:

1. REUSE EXISTING (2) 4" CONDUITS.

2. DO NOT BOND NEUTRAL AND GROUND BARS WITHIN MDP.

3. REMOVE ANY "SERVICE DISCONNECT" LABEL FROM PANELBOARD MCB. PROVIDE LABEL TO INDICATE THE

LOCATION OF THE SERVICE DISCONNECT WITHIN THE TRANSFORMER ENCLOSURE.

4. IF EXISTING CONDUCTORS ARE TOO SHORT TO TERMINATE ONTO NEW CIRCUIT BREAKER OUTPUT LUGS, EXTEND CONDUCTORS WITH COMPRESSION SPLICE. ENSURE EXTENSION CONDUCTORS IS AT LEAST 1' IN LENGTH TO HAVE SOLID TERMINATIONS IN THE CIRCUIT BREAKER OUTPUT LUGS. CONTRACTOR SHALL FIELD VERIFY LENGTHS OF CONDUCTORS PRIOR TO ORDERING TRANSFORMERS TO ELIMINATE SPLICES IF

POSSIBLE.

5. ENSURE NEUTRAL-GROUND BOND DOES NOT EXIST OR REMOVE BOND IF IT DOES EXIST.

6. CONTRACTOR SHALL PROVIDE INSULATION TESTING OF CABLES AFTER ADDITIONAL CABLE IS PULLED TO

ENSURE CABLES ARE IN GOOD CONDITION.

7. CONTRACTOR SHALL PROVIDE LABEL ON MDP WHERE INDICATING THE LOCATION OF THE NEUTRAL-GROUND

BOND OF THAT PARTICULAR ELECTRICAL SERVICE. PROVIDE LABEL INDICATING THE LOCATION OF MAIN

BUILDING SERVICE DISCONNECT.

8. RETAIN EXISTING NEUTRAL-GROUND BOND WITHIN SWITCHBOARD.

OIL FILLED TRANSFORMER SCHEDULE

NAME

KVA

RATING VOLTAGE

EXISTING

IMPEDANCE

CIRCUIT BREAKER

OPTIONS GROUND REMARKS

1-TLF-001-EXT 750 4160Δ-208Y 5.8 2000A, LSI #2/0 CU 1

3-TLF-001-EXT 150 4160Δ-208Y 4.32 400A, LSI #1/0 CU 1

9-TLF-001-EXT 300 4160Δ-208Y 5.0 800A, LSI #2/0 CU 1

11-TLF-001-EXT 150 4160Δ-208Y 4.3 400A, LSI #1/0 CU 1

66-TLF-001-EXT 300 4160Δ-208Y 5.66 800A, LSI #2/0 CU 1

137-TLF-001-EXT 150 4160Δ-208Y 5.08 400A, LSI #1/0 CU 1

187-TLF-001-EXT 150 4160Δ-208Y 4.4 400A, LSI #1/0 CU 1

PHASE

PHASE PHASE

PHASE

PHASE PHASE

NEUTRAL

GROUND

XO TERMINAL

PROVIDE NEW GROUNDING

ELECTRODE CONDUCTOR

TO GROUND ROD

RECONNECT EXISTING

GROUNDING CONDUCTOR

PHASE

PHASE PHASE

PHASE

PHASE PHASE

NEUTRAL

GROUND

XO TERMINAL

PROVIDE NEW GROUNDING

ELECTRODE CONDUCTOR

TO GROUND ROD

PROVIDE NEW GROUNDING CONDUCTOR.

DISCONNECT NEUTRAL/GROUND BOND

AT MAIN DISTRIBUTION PANEL

PHASE

PHASE PHASE

PHASE

PHASE PHASE

NEUTRAL

XO TERMINAL

PROVIDE NEW GROUNDING

ELECTRODE CONDUCTOR

TO GROUND ROD

EDGE OF BUILDING

M A

T E

R

IA

L O

F U

N D

IS

T

U R

B E

D T

O C

LE

A

N S

U R

F A

C E

S H

A

LL

B E

E X

C A

V A

T E

D B

O T

T O

M O

F H

O

LE

#4 R

E B

A R

S E

.W

F

IN

IS

H

E D

G R

A D

E

A

LL

A R

O U

N D

3/ 4"

C H

A M

F E

R

4"

1' -0

1'

-0

3"

3" T

Y P

IC

A

L

#8 x

S

T E

E L

M E

S H

5'-0" MIN8"

INSTALL PIERS TO

UNDISTURBED EARTH

5'-3" 5'-3"

ANTI-RAM BOLLARD. REFER TO

DETAIL FOR FURTHER INFORMATION

AREA WITHIN PROTECTION

PIPES MUST BE CLEAR FOR

OPENING OF TRANSFORMER

DOORS AND MAINTENANCE

4' -0

T

Y P

IC

A

L 6' -0

M

IN

7'

-6

4-#4 x 2'-3"

REBARS

1' -6

1' -1

2'

-3

1' -7

PIERSCL

PIERSCL

1'-6"

#4 x 7'-0"

REBAR (TYP)

MINIMUM4'-0"

PIERS

1'-6"

CL

4'-6"1'-6"

PIERSCL

M

IN

IM

U

M 4'

-0

#4 x 4'-6"

REBAR (TYP)

ONE LAYER NUMBER

8-6" x…